Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.2 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.3 L+₹6,820.41 (3.04%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹2.3 L+₹6,889.77 (3.07%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.3 L
EMD Value
₹4,620
Closing Date
12 Jun 2026, 6:00 pmClosed
Executive Engineer Rew Baramulla
REW BARAMULLA
Construction of R/Wall from Culvert near Masjid Bilal upto H/o Mohammad Ramzan Mir and others Posnag, Under CDF FY 2026-27, Panchayat Halqa Buchoo, Block Pattan.
2026_RDPR_310669_12
08/Xen/Rew/Bla/2026-2027 Dated. 22/05/2026
Open Tender
Civil Works
Percentage
45 days
BARAMULLA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Baramulla
₹4,620
18 Jun 2026
22 May 2026
13 Jun 2026
22 May 2026
12 Jun 2026
22 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: | - | Cum | - | - |
| 2 | Providing/Laying Stone soling hand packed on level in foundation trenches incl all carraiges of material. | - | Cum | - | - |
| 3 | Dry random rubble masonry with hard stone in foundation and plinth: With bond stone. | 1 | Cum | - | - |
| 4 | Random Rubble masonry with hard stone in foundation and plinth
including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse
sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and
curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) | 1 | Cum | 1 | ₹1 |
| 5 | Providing & laying damp-proof Course 40 mm thick with cement concrete 1:2:4 (1
cement:2 coarse sand: 4 graded stone agg 12.5 mm nominal size) and curing complete | 1 | Sqm | 1 | ₹1 |
| 6 | Providing and fixing of Information sign board and three stage photographs (Pre, post and during execution) | - | Job | - | - |
| 7 | Carriage of Sand & Cursher Bajiri for an average lead of 30 KM. | - | Cum | 1 | - |
| 8 | Carriage of stones for an average lead of 30 KM. | - | Cum | - | - |
stage.html
html • 0.02 MB
finance_1004876.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.13 MB
BOQ_1004876.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .