Loading…
Loading…
Tender Value
₹30 L
EMD Value
₹30,000
Closing Date
28 Sept 2026, 6:00 pmDue tomorrow
Assistant Manager (North West Zone)
New D.I/ M.S Pipe line wrok and water Leakage Reparing DI / MS 7 other line lekages work and also other maintenance work In Jagatpur, charodi area & Different places of Chandlodiya ward North west Zone (A.R.C)
347033
T.NOTICE-06(2026-27) TENDER- 133
Open
Civil Works
Works
Ahmedabad
3 documents required · 3 mandatory
₹1,500
Municipal Commissioner, Ahmedabad
₹30,000
20 Sept 2026
20 Sept 2026
20 Sept 2026
28 Sept 2026
20 Sept 2026
Name of Work : New D.I/ M.S Pipe line wrok and water Leakage Reparing DI / MS 7 other line
lekages work and also other maintenance work In Jagatpur, charodi area & Different places of
Chandlodiya ward North west Zone (A.R.C)
Sr. No. Quantity Items Rate Rs.Ps. Per Amount Rs.Ps.
1 Cost Labour Work
a 201 Unskilled Labours per shift 497.50 no.
b 201 Semiskilled labour per shift 497.50 no.
c 269 Fitter/Mason/Gas operator per shift 631.36 no.
d 30 Supervisor per shift 673.73 no.
e 200 Welder per shift 673.73 no.
2 0 Cost of Materials
a 500 Lead 204.24 kg.
b 65 Jute (Spun Yarn) 83.9 kg.
c 150 M-Seal 100 gm. pack 25.42 no.
d 87 Cement bag 334.75 Bag
e 18 Kapachi + Grit- Aggregates 1690.68 Cmt
f 25 Sand 1467.8 Cmt
g 102 Nut Bolt 89.83 kg.
h 51 MS Plate 90.68 kg.
i 2099 MS pipe /piece 101.69 kg.
j 261 MS Ring flange 150.85 kg.
k 102 MS Blank flange 114.41 kg.
l 81 Rubber Gasket 76.27 kg.
S.S. Spindle Rod, any Dia. With threads.
(Wt.of Finished Material)
Gun Metal Nut with threads. (Wt.of
finished Material)
o 24 Rubber Paint 207.63 litre
p 24 Structural Steel Work 77.12 Kg
q 8 Roller assemblies 381.36 no.
r 35 SS wire rope 59.32 rmt.
s 8 wooden float / rubber ball 593.22 no.
t 13 Anchor bolts 74.58 no.
Providing & Supplying of good quality of
3 0 rubber rings for following dia meter.
a 8 Rubber Ring for 400 mm dia pipe 338.98 no.
b 8 Rubber Ring for 450 mm dia pipe 381.36 no.
c 8 Rubber Ring for 500 mm dia pipe 457.63 no.
d 8 Rubber Ring for 600 mm dia pipe 550.85 no.
4 0 For Welding Joints
a 47 Rent of DG set per shift 1694.92 no.
b 47 Rent of Welding machine per shift 1016.95 no.
Rent for Grinder machine per shift (incl.
Nece. Required Disk)
d 47 Gas Cutting set per shift 487.29 no.
e 10 LPG bottle 1991.53 no.
f 100 Oxygen bottle 322.03 no.
5 0 Rent of Tools & Other Charges
Rent of Chain pulley block & Tripod per
a 11 423.73 shift.
Rent of de-watering pump (1.5 to 3 HP)
b 75 423.73 shift.
Rent of de-watering pump with fuel (1.5
c 8 889.83 shift.
to 3 HP) per shift
d 37 Rent for JCB Machine 535.71 Hrs
Providing & Supplying Hitachi Machine-
Providing & Supplying hydra crane
f 8 5169.49 shift
g 8 Dumper / Trucks for 8 Hr. 8000 shift
h 100 Transportation of machinery to or Fro 377.12 Trip
Rent for Scaffolding by H frame incl.
Khapeda (per pair per day)
Electric Demolition Hammer (11-E) per
Cement grouting pump per shift(With
Provdg. And fixing to wall, ceiling & floor
6 0 galvanised mild steel tubes (Medium
a 8 A) 20 mm 183.9 rmt.
Charges for Water connection by making
hole in CI/DI/MS main line
a 8 15 mm Dia. 312.5 no.
b 8 25 mm Dia. 535.71 no.
Provdg. & Fixing Gun Metal check or
nonreturn full wheel, …50 mm
9 0 For Masonry & RCC Work
Carting of Debris for lead from 50 m to
Kms. as directed.
Supply cutting, Bending, Binding and
placing in position steel as per plan and
design and as per ISS 2502 including cost
of steel and binding wire for reservoirs/
structures only including lift up to
meter height or depth below G.L. for all
diameters. Deformed(TMT) bars
confirming to relevant IS Fe-500 grade for
P/F Dead shuttering for slab, beam etc.
d 2999 Providing & Supplying Bricks 6.78 no.
Proving and Fixing F.R.C. Extra Heavy Duty
(EHD-35) Manhole Covers
Removing & relaying of existing CI/DI pipe
line & Specials, Cleaning of pipe &
Specials from Inside, including excavation,
11 refilling etc. comp. in line & level with any
type of joints as per instruction of engg.
in charge (As per previous tender Rates)
B 1.00 150 mm 78 RMT
C 1.00 200 mm 94 RMT
12 1018 Labours charges for collecting specials 21 K.G
from Municipals store loading
transportation, unloading to the site,
laying and fixing CI specials inclusive of all
jointing materials like lead, spun etc.and
labour, exacavation re-filling and nece.
dewatering as per instrucation of engg.
incharge (As per previous tender Rates)
13 1 Labour charges for installing and jointing
Sluice Valves including loading,
transporting from owner's store, lowering
in location to the required with
excavation refilling alignment by crane/
tripod and chain block including cost of
total nos. of nuts, bolts, Necessary
gaskets and excluding fixing of tail pieces
with lead & jute etc complete as directed
by Engg. in charge. (As per previous
14 0 Cutting of existing pipelines of following
diameters including carting of nece.
specials from AMC store to site and from
site to AMC store (recovered materials)
nace. labours for excavation, jodan &
backfilling fitter, supervisor, etc.
complete. Rate also includes electric
cutter, dewatering pump fuel and
transportation of machineries, chain
pulley block if requires working at an
instructed specific time of day or night
etc. complete. (As per previous tender
15 30 Labour charges for doing washout of 670 NO
water pipe line at end including necessary
excavation of pit, allowing the water to
flow for 15 minutes twice or thrice as per
site condition during supply hour,
dewatering the pit and plugging with
existing wooden butch and refilling the
pit .etc. comp .as per instruction (As per
previous tender Rates)
16 0 P/S OF good quality of rubber rings for
following dia meter. (As per previous
17 1 Supplying wooden taper butches from
jungle wood (Like limda, ambo) Etc.
comp. (As per previous tender Rates)
A 60 15 Mm dia. to 20 MM dia. 15 NO
B 1 25 Mm dia. to 37 MM dia. 20 NO
C 1 50 Mm dia. 100 NO
D 1 80 mm dia to 100 mm dia line 350 NO
E 1 150 mm dia 500 NO
F 1 200 mm dia 800 NO
18 0 Labour charges for repairing of sluice
valve / reflux valve including materials,
labours and testing etc.,complete (B)
Replacing of Glan packing only (GWSSB
19 1 Fixing of valve Road box incl .locating 446 NO
valve, nece. excavation, tem also inclues
cartring form AMC store to site.
Etc.Comp. as directed (As per previous
ARC tender rates)
20 0 Providing, laying, spreading and
compacting graded stone aggregate to
wet mix macadam specification including
premixing the Material with water at
OMC in mechanical mix plant carriage of
mixed Material by tipper to site, laying in
uniform layers in sub- base / base course
on well prepared surface and compacting
with vibratory roller to achieve the
desired density as per Codal Provision.
A 52 Production & Supply of WMM 1975 CMT
B 52 Laying of WMM 35 CMT
21 1 Transporting from AMC store and laying
spigot and socket New DI pipe line DI-k-9
pipes of various classes with CI/DI/MS
specials of following diameters. Rate
includes excavation up to minimum
mt. depth from top of pipe / as per
requirement in any soil, refilling after
laying pipe, covering and temptation of
carting surplus earth up to 30 mt. lead
and watering and compaction. Clearing
the site. All Joints shall be made tight &
leak free etc. comp. (As per previous
A 599 100 mm 64 RMT
B 299 150 mm 78 RMT
C 1 200 mm 94 RMT
D 1 250 mm 113 RMT
E 1 300 mm 137 RMT
22 Labour charges for repairing of lekage
CI/Di pipe line for following dia different
places including necessary excavation
manually or by machinery removing mud
dewatering cleaning of pipe and leakafe
portion and repairing by inserting lead wool
jute tools required for inserting lead
wool hiring charges of excavators No
Hydra/crane j.c.b dewatering set fuel
operator cost of lead wool etc complete
(including all material but excluding cost of
(GWSSB, SOR 2022-23, SECTION 1 G, Item
23 Labour charges for repairing of lekage CI/DI
pipe line of following diameter at different
places including necessary excavation
manually or by machinery, removing of
mud, dewatering, cleaning of pipe, cutting of
pipe, Jointing & repairing using CID joints
including CID joints, rubber rings, nut
bolts, hiring excavator, Hydra/ Crane, No
dewatering machine, fuel, operator etc
complete ( including cost of jointing
material but excluding cost of pipe)
(GWSSB, SOR 2022-23, SECTION 1 G, Item
24 Labour charges for repiaing of Sluice valve
/ Reflux valve inlcuding materials, labours
and testing etc. Complete. (i) Replacing
of S.S. Spindle only NO
(GWSSB, SOR 2022-23, SECTION 1G, Item
No.12.A.3, Page-79)
L, L & J of DI / CI Pipe (Tyton Joint)
25 Lowering,laying and jointing C.I.S &S Spun
pipes suitable for Tyton joints /moetarlined
D.I Pipes of various classes with CI/MS
specials Of following diameters in proper
positing,grade and alignment as airected by
Engineer-in-Charge including hydraulic testing
(GWSSB, SOR 2022-23, SECTION 1&2B
Labour, Item No.6, Page-36)
Refilling of Pipeline Trenches
Refilling the pipeline tranches incl. ramming,
watering, consolidating desposal of surplus
stuff as directed within a redius of 3 km. CMT
(GWSSB, SOR 2022-23, SECTION 1&2B
Labour, Item No.14, Page-40)
1.00 (A) Resilling as directed 22 CMT
(B) -do- with selected soil brought from outside
including all lead
C.C. M-20 (without w.p.chemical)
Providing and casting in situ C.C.in grade M-
20 (proportions as per mix design or as paer
table9 of IS456 2000 in masses by weigh
batching) using granite, quartzite trap metal of
size 6 mm to 20 mm for RCC work including
scaffolding centering, formwork needle
vibrated consolidation, ciring complete up to
meter depth or height (excluding cost of
reinforcement and neat finishing) with
centering and shuttering / deshuttering
etc.complete for structure other than water
retaining (Below GL)
(GWSSB, SOR 2022-23, SECTION 1C, Item
1.00 (A) Footing (without formwork) 5292
R&B Building SOR Ahmedabad City Year
Providing and fixing to wall, ceiling and floor
galvanised Mild steel tubes (Medium grade)
of the following nominal bore, tube fitting
and clamps including making good the wall
ceiling and floor.
(R&B Building SOR Year 2024-25, Item
1.00 (A) 15 mm dia (Item Code No.23001AA) 244.13 RMT
1.00 (B) 20 mm dia (Item Code No.23001BA) 297.25 RMT
1.00 (C) 25 mm dia (Item Code No.23001CA) 393.93 RMT
1.00 (D) 32 mm dia (Item Code No.23001DA) 491.51 RMT
1.00 (E) 40 mm dia (Item Code No.23001EA) 596.73 RMT
1.00 (F) 50 mm dia (Item Code No.23001FA) 779.60
Providing, laying and jointing in true line and
level U.P.V.C pipe (SCH - 40) of following dia.
including fittings of standard make as
approved by Engineer - in - charge. Pipe shall
be fixed on the wall with the help of clamp
at every shall be concealed as directed
including necessary Tee ,bend, any joint & RMT
any fittings etc. including testing of pipe and
joints and fixing the same with adhesive
solvent, including cost of all materials
(R&B Building SOR Year 2024-25)
20.00 (A) 15 mm dia (Item Code No.23061) 71.93 RMT
20.00 (B) 25 mm dia (Item Code No.23062) 90.93 RMT
20.00 (C) 32 mm dia (Item Code No.23063) 117.97 RMT
20.00 (D) 40 mm dia (Item Code No.23064) 146.65 RMT
20.00 (E) 50 mm dia (Item Code No.23065) 193.73 RMT
20.00 (F) 160 mm dia (Item Code No.23066) 822.99 RMT
6.00 (G) 110 mm dia (Item Code No.23067) 826.88
Providing FoR Cost of Materials & supplying
1.00 (R&B Building SOR Year 2024-25, Item 5234.00 NO
Common Burnt clay Bricks Conventional size
1.00 (R&B Building SOR Year 2024-25, Item 4.71 CMT
Crushed stone aggregate for Hard Quality
1.00 to 20mm size 470.25 CMT
(R&B Building SOR Year 2024-25, Item
Crushed stone aggregate for Hard Quality
1.00 20mm size 588.53 CMT
(R&B Building SOR Year 2024-25, Item
1.00 (R&B Building SOR Year 2024-25, Item 255.08 K.G
Providing TMT Bar FE 500D reinforcement for
R.C.C. work including bending, binding and
placing in Position complete upto floor two
(R&B Building SOR Year 2024-25, Item No.
