Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | Rank 1₹4.5 LAccepted-AOC | ₹4.5 L | Rank 1 | Accepted-AOC Rank 1 |
| 2 | Rank 2₹5.4 LRejected-AOC | ₹5.4 L | Rank 2 | Rejected-AOC Rank 2 |
| Sl No | Description | Qty | Unit | K HARINARAYANAN L2 | SUJEESH V L1 |
|---|---|---|---|---|---|
| 1.00Well Renovation in Various Wards | |||||
| 1.00 | 15.9.1:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortar | 10.14 | cum | 1,500 ₹15,210 | 1,068.61 ₹10,835.71 |
| 1.00 | 15.7.1:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In mud mortar | 2.43 | cum | 800 ₹1,940.8 | 650.4 ₹1,577.87 |
| 1.00 | OD319608/2025-2026:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand). Using departmental stones | 5.07 | cum | 5,800 ₹29,411.8 | 4,940.29 ₹25,052.21 |
| 1.00 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 13.23 | cum | 8,500 ₹1,12,455 | 7,446.56 ₹98,517.99 |
| 1.00 | OD338530/2025-2026:Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 20.91 | cum | 4,000 ₹83,620 | 3,564.16 ₹74,508.76 |
| 1.01 | 50.6.1.5:Solid block masonry using pre cast solid blocks ( Factory made) of size 30x20x20cm or nearest available size confirming to IS 2185 Part I of 1979 for super structure up to floor two level thickness 20cm and above in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 1.99 | cum | 7,500 ₹14,925 | 6,496.53 ₹12,928.09 |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.7 | cum | 11,000 ₹18,656 | 9,361.22 ₹15,876.63 |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 6.79 | sqm | 400 ₹2,714.4 | 344.64 ₹2,338.73 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 76.28 | kilogram | 150 ₹11,441.4 | 100.34 ₹7,653.53 |
Tender Value
Refer Docs
EMD Value
₹12,698
Closing Date
15 Nov 2025, 9:00 amClosed
AE
LAKKIDI PERUR GRAMA PANCHAYATH
Annual Plan-LPGP 2025-26 Public Well Renovation (CFC- Rs 6,00,000/-)-Pro.No115/25-26-General Civil Work
2025_LSGD_819501_21
01/2025-26/AE/LID EW/LPGP/PHASE3
Open Tender
Civil Works - Roads
180 days
LAKKIDI PERUR GRAMA PANCHAYATH
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,120
Yes
₹12,698
Yes
1 Mar 2026
6 Nov 2025
15 Nov 2025
6 Nov 2025
15 Nov 2025
6 Nov 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.50 MB
Tendernotice_2.pdf
PDF • 0.25 MB
Tendernotice_3.pdf
PDF • 0.25 MB
BOQ_1373849.xls
BOQ • 0.31 MB
115sbd.pdf
Other Document • 1.63 MB
Download all tender documents and submit your bid