Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.0 LAdmitted-Fee/PreQual/Technical/Finance | -20.90% | ₹3.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹3.4 L+₹33,552.40 (11.1%)Admitted-Fee/PreQual/Technical/Finance | -12.10% | ₹3.4 L+₹33,552.40 (11.1%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹3.5 L+₹49,756.68 (16.5%)Admitted-Fee/PreQual/Technical/Finance | -7.85% | ₹3.5 L+₹49,756.68 (16.5%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹3.6 L+₹60,241.81 (20.0%)Admitted-Fee/PreQual/Technical/Finance | -5.10% | ₹3.6 L+₹60,241.81 (20.0%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹3.7 L+₹68,248.63 (22.6%)Admitted-Fee/PreQual/Technical/Finance | -3.00% | ₹3.7 L+₹68,248.63 (22.6%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.8 L
EMD Value
₹9,532
Closing Date
17 Aug 2026, 6:00 pmClosed
Muhammed Faizal TA
Office of the Assistant Engineer LIDEW Section Pramadom Grama Panchayat
Pro No 160/25-26 -Tile work of Thengumkavu LPS Compound
2026_LSGD_863745_7
E1/AE/LIDEW/PRDM/2026-27
Open Tender
Civil Works - Buildings
Percentage
Pramadom GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹845
Yes
₹9,532
Yes
19 Aug 2026
5 Aug 2026
19 Aug 2026
5 Aug 2026
17 Aug 2026
5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Interlock work | |||||
| 1.001 | 16.68:Providing and laying 60 mm thick factory made cement concrete interlocking paver block of M - 30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. | - | sqm | 1,192.59 | - |
| 1.002 | 51.2.3:Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade | 1 | cum | 909.57 | ₹908.66 |
| 1.003 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | 9,235.97 | - |
stage.html
html • 0.02 MB
finance_1461789.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.29 MB
Tendernotice_2.pdf
PDF • 0.25 MB
Tendernotice_3.pdf
PDF • 0.24 MB
160aff.pdf
Tender Documents • 0.24 MB
160fot.pdf
Tender Documents • 0.25 MB
160pre.pdf
Tender Documents • 0.26 MB
160viewsbdmerged.pdf
Tender Documents • 1.70 MB
BOQ_1461789.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .