Tender Value
₹5.8 L
EMD Value
₹14,500
Closing Date
11 Oct 2024, 5:00 pmClosed
Assistant Executive Engineer
KIP O and M Sub Division No 1 Adoor
Annual Maintenance 2025 Kodumon distributor KIP O and M Annual maintenance of Kodumon distributary from Ch5315 to Ch16315m Kodumon West minor distributary from Ch 0 to Ch3280m Kodumon east minor distributary from Ch 0 to Ch1990m Murinjakal minor d
2024_Irrig_694225_1
IRR/PII/TR/1629/2024_5_1_1/1
Open Tender
Civil Works - Canal
Item Rate
180 days
Kodumon dist
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,280
Yes
₹14,500
Yes
6 Dec 2024
4 Oct 2024
16 Oct 2024
4 Oct 2024
11 Oct 2024
4 Oct 2024
Amount
Annual Maintenance- Kodumon Distributary
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
OD39532/2023-2024:Engaging Man mazdoor for removing floating materials and other vegetation from cnals and removing deposited earth silt from canal bed tho avoid overflow of water, construction of temporory bund across canals for control and regulate flow of water to minors and field boothies and for greesing oiling and operation of various shutters etc complete during water distribution period as per the direction of departmental officers at site
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
2.33.1:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth
JAIMES MATHEW
Bidder Name
G.SUDHAKARAN PILLAI
JAIMES MATHEW
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1081614.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .