Loading…
Loading…
Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Ok |
| 2 | Accepted-Technical 0 AJAY KUMAR 85 HASTAM HASTAM BANDA UTTAR PRADESH 210001 HASTAM BANDA UTTAR PRADESH 210001 UDYAM UP 13 0007628 | BANDA | UTTAR PRADESH | 210001 | Accepted-Technical Ok |
| 3 | Accepted-Technical NA | NA | NA | 121004 | Accepted-Technical Ok |
| 4 | Rejected-Technical 194 1 MATA WALA BAGH PURANI TEHSIL ROORKEE HARIDWAR UTTARAKHAND 247667 | HARIDWAR | UTTARAKHAND | 247667 | Rejected-Technical Disqualified of Technical bid |
| 5 | Rejected-Technical 1 234 8 | ALIGARH | UTTAR PRADESH | 202001 | Rejected-Technical Disqualified of Technical bid |
Tender Value
₹79 L
EMD Value
₹1.6 L
Closing Date
19 May 2026, 5:00 pmClosed
Suprintending Engineer
Office of the SE MGCCC Moradabad
Construction of V.R.B at Km 11.850 of Chandausi Branch.
2026_UPIDC_1147085_4
01/SE/2026-27
Open Tender
Civil Works - Bridges
Item Wise
Amroha
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹1.6 L
Moradabad
3 Jun 2026
11 May 2026
20 May 2026
11 May 2026
19 May 2026
11 May 2026
12 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation of Bridge etc. in ordinary soil excavation to be in the form of regular Pits and Earth Work in embankment to be in 20cm. layer including ramming and dressing the surface to the required levels and slopes. and also including 30 m lead and all lifts the earth from cutting to be used in making Canal Section or to be deposited in Spoil Bank as per direction of Engineer in charge in the section | 1 | CUM | 132 | ₹131.87 |
| 2 | Laying Cement concrete in M-10 1:3:6 including all costs of T&P material required for proper completion of work. | - | CUM | 5,849.25 | - |
| 3 | Laying C.C. in M-15 1:2:4 in Road etc. including all costs of T&P material required for proper completion of work. | - | CUM | 6,197.8 | - |
| 4 | Laying R.C.C. in M-20 1:1.5:3 in Toe wall Transitions sleepers lining etc. including all costs of T&P material required for proper completion of work. | - | CUM | 7,159.3 | - |
| 5 | Laying R.C.C. in M-25 1:1:2 in Raft wall bridge, wearing Coat etc. including all costs of T&P material required for proper completion of work. | - | CUM | 7,974.65 | - |
| 6 | Centering and shuttering for ordinary R.C.C. works including cost of all labour and T&P etc. complete. | 1 | SQM | 822 | ₹821.18 |
| 7 | Centering and Shuttering for Special type of R.C.C. works including cost of all labour and T&P etc. complete. | 1 | SQM | 1,010 | ₹1,008.99 |
| 8 | Laying of reinforcement in R.C.C including Cutting, Bending, Binding and Placing etc. Including cost of all labour and T&P etc. Complete. | - | M.T. | 72,805.2 | - |
| 9 | S/L Settlement Joint with G.P./ Copper/Stainless Steel water stop including cost of all labour and T&P etc. Complete. | 1 | R.M. | 17,130.8 | ₹17,113.67 |
| 10 | S/F 60 cm. long 50 mm dia P.V.C. Pipe Spout including cost of all labour and T&P etc. Complete. | - | NOS | 132 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
cancelled_1.pdf
pdf • 0.60 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.79 MB
BOQ_2145429.xls
BOQ • 0.24 MB
Tenderbooklot4.pdf
Tender Documents • 2.70 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .