| 1 | L1₹1.0 CrAccepted-AOC NULL | ₹1.0 Cr | L1 | Accepted-AOC Lowest |
| 2 | L2₹1.0 Cr+₹1.0 L (0.99%)Rejected-Finance SANTHOSH BHAVAN PADAMUGAL KOCHI PIN 682030 | KOCHI | ERNAKULAM | KERALA | 682030 | ₹1.0 Cr+₹1.0 L (0.99%) | L2 | Rejected-Finance Highest |
| Sl No | Description | Qty | Unit | G S Infrastructure L1 | AA AND S CONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.00Approach | |||||
| 1.00 | OD3938/2024-2025:Putting up ring bund of top width 1.50m, bottom width 2.75m.and average height of 2.50m with 1:1/4 side slope and protect the sides with coconut post of 4.50m long driving down 2.00m below bed level at 75cm c/c, providing 3 rows of wailing pieces 1/4 split coconut post on both sides and 1/4 split cross ties to alternate posts at top, bottom and middle portion and screening the sides of bund with Separation membrane of impermeable plastic sheet 125 micron thick fixed properly using coconut post and wailing pieces using reaper and nails in full height including tying properly using iron wire and coir altogether and supply and filling inside with hard clay/cut earth up to 2.50m, level and conveyed with all leads and lifts including consolidating properly and maintain the bund till the work is completed and dismantling the bund after completion of work etc. as per the directions of departmental officers at site. (as per CTE approved OD 5.3) Bottom width 2.75m, Height 2.5m Side slope 1:1/4 Length of coconut pile 4.50m Spacing 0.75m No. of layers 2 Length of full coconut pile required for 10m = ((10/0.75)+1)x2x4.5 = 126m Length of (1/4 split) coconut cross ties for 10m = 3x2.5 av. x 7 Nos. = 52.50 m
Length of 1/4 split wailing pieces for 10m = 3x2x10 = 60m | 88 | metre | 3,988 ₹3,50,944 Lowest | 4,000 ₹3,52,000 |
| 1.00 | OD5946/2023-2024:Supplying and stacking well matured straight 6m long coconut post having avg diameter on 25cm for driving down through various strata below bed level including cost conveyance, labour charges etc complete. (as per CTE approved OD 3.1) | 1,642 | metre | 230 ₹3,77,660 Lowest | 250 ₹4,10,500 |
| 1.00 | OD5947/2023-2024:Driving down coconut pile to lines and levels through soft to medium clay soil strata including all hire charges and labour and all other appliances necessary for pile driving down after pointing the bottom end. Details for one post of 6m long 15 numbers per day 6X15=90m Details for 90m length. (based on CTE approved OD 3.2) | 1,642 | metre | 197 ₹3,23,474 Lowest | 200 ₹3,28,400 |
| 1.00 | 60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site. | 285 | cum | 3,750 ₹10,68,750 Lowest | 3,800 ₹10,83,000 |
| 1.00 | OD5948/2023-2024:Bailing out water using 5 HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete (as per CTE approved OD no.22.1) | 160 | hour | 260 ₹41,600 Lowest | 375 ₹60,000 |
| 1.01 | 13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer | 140 | sqm | 70 ₹9,800 | 65 ₹9,100 Lowest |
| 1.01 | 13.45.1:Finishing walls with textured exterior pint of required shade:New work (Two or more coats applied @ 3.28 ltr/ 10 sqm ) over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm | 140 | sqm | 250 ₹35,000 | 245 ₹34,300 Lowest |
| 2.00Road work | |||||
| 2.00 | OD3901/2024-2025:Filling with Quarry Muck Filling up low lying and water logged areas with quarry
muck, spreading in layers, leveling the top at site and consolidation by smooth
wheeled roller, etc complete for improving the CBR value of subgrade. (based on CTE
approved OD 24.1)
Details of cost for 300 cum | 310 | cum | 2,550 ₹7,90,500 Lowest | 2,600 ₹8,06,000 |
Tender Value
₹92.8 L
EMD Value
₹50,000
Closing Date
28 Apr 2025, 6:00 pmClosed
Superintending Engineer HECC
Superintending Engineer, Harbour Engineering Central Circle, Corporation Building, Paramara Road, Ernakulam North,Kochi-18
GENERAL-Upgradation of Coastal Road in Kottayam District -Approcch Road to Kariyil Pongalakkari Bridge (Balance work) in Ward no 8 of Kumarakom Gramapanchayat in Ettumannoor LAC-General Civil Work
2025_HED_756263_1
HED/CEHED/TR/1/2024_5_2_1/1
Open Tender
Civil Works - Roads
Item Rate
365 days
Kariyil Pongalakkari
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
Yes
₹50,000
Yes
2 Sept 2025
28 Mar 2025
30 Apr 2025
28 Mar 2025
28 Apr 2025
28 Mar 2025
Amount
Approach
OD3938/2024-2025:Putting up ring bund of top width 1.50m, bottom width 2.75m.and average height of 2.50m with 1:1/4 side slope and protect the sides with coconut post of 4.50m long driving down 2.00m below bed level at 75cm c/c, providing 3 rows of wailing pieces 1/4 split coconut post on both sides and 1/4 split cross ties to alternate posts at top, bottom and middle portion and screening the sides of bund with Separation membrane of impermeable plastic sheet 125 micron thick fixed properly using coconut post and wailing pieces using reaper and nails in full height including tying properly using iron wire and coir altogether and supply and filling inside with hard clay/cut earth up to 2.50m, level and conveyed with all leads and lifts including consolidating properly and maintain the bund till the work is completed and dismantling the bund after completion of work etc. as per the directions of departmental officers at site. (as per CTE approved OD 5.3) Bottom width 2.75m, Height 2.5m Side slope 1:1/4 Length of coconut pile 4.50m Spacing 0.75m No. of layers 2 Length of full coconut pile required for 10m = ((10/0.75)+1)x2x4.5 = 126m Length of (1/4 split) coconut cross ties for 10m = 3x2.5 av. x 7 Nos. = 52.50 m Length of 1/4 split wailing pieces for 10m = 3x2x10 = 60m
OD5946/2023-2024:Supplying and stacking well matured straight 6m long coconut post having avg diameter on 25cm for driving down through various strata below bed level including cost conveyance, labour charges etc complete. (as per CTE approved OD 3.1)
OD5947/2023-2024:Driving down coconut pile to lines and levels through soft to medium clay soil strata including all hire charges and labour and all other appliances necessary for pile driving down after pointing the bottom end. Details for one post of 6m long 15 numbers per day 6X15=90m Details for 90m length. (based on CTE approved OD 3.2)
60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
OD5948/2023-2024:Bailing out water using 5 HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete (as per CTE approved OD no.22.1)
13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer
13.45.1:Finishing walls with textured exterior pint of required shade:New work (Two or more coats applied @ 3.28 ltr/ 10 sqm ) over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm
Road work
OD3901/2024-2025:Filling with Quarry Muck Filling up low lying and water logged areas with quarry muck, spreading in layers, leveling the top at site and consolidation by smooth wheeled roller, etc complete for improving the CBR value of subgrade. (based on CTE approved OD 24.1) Details of cost for 300 cum
4.11.1:Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. (i) Using naturally occuring gravel
4.9:Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead
11.4.1.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I. P.C.C grade M 10 (i) Nominal mix 1:3:6
11.4.3.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203III. P.C.C. grade M 20 (i) Nominal mix (1:2:4)
10.20:Road Markers/Road Stud with Lens Reflector <br> Providing and fixing of road stud 100 x 100 mm die cast in aluminium, resistant to corrosive effect of salt and grit, fitted with lense reflectors, installed in concrete or asphaltic surface by drilling holes 30 mm upto a depth of 600 mm and bedded in a suitable bituminous grout or epoxy mortar, all as per BS:873 (Part 4) 1973.
10.3.A.2:Direction and Place Identification signs upto 0.9 sqm size board <br> A. Retro-reflectorised Traffic Signs <br> Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3, fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqm supported on 2 inch dia GI Pipe firmly fixed to the ground by means of properly designed foundation with M-15 grade cement concrete 450 x 450 x 600 mm, 600 mm below ground level as per approved drawing and Tehnical Specification Clause 1701.
Base Slab and stem
12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
12.8.G.2.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M30 - Using Batching Plant, Transit Mixer and Concrete Pump
13.5.G.p.2:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M30 - Height upto 5m - using Batching Plant, Transit Mixer and Concrete Pump
13.6:Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications
55.38a:Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on Structural Steel c section vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of structural steel c section 150 x 75 x 5 mm, 330 mm long complete as per clause 811.3.
AA AND S CONSTRUCTIONS (BID ID -2202704)
Bidder Name
G S Infrastructure
AA AND S CONSTRUCTIONS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1228208.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .