| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹3.3 LAccepted-AOC | ₹3.3 L | L-1 | Accepted-AOC As per TC recommendation. |
| 2 | L-2₹3.4 L+₹9,398.65 (2.82%)Rejected-Finance | ₹3.4 L+₹9,398.65 (2.82%) | L-2 | Rejected-Finance As per TC recommendation. |
| 3 | L-3₹3.6 L+₹22,797.75 (6.84%)Rejected-Finance AT MOHUL BAGAN COLONY RAJPURA P O KUMARDHUBI DIST DHANBAD 828203 | DHANBAD | JHARKHAND | 828203 | ₹3.6 L+₹22,797.75 (6.84%) | L-3 | Rejected-Finance As per TC recommendation. |
| Sl No | Description | Qty | Unit | CHUNMUN SINGH L3 | tapan mondal L1 | CHITRANJAN SINGH L2 |
|---|---|---|---|---|---|---|
| 1.00Item Description/ Heading | ||||||
| 2.00 | Carriage of Materials by mechanical transport including loading, unloading and stacking :Earth Lead - 1 Km | 225 | cum | 109 ₹24,525 | 105 ₹23,625 Lowest | 108 ₹24,300 |
| 3.00 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. | 7.01 | cum | 187 ₹1,310.87 | 182.5 ₹1,279.33 Lowest | 185 ₹1,296.85 |
| 4.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 7.28 | cum | 5,700 ₹41,496 | 5,323 ₹38,751.44 Lowest | 5,500 ₹40,040 |
| 5.00 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing and reinforcement with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size). | 6.92 | cum | 7,210 ₹49,893.2 | 7,014.5 ₹48,540.34 Lowest | 7,100 ₹49,132 |
| 6.00 | Providing, hoisting and fixing up to floor five level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like including the cost of required centering, shuttering but excluding cost of reinforcement, with 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20mm nominal size). | 1.53 | cum | 6,740 ₹10,312.2 | 6,500 ₹9,945 Lowest | 6,600 ₹10,098 |
| 7.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Mild steel and Medium Tensile steel bars. | 264.83 | kg | 74 ₹19,597.42 | 69 ₹18,273.27 Lowest | 72 ₹19,067.76 |
| 8.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars. | 484.4 | kg | 76 ₹36,814.4 | 70.3 ₹34,053.32 Lowest | 74 ₹35,845.6 |
| 9.00 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand) | 2.25 | cum | 5,740 ₹12,915 | 5,520.3 ₹12,420.68 Lowest | 5,650 ₹12,712.5 |
| 10.00 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in :Cement mortar 1:6 (1 cement : 6 coarse sand) | 6.75 | cum | 6,620 ₹44,685 | 6,489 ₹43,800.75 Lowest | 6,510 ₹43,942.5 |
Tender Value
₹2.8 L
EMD Value
₹3,600
Closing Date
12 Apr 2019, 5:00 pmClosed
AE (C), Mugma Area
OFFICE OF THE GM, MUGMA AREA
Repairing and fencing of barbed wire around substation at Shampur-B Colliery under Lakhimata Group of Mines.
2019_ECL_135184_1
ECL/GM/MA/CE/2019/1393 dt-22.03.2019
Open Tender
Civil Works - Others
Item Rate
45 days
OFFICE OF THE GM, MUGMA AREA
Please refer Tender documents.
11 documents required · 11 mandatory
₹3,600
13 Jun 2026
2 Apr 2019
15 Apr 2019
2 Apr 2019
12 Apr 2019
2 Apr 2019
stage.html
html • 0.04 MB
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .