Loading…
Loading…
Tender Value
₹10.0 L
EMD Value
₹10,000
Closing Date
7 Sept 2026, 6:00 pm
PRAVINBHAI HADIYAL
Applying Thermoplastic paint at different T.P. and other different places In Indrapuri ward South Zone.
339908
E Tender Notice No.5/2026-27 T No.215
Open
Civil - All
Works
Ahmedabad
₹900
MUNICIPAL COMMISSIONER, AHMEDABAD
₹10,000
29 Aug 2026
29 Aug 2026
29 Aug 2026
7 Sept 2026
29 Aug 2026
Name Of Work:- Applying Thermoplastic paint at different T.P. and other different places at Indrapuri ward
Sr. Rate Amount
Item Description Quantity Per
Road marking with hot applied thermoplastic paints strictly of Automark -
"Specsmark", Asian Paints-"Apcomark", Katalline- "Traffix O" or Berger Paints-
"Sigmark" with reflectorising glass beads of Automark-"Autolux Gold", "Swarco",
"Sovitec" Asian Paints-Apcobids", "Potters" on bitumen surface providing and
laying a hot applied thermoplastic compound 2.5 mm thick including
reflectorising glass beads @ 250gms per sqm area, thickness of 2.5mm is
excluding of surface applied glass beds as per IRC:35-2015. The finished surface
1 to be level, uniform and free from streaks and holes. zebra patta /bump patta
lane/center line/ edge line/cut patta. The white color marking should provide
liminance coefficinet on cemend road shalll be min 130 mcd/m2/lux and Asphalt
road shall be min 100 mcd/m2/lux during the service life during the day time.
The marking should meet the performance criteria for night time reflectivity, wet
reflectivity and skid resistance as mentioned in the section-15 of IRC 35-2015.
(As per approved R.A)
Providing and laying Road marking with hot applied thermoplastic paints strictly
of Automark - "Specsmark", Asian Paints-"Apcomark", Katalline- "Traffix O" or
Berger Paints-"Sigmark" with reflectorising glass beads of Automark-"Autolux
Gold", "Swarco", "Sovitec" Asian Paints-Apcobids", "Potters" on bitumin surface
providing and laying a hot applied thermoplastic compound 2.5 mm thick
including reflectorising glass beads @ 250gms per sqm area, thickness of 2.5mm
is exclusive of surface applied glass beds as per IRC:35. The finished surface to be
level, uniform and free from streaks and holes.) Directional Arrow, Lettering (1
word - up to 4 letters), or any kind of Artwork etc. (which shall maximum size
upto 2.75 Sqmt out to out) Item shall include providing Stencils for lettering,
2 direction arrow signages, and as per requirement. including cleaning, required
maintenance, etc. complete pre and post work. Cost shall also include laying
with applicator machine & operating boilers, Skilled Labours for road marking,
and Un-Skilled labours for barricading/protection, traffic diversion, and it shall
also include wastage of material, etc. Contractor shall be responsible to run his
own thermoplastic applicator machine & supply necessary diesel, gas, fuel, etc,
also it will be his responsibility to Operate preheater. for good quality of
workmanship as instructed by Engg-in-charge. Agency has to quote rate on Nos.
work basis which shall include following manpower and machinery for each set).
(As per approved R.A)
CAT EYE/Road Stud/RPM: Supplying of Moulded Twin Shank Raised Pavement
Markers made of polycarbonates and ABS moulded body and reflective panels
with Micro Prismatic Lens(No Glass Bed Lens) capable of Providing total internal
reflection of the light entering the lens face and shall support a load of
kgs. tested accordance to ASTM D 4280 Type H and complying to specification of
category A of MORTH Circular NO RW/NH/33023/10-97-DO lll Dt.11.06.1997.
The height, width and length shall not exceed 20 mm,130 mm and 130mm and
3 with minimum reflective area of 13 sqcm on each side and slope to the base
shall be 35+/-5 degree.The strength of detachment of integrated cylindrical
shank,(of diameter not less than 19+/-2 mm and height not less than 30+/-2
mm) from the body is to be a minimum value of 500 kgf. Fixing will be by drilling
holes on the road for the shank to go inside, without nails and using epoxy resin
based adhesive as per manufacturer's recommandation and The color of the
marker should be as per the IRC 35-2015 and as directed by Engineer-In-
charge.(R&B SOR 2023-24 Item code:26162A)
Providing and applying primer before hot applied thermoplastic paints marking
on RCC road surface, which must ensure better adhesion of thermoplastic paint
to the surface and also increase paint durability, including all material,
4 manpower, tools and machineary required for work, with all required safety
standards to work in running traffic conditions, as per standards and as
instructed by engg in charge Agency has to quote rate on Sq.Mt. work basis).(As
per approved R.A)
Providing & applying C.R. Base Road Marking Painting lines, dashes, arrow,
letters etc. on Road in two coats on new Work with ready mixed road marking
paint conforming to IS:164 and AASHTO standard M-248-90 on concrete/
5 bituminous surface,including required additive/ solvent, providing safety
cones,barricades, string, chalks or req. colour for line marking,etc. Cleaning the
surface, removing of all dirt , dust & other foreign matter and clear the site as
per engineer incharge.(As per approved R.A)
Estimated Tender Amount: Rs.
The Rates are Exclusive of GST. Prevailing GST will be paid separately.
Contractor’s Quoted Rate
IN FIGURE IN WORDS
Net Quoted Tender Amount Rs.
Seal and Signature of the Bidder Additional City Engineer
mobile no. (South Zone)
AHMEDABAD MUNICIPAL CORPORATION
"South Zone Office", Opp. Fire Station, Rambaug, Maninagar, Ahmedabad -
Municipal Commissioner invites online Percentage Rate sealed tenders from interested contractors for
the work mentioned below.
Applying Thermoplastic paint at different T.P. and other
different places In Indrapuri ward South Zone.
2 Time Limit 12Months
3 Tender Validity Period 120 days from the date of submission of the tender
Register “E2” class in PWD in Govt. R&B/CPWD/AMC or
4 Eligibility Criteria equivalent registration with any other state Govt. Or
Estimated Cost put to
Rs.10,000/- Demand Draft Or Bank Guarantee in favor of
Earnest Money Deposit
6 Municipal Commissioner, Ahmedabad to be submitted as
prescribed in tender.
5 % of the Tender Amount in form of Bank Guarantee /
7 Security Deposit Demand Draft in favor of Municipal Commissioner,
Ahmedabad to be submitted as prescribed in tender.
Tender fees Rs.900/-Demand Draft in favor of Municipal Commissioner,
(Non refundable) Ahmedabad)
In separate sealed cover each for EMD and Tender Fees along
Submission of EMD and
with Tender as described in the invitation of tender and
submitted to Assistant Manager(South zone), South zone
office, Rambaug, Maninagar Ahmedabad.
Tenders issue date Tenders from the amc.nprocure.com website shall be
downloaded from AS PER TENDER NOTICE INVITED
As per Notice inviting Tender / Addendum /
Last date of receiving
11 Corrigendum.The tenders received after latest schedule date
and time will not be entertained under any circumstances.
As per Notice inviting Tender / Addendum / Corrigendum
Date of Opening to Assistant Manager / Dy.C.E.(S/Z) office, 2nd Floor, South
Zone Office, Opp. Fire Station, Maninagar, Ahmedabad-
Document shall be submitted in sealed envelope systems By
Mode of sending the RPAD/Speed post/ Hand Delivery in sealed covers in
Tender Documents Duplicate ( One Original & One Duplicate) duly sign & seal by
14 Terms, Condition, & All general condition of contract mentioned in tender shall be
Specification applicable.
The contractor shall be responsible to make good and remedy
at this own expenses any defect which may developed or may
15 Defect &Liability Period be noticed before the period mentioned here under from the
certified date of completion, The within 15 days of receipts of
the notice. In the case of failure on the part of the contractor,
the Engineer in charge may rectify or remove or re-execute the
work at the risk & cost of the contractor. The Engineer in
charge shall be entitled to appropriate the whole or any part of
the amount of security deposit towards they expenses, If any,
incurred by him in rectification, removal or re- execution. The
defect liability period shall be as under (a) for all works costing
up to Rs. 50,000 (amount put to tender), the period shall be
three months from the certified date of completion. (b) for all
works costing more than Rs. 50,000 and up to Rs. 1 crore
(Amount put to tender) ,the period shall be six (6) month from
the certified date of completion or one monsoon , which ever
letter.(c) the major project costing more than Rs. 1 crore , the
period shall be 12 months from the certified date of completion
which should include one monsoon.(d) For building works
the period specified in (a) ,(b) & (c) above or elapse of
monsoon period following certified date of completion,
whichever is letter . For the purpose of deciding the monsoon
period, the 30 September may be treated as the last date.
0.1% per day delay of remaining work after the completion
16 Compensation for Delay
date but not more than 10% of cost of remaining works.
Deduction of Retention Retention @ 2% of the value of work done will be deducted
17 Money from each RA from each RA bill. It will be released along with release of
Bill payment of Final Bill.
Addendum/Corrigendum If any Shall be Published 48 Hrs.
Price To the Final Submission Time And Date. The Same Shall
18 Addendum/Corrigendum
From a part Of Tender And The Same As to be Attached
Along With The Tender Document.
19 For E.P.F. Act. As per Account department circular no.37, date-09/08/2018
As per AMC Finance Department Circular No. 38 dated 21-11-
20 GST 2022. The Rates are Exclusive of GST. Prevailing GST will be
paid separately.
Conditional tenders will not be accepted. Municipal Commissioner reserves the rights to
reject any or all the tenders without assigning any reasons thereof.
Seal and Signature of the Bidder Add. City Engineer
AHMEDABAD MUNICIPAL CORPORATION
ENGINEER DEPARTMENT
TECHNICAL SPECIFICATION
Name of Work : Applying Thermoplastic paint at different T.P. and other different
places In Indrapuri ward South Zone.
ITEM No.1 Thermoplastic paint
Road marking with hot applied thermoplastic paints strictly of Automark - "Specsmark", Asian
Paints-"Apcomark", Katalline- "Traffix O" or Berger Paints-"Sigmark" with reflectorising glass
beads of Automark-"Autolux Gold", "Swarco", "Sovitec" Asian Paints-Apcobids", "Potters" on
bitumen surface providing and laying a hot applied thermoplastic compound 2.5 mm thick
including reflectorising glass beads @ 250gms per sqm area, thickness of 2.5mm is excluding of
surface applied glass beds as per IRC:35-2015. The finished surface to be level, uniform and free
from streaks and holes. zebra patta /bump patta lane/center line/ edge line/cut patta. The white
color marking should provide liminance coefficinet on cemend road shalll be min
mcd/m2/lux and Asphalt road shall be min 100 mcd/m2/lux during the service life during the day
time. The marking should meet the performance criteria for night time reflectivity, wet
reflectivity and skid resistance as mentioned in the section-15 of IRC 35-2015. (As per approved
ITEM No.2 Thermoplastic paint Directional Arrow, Lettering (1 word - up to 4 letters), or any
kind of Artwork etc.
Providing and laying Road marking with hot applied thermoplastic paints strictly of Automark -
"Specsmark", Asian Paints-"Apcomark", Katalline- "Traffix O" or Berger Paints-"Sigmark" with
reflectorising glass beads of Automark-"Autolux Gold", "Swarco", "Sovitec" Asian Paints-
Apcobids", "Potters" on bitumin surface providing and laying a hot applied thermoplastic
compound 2.5 mm thick including reflectorising glass beads @ 250gms per sqm area, thickness
of 2.5mm is exclusive of surface applied glass beds as per IRC:35. The finished surface to be level,
uniform and free from streaks and holes.) Directional Arrow, Lettering (1 word - up to 4 letters),
or any kind of Artwork etc. (which shall maximum size upto 2.75 Sqmt out to out) Item shall
include providing Stencils for lettering, direction arrow signages, and as per requirement.
including cleaning, required maintenance, etc. complete pre and post work. Cost shall also
include laying with applicator machine & operating boilers, Skilled Labours for road marking,
and Un-Skilled labours for barricading/protection, traffic diversion, and it shall also include
wastage of material, etc. Contractor shall be responsible to run his own thermoplastic applicator
machine & supply necessary diesel, gas, fuel, etc, also it will be his responsibility to Operate
preheater. for good quality of workmanship as instructed by Engg-in-charge. Agency has to
quote rate on Nos. work basis which shall include following manpower and machinery for each
set). (As per approved R.A)
MoRT&H Cluses 803 ROAD MARKINGS
The colour, width and layout of road markings shall be in accordance with the Code of Practice
for Road Markings with paints, IRC:35-2015, and as specified in the drawings or as directed by
803.2 Materials
Road markings shall be of ordinary road marking paint, hot applied thermoplastic compound, or
reflectorised paint as specified in the item and the material shall meet the requirements as
specified below.
803.4 Hot Applied Thermoplastic Road Marking
803.4.1 Thermoplastic Material
803.4.1.1 General :
The thermoplastic material shall be homogeneously composed of aggregate, pigment, resins and
glass reflectorizing beads. The colour of the compound shall be white or yellow OS colour No.
356) as specified in the drawings or as directed by the Engineer.
803.4.1.2 Requirements
(1)Composition: The pigment, beads, and aggregate shall be uniformly dispersed in the resin. The
material shall be free from all skins, dirt and foreign objects and shall comply with requirements
indicated in Table 800-9.
TABLE 800-9. Proportions of constituents of marking material (Percentage by weight)
Component White Yellow
Binder 18.0 min. 18.0 min.
Glass Beads 30-30 30-30
Titanium Dioxide 10.0 min. -
Calcium Carbonate and 42.0 max. See Note below
Yellow Pigments - See Note below
Note: Amount of yellow pigment~ calcium carbonate and inert fillers shall be at the option
of the manufacturer, provided all other requirements of this Specification are met.
(ii) Properties: The properties of thermoplastic material, when tested in accordance with ASTM
D36/BS-3262-(Part 1), shall be as below:
(a) Luminance :
White: Daylight luminance at 45 degries-65 per cent min. as per AASHTO M
Yellow: Daylight luminance it 45 degien-45 per cent min. as per AASHTO M
(b) Drying time: When applied at a temperature specified by the manufacturer and to the required
thickness, the material shall set to bear traffic in not more than 15 minutes.
(c) Skid resistance: not less than 45 as per BS:
(d) Cracking resistance at low temperature: The material shall show no cracks on application to
concrete blocks.
(e) Softening point 102.5 :t 9.50 C as per ASTM D
(f) Flow resistance Not more than 25 per cent as per AASHTO M
(g) Yellowness Index (for white thermoplastic paint): not more than 0.12 as per AASHTO M
(iii) Storage Life : The material shall meet the requirements of these Specifications for a period of one
year. The thermoplastic material must also melt uniformly with no evidence of skins or unmelted
particles for the one year storage period. Any material not meeting the above requirements to
be replaced by the manufacturer/ supplier/Contractor.
(iv) Reflectorisation : Shall be achieved by incorporation of beads. the grading and other properties
of the bonds shall be as specified in Clause 803.4.2.
(v) Marking : Each container of the thermoplastic material shall be clearly and indelibly marked with
the following information:
1. The name, trade mark or other means of identification of manufacturer
2, Batch number
3. Date of manufacture
4. Colour (white or yellow)
5. Maximum application temperature and maximum safe beating temperature.
(vi) Sampling and testing: The thermoplastic material shall be sampled and tested in accordance with
the appropriate ASTM/BS method. The Contractor shall furnish to the Employer a copy of
certified test reports from the manufacturers of the thermoplastic material showing results of all
tests specified herein and shall certify that the material meets all requirements of this
803.4.2 Reflectorized glass beads
803.4.2.1 General :
This Specification covers two types of glass beads to be used for the production of reflectorized
pavement markings
Type I beads -are those which are a constituent of the basic thermoplastic compound vide Table
800-9 and Type 2 beads are those which are to be sprayed on the surface vide Clause 803.6.4.
803.4.2.2 The glass beads shall be transparent, colourless and free from milkiness, dark
particles and excessive air inclusions.
These shall conform to the requirements spelt out in Clause 803.4.2.3.
803.4.2.3 Specific requirements
a) Gradation: Ile glass beads shall meet the grada tion requirements for the two types as given in
TABLE 800-10 Gradation Requirements For Glass Bead
Sieve size Percent retained
850 micron 5 to 20 0 to
below 180 micron 0 to
b)Roundness: The glass beads shall have a minimum of 70 per cent true spheres.
c) Refractive index: The glass beads. shall have a minimum reflective index of 1.50.
d) Free flowing properties: The glass beads shall be free of hard lumps and clusters and shall
dispense readily under any conditions suitable for paint striping. They shall pass the free
803.4.2.4 Test methods:
The specific requirements shall be tested with the following methods:
(i)Free- flow test: Spread 100 grams of beads evenly in a 100 mm diameter glass dish. Place the
dish in a 250mm inside diameter desiccator which is filled within 25 mm of the top of a
desiccator plate with sulphuric acid water solution ( specific gravity 1.10). Cover the desiccator
and let it stand for 4 hours at 20 to 29 degree C. Remove sample from desiccator, transfer beads
to a pan and inspect for lumps or clusters. Then pour beads into a clean, dry glass funnel having a
100mm stem and 6 nun orifice. If necessary, initiate flow by lightly tapping the funnel. The glass
spheres shall be essentially free of lumps and clusters and shall flow freely through the funnel.
(ii) The requirements of gradation, roundness and refractive index of glass beads and the
amount of glass beads in the compound shall be tested as per BS 6088 and BS 3262 (Part 1).
(iii)The Contractor shall furnish to the Employer a copy of certified test reports from the
manufacturer of glass beads obtained from a reputed laboratory showing results of all tests'
specified herein and shall certify that the material meets all requirements of this Specification.
However, if so required. these tests may be carried out as directed by the Engineer.
803.4.3 Application properties of thermoplastic material
803.4.31 The thermoplastic material shall readily get screeded/ extruded at temperatures
specified by the manufacturers for respective method of application to produce a line of
specified thickness which shall be continuous and uniform in shape having clear and sharp edges.
803.4.3.2 The material upon heating to application temperatures shall not exude fumes, which
are toxic, obnoxious or injurious to persons or property.
803.4.4 Preparation
(i) The material shall be melted in accordance with the manufacturer's instructions in a heater
fitted with a mechanical stirrer to give a smooth consistency to the thermoplastic material to
avoid local overheating. The temperature of the mass shall be within the range specified by the
manufacturer, and shall on no account be allowed to exceed the maximum temperature stated
by the manufacturer. The molten material should be used as expeditiously as possible and for
thermoplastic material which has natural binders or is otherwise sensitive to prolonged heating,
the material shall not be maintained in a molten condition not more than 4 hours.
(ii) After transfer to the laying equipment, the material shall be maintained within the
temperature range specified by the manufacturer for achieving the desired consistency for
803.5 Reflectorised Paint--deleted
Reflectorised paint, if used, shall conform to the Specification by the manufacturers and
approved by the Engineer. Reflectorising glass beads for reflectorising paints where used shall
conform to the requirement of Clause 803.4.2.
803.6 Application
803.6.1 Marking shall be done by machine. For locations where painting cannot be done by
machine, approved manual methods shall be used with prior approval of the Engineer. The
Contractor shall maintain control over traffic while painting operations are in progress so as to
cause minimum inconvenience to traffic compatible with protecting the workmen.
803.6.2 Where the compound is to be applied to cement concrete pavement, a sealing
primer as recommended by the manufacturer, shall be applied to the pavement in advance of
placing of the stripes to ensure proper bonding of the compound. On new concrete surface any
laitance and/or curing compound shall be removed before the markings are applied.
803.6.3 The thermoplastic material shall be applied hot either by screeding or extrusion
process. After transfer to the laying apparatus, the material shall be laid at a temperature within
the range specified by the manufacturer the particular method of lying being used. The paint
shall be applied using a screed or extrusion machine.
803.6.4 The pavement temperature shall not be less than 10'C during application. All surfaces to
be marked shall be thoroughly cleaned of all dust, dirt/grease, oil and all other foreign matter
before application of the paint.
The material, when formed into traffic stripes, must be readily renewable by placing an
overlay of new material directly over an old line of compatible material. Such new material shall
so bond itself to the old line that no splitting or separation takes place.
Thermoplastic paint shall be applied in intermittent or continuous lines of uniform
thickness of at least 2.5 mm unless specified otherwise. 'Where arrows or letters are to be
provided, thermoplastic compound may be hand- sprayed. In addition to the beads included in
the material, a further quantity of glass beads of Type 2, conforming to the above noted
Specification shall be sprayed uniformly into a mono-layer on to the hot paint line in quick
succession of the paint spraying operation. The glass beads shall be applied at the rate of
grams per square meter area.
803.6.5 The minimum thickness specified is exclusive of surface applied glass beads. The
method of thickness measurement shall be in accordance with Appendices B and C of BS -
803.6.6 The markings shall be done to accuracy within the tolerances given below:
i) Width of lines and other markings shall not deviate from the specified width by more than
ii) The position of lines, letters, figures, arrows and other markings shall not deviate from the
position specified by more than 20 mm
iii) The alignment of any edge of a longitudinal line shall not deviate from the specified alignment
by more than 10 mm in 15 m.
iv) The length of segment of broken longitudinal lines shall not deviate from the specified length
by more than 150 mm.
In broken lines, the length of segment and the gap between segments shall be as
indicated on the drawings; if these lengths are altered by the Engineer, the ratio of the lengths of
the painted sections shall remain the same.
803.6.7 Properties of finished road marking
The finished lines shall be free from ruggedness on sides and ends and be parallel to the
general alignment of the carriageway. The upper surface of the lines shall be level, uniform and
free from streaks.
(a) The stripe shall not be slippery when wet.
(b) The marking shall not lift from the pavement in Freezing weather.
(c) After application and proper drying, the stripe shall show no appreciable
deformation or discoloration under traffic and under road temperatures up to 60 degree C.
(d) The marking shall not deteriorate by contact with sodium chloride, calcium chloride
or oil drippings from traffic.
(e) The stripe or marking shall maintain its original dimensions and position. Cold
ductility of the material shall be such as to permit normal. movement with the road surface
without chopping Or cracking.
(f) The colour of yellow. Marking shall conform to IS Colour No. 356 as given in IS:
Performance Criteria: The criteria given here under are meant to be used on white colour
pavement marking only.
1.1 Day Time Visibility
The luminance coefficient under diffuse illumination Qd for road marking on
Cement road (Qd) shall be minimum of 130 mcd/m2/lux during the expected life service time
Asphalt road (Qd) , shall be minimum of 100 mcd/m2/lux during the expected life service time
Testing method shall be according to Annexure D.
1.2 Night Time Visibility
(i) Dry retro-reflection
Dry retro-reflection shall be compliant with Table (i) and measured in accordance with the
method descried in Annexure E.
(i) Initial and Minimum Performance for Dry Retro Reflectivity during Nighttime
S. Design Speed (RL) Retro –Reflectivity (mcd/m2/lux)
Initial (7 Days) Minimum Threshold Level (TL) and
warranty period Required up to 2 years
3 Above 100 350
(i) Wet retro-reflection
Wet retro-reflection shall be compliant with Table (ii) and measured in accordance with the
method descried in Annexure E. irrespective of the design speed .In wet condition design speed
does not have bearing on road marking
(ii) Initial and Minimum Performance for Dry Retro Reflectivity during Nighttime
S. no Design Speed (Rw) Retro –Reflectivity (mcd/m2/lux)
Intian (7 days) Minimum Threshold Level
SPECIAL TERMS AND CONDITIONS FOR THERMOPLAST PAINT WORK
1) Agency should carry out such type of work by only using his owned Thermoplastic paint laying
machine with temperature controller and automatic mixing arrangement of glass beads in
required proportion.
2) After completion of the laying of thermoplastic paint work, guarantee for durability and
reflectivity as per below given by the bidder in the writing.
Defect liability period for Thermoplastic paint shall be considered as follows:
1. For zebra / pedestrian crossing, stop line, letters and arrows: 1 Years from the date of
execution. For all other Thermoplastic paint: 2 Years.
3) Agency who carry out such type of work shall have an experience of carrying out similar type
4) Test certificates as per M.O.S.T. Specification for Road and Bridge works Clause 803.4.1.2(vi)
should be furnished of reputed laboratory before starting the work.
803.6.8 Measurements for Payment
803.6.8.1 The painted markings shall be measured in sq. metres of actual area marked (excluding
the gaps, if any).
803.6.8.2 In respect of markings like directional arrows and lettering, etc., the measurement shall
Contractor shall have to Submit the manufacture test certificate before Starting the work at no
Contractor Shall have to Submit the test report of Both thermoplastic paint and glass beads from
approved Laboratory for paint & glass beads at no extra cost before producing bill and then
after on end when asked by AMC.
Contractor shall have to submit the filled form as mentioned above in Soft (Signed & scanned)
and two hard copies.
USAGE CONFORMANCE CERTIFICATE
Details of the thermoplastic painting work is carried out using Name of Manufacturer
sr Type of work with size Qty Remarks
Certified that the above Hot Applied Thermoplastic Road Marking have been
manufactured using Brand Name & Product name of thermoplastic material & Glass bid
(according to ASTMD 36/BS3262) and are covered by the
Which will expire on dated.............
Name of Thermoplastic Material Manufacturer Name of Converter
Name of Thermoplastic Product
Authorized Signatory Authorized Signatory
The Contract unit rate for road markings shall be payment in full compensation for
furnishing a labour, materials, tools, equipment, including all incidental costs necessary for
carrying out the work at the site conforming to these Specifications complete as per the
approved drawing(s) or as directed by the Engineer and all other incidental costs necessary to
complete the work to these Specifications.
ITEM No.3 CAT EYE/Road Stud/RPM:
Supplying of Moulded Twin Shank Raised Pavement Markers made of polycarbonates and ABS
moulded body and reflective panels with Micro Prismatic Lens(No Glass Bed Lens) capable of
Providing total internal reflection of the light entering the lens face and shall support a load of
13635 kgs. tested accordance to ASTM D 4280 Type H and complying to specification of category
A of MORTH Circular NO RW/NH/33023/10-97-DO lll Dt.11.06.1997. The height, width and
length shall not exceed 20 mm,130 mm and 130mm and with minimum reflective area of
sqcm on each side and slope to the base shall be 35+/-5 degree.The strength of detachment of
integrated cylindrical shank,(of diameter not less than 19+/-2 mm and height not less than 30+/-
2 mm) from the body is to be a minimum value of 500 kgf. Fixing will be by drilling holes on the
road for the shank to go inside, without nails and using epoxy resin based adhesive as per
manufacturer's recommandation and The color of the marker should be as per the IRC 35-2015
and as directed by Engineer-In-charge.(R&B SOR 2023-24 Item code:26162A)
Detailed Technical Specifications for Moulded Twin Shanks Cat Eye / Road Stud / RPM
Material & Manufacturing
The work shall cover the providing and fixing of Raised Pavement marker (RPM) or road stud, a
device which is bonded to or anchored within the road surface, for lane marking and delineation
for night-time visibility, as specified in the contract.
2.1 Plastic body of RPM road stud shall be molded from ASA ( Acylicstyreneactylonitrile ) of HIPS (
Impacts polystyrene) or ABS or any other suitable material approved by the Engineer in charge.
The marker shall support a load of 13635 kg. tested in accordance with ASTM D
2.2 Reflective panels shall consist if number or lenses containing single or dual prismatic cubes
capable of providing total internal reflection the light entering the lens face lenses shall be
molded of methyl methecrylat conforming to ASTM D 788 or equivalent.
The slope or retro relfecting surface shall prfeably be 35. + 5degree to base. The area of each
retro reflecting surface shall not be less then 13.0 sqmt.
4. Optical performance
4.1 Unidirectional and bi directional studs each reflector or combination of reflector on each face of
the stud shall have a CIL not less the given in Table 1 or 2 appropriate.
4.2 Omni directional studs
Each omni directional stud shall have a min. CIL of not less than 2mcd/lx
Table 1 min. CIL vales for category 'A' studs.
Entrance Angle Observation Angle C.I.L. in mcd/lx
White Amber Red
Table 2 min. CIL vales for category 'B' studs.
Entrance Angle Observation Angle C.I.L. in mcd/lx
White Amber Red
1) The enterance angle of 0º U corresponds to the normal aspect of the reflectors when the
reflecting road stud is installed in horizontal road surface.
2) The stud incorporating one or more corner cube reflectors shall be included in category ‘A’. the
stud incorporating one or more bi-convex reflectors shall be included in category ‘ B’.
5.1 Coefficient of luminance intensity can be measured by produce described in ASTM 809 '' Practice
for Measuring Photometric characteristics'' or as recommended in BS 879 part 4:1973
5.2 under test conditions, a stud shall not be considered to fail the photometric requirements if the
measured C.I.L at any one position of measurements is less than the values specified in Table
or 2 provided that
i) the value is not less than 80 percent of the specified minimum and
ii) the average of the left and right measurements for the specific angle is greater than the
specified minimum
6. Fixing of Reflective studs
6.1 Requirements
The enveloping profile of the head of the stud shall be smooth and the studs shall not present any
sharp edges to traffic. The reflecting portion of the studs shall be free from crevices or ledges
where dirt might accumulate. Marker height shall not be less than 10mm and shall not exceed
mm. and it’s width should not exceed 130mm. the base of the marker shall be flat within 1.3mm.
if the bottom of the marker is configured, the outer most faces of the configurations shall not
deviate more than 1.3mm from the flat surface. The marker shall be fitted with two polymer
shanks at appropriate places at either ends and shall be slotted along its length. The Shank
Length for Each of the shanks shall not be less than 20 millimeter.
All road studs shall be legibly marked with name, trade mark or other means of identifications of
the manufacturer.
The reflective marker shall be fixed to the road surface using the adhesives and the procedure
recommended by the manufacturer. No nails should be used to fix the marker so that they do
not pose safety hazard on the roads. Regardless of the type of adhesive used ,the markers shall
not fixed if the pavement is not surface dry and on new asphalt concrete surface until the
surface has been opened to traffic for period of not less than 14 hours. The portions of the Road
surface to which marker is to be bonded by the adhesive shall be free of dirt, curing compound,
grease, oil, moisture, loose or and any other material which would adversely affect the bond of
The adhesive shall be placed uniformly on the Cleaned pavement surface or on the bottom of
the markers in a quantity. sufficient to result in complete coverage of the area of the contact of
the better surface with no voids present at a slight excess after the better surface has been
lightly pressed in place. For epoxy installations, excess adhesive around the edge of the marker,
excess Adhesive on the pavement and adhesive on the exposed surfaces of the markers shall be
immediately removed.
6.3 Warranty and Durability
The contractor shall obtain from the manufacturer a two year warranty for contractor held
performance including stipulated retro reflectance of the reflecting panel and submit the same
to the Engineer in charge. In additional a two year warranty for satisfactory infield performance
of the finished road marker shall also be given by the contractor who carried out the work of
fixing of reflective road markers. In case the markers are displaced. damage get worn out or low
their reflectivity compared to stipulated standards, the contactor would be required to replace
all such marker within 15 days of the intimation from the Engineer at his own cost.
7. Measurement of Payment
The measurement or reflective road markers shall be in number of diff. types of marker supplied
The contract unit rate for reflective road marker shall be payment in full compensation for
furnishing all labor, materials, tools, equipment including incidental costs necessary for carrying
out the work at side conforming to the specifications complete as per approved drawings or as
directed by the Engineer
USAGE CONFORMANCE CERTIFICATE
Details of the Cat-Eye fixing work is carried out using Name of Manufacturer
Sr Type of work with size Qty Remarks
Certified that the Cat-Eye fixing work have been manufactured using Brand Name of
Reflective pavement marker (RPM) (According to ASTM D- 4280) and are covered by
which will be expired on dated.............
Name of Cat -Eye Manufacturer Name of Converter
Authorized Signatory Authorized Signatory
Special Note: Contractor may submit a certificate of being authorized converter of
approved manufacturers
ITEM NO.4 PRIMER
Providing and applying primer before hot applied thermoplastic paints marking on RCC
road surface, which must ensure better adhesion of thermoplastic paint to the surface and also
increase paint durability, including all material, manpower, tools and machineary required for
work, with all required safety standards to work in running traffic conditions, as per standards
and as instructed by engg in charge. Agency has to quote rate on Sq.Mt. work basis.
The contract unit rate for Providing and applying primer before hot applied thermoplastic paints
marking on RCC road surface shall be payment in full compensation for furnishing all labor,
materials, tools, equipment including incidental costs necessary for carrying out the work at side
conforming to the specifications complete as per approved drawings or as directed by the
ITEM NO.5 C.R. Base Road Marking Paint
Providing & applying C.R. Base Road Marking Painting lines, dashes, arrow, letters etc. on Road in
two coats on new Work with ready mixed road marking paint conforming to IS:164 and AASHTO
standard M-248-90 on concrete/ bituminous surface,including required additive/ solvent,
providing safety cones,barricades, string, chalks or req. colour for line marking,etc. Cleaning the
surface, removing of all dirt , dust & other foreign matter and clear the site as per engineer
incharge.(As per approved R.A)
Over 10 Cm in Width
Up to 10 Cm in Width
The colour, width and layout of road markings shall be in accordance with the Code of Practice
for Road Markings with paints, IRC : 35, and as specified in the drawings or as directed by the
Road markings shall conform to. Gr Made I as per IS:
3.00 Workmanship
3.1.1 The materials required for work of painting work shall be obtained directly from
approved manufacturers or approved dealer and brought to the site in maker's drums, kegs etc.
with seal unbroken.
3.1.2 All materials not in actual use shall be kept properly protected, lids of containers
shall be kept closed and surface of paint in open or partially open containers covered with a thin
layer of turpentine to prevent formation of skin. The materials which have become stale or flat
due to improper and long storage shall not be used. The paint shall be stirred thoroughly in its
container before pouring into small containers. While applying also the paint shall be
continuously stirred in smaller container. No left over paint shall be put back into stock tins.
When not in use, the containers shall be kept properly closed.
3.1.3 If for any seasons, thinning is necessary, the brand of thinner recommended by the
manufacturer shall be used.
3.1.4 The surface to be painted shall be thoroughly cleaned and dusted. All rust, dirt and
grease shall be thoroughly removed before painting is started. No painting on exterior or other
exposed parts of the work shall be carried out in wet, damp of otherwise unfavorable weather
and all the surfaces shall be thoroughly dry before painting work is started.
3.1.5. The road marking shall preferably be laid with appropriate road marking machinery/
or by brush as specified by the Engineer In charge. Laying thickness of road marking paint shall
be as specified by the Engineer.
4.00 Mode of Measurement
A) Over 10 Cm in Width –The rate shall be for a unit of one Sq.mt
B) Up to 10 Cm in Width the rate shall be for a unit of running meter.
(1) Contractor shall have to submit the manufacture test certificate of retro reflective sheet
before Starting the work at no Extra cost
(1) Contractor Shall have to Submit the test report of retro reflective sheet from Govt.
approved Laboratory testing of sheeting at no extra cost before producing First R.A bill and
then after on end when asked by AMC. The contractor shall not be paid extra for same.
(2) Contractor shall have to submit the filled form as mentioned below in Soft (Signed &
Scanned) and two hard copies
USAGE CONFORMANCE CERTIFICATE
Details of the Providing & applying C.R. Base Road Marking Painting work is carried out using
Name of Manufacturer
Sr Type of work with size Qty Remarks
Certified that Providing & applying C.R. Base Road Marking Painting work have been
manufactured using Brand Name of (IS:164 and AASHTO standard M-248-90) and are covered
which will be expired on dated.............
Name of C.R. Base Road Marking Paint Material Manufacturer Name of Converter
Name of C.R. Base Road Marking Paint Product
Authorized Signatory Authorized Signatory
Contractor’s Signature Add.City Engineer
ftuLx[tfxhle mne - rm¬tu yuze.mexe yuLSlegh
btuctEj lkch mt&u (œrûtK Ítul)
FOR BANK GUARANTEE
Seal and Signature of the Bidder Add. City Engineer (South Zone)
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
General terms & conditions
1. A booklet of FORM B-1 of Gujarat State Roads & Building Department / Water Resources
Department with the latest correction slips may be referred for quality of construction &
standard of Procedure (SOP). (only English version)
2. In the specification “as directed" / "approved" shall be taken to mean "as directed /
"approved" by the Engineering in charge.
3. Wherever a reference to any Indian standard appears in the specifications, it shall be taken
to mean as reference to the latest edition of the same of force on the date of agreement.
4. In "Mode of measurement" in the specifications wherever a dispute arises in the absence of
specific mention for a particulars point / aspect, the same in the relevant Indian Standards
shall be referred to.
5. All measurement and computations, unless otherwise specified shall be carried out nearest
to the following limits :-
i) Length, width and depth, Height 0.01 Meter
ii) Areas 0.01 Sq.mts.
iii) Cubic contents 0.01 Cu. mts.
In recording dimensions of work, the sequence of length, width and height (Depth) or
thickness shall be followed.
6. Definite particulars covered in the items of work, though not mentioned or elucidate in its
specifications shall be deemed to be included therein.
7. Approval of the samples of various materials given by the Engineer in charge or AMC's
Consultant shall not absolve the contractor from the responsibility of replacing defective
materials brought on site or materials used in the work found defective at a later date. The
contractor shall have no claim to any payment or compensation whatsoever on account of
any such materials being rejected by the Engineer in charge.
8. The contractor’s rate for the item of work shall be for the work completed in all respect.
9. All materials including those of electrical shall be got approved by the Engineer in charge/
Architect before using them in the work.
10. Materials as and when rejected by the Engineer in charge or AMC's Consultant shall be
removed from the site of work within 24 hours.
11. All work shall be carried out in a manner applying the best technique.
12. All tools, templates, machinery and equipment for correct execution of the work as well as
for checking lines, levels, alignment of the works & all precautionary measures during
execution shall have to be kept in sufficient numbers and in good working condition at the
site of the work.
13. Special modes of the construction not adopted in general Engineering practice, if proposed
to be adopted by the contractor shall be considered only if the contractor provided
satisfactory evidence that such special mode of construction and completion of work to the
required strength and quality. Acceptance of the same by the Engineer in charge shall not
however, absolve the contractor from the responsibility of any adverse effect and
concordance of adopting the same in the course of exaction or completion of the work.
14. The contractor shall be responsible for observing the rules and regulation imposed under
the "Minor Mineral Act", and such other laws and rules prescribed by the Government from
15. All necessary safety measures and precautions (incl. those laid down in the various relevant
Indian Standard) shall be taken to engrave the safety of men, materials and machinery on
the work and also of the work itself.
16. Quantity measured in the tender is approximate. It may increase or decrease looking to the
quantum of actual work for which no any claim shall be entertained by A.M.C.
17. Contractor shall have to execute extra item if required only after necessary permission from
18. The work in general shall be carried out as per standard specifications of the relevant items
to be executed & as per the instruction of Engineer in charge & as per the guidance of
AMC's Consultant for this project.
19. The general terms & conditions of the contract shall be applicable & shall be binding on the
contractor. The contract agreement shall have to be executed between AMC & the agency
to which work is awarded for execution.
20. The time limit shall be reckoned after next day from the date of issue of the written work
order to the contractor after fullfillng the formality life SD & Agreement. No time
extension will be granted under any circumstances.
21. In case of any ambiguity in specifications mentioned in this tender, the interpretation given
by Additional City Engineer /Dy.M.C of A.M.C. will be final and binding to the
22. The contractor shall take no advantage of any apparent error or omission in drawing or
specification and the Engineer -in-charge shall make such corrections and interpretations as
necessary to fulfill the intent of the plants and specifications.
23. The quantities of items in BOQ (Bill of Quantities) may vary in case of necessity arises.
24. All prevailing taxes/duties chargeable by State Govt./Central Govt. and the Municipal
Corporation. will be payable by the contractor.
25. No any kind of price rise / price escalation / price variation for cement , steel or labour shall
26. Contractor is requested to see the site physically before tendering. He is also requested to
quote the rates keeping in view of all the points mentioned in relevant pages of tender
27. Water Supply: The contractor shall arrange at his own cost, a suitable supply of piped
water for the construction of the works and provide a satisfactory supply of potable water
for drinking, washing, sanitation and cleaning down. The contractor will be responsible for
all the costs where applicable of connection, meter installation, water consumed, water
required for testing purposes, disconnection and the laying, maintenances and ultimate
removal of any distribution system around the site.
28. Electricity: Electric supply will be made available at the site by the Contractor and the
contractor must make his own arrangements with the Corporation and Electricity Supply
Authorities and with other contractors to connect and to take a supply from such services,
paying all costs in connection therewith.
The Contractor shall be entitled to use supply Electricity as may be available on the site for
purpose of the work and shall pay such charges as is fixed by the appropriate supply
In case there is any delay in supply of power site of any interruption or fault in the power
during the work. No compensation shall be paid for idle labor staff, machineries and for use
of diesel operating sets etc. as the case may be.
29. Tenders shall submit all the valid/certified documents in support of their initial/eligibility
criteria mentioned above along with the bid. They shall have also to submit the income tax
clearance certificate and solvency certificate.
30. No advance such as secured advance machinery advance, mobilization advance or materials
advance will be given.
31. The contractor shall get the electrical works executed through the authorized Government
approved licensed electrical person or firm in appropriate category in accordance to
contractual provisions.
32. The electrical works shall be carried out strictly in accordance with the directives issued by
Engineer in charge.
33. Contractors shall not have any dispute or claim for any kind of compensations
(i) If the quantity stipulated in the tender items varies or the scope of work changes &
thereby total amount of work increases/ decreases.
thereby total amount of work increases/ decreases.
(ii) If the work gets delayed/ postponed for some administrative/ technical decision
34. In case of any dispute, decision of Municipal Commissioner shall be final and binding on
the contractors.
35. Tenders which do not fulfill all or any of conditions or are submitted incomplete in any
respect will be rejected. Municipal Commissioner reserves the right to increase/decrease the
scope of work. No any claim to that effect shall be entertained. The Municipal
Commissioner also reserves the right to reject any or all the tenders without assigning any
reason thereof.
36. The contractors are requested to quote their rates considering above tender conditions.
37. The contractor shall have to paid balance Security Deposit within 10 days from the date if
issue of Letter of Interest (LOI). And after paying the balance S.D. the time limit will be
started & Execution of Agreement to be done than after.
In case of delay in paying balance S.D. by more than 10 days penalty at the rate of
0.01% of sanction tender amount per day will be deducted from the Bill.
Eventhough in special case, if work is not started because of monsoon or any other
special reason (like site is not available), after evaluation of situation the actual date of
starting of work will be consider after approval of Dy.M.C. (South zone)
38. The Contractor shall not claim for increase or decrease in the quantity of the item or the
39. The payment shall be made as per the A.M.C policy for the work done by the contractor.
40. Conditional tenderes will not be accepted.
41. The Contractor must be followed the rules and regulations for COVID-19 as per guidelines
published by WHO/ Center government/State government /Ahmadabad municipal
SLA Breach and Penalty Clause for Road & Footpath Complaints
1. Complaint Resolution within SLA:
The Contractor/ Agency shall attend to and completely resolve all complaints related to Road and Footpath works
within the prescribed Service Level Agreement (SLA) time limit mentioned in the tender. The SLA period shall be
calculated from the date and time of registration/allotment of the complaint.
2. SLA for Road & Footpath Complaints:
તેમજ મરામત અને િનભાવના કાયની આવતી સી.સી.આર.એસ, ફ રયાદો ની કામગીર SLA (Service
Level Agreement) િપર યડમાં િનકાલ ફર યાત કરવાનો થાય છે જો આવેલ ઓનલાઈન સી.સી.આર.એસ.
ફ રયાદનો તેના SLA (Service Level Agreement) િપર યડમાં િનકાલ કરવામાં ન હ આવેતો નીચે ુ બની
BUILDING CATEGORY
Sr.No. Category Problem SLA Penalty per one
Problem Per day
1 Public Building No Water Supply in Public Building 24 Hours
2 Public Building Public toiles and urinals-repairing of doors, 360 Hours
windows, tiles, ceiling, plaster and others
3 Public Building Muni. school repairing and other 168 Hours
maintenance complains
Sr.No. Category Problem SLA Penalty per one
Problem Per day
1 Water>>Engineering Inadequate water or low inflow pressure- 240 Hours
2 Water>>Engineering Leakage In pipe Line-Eng 48 Hours
3 Water>>Engineering Water quality-polluted water-Eng 24 Hours
4 Water>>Engineering No Water Supply-Eng 240 Hours
5 Water>>Engineering Water-other 72 Hours
DRAINAGE CATEGORY
Sr.No. Category Problem SLA Penalty per one
Problem Per day
1 Drainage Engineering No Drainage Machine hole Cover-Eng 24 Hours
2 Drainage Engineering Frequent Breakdown & Blockage Of 96 Hours
Sr.No. Category Problem SLA Penalty per one
Problem Per day
1 Road Pot holes on the road 24 Hours
2 Road Patch work Relaying of a portion of road 72 Hours
3 Road Deep pit-large Settlement of road 48 Hours
4 Road Removing of waste-Dust laying on both 72 hours
side of the road after resurfacing
5 Road Road Other 48 Hours
6 Footpath Road-Footpath Repairing 168 Hours
3. Penalty for Breach of SLA:
If any complaint is not completely resolved within the prescribed SLA period, the same shall be treated
as SLA Breach and the applicable penalty mentioned above shall be imposed on the Contractor/Agency.
4. Additional Penalty for Continued Delay:
If the complaint remains unresolved even after expiry of the SLA period, the applicable penalty shall be
recovered for every additional 24 hours or part thereof until the complaint is completely rectified and
verified by the concerned Engineer/authorized officer.
5. Actual Resolution and Verification:
Temporary barricading, placing of material, or initiation of work shall not be considered as resolution of
the complaint. The complaint shall be considered closed only after the required work is completed and
the same is verified by the concerned Engineer/authorized officer.
6. No Exemption on Account of Delay:
The Contractor/Agency shall not claim exemption from penalty merely on the ground that the work has
been started. In case the complaint continues to remain unresolved beyond the prescribed SLA, penalty
shall continue to accrue until satisfactory completion of the work.
7. Recovery of Penalty:
The penalty amount shall be recovered from the Contractor's running bill/final bill/security deposit or
any other amount payable to the Contractor by the Municipal Corporation, without prejudice to any
other action permissible under the tender/contract conditions.
8. Reopened/Unsatisfactory Complaints:
If a complaint is closed without satisfactory rectification and is subsequently reopened by the
complainant, the same shall be treated as an unresolved complaint and the applicable SLA/penalty
provisions shall continue to apply.
9. Repeated Delay:
In case of repeated failure to resolve complaints within the prescribed SLA, the Municipal Corporation
shall have the right to issue a warning/show-cause notice and take further contractual action, including
withholding of payment, recovery of additional expenditure, or other action as per the terms and
conditions of the tender.
10. Exceptional Circumstances:
Any extension of SLA shall be considered only in genuine circumstances beyond the control of the
Contractor and shall require prior approval Engineer In-charge. No extension shall be considered
merely due to shortage of labour, machinery, materials, traffic arrangements or other resources under
the Contractor's responsibility.
Signature of contractor with seal Add. City Engineer(S.Z)
Date Ahmedabad Municipal Corporation
FORM OF BANK GUARANTEE
(hereinafter called the Tenderer) is desirous and preferred to tender for works in accordance with
the terms and conditions of tender for the work of
1 .Therefore. We hereby affirm that -we are guarantors on behalf of the Tenderer up to
(in figures) and we undertake to pay to Municipal Commissioner, Ahmedabad Municipal Corporation,
A'bad specified up to his first written demand, without demur without delay and without the necessity
of a previous of judicial or administrative procedures and without the necessity to prove to the Bank
the defects or short comings or debits of the contractor any sum within the limit of
2. We further agree that the Guarantee herein contemned shall remain in full force and effect during
the period that would be taken for the acceptance of tender.
However unless a demand of claim under this guarantee is made on its in writing on or before the
(Date to be specified will not he less than 180 days from the stipulated date of receiving the tender) we
shall be discharge form all liabilities under the guarantee thereafter.
3. We undertake not to revoke the guarantee during it currency except with the previous consent of the
Municipal Commissioner, Ahmedabad Municipal Corporation, A'bad in writing.
4. We lastly undertake not to revoke the guarantee for any charge in constitution of the Tenderer or of
5. The contractors shall have to furnish income tax clearance certificate before his tender is accepted
and intimate assessment number and ward under which he is assessed.
6. Copies of certificate as regards previous experience, if any, must accompany the tender.
Signature of Contractor Add.C.E (S.Z) Dy. Municipal Commissioner (S.Z)
Date Ahmedabad Municipal Corporation
TENDER DECLARATION FORM
The Deputy Municipal Commissioner,
South Zone, Ahemedabad
Name of Works: - Applying Thermoplastic paint at different T.P. and other different places In
Indrapuri ward South Zone.
I/We the undersigned have carefully gone through and clearly understood the Tender
documents for the above work. I/We have satisfied myself/ourselves as to the location of site,
examined drawings. I/We have visited site & fully acquainted with local situations regarding materials,
labours & others factors pertaining to work before submitting tenders.
I/We do hereby offer to execute and complete the whole of the work within the time specified
all in accordance with the specification, designs, drawing and instruction in writing referred to in the
said document and with such materials as are provided for, at the respective rates which I/we have
quoted in the schedule-B or at such other rates as maybe fixed under the provisions of these conditions.
In the event of this tender being accepted I/We agree to enter into an agreement and when required and
execute the contract, according to your fom1 of agreement as or in default where of I/we bind myself/
ourselves to forfeit the "Earnest Money Deposit."
I/We understand that if I/WE shall not enter in agreement within ten days or decided by AMC
from the date of receipt of letter of acceptance, you will forfeit the earnest money paid by me/us and
take necessary action as deemed fit.
I/We have enclosed a DEMAND DRAFT or PAY ORDER as an “Earnest Money Deposit", for
the sum as mentioned in tender notice, the full value of which is to be absolutely forfeited to the
Employer If I/We fail to commence the work specified. Otherwise the said sum shall be retained, by
the Employer as on account of such. Security) ' Deposit'.' as provided for in the aforesaid documents.
I/We agree not to employ sub-contractors other then those that may be approved in accordance
with Conditions in the aforesaid documents.
I/We understand that you are not bound to accept the lowest or any tender which you may
I/We am/are bound to execute the job if the work order is issued within 120 days from the date
of opening of the tender.
I/We agree to pay the Government income-Tax, Sales-Tax (Central and State) ,Sales Tax on
work, octroi duties and other prevailing Government taxes/charges on such items on which the same
are leviable and therates quoted by me/us are inclusive of the same.
Yours faithfully
Signature of the contractor
ybœtJtœ BGþrlrmvj ftuvotuhuNl
ÆÂûtKÍtul - Esluh Ftðþ
1. mbgbgto>t ykdu yuj.ytu.ytR. ytÃgt ctœ 10 rœJm mw^ebtk sÁhe me¾gtuhexe rzvtuÍex
Che ðgth ctœ&e dKJtbtkk ytJNu. <ubs ðgth ctœ Jfo ytuzoh R~gw &gu&e mbtg bgtoœt
NY &guje dKtNu. <&t <u mt&u fhthvºt fhJtltu hnuNu. ylu <u bwsc ftb NÁ fhJtle
<theF dKJtbtk ytJNu. yuj.ytu.ytR. ytÃgt ctœ me¾gtuhexe rzvtuÍex ChJtbtkk rœl -
15 fh<tk J^w rJjkc ltk rfMmt btk <ubs Jfo ytuzoh ytvu&e ftb NY fhJtbtkk rJjkc &gu&e
«r<rœl bkswh xuLzh hfbltk 0.01 % juFu vulÕxe cej btk&e ftvJtbtk ytJNu. <ub A<tk
rJrNÐ rfMmt btk atubtmt ltk fthKu y&Jt yrlJtgo fthKtumh ftb NÁ &R Nfu <ub l ntug
<u rfMmt btk gtuøg<t aftme zu.Bgw.frb©h (œ.Ítul) le bkswhe bu¤Je ftb NÁ fhJtle
<theF dKJtbtk ytJNu.
2. xuLzh Jujezexe 120 r>Jm Mþ^ele hnuNu.
3. xuLzh Ch<e JF<u yluoMxble ChJtle hnuNu.
4. S.yum.xe. «J<obtl œh «btKu yjd&e awfJJtbtk ytJNu. xuût fu yLg ftuE vK mhfthe
fhJuht ChJtle sJtc>the ftuLx[tfxhle hnuNu.
5. htsg / fuL÷ mhfth©elt JF<tuJF<lt ftg>t Bþsc su ftuE hfble fvt< fhJtle &Nu <u
bwsc ftuLx[tfxlt cejbtk&e fvt< fhJtbtk ytJNu.
6. juch JuÕVuh Vkz btxu ntjbtk htsg mhfth©eyu fhuj nwfb Bþsc 1% (yuf xft) hfb
cejbtk&e ftve juJtbtk ytJNu.
7. bxehegj xuMxekdltu xuMxekdltu FhuFh &guj Fao ftuLx[tfxh©e vtmu &e Jmwj fhJtbtk
8. ftb ytv<e JF<u su <u ftuLx[tfxhLþk hSMx[uNl ægtlbtk htFelu <ule bgto>tbtk ftb
ytvJtbtk ytJNu.
9. yt xuLzh su <u Jdolt btLg gtœe lt ftuLx[tfxhtu Che NfNu. dJobuLxlt btLg ftuLx[tfxhu
y.BGþ.ftuvotu.btk btLg ftuLx[tfxhtu le gtœebtk hSMxuNl fhtJJtLþk hnuNu.
10. yt Wvhtk< y.BGþ.ftuvotu. lt slhj ftuLx[ufx fLzeNl ylu xuLzhle Nh<tu ck^lf<ot hnuNu.
su BGþrl.ftuvtuohuNl Juc mtEx www.ahmedabadcity.gov.in Wvh Bþfuj Au.
11. ftuLx[tfxh lu vubuLx - hl´dcej BGþrl.ftuvotu.lt su <u atÕþ mbglt mhfGþjh Bþsc fhJtbtk
12. Nh<e xuLzh MJefthJtbtk ytJNu lrn.
13. xuLzh MJefthÔþ, h> fhÔþ, ftulu ytvÔþ ylu fgt CtJ&e ytvÔþ <u ykdu
zu.BGþrl.frbNlh©eltu rlKog ytFhe hnuNu.
14. œhuf ytExbltk MvuNeVefuNl ftuvtuohuNlltk bkswh &guj MvuNeVefuNl Bþsc <&t RLzegl
MxtLzzo ftuz ytuV «ufxem ltkk btLg ^tht ^tuhKtu Bþsc hnuNu ylu zu.mexe yuLSlegh©eltu
rlKog ytFhe hnuNu. Jtuxh´d fhJtbtk lrn ytJu fu >hhtus J^thtltu zucheÍ WvtzJtbtk
lrn ytJu <tu ftuLx[tfxhltk Fauo ylu òuFbu Jdh ltuxemu Jtuxh´d fhtJJtbtk <&t zucheÍ
WvtzJtbtk ytJNu ylu cejbtk&e hfb ftve juJtbtk ytJNu.
15. yufe JF<u yuf fh<tk Jæþ søgtytuyu ftbNY fhJtltu Jfoytuzoh b¤u <tu ftb yuf mt&u s
yuf s c<tJuj søgtyu fhJwk vzNu. yuf ftb ÃþÁ &tg vAe cesw ftb NY fheyu <uÔþk atjNu
16. atÕþ ftbu ftuEvK mrJom jtEllu LþfNtl l &tg <u he<u ftb fhÔþk vzNu, òu ftuE mrJom
jtEl lu LþfNtl &Nu <tu <ule mkÃËKo sJtcœthe (òlbtjle) ftuLx[tfxhle vtu<tle hnuNu.
mtEx vh ftb œhBgtl bswh fu sl<t lt ftuE btKmlt òlbtjlu lwfNtl &tg <ule
sJtcœthe ftuLx[tfxhle hnuNu. vtujem Vhegt> &tg <tu <ule sJtc>the vK ftuLx[tfxhle
hnuNu. CuFz ^me l vzu <ule sJtc>the vK vtujem Vhegt>btk ftuLx[tfxhle hnuNu. CuFz
^me l vzu <u btxu mjtb<elt vdjtk (suJt fu >tuhzwk ctk^e bsqh Ftztbtk W<thJt, mtuh´d
ylu Mx[x´d fhJt rJduhu) je^t Jdh bsqhlu Ftztbtk W<thNu <tu ftuLx[tfxh s vtujem
Vhegt>btk sJtct>h hnuNu ylu BGþrl.ftuvtuohuNlltu ftuEvK MxtV ytlt btxu sJtc>th
hnuNu lrn. ytxÕþk mbSlu s xuLzh ChÔþk. Btswhtultu rJbtu vK W<thtJJtu.
17. juch yufx «btKu <ubs Bgw. frb§h©eltkk vrhvºt lkch 81 <t.26.02.2015 bwsc
<btb juch / bsqhtulwk dwsht< rcÕzekd yuLz y^h fLMx[[fNl Jfombtkk VhSgt< hSMx[uNl
fhtJJt ykdu ybj fhJtltu hnuNu <&t fuxjt juch jtJNtu <u vK sKtJJtLþk hnuNu. juch
yufx «btKu ftgoJtne lrn &E ntug <tu <u btxu ftuLx[tfxh mkÃËKovKu sJtc>th hnuNu. ylu
<ulu vubuLx ytvJtbtk ytJNu lrn <ubs ct¤ bswhtulu ftb Wvh htFe NftNu lrn. <ubs
JF<tu JF< Bgw. frBNlh©e îtht fhJtbtkk ytJuj mh¾gwjhtule Nh<tu ftuLx[[tfxhlu ckk^l
18. ftuEvK ftgœtfeg jexeduNl ybœtJtœ Nnuhle ftuxobtk hnuNu.
19. ftuE fthKmh òu ftuLx[tfxhlu ftb l ytve Nftg <tu <u ykdu ftuLx[tfxh ftuEvK «fthltu
LþfNtle- J¤<hltu n¬ >tJtu fhe NfNu lrn fu ftg>tfeg ftgoJtne yt ykdu &E NfNu
lrn. xuLzh bkswh >ltu y&o ftb ytve s >uJtLþk Au <uJtu &E NfNu lrn.
20. ytuVh y&Jt xuLzhbtk œNtoJuj ytRxbltu sÚ&tu mkCrJ< sÚ&tu Au subt atjw ftb œhBgtl
VuhVth &Jtle N¾g<t hnuje Au.
21. M&¤ vrhÂM&r< / sYhegt< Bþsc ftb fhtJ<t xuLzhbtk sKtJuj fJtuLxexebtk J^ Dx &Nu <tu
<u ykdu ftuLx[tfxh îtht ftuEvK «fthle J^thtle ltKtkfeg btkdKe fhe NfNu lrn. ylu
ftb ytuAw &tg <tu ftuLx[tfxhle J¤<hle btkdKe MJefthJtbtk ytJNu lrn.
22. mtEx vh jtJJtbtk ytJuj btjmtbtl hesufx fhJtbtk ytJu <tu ðþhk< r>l-1btk vh< jE
sJtltu hnuNu. yLg&t ftuvtuohuNl îtht <u hesufx btjltu rlftj fhe >uJtbtk ytJNu ylu <ule
LþfNtlele sJtc>the ftuLx[tfxhle hnuNu.
23. su ftuLx[tfxh vtmu bswhtultu rJbtu, ydtW&e W<htÔgtu ntug <ublu «t^tLg ytve ftb ytve
24. bsqhtu fu htn>theytulu ftuEvK «fthltu yfMbt< &tg <tu <ule vtujem ftgoJtnele fu juch
yufx bwscle ftgoJtnele sJtc>the yb.BGþrl.ftuvtuo.lt fboatheytule ftuEvK he<u hnuNu
lrn.btºt ftuLx[tfxh s yt btxu sJtc>th hnuNu. bswhtulu dbçËx, nuÕbux nt<k btuò
rJduhu ftuLx[tfxhu VhSgt< ytvJtltk hnuNu. bswhtu <&t MþvhJtEÍ fu Bþft>bltu rJbtu vK
W<thJtltu VhSgt< hnuNu. juch yufx Bþsc ltuk^Ke fhtJe <ult rlgbtuLþk vtjl fhJt
ftuLx[tfxh ck^tguj hnNu. ct¤ bswhtu htFe NftNu lrn.
25. bsqhtu fu htn>theytulu ftuEvK «fthltu yfMbt< &tg <tu <ule vtujem ftgoJtnele fu juch
yufx bwscle ftgoJtnele sJtc>the yb.BGþrl.ftuvtuo.lt fboatheytule ftuEvK he<u hnuNu
lrn.btºt ftuLx[tfxh s yt btxu sJtc>th hnuNu. bswhtulu dbçËx, nuÕbux nt<k btuò
rJduhu ftuLx[tfxhu VhSgt< ytvJtltk hnuNu. bswhtu <&t MþvhJtEÍ fu Bþft>bltu rJbtu vK
W<thJtltu VhSgt< hnuNu. juch yufx Bþsc ltuk^Ke fhtJe <ult rlgbtuLþk vtjl fhJt
ftuLx[tfxh ck^tguj hnNu. ct¤ bswhtu htFe NftNu lrn.
26. rcÕz´d ftble ytExbtu btxu - slhj xuflefj MvuNeVefuNl ytuV rcÕz´d Jfomle çþf
Bþsc yLþmhJtltk hnuNu. Mt>h ÃþM<eft øþsht< çþf Mxtumo 20-ce, zeMx[ef Ntuv´d, mufxh-
21, dtk^eldh&e b¤e hnuNu. su Juc mtEx www.ahmedabadcity.gov.in Wvh
27. bxehegj fu ceò xuMx´d hevtuxo ftuLxtfxhu vtu<tlt Fauo ftuvotuhuNl sKtJu <u søgtyu
fhtJJtlt hnuNu. yt ykdultu mkÃËKo Fao <&t Bgwrl.MxtVlu juctuhuxhe Mþ^e <&t
buLGþVufah´d søgt Mþ^e jtJJt -jE sJtltu Fao vK ftuLx[tfxhu CtudJJtltu hnuNu.
28. btj su <u Mxtumo Wvh y&Jt mtEx Wvh jtuftulu lz<h l &tg <u he<u MËalt Bþsc
W<thJtltu <ubs dtuXJJtltu hnuNu.
29. òu BGþ.yuLSlegh´d MxtV sKtJu <tu ftuLx[tfxhu atÕþ ftbu mtEx Wvh zeÍexj fubuht&e ftb
atÕþ > vnujt, atÕþ ftbu <&t ftb ÃËKo >ltk Vtuxtud{tVm BGþrl.yturVmbtk ytvJtltk
hnuNu <u rmJtg ftbLþk vubuLx fhJtbtk ytJNu lrn òu MxtV MËalt ytvu <tu fubuhtbtk&e
ftuBÃGþxhbtk Vtuxt x[tLmVh fhe ytvJtlt hnuNu. yt ykdu ftuE vK J^thtltu Fao ytvJtbtk
30. ftuEvK fthKmh xuLzh h> fhJtbtk ytJu <tu ftuLx[tfxh <u ykdu ftuEvK «fthltu n¬ >tJtu fu
J¤<hle btkdKe fhe NfNu lrn. yt Nh< MJeftgo ntug <ubKu s xuLzh ChÔþk.
31. bxehegÕm suJt fu hu<e, #xtu, mebuLx, vtEv, rJduhu MxtLzzo bxehegÕm MvuNeVefuNl
«btKult jtJJtlt hnuNu. sgtk ftuE atuFJx l &E ntug ðgtk ytE.yum.ftuz «btKu
bxehegÕm jtJJtLþk <&t xuMx´d fhtJJtLþk hnuNu. <ubs ftuLx[tfxhu muBvj yu«wÔz fhtÔgt
ct> ftb NY fhtJJtLþk hnuNu.
32. yt xuLzhbtk òu ftuE ytExb hne dE ntug <tu <u atÕþ yum.ytu.yth.btk&e juJtbtk ytJNu
ylu òu yum.ytu.yth.btk ytExb l ntug <tu btfuox huEx&e huEx yultjemem fhe su CtJ
Ft<t <hV&e ytvu <u ftuLx[tfxhu juJtltu hnuNu. yt mbSlu s xuLzh ChJtLþk hnuNu. J^tht
le ytRxb btk ftuLx[tfxhle btkdKe Bþsc CtJ b¤Nu lrn.
33. atÕþ ftb >hBgtl «tuxufNlle mkÃËKo sJtc>the ftuLx[tfxhle hnuNu subtk vevzt, >tuhzt,
CgMËaf ctuzo, jtj xul , cuhefuxekd xuv, ÃjtMxef vèe, rJ. ftuLx[tfxhu jtJJtLþk ylu
mtaJJtLþk hnuNu. ylu ftuEvK yfMbt< &Nu <tu <ule mkÃËKo sJtc>the ftuLx[tfxhle hnuNu.
34. MxtV MËalt ytvu <tu mtEx Wvh zuEje «tud{um hSMxh ftuLx[tfxhu htFJtLþk hnuNu. >hhtus
ytme.mexe yuLSlegh©ele <ubtk mne juJtle hnuNu, <ubtk >hhtus ftb fh<t bswhtule
mkÏgt, fhuj ftbdehe <&t yr^ftheytuyu ftb Mþ^thJt fu «tud{um J^thJt ltuk^ fhuj ntug
<tu <uLþk ftuBÃjtgLm ytvJtLþk hnuNu ytJe ltuk^ltk sJtc l &gu fu <u «btKu M&¤ Wvh ybj
l &gu ftuLx[tfxhlu vulÕxe fhJtle m•tt yuze.mexe yuLSlegh©elu hnuNu <u ykdu ftuLx[tfxh
ftuE Jtk^tu jE NfNu lrn.
35. rlg< mbgbgto>tbtk ftb ÃþY l &gu&e xuLzh ¾jtuÍ bwsc ctfe ftbltkk 10.00% juFu
vulÕxe BGþrl.ftuvtuohuNllu åþfJJtle hnuNu.
36. xuLzh le yt Nh<tu ce - 1 Vtubobtk sKtJuj Nh<tulu ytuJhYj fhNu.
Wvhtuf< <btb Nh<tu <&t rlgbtu buk ft¤SÃËJof Jtkauj Au ylu blu fçËj bksqh
ftuLx[tfxhle mne - rm¬tu yuze.mexe yuLSlegh
btuctEj lkch mt&u (œrûtKÍtul)
yufhthlwk Vtubo
(1) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt xuLzh hsw fh<tk vnujtk buk/ybu M&¤le bwjtft< je^e Au
ylu ftblu jd<t btjmtbtl, bswhe ylu ceS ctc<tulu jd<e M&trlf vrhrM&r<le ò<-btne<e
(2) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt ftuLx[tfxhtule Nh<tu rJd<tu ylu xuLzhlu jd<t >M<tJustu
ft¤SvwJof yÇgtm fgtuo Au ylu <u bwsc <ultu ybj fhJt mkb< Awk/Aeyu.
ftuLx[tfxhle mne - rm¬tu yuze.mexe yuLSlegh
btuctEj lkch mt&u (œrûtK Ítul)
" ybœtJtœ BGþrlrmrvj ftuvtuohuNl”
œrûtK Ítul- Esluh Ftðþ
vtKe, z[ulus, vuJ´d, heEMxuxbuLxlt ftuLx[tfxhu Ftm JtkaJt ylu ægtlbtk htFJtle ctc< leau Bþsc Au.
" yt ftblt œhuf ytExblt sÚ&tbtk ~ËLg &e cMmtu xftle JD^x &Jt mkCJ Au. ftuE ytExbltu CtJ
J^thtu ytvJtbtk ytJNu lrn. yBþf søgtyu swlt vÚ&h s VheJth heEMxux fhJtlt &Nu. <uJe œhuf ytExbbtk J^^x
&tg fu ytExb yufÍefGþx l &tg <uÔþk vK clNu. ytlt btxu ftuEvK «fthle J¤<hle btkdKe fhJtle hnuNu lrn fu
CtJ J^thtu, vK ytvJtltu &Nu lrn. <ult btxu Ãþh<tk mt^ltu ylu bsqhtu ntug, yuf mt&u yluf søgtytuyu ftb
fhJtle ûtb<t ntug <ubKu s rJathelu xuLzh ChÔþk. bsqhtu l&e fu dtbzu s<t hÌtt Au fu ntu¤e, lJhtºte, rœJt¤e, jøl
meÍl fu yLg <nuJthtubkt fu «mkdtubtk bsqhtu ytJ<t l&e <uJt fu ceò ftuEvK cntlt nuX¤ ftb ck^ htFe NftNu lrn
yLg&t htuslt Yt.250.00le J^thtle vulÕxe ftb ck^ hnu fu MËalt fh<t ytuAt bsqhtu ytJu <ulu je^u fhJtbtk
ftuLx[tfxhle mne yuze.mexe.yuLS.
rm¬t ylu btuctEj lkch (œrûtK Ítul)
AHMEDABAD MUNICIPAL CORPORATION
ENGGNIERING DEPARTMENT
GENERAL SPECIFICATION
Time limit for the work shall be as per tender notice after the order to start the
works. Progress of work should be in proportion to time limit. The details of
reinforcement of R.C.C. work shall be as per design and instructions of Add. City
Engineer and his order will be considered final.
The contractor shall have to maintain account of steel, cement and other materials
that may be brought by him on site. This account shall be regularly maintained and kept
open for inspection by Municipal Staff. Watering of all the items shall be as per
instructions otherwise no payment shall be made to contractors. Mixing of concrete
shall be done by concrete mixer machine. Arrangements of binding vibrator for R.C.C.
works if required shall have to be made by the contractor.
The contractor shall be remain responsible for Workmen’s compensation if any
accident. The contractor shall arrange for barricading at night and arrangement of Pagi
at night to direct the traffic. He shall be responsible for any damage to public. If any
incident happen, during the execution of work. In case of dispute for unseen or
overlooked items the decision of the Dy. City Engineer shall be final. The contractor
shall have to give site clean of all rubbish during the work and at the time of completion
of work and hand over the site with final finishing of the work as directed. All the
rejected materials shall be removed from site within 24 hours by contractor at this risk
and cost. Debris shall have to cart daily from site.
For mixing mortar either for masonry or for plaster or for any other purpose
contractor shall have to prepare through of bigger size and mix the mortar in the
required proportion. In on case he shall be allowed to mix the mortar either on floor or
any finished surfaces. The contractor shall have to make his own arrangement for water
required for the work.
If any extra item crops up during the progress of work the same shall be carried
out by the contractor and he shall be paid at the rate fixed by Add.C.E. as per the rate
analysis based on latest SOR or if item is not available in SOR than based on current
market rates. In case of extra item decision of Add. City Engg. shall remain final
regarding rate.
If in the interest of the Corporation it is necessary to change either any site or the
design of the propose work the contractor shall carry out the same at his quoted rates
without charges any extra and the contractor will have to carry out the works and he
will be paid at the rate quoted by him. No claim for extra rate for subsequent changes in
site and design is entertained.
The cubical contents of the cement bag shall be taken as 1-20 cft. Per bag and the
contractors shall have to prepare the measures boxes according to this measure.
Octroi exemption passes shall not be given for any materials required for the
work. Contractor will be fully responsible for compliance of the various provisions
under contract Act. 1970 and the Rules framed the to under.
The tender for the work shall remain open for a period (120) days from the date
of opening of the tenders for this work and that the tenderer shall not be allowed to
withdraw on modify the offer on his own during the period. If any tenderer withdraw or
makes any modifications or addition in the terms and conditions of his tender not
acceptable to the Municipal Corporation the Municipal Corporation shall without
prejudice to any right or remedy be at liberty to forfeit in full the said earnest money
and black list the contractor.
If work is not started within specified time limit i.e. within ten days from the date
of order to start the work the penalty of the 0.01% tender Amount per day of delay of
start shall be recovered separately from the immediate bills payable to the contractor.
Contractor has to make his own arrangement for procurement of steel and cement.
Contractors should note the following conditions carefully:-
i) Conditional tender shall not be accepted.
ii) All tenders are to be submitted in duplicate without which the tenders are liable to
iii) In case of tender downloaded from website, tender fee & EMD should be
submitted in form of demand draft.
iv) Condition of Form - B1 only Standard Specification of material & code of
practice will be applicable. Form B1 can be is available in website. Specification
shall be as per ' R & B Dept. - Govt. of Gujarat booklets of Building Works &
and Road Works Specifications published by Gujarat Book Depot, Sector-21.
Gandhinagar. Other techinical condition will be applicable as per tender condition
Contractor's signature & Stamp ADD CITY ENGINEER
Mobile No.:- (South Zone)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
E Tender Notice No 5 2026 2027 Tender No 215 Thermoplast.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].