Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L 1₹24.6 LAccepted-Finance ABC OF VIJAYPUR SECTION UNDER EDD BAGESHWAR | L 1 | Accepted-Finance Accepted | |
| 2 | L 2₹24.8 L+₹17,592.47 (0.72%)Rejected-Finance DURGA CITY CENTER BHOTIYA PAARAW HALDWANI DISTT NAINITAL | NAINITAL | UTTARAKHAND | 244715 | L 2 | Rejected-Finance Rejected | |
| 3 | L 3₹24.9 L+₹26,862.13 (1.09%)Rejected-Finance SHEESHMAHAL KATHGODAM ALMORA | L 3 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | GURUKRIPA ENGINEERS AND CONTRACTORS L1 | J D M ENTERPRISES L3 | MAA JAGDAMBA TRADERS L2 |
|---|---|---|---|---|---|---|
| 1.00NON-CENTRALIZED MATERIAL (SUPPLY) | ||||||
| 2.00 | Stay Clamp for SP-23 Single end | 88 | Nos | 274 ₹24,112 Lowest | 280 ₹24,640 | 275 ₹24,200 |
| 3.00 | Stay Clamp for SP-23 Double end | 88 | Nos | 309 ₹27,192 Lowest | 315 ₹27,720 | 311 ₹27,368 |
| 4.00 | Earth wire clamp for SP-23 with N&B | 60 | Nos | 289 ₹17,340 Lowest | 295 ₹17,700 | 292 ₹17,520 |
| 5.00 | HT Stay Insulator | 264 | Nos | 189 ₹49,896 Lowest | 195 ₹51,480 | 190 ₹50,160 |
| 6.00 | Bracing clamp Top for SP-23 with N&B | 120 | Nos | 249 ₹29,880 Lowest | 255 ₹30,600 | 250 ₹30,000 |
| 7.00 | Bracing clamp Bottom for SP-23 with N&B | 120 | Nos | 274 ₹32,880 Lowest | 276 ₹33,120 | 280 ₹33,600 |
| 8.00 | Top Channel Holding Clamp for SP-23 Pole | 164 | Nos | 199 ₹32,636 Lowest | 205 ₹33,620 | 210 ₹34,440 |
| 9.00LABOUR PART (WORK) | ||||||
| 10.00 | Erection of Earthing Rod | 20 | Nos | 723 ₹14,460 Lowest | 728 ₹14,560 | 726 ₹14,520 |
Tender Value
₹24.6 L
EMD Value
₹74,000
Closing Date
20 Apr 2026, 3:00 pmClosed
Superintending Engineer
Superintending Engineer EDC Ranikhet
Construction of HT line for parting Sheherfatak feeder and Connecting to Satyun Sub-station under EDD Almora
2026_UPCL9_93925_1
EDC(R)-04/2026-27
Open Tender
Electrical Works
Item Wise
90 days
Almora
As per Tender Documents
2 documents required · 2 mandatory
₹1,180
Executive Engineer
₹74,000
3 Jun 2026
7 Apr 2026
21 Apr 2026
7 Apr 2026
20 Apr 2026
7 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | NON-CENTRALIZED MATERIAL (SUPPLY) | - | - | - | - |
| 2 | Stay Clamp for SP-23 Single end | - | Nos | - | - |
| 3 | Stay Clamp for SP-23 Double end | - | Nos | - | - |
| 4 | Earth wire clamp for SP-23 with N&B | - | Nos | - | - |
| 5 | HT Stay Insulator | - | Nos | - | - |
| 6 | Bracing clamp Top for SP-23 with N&B | - | Nos | - | - |
| 7 | Bracing clamp Bottom for SP-23 with N&B | - | Nos | - | - |
| 8 | Top Channel Holding Clamp for SP-23 Pole | - | Nos | - | - |
| 9 | LABOUR PART (WORK) | - | - | - | - |
| 10 | Erection of Earthing Rod | - | Nos | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
Sheherfatakfeeder04.pdf
Tender Documents • 0.69 MB
BOQ_111171.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .