Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 CrAccepted-Finance SAKRAUR MARCHAUR GONDA | GONDA | GONDA | UTTAR PRADESH | ₹3.0 Cr | L1 | Accepted-Finance ACCEPTED DUE TO LOWEST RATE QUOTED |
| 2 | L2₹3.0 CrRejected-Finance | ₹3.0 Cr | L2 | Rejected-Finance REJECTED DUE TO HIGHER RATE QUOTED |
Tender Value
₹3.0 Cr
EMD Value
₹17.1 L
Closing Date
15 Apr 2026, 12:00 pmClosed
Superintending Engineer
Office of the Superintending Engineer, Bahraich-Shrawasti Circle, P.W.D., Bahraich
Construction of 3x18Mtr. R.C.C. Well Foundation Minor Bridge, Approach Road and Protection Work in Km.-7 at Godahiya No. 4 Link Road in Financial Year 2025-26
2026_CEDPW_1131615_1
1207/8 Kam/e_Tendering/BRH-SWT Circle/2025-26 Dated - 20-03-2026
Open Tender
Civil Works - Bridges
360 days
Bahraich
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,715
₹17.1 L
Yes
Bahraich
20 Apr 2026
30 Mar 2026
15 Apr 2026
30 Mar 2026
15 Apr 2026
30 Mar 2026
4 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Providing and construction one span service road to reach Island Location one pier to another pier. (Foundation) | |||||
| 2Providing and constructing Temporary Island 10m Dia for Construction of well foundation for 5.0m Dia well. (Foundation) | |||||
| 3Providing and laying cutting edge of miled steel for well Foundation complete as per drg. And tech.Sps. (Foundation) | |||||
| 4Plain/Reinforced cment cone , in well found,compl, as per drawing and technical. A.well curb M-25 (Foundation) | |||||
| 5Plain/Reinforced cment cone , in well found,compl, as per drawing and technical. B.well Steining M-25 (Foundation) | |||||
| 6Plain/Reinforced cment cone , in well found,compl, as per drawing and technical.f, falls steining M-25 (Foundation) | |||||
| 7Plain/Reinforced cment cone , in well found,compl, as per drawing and technical. C.Bottom Plugging M-25+ 10% (Foundation) | |||||
| 8Plain/Reinforced Cement Conc. In well found Compl.as per drawing and technical. A. Intermediate Plugging Conc. To be placed using tremie pipe (Note: 10 % extra cement added for Under water Conce.)Under water Conce.) (Foundation) | |||||
| 9Plain/Reinforced cment cone , in well found,compl, as per drawing and technical. E- well cap M-30 (Foundation) | |||||
| 10Sinking of 5.0 m.external diameter well through all typsof starts Nomly clayey soil and rock as shown against each case complete as per drawing and technical spec.depth of sinking is reckoned from bed level 0 to 3 Meter. M25 (Foundation) | |||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.12 MB
BOQ_2111643.xls
BOQ • 0.39 MB
T_2.pdf
Tender Documents • 0.48 MB
Download all tender documents and submit your bid