| 1 | L1₹11.2 CrAccepted-AOC | L1 | Accepted-AOC First Lowest | |
| 2 | L2₹11.7 Cr+₹49.7 L (4.43%)Rejected-AOC VIII 240 THERUVATH BUILDING UZHAVOOR P O KOTTAYAM KERALA 686634 | KOTTAYAM | KOTTAYAM | KERALA | 686634 | L2 | Rejected-AOC Second lowest |
| Sl No | Description | Qty | Unit | Bejoy Paul L1 | THERUVATH BUILDERS L2 |
|---|---|---|---|---|---|
| 1.00DRAIN | |||||
| 1.00 | 12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means | 1,061.55 | cum | 103.4 ₹1,09,764.27 Lowest | 150 ₹1,59,232.5 |
| 1.00 | 12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. | 101.1 | cum | 7,972.9 ₹8,06,060.19 Lowest | 9,000 ₹9,09,900 |
| 1.00 | 12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer | 515.61 | cum | 10,033.5 ₹51,73,372.94 | 10,000 ₹51,56,100 Lowest |
| 1.00 | 12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications | 31.21 | MT | 1,09,540.9 ₹34,18,661.95 | 95,000 ₹29,64,855 Lowest |
| 1.00 | 2.1.4:Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit Girth above 1800 mm | 15 | each | 5,048.3 ₹75,724.5 Lowest | 10,000 ₹1,50,000 |
| 2.00CULVERTS | |||||
| 2.00 | 2.4.2.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Prestressed / reinforced cement concrete grade M-20 & above - By Mechanical Means | 8.14 | cum | 1,811.6 ₹14,746.42 | 1,400 ₹11,396 Lowest |
| 2.00 | 2.4.4.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Dismantling Stone Masonry - Rubble stone masonry in cement mortar. | 53.5 | cum | 848.7 ₹45,407.15 | 750 ₹40,126.5 Lowest |
| 2.00 | 12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means | 688.59 | cum | 103.4 ₹71,200.41 Lowest | 150 ₹1,03,288.8 |
Tender Value
₹10.7 Cr
EMD Value
₹5 L
Closing Date
17 Feb 2026, 3:00 pmClosed
Project Director, PMU-KRFB, TVM
The Project Director, Kerala Road Fund Board, Project Management Unit, Ground Floor, BSNL Office Building at CGM(O), Doorsanchar Bhavan, PMG Junction Trivandrum-695033
Construction
2026_KRFB_832721_1
PWD/KR/TR/13493/2025_5_1_1/1
Open Tender
Civil Works - Roads
Item Rate
425 days
Thrissur
Please refer Tender documents.
8 documents required · 8 mandatory
₹19,518
Yes
₹5 L
Yes
24 Sept 2026
3 Feb 2026
19 Feb 2026
3 Feb 2026
17 Feb 2026
3 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1DRAIN | |||||
| 1.001 | 12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means | 1,061.55 | cum | - | - |
| 1.002 | 12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. | 101.1 | cum | - | - |
| 1.003 | 12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer | 515.61 | cum | - | - |
| 1.004 | 12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications | 31.21 | MT | - | - |
| 1.005 | 2.1.4:Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit Girth above 1800 mm | 15 | each | - | - |
| 2CULVERTS | |||||
| 2.001 | 2.4.2.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Prestressed / reinforced cement concrete grade M-20 & above - By Mechanical Means | 8.14 | cum | - | - |
| 2.002 | 2.4.4.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Dismantling Stone Masonry - Rubble stone masonry in cement mortar. | 53.5 | cum | - | - |
| 2.003 | 12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means | 688.59 | cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
Requisitionfore-payment.pdf
Additional Documents • 0.10 MB
SBD.pdf
Tender Documents • 1.92 MB
BOQ_1399884.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .