| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.1 CrAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹8.7 Cr+₹57.5 L (7.08%)Admitted-Finance PARAKKAL HOUSE CHERUVADI POST MAVOOR VIA CALICUT 673661 OFFICE ROOM NO F30 EMS STADIUM COMPLEX PAVAMANI ROAD PUTHIYARA POST CALICUT 673004 | CALICUT | KOZHIKODE | KERALA | 673661 | L2 | Admitted-Finance | |
| 3 | L3₹9.3 Cr+₹1.2 Cr (14.8%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | Rejected-Technical | - | Rejected-Technical Disqualified |
| Sl No | Description | Qty | Unit | MANOHARAN D L3 | HRL ENTERPRISES L2 | BHIVAI CONSTRUCTION L1 |
|---|---|---|---|---|---|---|
| 1.00WORKING CHARGES | ||||||
| 1.00 | OD86124/2026-2027:Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- charge Bituminous Road | 3,520 | sqm | 104.97 ₹3,69,494.4 | 108.22 ₹3,80,934.4 | 91.44 ₹3,21,868.8 Lowest |
| 1.00 | OD86127/2026-2027:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge. Concrete road | 285 | cum | 913.24 ₹2,60,273.4 | 1,000 ₹2,85,000 | 795.46 ₹2,26,706.1 Lowest |
| 1.00 | 100.59.1:Cutting the bituminous / concrete roads with cutting machine for a minimum depth of 200mm along the sides of proposed alignment of the pipe to be laid without causing any damage to other utilities, including the charges for hire and conveyance of tools and plant, cost of consumables and charges for lighting, watching, ribbon fencing, caution boards, traffic diversion, and as per the direction of departmental officers etc. complete, before carrying out the demolition of bituminous / concrete road by mechanical means and carrying out the excavation. | 9,550 | metre | 26.3 ₹2,51,165 | 40 ₹3,82,000 | 22.91 ₹2,18,790.5 Lowest |
| 1.00 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | 9,145.84 | cum | 657.84 ₹60,16,499.39 | 660 ₹60,36,254.4 | 573 ₹52,40,566.32 Lowest |
| 1.00 | 100.1.5:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50 m, in Ordinary Rock. | 2,286.46 | cum | 970.35 ₹22,18,666.46 | 1,000 ₹22,86,460 | 845.2 ₹19,32,515.99 Lowest |
| 1.01 | 100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals. | 18,000 | metre | 31.26 ₹5,62,680 | 32 ₹5,76,000 | 27.23 ₹4,90,140 Lowest |
| 1.01 | 100.9.8:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 90 mm nominal outside diameter pipes. | 5,500 | metre | 101.18 ₹5,56,490 | 120 ₹6,60,000 | 88.13 ₹4,84,715 Lowest |
| 1.01 | 100.9.9:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 110 mm nominal outside diameter pipes. | 3,000 | metre | 149.03 ₹4,47,090 | 160 ₹4,80,000 | 129.81 ₹3,89,430 Lowest |
| 1.01 | 100.9.11:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 160 mm nominal outside diameter pipes. | 3,500 | metre | 235.66 ₹8,24,810 | 250 ₹8,75,000 | 205.27 ₹7,18,445 Lowest |
Tender Value
₹9.6 Cr
EMD Value
₹2 L
Closing Date
21 Aug 2026, 3:00 pmClosed
Superintending Engineer
KWA, PH Circle, Kalmandapam, Palakkad
Implementation in wards 24,25,26 and 27-Pipe line work-
2026_KWA_865241_1
05/26-27/SE/PHC/PKD
Open Tender
Civil Works - Water Works
Item Rate
420 days
Palakkad
Please refer Tender documents.
14 documents required · 14 mandatory
₹11,025
₹2 L
Yes
KWA, PH Circle, Palakkad
7 Oct 2026
11 Aug 2026
22 Aug 2026
11 Aug 2026
21 Aug 2026
11 Aug 2026
11 Aug 2026 - 14 Aug 2026
14 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1WORKING CHARGES | |||||
| 1.001 | OD86124/2026-2027:Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- charge Bituminous Road | - | sqm | - | - |
| 1.002 | OD86127/2026-2027:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge. Concrete road | - | cum | - | - |
| 1.003 | 100.59.1:Cutting the bituminous / concrete roads with cutting machine for a minimum depth of 200mm along the sides of proposed alignment of the pipe to be laid without causing any damage to other utilities, including the charges for hire and conveyance of tools and plant, cost of consumables and charges for lighting, watching, ribbon fencing, caution boards, traffic diversion, and as per the direction of departmental officers etc. complete, before carrying out the demolition of bituminous / concrete road by mechanical means and carrying out the excavation. | - | metre | - | - |
| 1.004 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | - | cum | - | - |
| 1.005 | 100.1.5:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50 m, in Ordinary Rock. | - | cum | - | - |
| 1.006 | 100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals. | - | metre | - | - |
| 1.007 | 100.9.8:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 90 mm nominal outside diameter pipes. | - | metre | - | - |
| 1.008 | 100.9.9:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 110 mm nominal outside diameter pipes. | - | metre | - | - |
| 1.009 | 100.9.11:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 160 mm nominal outside diameter pipes. | - | metre | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
KWAGeneralConditionsforeTenderingV5.pdf
PDF • 0.69 MB
Tendernotice_1.pdf
PDF • 0.51 MB
VOl1_merged_merged.pdf
Tender Documents • 17.75 MB
BOQ_1464194.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .