Tender Value
₹22.1 L
EMD Value
₹2.2 L
Closing Date
18 Nov 2026, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Rajesh Kumar
Executive Engineer Prov. Div. P.W.D. Chandauli
Dheena Nuri se Bahora Jalalpur Marg Par Kshatigrast Puliya Ke Vishesh Marammat Ka Kary
2026_CEUVZ_1204625_9
3983/4A Dt 23.10.2026
Open Tender
Civil Works
Fixed-rate
60 days
Chandauli
Please refer Tender documents.
3 documents required · 3 mandatory
₹945
₹2.2 L
Yes
23 Nov 2026
3 Nov 2026
18 Nov 2026
3 Nov 2026
18 Nov 2026
3 Nov 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | For Approach Construction of Embankment with approved Material Obtained from Borrow Pits with a lift upto 1.5 m,transporting to site, spreading, grading to required slopes and compacting to meet requirment of Table 300.1 and 300.2 with lead upto 5000 m as per Technical Specification Clause 303.1 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 100 | Cum | 220 | ₹22,000 |
| 2 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density,complete as per Technical Specification clause 405. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 37 | Cum | 2,550 | ₹94,350 |
| 3 | Providing, laying, spreading and compacting of sukrut stone stone aggregates of specific sizes(45.0-63mm) to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber,applying and brooming ,binding materials to fill-up the interstices of coars aggrigate,watering and compacting to the required density Grading-2 as per Technical Specification clause 405 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 21 | Cum | 3,000 | ₹63,000 |
| 4 | Providing, laying, spreading and compacting of sukrut stone stone aggregates of specific sizes(22.4-53mm) to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber,applying and brooming ,binding materials to fill-up the interstices of coars aggrigate,watering and compacting to the required density Grading-3 as per Technical Specification clause 405 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 21 | Cum | 3,200 | ₹67,200 |
| 5 | Providing and applying primer coat with bitumen emulsion (SS) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg per sqm using mechanical means as per Technical Specification Clause 502 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 281.25 | Sqm | 58 | ₹16,312.5 |
| 6 | Providing and applying tack coat with Bitumen (VG-10) using bitumen distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with Air compresser as per Technical Specification Clause 503 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 281.25 | Sqm | 25 | ₹7,031.25 |
| 7 | Providing, Laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emuslion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 KN static roller capacity, finished to required level and grades to be followed by seal coat of Type 'C' as per Tehnical Specification Clause 508 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 281.25 | Sqm | 235 | ₹66,093.75 |
| 8 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 281.25 | Sqm | 88 | ₹24,750 |
| 9 | Construction of Subgrade and earthen shoulders with approved material obtained from R.O.W. with all lift and leads, transporting to site, spresding grading to reqiire slope and compacted to meet requirement of Tables 300.2 as per Technical Specification Clause 303.1 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 24 | Cum | 60 | ₹1,440 |
| 10 | Fro Box Culvert (1 cell x 3 m span x 3 m H) Excavation in foundation in ordinary soil (loamclay or sand) including lift up to 1.5m and lead up to 30m. and including filling watering and ramming of excavated earth into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth ad directed by the Engineer in charge up to a distance of 30m. from the foundation trenches including all T&P phowarah and basket etc. complete. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 227 | Cum | 125 | ₹28,375 |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.67 MB
BOQ_2281829.xls
BOQ • 0.29 MB
CRDM.pdf
PDF • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .