Loading…
Loading…
Tender Value
₹6.1 Cr
EMD Value
₹1.1 L
Closing Date
1 Sept 2026, 5:16 pm
Executive Engineer (R & B) Division, Rajpipla (State)
Celebration of Rashtriya Ekta Diwas Function-2026 For Cultural Program & Bharat Parv (From 1st Nov to 15th Nov) at Ekta nagar. Dist Narmada (Providing Mandap & Other Services For Cultural Program in Ektanagar)
336275
SK 06 of 2026-27
Open
Civil - All
Works
Vadodara
16 documents required · 14 mandatory · 2 optional
₹3,600
Executive Engineer Rajpipla R and B Division Rajpipla
₹1.1 L
18 Aug 2026
18 Aug 2026
18 Aug 2026
1 Sept 2026
18 Aug 2026
Name Of Work : Celebration of Rashtriya Ekta Diwas Function-2026 For Cultural Program & Bharat Parv
(From 1st Nov to 15th Nov) at Ekta nagar. Dist Narmada (Providing Mandap & Other Services For Cultural
Program in Ektanagar)
BILL OF QUANTITIES
Item Description of Item (with brief specification and reference to book of
Quantity Unit Rate Amount
No. specifications)
1 Multilevel Performance stage work for cultural programme for Ekta Divas
celebration Job entailing use of jack system for multilevel staging made of
prefabricated steel H frames (erected on base plates) and tie rods forming a grid
of 1.33mt. x 1.33mt. having possibility of height adjustment at very grid of
1.33mt. with additional wooden support in between grid for additional strength
required for dance performance and use of jacks on top of H frame to
make height adjustments at every 6 inches. Wooden section (Runners) framework
on top of jack system staging to form grid of 2' x 2' on top of which 19mm 2800.00 Sq.M 1015.00
ply board Waterproof and Fire Retardant) is fixed cut to shape as per stage
design steps, curves and ramps fabricated specially on site with wooden
supports as per design requirement synthetic new wolen carpet of reputed make
(obeetee or similar) cut to shape and placed on the stage, steps and ramps
top surface using fevicol rubber adhesive all the height raisers / elevations of the
stage height are covered with Two layer of 19mm plywood,as per instruction of
engineer in-charge.
2 Providing, Fixing, Installing & dismantling after complition of program
Stage on hire basis with required steps/Ramp with both side railing of
required height constructed using prefabricated H Frame Supports in 40mm
or 50 mm M.S. Pipe as directed by engineer in charge with Cross members fixed
properly for stability. The top has to be covered with two layers 19mm thick 510.00 Sq.M 855.00
plywood / Block Board sheet in proper level and all four side of stage covered
with neat and clean cloth as directed by engineer in charge. (Only plan area will
be measured & accounted the same) For up to 3.70 m height
3 Providing, fixing, Installing & dismantling after complition of program :
Plywood Flooring on stage/plateform on hire basis as directed by engineer in 8260.00 Sq.M 330.00
charge. two layers 19mm thick plywood
4 Providing and fixing Brand New Non woolen Synthetic Carpet of colour as
approved on hire basis in flooring including all labour and material etc. complete as
directed by Engineer-in- charge Non woolen Synthetic carpeting.
5 Providing, fixing & arranging as directed on hire basis chairs of good quality
with all labour & materils Providing, fixing & arranging it on before Rehearsal Day
till end of Fuction as directed by engineer in charge as directed etc. comp. PVC 1350.00 No 13.00
Moulded chair (With / Without handle)
6 Wooden chairs/Banquet chair with cushion of Gadi (Providing, fixing &
arranging it on before Rehearsal Day till end of Fuction) 6500.00 No 71.00
7 Providing & fixing good quality leather sofa on hire basis with good quality
leather and required apporved size with necessary cloth / cap/ handle
covering of good quality fresh white cloth with all labour & materils as 10.00 No 1500.00
directed by engineer in charge as directed etc.Single Seated (arrange it before
Rehearsal Day till end of Fuction)
8 Double Seated (arrange it before Rehearsal Day till end of Fuction) 50.00 No 2375.00
9 Three Seated (arrange it before Rehearsal Day till end of Fuction) 50.00 No 3325.00
10 Providing & fixing VVIP Glass tepoi with / without wooden framing for
dias and green rooms on hire basis. 100.00 No 650.00
11 Providing, fixing, Installing & dismantling after complition of program :
Pagoda covered on hire basis from all sides for security, frisking, water
station, helipad etc. 5M. X 5M. (Providing, fixing & arranging it on before 40.00 No 20000.00
Rehearsal Day and on Fuction Day)
12 Moulded Aircraft type VIP Toilets on hire basis with European Seat, Looking
Glass and arrnagment of Watertank, Stands and soakpits 25.00 No. 11400.00
13 Providing, fixing & arranging table on hire basis of minimum size 1.20 mtr x 0.60 mtr
& counter covered with clothes and frills all around and top as directed, Tables 300.00 No. 200.00
with decorative Frills and Table covers.
14 Providing & Laying of Fire Extinguisher on hire basis with valid certificate Providing
and Fixing ABC type 5Lt Capacity Fire extinguishers around the venue with 60.00 No. 1425.00
operator in dressas directed by the site engineers
15 Supplying of branded ISI mark Mineral water bottle as per
instruction of engineer in charge (Himalaya make Only) (c) 1000 ml 120.00 No. 200.00
16 Mineral Water bottles (in plastic bottle) (ISI mark) 250 ml 10000.00 No. 10.00
17 Providing waiter in uniform as per requirement. 30.00 No. 1000.00
18 Providing P.R.O. Boy/ Girl in uniform as per requirement (skilled) (5 x 2 days) 5.00 No. 2500.00
19 Providing & fixing wooden framing/ partition wall using 6mm plywood on both side
over wooden / steel framing in horizontal & vertical direction in spacing as directed
for spacing and fixing plywood with necessary hardware & adhesive including proper 595.00 Sq.M 1000.00
finishing etc. complete as directed by Engineer-in-charge. (Only Front elevation area
will be meassured & accounted the same)
20 Providing Wall paper of approved quality on partion wall for green room as directed
by Engineer in charge. 224.00 Sq.M 200.00
21 Providing, Fixing and Removing Siganges of required size ( 3' x 2' and 10' x 12' ) with
frame work using box pipe of 25 mm x 25 mm etc. as directed by Engineer in cherge. 20.00 No. 2500.00
22 Providing, Installing, arranging & dismantling after complition of program
Q manager having brass pole & chains / links covered with velvet type covering 100.00 No. 750.00
23 Providing, Fixing & erecting ladies checking room with size 2.00 m x 2.00 m or
as required on site with entry, exit provision & having complete privacy 20.00 No. 2375.00
from all four side etc complete
24 Decorative Flower Pot on hire basis 200.00 No. 75.00
25 Providing and Spraying Fire retardant Spray to All stage area,D Zone ,Cultural
stage,Green Room PM,VVIP area and all furnishing materials and Mandap as per 25.00 Kg 690.00
NFPA with all labours as per Directed Engineer In-Charge.
26 Providing, Installing, arranging & dismantling after complition of program
prefabricated steel railing having height 1.20 m & length upto 3.00 mt etc. complete
for ground management / barrigating tied / attached with each other & firmly 2790.00 Rmt. 190.00
anchared to ground using additional pole anchared to ground if required or as
directed by engineer in charge
27 Truss Mandap made of 12" x 12" pillar of 12' to 16' height,Maitntaining appropriate
slope for water matirial on that trusses with colored cloth & bottom flae celling eith 21411.00 Sq.Mt 410.00
all labours and material as directed by engineering in charge etc.comp.
28 Providing and Installing mojo type barricate on hire basis made from M.S.
Angle frame with G.I. wire mesh Jali of required height on hire charge including
disassembling the same after completion of the event including all
transportation, carriage, lead and lift etc. complete as directed by
engineer in charge. (Minimum height of barrigate 1.20 m)
29 Providing and fixing Cloth Wall partition on hire basis (cloth on both side) fixed on
wooden section framework including all labour and material etc. complete as 1035.00 Rmt. 120.00
directed by Engineer‐incharge. (b) 1.86 mt to 4.00 mt
30 Providing and Erecting AC Green Room Size 16x24 with 4" inch platform with carpet
covering, framing with door and wallpaper for ceilling, lighting, sofa, tipoi, pantry,
mirror, curtains, towel hanger, aircraft toilet and decoration etc comp. As directed 10.00 No 235000.00
by engineer in charge.
31 Providing Rangoli work by using wooden colourful works / Chiroli
colours / Natural Flowers leaves as directed by all types of material labour
required adhesive etc. complete and such Rangoli should be kept infect upto the end 210.00 Smt 425.00
of programme etc.complete
32 Providing, Fixing & Installing Gypsum false ceiling on hire basis in green room /
mandap / room including dismentaling the same after completion of the event
including All labour & material etc. complete as directed by Engineer-incharge.
33 Providing Standy for information : Computerised Type on Both Sides made of hard
board /Acralyc Sheet/Paper including Fitting etc. as per size & Shape & material 20.00 No 200.00
selection by officer-in-charge
34 Prov. & Fix. Fixed type barricating - metal framing with interlock and self standing
with all labour & materils as directed by engineer in charge as directed etc. comp. 200.00 Rmt. 350.00
35 Hoarding with Metal frame & Truss made of 12" x 12" pillar of 12' to 20' height,
structure with installation & all labours and material as directed by engineering in 84.00 Sq.Mt 600.00
charge etc.comp.
36 Providing & fixing all colourful lehriya cloth on barricades including all labour charges
as per directed Engineer In-Charge. 600.00 Rmt. 25.00
37 Providing & erecting German Alluminium Fabricated Structural Dome having
span (Center to Center) & Side support Height from ground level as per following
to accomodate stage light truss inside as per site requirement and as directed
by engineer in charge & roof covered with SRF Fabric (Waterproof and Fire 9600.00 Sq.Mt 300.00
Resistant) with colourful facia including efficiant rain water drainage
system.Upto 60 mtr span & Support Height more than 5 mt.
38 Providing and fixing cloth draping in ceiling or on vertical walls in desired shape and
pattern using necessary wooden / bamboo framing using cloth of one or 1500.00 Sq.Mt 100.00
more colours as directed including finishing etc.
39 Supplying & fix. flower decoration if required on any other area with necessary
flower strips, bukey, roses or any other flowers with all labour & materils as directed 500.00 Sq.Mt 1000.00
by engineer in charge as directed etc.comp.
40 Supplying of 200 Ltrs. empty oil drum painted red & white for traffic guidance with
all labour & materils as directed by engineer in charge as directed etc. comp. 50.00 No 40.00
41 Providing and fixing box type Entry Gate of size 15' x 12' x 2.50' made 19mm
thick plywood/block board covered with cloth & decoration etc. complete as 10.00 No 25000.00
directed by Engineer-in- charge.
42 Container type V.V.I.P. toilet for green room with walls made of G.I. sheets and W.C.
pan, urinal, wash basin, mirror & other required accessories etc. complete. 2.00 No 57000.00
43 Providing, Erecting and Removing Flag Poles of good quality as approved by
engineer in charge. 200.00 No 200.00
44 Providing, Supplying, Installing, Operating and Dismantling Motorized Rotating Stage
Providing, supplying, fabricating, erecting, testing, commissioning, operating during
the event period and dismantling after completion a motorized rotating stage
(revolving platform) of approved diameter/shape and height, constructed using
heavy-duty structural steel framework with adequately designed circular track, roller
assembly, bearings, drive mechanism, geared motors, control panel and all
associated structural and mechanical components complete.
The stage platform shall be finished with approved quality plywood/board decking
and carpet/floor finish as directed. The revolving mechanism shall provide smooth,
vibration-free and noiseless rotation with variable speed control, forward/reverse
operation, emergency stop facility and adequate load-carrying capacity suitable for
cultural programmes, performances, ceremonies, exhibitions and public events. 9.00 sqmt 8000.00
The item shall include structural design, fabrication, transportation, loading-
unloading, erection, testing, operation by trained personnel during event period,
electrical connections from nearest source, control systems, cable management,
safety locking arrangements, guard protection, maintenance during use, dismantling
after completion, removal from site and restoration of the area complete.
The rate shall also include all necessary fire and safety measures, emergency stop
switches, electrical safety devices, earthing, insulated wiring, fire extinguishers,
safety barricading, access stairs, skirting, labour, tools and plants, consumables,
overheads, contractor's profit and all incidental charges complete as directed by the
Engineer-in-Charge.
45 Providing, Supplying, Installing, Testing, Operating and Dismantling Hydraulic Lift
Providing, supplying, fabricating, erecting, testing, commissioning, operating during
the event period and dismantling after completion a Hydraulic Lift Stage (Elevating
Platform) of approved size, capable of smooth vertical movement from the initial
level to the required height through an electro-hydraulic lifting system comprising
hydraulic cylinders, power pack, pumps, motors, valves, control panel, structural
steel framework, guide mechanism and all associated accessories complete. The
platform shall be constructed using heavy-duty structural steel members with
adequately designed load- earing capacity and finished with approved quality
plywood/wooden decking and carpet/floor finish as directed. The hydraulic lifting
mechanism shall ensure smooth, synchronized and vibration-free operation with
variable height adjustment, safety locking arrangements, emergency lowering 16.00 sqmt 12000.00
system, overload protection and emergency stop facility. The item shall include
structural design, fabrication, transportation, loading-unloading, erection, tes ing,
commissioning, operation by trained personnel during the event period, electrical
connections from the nearest source, control systems, cable management,
maintenance during use, dismantling after completion and removal of all materials
from site complete.
The rate shall further include fire and safety measures, safety railings, anti-slip
flooring, emergency stop switches, electrical safety devices, earthing, insulated
wiring, hydraulic safety locks, fire extinguishers, barricading, access stairs, skirting,
operator support, labour, tools and plants, consumables, overheads, contractor's
profit and all incidental charges complete as directed by the Engineer-in-Charge.
The hydraulic stage shall be suitable for cultural programmes, inauguration
46 ceremonies, performances,
Providing, printing, product
supplying, fixing,launches, official
maintaining events
during and public
the event periodgatherings.
removing after completion digital printed flex banner of approved design, artwork,
colour scheme and content, printed on approved quality front-lit/back-lit/star flex
media of minimum 280 GSM to 440 GSM thickness using eco-solvent/solvent/UV
printing technology with high-resolution multicolour printing. The item shall include
necessary hemming, eyelets, stitching, ropes, cable ties, clamping arrangements,
framing support wherever required, transportation, loading-unloading, fixing at all 120.00 sqmt 150.00
levels and heights, maintenance during the event period, removal after completion
and disposal of waste materials complete as directed by the Engineer-in-Charge.
The rate shall include preparation of artwork (if required), printing, labour, tools and
plants, scaffolding/lifting arrangements, overheads, contractor's profit and all
incidental charges complete.
47 Providing, supplying, erecting, maintaining and dismantling Truss Dome Structure
comprising heavy-duty aluminium/MS truss framework with waterproof, UV-
resistant and fire-retardant PVC/SRF fabric roofing and side cladding, including
anchoring, bracing, emergency exits, fire extinguishers, safety signage, electrical
safety provisions, transportation, maintenance during event period and dismantling
after completion, complete in all respects.
48 Providing, supplying, erecting, furnishing, maintaining and dismantling PM
Lounge/VVIP Lounge comprising weatherproof modular structure with insulated wall
panels, waterproof roofing, false ceiling, premium flooring/carpet, air-conditioning
arrangements, sofa seating, centre tables, reception and waiting area, decorative
finishes, lighting, electrical fittings, pantry facilities, branding elements, fire- 300.00 sqmt 8000.00
retardant materials, fire extinguishers, emergency exits, safety signage, security
arrangements and all accessories complete, including transportation, erection,
maintenance during event period and dismantling after completion, complete in all
respects as directed by the Engineer-in-Charge.
49 Multilevel Performance stage work for cultural programme for Ekta Divas
celebration Job entailing use of jack system for multilevel staging made of
prefabricated steel H frames (erected on base plates) and tie rods forming a grid
of 1.33mt. x 1.33mt. having possibility of height adjustment at every grid of
1.33mt. with additional wooden support in between grid for additional strength
required for dance performance and use of jacks on top of H frame to
make height adjustments at every 6 inches. Wooden section (Runners) framework
on top of jack system staging to form grid of 2' x 2' on top of which 19mm 2800.00 Sq.M 1015.00
ply board Waterproof and Fire Retardant) is fixed cut to shape as per stage
design steps, curves and ramps fabricated specially on site with wooden
supports as per design requirement synthetic new wolen carpet of reputed make
(obeetee or similar) cut to shape and placed on the stage, steps and ramps
top surface using fevicol rubber adhesive all the height raisers / elevations of the
stage height are covered with Two layer of19mm plywood,as per instruction of
engineer in-charge. (For 15 Days )
50 Providing, Fixing, Installing & dismantling after complition of program
Stage on hire basis with required steps/Ramp with both side railing of
required height constructed using prefabricated H Frame Supports in 40mm
or 50 mm M.S. Pipe as directed by engineer in charge with Cross members fixed
properly for stability. The top has to be covered with two layers 19mm thick 510.00 Sq.M 855.00
plywood / Block Board sheet in proper level and all four side of stage covered
with neat and clean cloth as directed by engineer in charge. (Only plan area will
be measured & accounted the same) For up to 3.70 m height (For 15 Days )
51 Providing, fixing, Installing & dismantling after complition of program :
Plywood Flooring on stage/plateform on hire basis as directed by engineer in 8260.00 Sq.M 330.00
charge. two layers 19mm thick plywood (For 15 Days )
52 Providing and fixing Brand New Non woolen Synthetic Carpet of colour as
approved on hire basis in flooring including all labour and material etc. complete as
directed by Engineer-in- charge Non woolen Synthetic carpeting. (For 15 Days
53 Providing, fixing & arranging as directed on hire basis chairs of good quality
with all labour & materils Providing, fixing & arranging it on before Rehearsal Day
till end of Fuction as directed by engineer in charge as directed etc. comp. PVC
Moulded chair (With / Without handle) (For 15 Days )
54 Wooden chairs/Banquet chair with cushion of Gadi (Providing, fixing &
arranging it on before Rehearsal Day till end of Fuction) (For 15 Days )
55 Providing & fixing good quality leather sofa on hire basis with good quality
leather and required apporved size with necessary cloth / cap/ handle
covering of good quality fresh white cloth with all labour & materils as 3.00 No 1500.00
directed by engineer in charge as directed etc.Single Seated (arrange it before
Rehearsal Day till end of Fuction) (For 15 Days )
56 Double Seated (arrange it before Rehearsal Day till end of Fuction) (For 15 Days )
57 Three Seated (arrange it before Rehearsal Day till end of Fuction) (For 15 Days )
58 Providing & fixing VVIP Glass tepoi with / without wooden framing for
dias and green rooms on hire basis. (For 15 Days )
59 Providing, fixing, Installing & dismantling after complition of program :
Pagoda covered on hire basis from all sides for security, frisking, water
station, helipad etc. 5M. X 5M. (Providing, fixing & arranging it on before
Rehearsal Day and on Fuction Day) (For 15 Days )
60 Moulded Aircraft type VIP Toilets on hire basis with European Seat, Looking
Glass and arrnagment of Watertank, Stands and soakpits (For 15 Days ) 5.00 No. 11400.00
61 Providing, fixing & arranging table on hire basis of minimum size 1.20 mtr x 0.60 mtr
& counter covered with clothes and frills all around and top as directed, Tables 5.00 No. 200.00
with decorative Frills and Table covers. (For 15 Days )
62 Providing & Laying of Fire Extinguisher on hire basis with valid certificate Providing
and Fixing ABC type 5Lt Capacity Fire extinguishers around the venue with 20.00 No. 1425.00
operator in dressas directed by the site engineers (For 15 Days )
63 Supplying of branded ISI mark Mineral water bottle as per
instruction of engineer in charge (Himalaya make Only) (c) 1000 ml (For 15 Days 120.00 No. 200.00
64 Mineral Water bottles (in plastic bottle) (ISI mark) 250 ml (For 15 Days ) 2000.00 No. 10.00
65 Providing waiter in uniform as per requirement. (For 15 Days ) 15.00 No. 1000.00
66 Providing P.R.O. Boy/ Girl in uniform as per requirement (skilled) (5 x 2 days) (For
67 Providing & fixing wooden framing/ partition wall using 6mm plywood on both side
over wooden / steel framing in horizontal & vertical direction in spacing as directed
for spacing and fixing plywood with necessary hardware & adhesive including proper
finishing etc. complete as directed by Engineer-in-charge. (Only Front elevation area
will be meassured & accounted the same) (For 15 Days )
68 Providing Wall paper of approved quality on partion wall for green room as directed
by Engineer in charge. (For 15 Days )
69 Providing, Fixing and Removing Siganges of required size ( 3' x 2' and 10' x 12' ) with
frame work using box pipe of 25 mm x 25 mm etc. as directed by Engineer in cherge. 5.00 No. 2500.00
70 Providing, Installing, arranging & dismantling after complition of program
Q manager having brass pole & chains / links covered with velvet type covering 10.00 No. 750.00
etc. complete. (For 15 Days )
71 Providing, Fixing & erecting ladies checking room with size 2.00 m x 2.00 m or
as required on site with entry, exit provision & having complete privacy 5.00 No. 2375.00
from all four side etc complete (For 15 Days )
72 Decorative Flower Pot on hire basis (For 15 Days ) 50.00 No. 75.00
73 Providing and Spraying Fire retardant Spray to All stage area,D Zone ,Cultural
stage,Green Room PM,VVIP area and all furnishing materials and Mandap as per 20.00 Kg 690.00
NFPA with all labours as per Directed Engineer In-Charge. (For 15 Days )
74 Providing, Installing, arranging & dismantling after complition of program
prefabricated steel railing having height 1.20 m & length upto 3.00 mt etc. complete
for ground management / barrigating tied / attached with each other & firmly 250.00 Rmt. 190.00
anchared to ground using additional pole anchared to ground if required or as
directed by engineer in charge (For 15 Days )
75 Providing and Installing mojo type barricate on hire basis made from M.S.
Angle frame with G.I. wire mesh Jali of required height on hire charge including
disassembling the same after completion of the event including all
transportation, carriage, lead and lift etc. complete as directed by
engineer in charge. (Minimum height of barrigate 1.20 m) (For 15 Days )
76 Providing and fixing Cloth Wall partition on hire basis (cloth on both side) fixed on
wooden section framework including all labour and material etc. complete as
directed by Engineer‐incharge. (b) 1.86 mt to 4.00 mt (For 15 Days )
77 Providing and Erecting AC Green Room Size 16x24 with 4" inch platform with carpet
covering, framing with door and wallpaper for ceilling, lighting, sofa, tipoi, pantry,
mirror, curtains, towel hanger, aircraft toilet and decoration etc comp. As directed
by engineer in charge. (For 15 Days )
78 Providing Rangoli work by using wooden colourful works / Chiroli
colours / Natural Flowers leaves as directed by all types of material labour
required adhesive etc. complete and such Rangoli should be kept infect upto the end
of programme etc.complete (For 15 Days )
79 Providing, Fixing & Installing Gypsum false ceiling on hire basis in green room /
mandap / room including dismentaling the same after completion of the event
including All labour & material etc. complete as directed by Engineer-incharge. (For
80 Providing Standy for information : Computerised Type on Both Sides made of hard
board /Acralyc Sheet/Paper including Fitting etc. as per size & Shape & material 5.00 Sq.M 200.00
selection by officer-in-charge (For 15 Days )
81 Prov. & Fix. Fixed type barricating - metal framing with interlock and self standing
with all labour & materils as directed by engineer in charge as directed etc. comp. 50.00 No 350.00
82 Providing & fixing all colourful lehriya cloth on barricades including all labour charges
as per directed Engineer In-Charge. (For 15 Days )
83 Providing & erecting German Alluminium Fabricated Structural Dome having
span (Center to Center) & Side support Height from ground level as per following
to accomodate stage light truss inside as per site requirement and as directed
by engineer in charge & roof covered with SRF Fabric (Waterproof and Fire 2500.00 Sq.Mt 300.00
Resistant) with colourful facia including efficiant rain water drainage
system.Upto 60 mtr span & Support Height more than 5 mt. (For 15 Days )
84 Providing and fixing cloth draping in ceiling or on vertical walls in desired shape and
pattern using necessary wooden / bamboo framing using cloth of one or
more colours as directed including finishing etc. (For 15 Days )
85 Supplying & fix. flower decoration if required on any other area with necessary
flower strips, bukey, roses or any other flowers with all labour & materils as directed 200.00 Sq.Mt 1000.00
by engineer in charge as directed etc.comp. (For 15 Days )
86 Providing and fixing box type Entry Gate of size 15' x 12' x 2.50' made 19mm
thick plywood/block board covered with cloth & decoration etc. complete as 2.00 Sq.Mt 25000.00
directed by Engineer-in- charge. (For 15 Days )
87 Container type V.V.I.P. toilet for green room with walls made of G.I. sheets and W.C.
pan, urinal, wash basin, mirror & other required accessories etc. complete. (For 15 2.00 Sq.Mt 57000.00
88 Providing, Erecting and Removing Flag Poles of good quality as approved by
engineer in charge. (For 15 Days )
89 Providing, Supplying, Installing, Operating and Dismantling Motorized Rotating Stage
Providing, supplying, fabricating, erecting, testing, commissioning, operating during
the event period and dismantling after completion a motorized rotating stage
(revolving platform) of approved diameter/shape and height, constructed using
heavy-duty structural steel framework with adequately designed circular track, roller
assembly, bearings, drive mechanism, geared motors, control panel and all
associated structural and mechanical components complete.
The stage platform shall be finished with approved quality plywood/board decking
and carpet/floor finish as directed. The revolving mechanism shall provide smooth,
vibration-free and noiseless rotation with variable speed control, forward/reverse
operation, emergency stop facility and adequate load-carrying capacity suitable for
cultural programmes, performances, ceremonies, exhibitions and public events. 9.00 No 8000.00
The item shall include structural design, fabrication, transportation, loading-
unloading, erection, testing, operation by trained personnel during event period,
electrical connections from nearest source, control systems, cable management,
safety locking arrangements, guard protection, maintenance during use, dismantling
after completion, removal from site and restoration of the area complete.
The rate shall also include all necessary fire and safety measures, emergency stop
switches, electrical safety devices, earthing, insulated wiring, fire extinguishers,
safety barricading, access stairs, skirting, labour, tools and plants, consumables,
overheads, contractor's profit and all incidental charges complete as directed by the
Engineer-in-Charge. (For 15 Days )
90 Providing, Supplying, Installing, Testing, Operating and Dismantling Hydraulic Lift
Providing, supplying, fabricating, erecting, testing, commissioning, operating during
the event period and dismantling after completion a Hydraulic Lift Stage (Elevating
Platform) of approved size, capable of smooth vertical movement from the initial
level to the required height through an electro-hydraulic lifting system comprising
hydraulic cylinders, power pack, pumps, motors, valves, control panel, structural
steel framework, guide mechanism and all associated accessories complete. The
platform shall be constructed using heavy-duty structural steel members with
adequately designed load-bearing capacity and finished with approved quality
plywood/wooden decking and carpet/floor finish as directed. The hydraulic lifting
mechanism shall ensure smooth, synchronized and vibration-free operation with
variable height adjustment, safety locking arrangements, emergency lowering 16.00 No 12000.00
system, overload protection and emergency stop facility. The item shall include
structural design, fabrication, transportation, loading-unloading, erection, testing,
commissioning, operation by trained personnel during the event period, electrical
connections from the nearest source, control systems, cable management,
maintenance during use, dismantling after completion and removal of all materials
from site complete.
The rate shall further include fire and safety measures, safety railings, anti-slip
flooring, emergency stop switches, electrical safety devices, earthing, insulated
wiring, hydraulic safety locks, fire extinguishers, barricading, access stairs, skirting,
operator support, labour, tools and plants, consumables, overheads, contractor's
profit and all incidental charges complete as directed by the Engineer-in-Charge.
The hydraulic stage shall be suitable for cultural programmes, inauguration
91 ceremonies, performances,
Providing, printing, product
supplying, fixing,launches, official
maintaining events
during and public
the event periodgatherings.
removing after completion digital printed flex banner of approved design, artwork,
colour scheme and content, printed on approved quality front-lit/back-lit/star flex
media of minimum 280 GSM to 440 GSM thickness using eco-solvent/solvent/UV
printing technology with high-resolution multicolour printing. The item shall include
necessary hemming, eyelets, stitching, ropes, cable ties, clamping arrangements,
framing support wherever required, transportation, loading-unloading, fixing at all 120.00 No 150.00
levels and heights, maintenance during the event period, removal after completion
and disposal of waste materials complete as directed by the Engineer-in-Charge.
The rate shall include preparation of artwork (if required), printing, labour, tools and
plants, scaffolding/lifting arrangements, overheads, contractor's profit and all
incidental charges complete.
92 Providing, supplying, erecting, furnishing, maintaining and dismantling PM
Lounge/VVIP Lounge comprising weatherproof modular structure with insulated wall
panels, waterproof roofing, false ceiling, premium flooring/carpet, air-conditioning
arrangements, sofa seating, centre tables, reception and waiting area, decorative
finishes, lighting, electrical fittings, pantry facilities, branding elements, fire- 50.00 sqmt 8000.00
retardant materials, fire extinguishers, emergency exits, safety signage, security
arrangements and all accessories complete, including transportation, erection,
maintenance during event period and dismantling after completion, complete in all
respects as directed by the Engineer-in-Charge. (For 15 Days )
93 Percentage for hire charges of items of Group-1 which is to be kept morethan one
day (For Pervious day of function and the main function date full Item Rate will be
applicable and from second day of main function onwards percentage hire charges 12296980.00 % 0.40
will be applicable for items to be executed) For 2nd day
94 Percentage for hire charges of items of Group-1 which is to be kept morethan one
day (For Pervious day of function and the main function date full Item Rate will be
applicable and from second day of main function onwards percentage hire charges 12296980.00 % 0.15
will be applicable for items to be executed) For 3rd day
95 Percentage for hire charges of items of Group-1 which is to be kept morethan one
day (For Pervious day of function and the main function date full Item Rate will be
applicable and from second day of main function onwards percentage hire charges 12296980.00 % 0.15
will be applicable for items to be executed) For 4th day
96 Percentage for hire charges of items of Group-1 which is to be kept morethan one
day (For Pervious day of function and the main function date full Item Rate will be
applicable and from second day of main function onwards percentage hire charges 12296980.00 % 0.15
will be applicable for items to be executed) For 5th day
97 Percentage for hire charges of items of Group-1 which is to be kept morethan one
day (For Pervious day of function and the main function date full Item Rate will be
applicable and from second day of main function onwards percentage hire charges 12296980.00 % 0.15
will be applicable for items to be executed) For 6th day
98 Percentage for hire charges of items of Group-1 which is to be kept morethan one
day (For Pervious day of function and the main function date full Item Rate will be
applicable and from second day of main function onwards percentage hire charges 12296980.00 % 0.15
will be applicable for items to be executed) For 7th day
99 Percentage for hire charges of items of Group-1 which is to be kept morethan one
day (For Pervious day of function and the main function date full Item Rate will be
applicable and from second day of main function onwards percentage hire charges 12296980.00 % 0.15
will be applicable for items to be executed) For 8th day
100 Percentage for hire charges of items of Group-1 which is to be kept morethan one
day (For Pervious day of function and the main function date full Item Rate will be
applicable and from second day of main function onwards percentage hire charges 12296980.00 % 0.15
will be applicable for items to be executed) For 9th day
101 Percentage for hire charges of items of Group-1 which is to be kept morethan one
day (For Pervious day of function and the main function date full Item Rate will be
applicable and from second day of main function onwards percentage hire charges 12296980.00 % 0.15
will be applicable for items to be executed) For 10th day
102 Percentage for hire charges of items of Group-1 which is to be kept morethan one
day (For Pervious day of function and the main function date full Item Rate will be
applicable and from second day of main function onwards percentage hire charges 12296980.00 % 0.15
will be applicable for items to be executed) For 11th day
103 Percentage for hire charges of items of Group-1 which is to be kept morethan one
day (For Pervious day of function and the main function date full Item Rate will be
applicable and from second day of main function onwards percentage hire charges 12296980.00 % 0.15
will be applicable for items to be executed) For 12th day
104 Percentage for hire charges of items of Group-1 which is to be kept morethan one
day (For Pervious day of function and the main function date full Item Rate will be
applicable and from second day of main function onwards percentage hire charges 12296980.00 % 0.15
will be applicable for items to be executed) For 13th day
105 Percentage for hire charges of items of Group-1 which is to be kept morethan one
day (For Pervious day of function and the main function date full Item Rate will be
applicable and from second day of main function onwards percentage hire charges 12296980.00 % 0.15
will be applicable for items to be executed) For 14th day
106 Percentage for hire charges of items of Group-1 which is to be kept morethan one
day (For Pervious day of function and the main function date full Item Rate will be
applicable and from second day of main function onwards percentage hire charges 12296980.00 % 0.15
will be applicable for items to be executed) For 15th day
In Word : Six Crore Six Lakh Fifteen Thousand Eight Hundred Forty - Three Rupees Only.
I/We am/are willing to carry out the work at… % above/below percent(Should be written in figures and words) of the estimated rate mentioned
above. Amount of my /our tender works out as under.
* Estimated Amount * Estimated Amount
put to tender put to tender
Deduct :…………% Below Add :………%Above
In Words …………………………………… In Words………………………………
* (Please strike out whichever is not applicable).
1 The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for which no extra
payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017 Cement Consumption/16/C
Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost of difference of
cement consumption have been deducted from the rate of original item at the rate of input rate mentioned in all the tender.
5 The amount of dismentalled credit materials at Rs. 0 shall be deducted from first R.A. Bill.
6 The Contractor will have to submit the mix design for different grades his own cost befor execution as directed and to be approved From the
Engineer In Charge.
7 Group-1 Item No. 49 to 92 Consider For Hire charges Rent.
Deputy Executive Engineer Executive Engineer
Const.(R&B) sub Division Rajpipla (R&B) Division
Rajpipla Rajpipla
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
00 E Tender Notice.pdf
1 Vol 1 SBD Book.pdf
2 VOL 2 Specification index.pdf
3 VOL 03 SBD Book.pdf
5 GR New - Building.pdf
6 GR MANDAP.pdf
7 BOQ.pdf
000 CL.pdf
8 PQ Culturalprogram and Bharat Parv.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].