Providing and laying controlled cement
concrete M.200 and curing complete
excluding the cost of formwork and
reinforcement for reinforced concrete work
in (A)Foundations, footings, Base of columns
and Mass concrete
(R&B Building SOR Year 2024-25, Item
No.5.8.2, Item Code No.05024AA)
Providing and laying (to level or slopes) and
jointing with stiff mixture of Cement Mortar
in proportion 1:1 Salt glazed stoneware pipes
including testing of pipes and joints complete. RMT
(R&B Building SOR Year 2024-25, Item
2.00 (A) 100 mm (Item Code No.24001AA) 211.05 RMT
2.00 (B) 150 mm (Item Code No.24001BA) 288.23 CMT
Demolition including stacking of serviceable
materilas and disposal of unserviceable
materials with all lead and lift. (i) R.C.C. work
(R&B Building SOR Year 2024-25, Item No.
20.3, Item Code No.20002)
Dismentaling tiled of stone floors laid in mortar
including stacking of serviceable materilas and
disposal of unserviceable materials with all
(R&B Building SOR Year 2024-25, Item No.
20.23, Item Code No.20005)
Filling available excavated earth (excluding
rock) in trenches, plinth, sides of foundations
etc. in layers not exceeding 20 cm. in depth
1.00 consolidation each deposited layer by 129.10 Cu.M
ramming and watering
(R&B Building SOR Year 2024-25, Item
No.4.12, Item Code No.4006)
Excavation for foundation upto 1.5 m depth
including sorting out and stacking of useful
materials and disposing off the excavated
5.00 stuff upto 50 Meter lead. (A) Loose or soft soil 201.81
(R&B Building SOR Year 2024-25, CH-4B, Item
Code No.4B0001A)
Conveyance charge of (A) lime murrum
building rubbish earth manure or sludge &
execavated rock and rubbish [Lime murrum
building rubbish
(R&B Building SOR Year 2024-25, Item Code
5.00 (A) Lead Up to 1 km. 261.35 CMT
5.00 (B) Lead Up to 2 km. 283.56 CMT
5.00 (C) Lead Up to 3 km. 301.98 CMT
5.00 (D) Lead Up to 4 km. 318.17 CMT
(E) Lead Up to 5 km.
Hydraulic Excavator 1 cum bucket capacity @
60 cum per hour (R&B Building SOR Year
2024-25, Part-D, Item Code No.H016)
BASIC RATES OF LABOUR
(R&B Building SOR Year 2024-25)
(A) Labour charges - Excavator (Item Code
(B) Labour charges - Mazdoor (Female) (Item
(C) Labour charges - Mazdoor (Male) (Item
(D) Labour charges - Plumber (Fitter) (Item
(E) Labour charges - Plumber(Fitter)Assist
15.00 (Item Code No.L026) 570
Labour charges for repairing of sluice
valve / reflux valve including materials,
labours and testing etc.,complete No
(B)Replacing of Glan packing only (GWSSB
Providing FoR Cost of Materials & supplying
Providing TMT Bar FE 500D reinforcement for
R.C.C. work including bending, binding and
placing in Position complete upto floor two
level (R & B Building SOR 21-22 Item no.
Lead (AMC central Stroe i.code
rate as on dated 21.02.2023)
Jute (Spun Yarn) (AMC central Store i.code
Nut Bolt (AMC central Store i.code
rate as on dated 21.02.2023)
AMC SOR Year 2016 (As On website)
Transporting from AMC store and laying
spigot and socket New DI pipe line DI-k-9
pipes of various classes with CI/DI/MS
specials of following diameters. Rate includes
excavation up to minimum 1.0 mt. depth from
top of pipe / as per requirement in any soil,
refilling after laying pipe, covering and Rmt.
temptation of carting surplus earth up to 30 mt.
lead and watering and compaction. Clearing
the site. All Joints shall be made tight & leak
free etc. comp.
(AMC SOR Year 2016 Labour work WPL, It.
15.00 (A) 80 mm dia 71.00 Rmt.
Only Removing & recover of existing CI/DI
pipe line & Specials, removing any type of joint
, carting it to the Muni. Stores as & where
directed as per instruction of Engg. In charge
with excavation & refilling.
AMC SOR Year 2016 (As On website)
1.00 (A) 80 mm dia 71.00 Rmt
1.00 (B) 100 mm dia 72.00 Rmt
1.00 (C) 150 mm dia. 87.00 Rmt
1.00 (E)250 mm dia. 127.00 Rmt
Removing & relaying of existing CI/DI
pipe line & Specials, Cleaning of pipe &
Specials from Inside, including excavation,
refilling etc. comp. in line & level with any type Rmt
of joints as per instruction of engg. in charge.
AMC SOR Year 2016 (As On website)
1.00 (A) 80 mm dia 71.00 Rmt
1.00 (B) 100 mm dia 72.00 Rmt
1.00 (C) 150 mm dia. 87.00 Rmt
1.00 (E)250 mm dia. 126.00 Rmt
Labour charges for installing and jointing
Sluice Valves including loading, transporting
from owner's store, lowering in location to
the required with excavation refilling
alignment by crane/ tripod and chain block
including cost of total nos. of nuts, bolts, No
Necessary gaskets and excluding fixing of tail
pieces with lead & jute etc complete as
directed by Engg. in charge.
AMC SOR Year 2016 (As On website)
Labour Charges for removing and
recover of ex. C.I. Sluice valve with tail
pieces and carting it up to Muni.Store or site
as per instruction of Engg. In charge item
include. necessary Excavation, removing or No
making joints, refilling etc.comp. as directed
by Engg in charge.
AMC SOR Year 2016 (As On website)
Cutting of existing pipelines of following
diameters including carting of nece. specials
from AMC store to site and from site to AMC
store (recovered materials) nace. labours for
excavation, jodan & backfilling fitter,
supervisor, etc. complete. Rate also includes
electric cutter, dewatering pump fuel and No
transportation of machineries, chain pulley
block if requires working at an instructed
specific time of day or night etc. complete.
AMC SOR Year 2016 (As On website)
Labours charges for collecting specials
from Municipals store loading
transportation, unloading to the site, laying and
fixing CI specials inclusive of all jointing
50.00 materials like lead, spun etc.and labour, 24.00 kgs.
exacavation re-filling and nece. dewatering as
per instrucation of engg. incharge.
AMC SOR Year 2016 (As On website)
Labour charges for recovering CI specials
from old line by heating the old joints by gas
/ any heating device and recovering the
1.00 fittings in re-usable condition and loading, 12.50 Nos
carting, unloading them to nearby Municipal
AMC SOR Year 2016 (As On website)
Fixing of valve Road box incl .locating
valve, nece. excavation, Brick
Masonary,PCC work. Item also inclues
cartring form AMC store to site. Etc.Comp.
AMC SOR Year 2016 (As On website)
Excavation for trail pit of maximum
diamension of 1.5 mt x0.75 x 1.5 mt depth
for location of existing line including
excavation but excluding cost asphalt
cutting but including refilling, watering etc.
comp as per instruction of
Engg in charge.
AMC SOR Year 2016 (As On website)
Making hole on existing CI/DI/MS water
pipe line including nacessary GI fittings item
also includes necessary excavation,
dewatering and refilling as per instruction
engg. In charge etc.comp.
AMC SOR Year 2016 (As On website)
2.00 E) 50 mm Dia 3000.00 Rmt.
Labour for change of GI water pipe line up to
1.00 customer end.(in Muni.Limit) 35.00 No
AMC SOR Year 2016 (As On website)
Labour Work for temp Jodan of ex.line for
running water supply incl making collar
between gap of pipe & jointing with jute & day
after removing all this as per inst etc.comp as
AMC SOR Year 2016 (As On website)
Labour charges for doing washout of water
pipe line at end including necessary
excavation refilling the pit. Allowing the
water to flow for 15 minutes twice or thrice
as per site condition during supply hour,
dewatering the pit and plugging with
existing wooden butch. etc. comp. as per
AMC SOR Year 2016 (As On website)
Supplying wooden taper bunches from
jungle wood (Like limda, ambo) Etc.comp.
AMC SOR Year 2016 (As On website)
10.00 (A) 15 Mm dia. to 20 MM dia. 15.00 No
10.00 (B) 25 Mm dia. to 37 MM dia. 20.00 No
2.00 (D) 80 mm dia to 100 mm dia line 350.00 No
P/S OF good quality of rubber rings for
following dia meter. No
AMC SOR Year 2016 (As On website)
Providing , Supplying and fixing ISI
mark approved quality for ferrul
connecting to existing CI/DI pipe line of water No
tight joints per inst.of engg. In charge
AMC SOR Year 2016 (As On website)
Extra rate over item of excavation of earth
for excavation of asphalt pavement of
thickness up to 0.20 meter including
demolishing the asphalt carpet,metal,soiling smt
etc.comp. with stacking the material as
AMC SOR Year 2016 (As On website)
50.00 a) up to 0.20 meter thickness (By Manual) 80.00 smt
b)Up to 0.30 meter (By Breaker Machine
100.00 including cost of operator, fuel, & 200.00 smt
transportation etc complete.
c) 0.30 meter & above (By Breaker Machine
25.00 including cost of operator, fuel, 350.00 Cmt
& transportation etc complete.
Providing, laying, spreading and compacting
graded stone aggregate to wet mix macadam
specification including premixing the Material
with water at OMC in mechanical mix plant
carriage of mixed Material by tipper to site,
laying in uniform layers in sub‐ base / base 1710.00 Cmt
course on well prepared surface and
compacting with vibratory roller to achieve the
desired density as per Codal Provision. SOR
‐(Jan‐ 2021/22) Rate for Road Works
3.00 Production & Supply of WMM 1675.00 Cmt
3.00 Laying of WMM 35.00
Supplying Pneumatic Breaker Machine
for RCC Slab or Asphalt Demolishing
Work on site by using Operator, fuel,
power Supply etc. Complete as Directed. (No
payment should be allowed for non
1.00 working condition of machinery and for 600.00 hr
pipe line excavation and M.H. work.
Allowed only for break down work) (
Based on Previously approved
rate by C E sir )
Providing & Supplying JCB Machine on rental
basis in case of emergency situation and
break down type work & also during
unavoidable condition as per instruction of
engg.incharge , rate includes all nece.
shifting, fuel and operating charges and
1.00 stacking of useful & non-useful materials 600.00 hr
separately up to store. (No payment should
be allowed for non working condition of
machinery and for pipe line excavation and
laying work) ( Based on Previously
approved rate by C E sir )
Providing & Supplying Hitachi Machine-110
capacity on rental basis in case of
emergency situation and break down type
work & also during unavoidable condition as
per instruction of engg.incharge , rate includes
all nece. shifting, fuel and operating
charges . (No payment should be
allowed for non working condition of
(Based on central work shop rate)
Providing & Supplying Hitachi Machine-200
capacity on rental basis in case of
emergency situation and break down type
work & also during unavoidable condition as
per instruction of engg.incharge , rate includes
all nece. shifting, fuel and operating
charges . (No payment should be
allowed for non working condition of
(Based on central work shop rate)
Providing & Supplying hydra carne Machine
of 12 tone capacity on rental basis in case
of emergency situation and break down
type work & also during unavoidable
condition as per instruction of
2.00 engg.incharge , rate includes all nece.
shifting, fuel and operating charges . (No
payment should be allowed for non
working condition of machinery) (Based on
central work shop rate )
Hiring and operating Mud Pumps incl. Cost
of fuel and operator including the cost of to
and fro transportation, laying of the delivery
hoses as required, lowering and lifting the
pumps as and when required etc. complete.
Set Do As Directed. (No payment should be
allowed for non working condition of
machinery ) ( Based on Previously
approved rate by C E sir )
Providing and operation dewatering
Pump including fuel charges & operator
Charges etc. as directed etc. comp. (Shift
30.00 for Eight Hour) (For Each Pump Set, No 600.00 Rmt
payment should be allowed for non
working condition of machinery ) ( Based
on Previously approved rate by C E sir )
Barricading the entire break down or
excavated area on rental basis using wooden
ballies / M.S.angles at max. 2.00 meter
centre to centre, C.G.I. Sheet, reflective
paint / Board out side to avoid accident & for
smooth traffic diversion & movement including
cautionary board etc. Item also includes for
22.72 making temporary sufficient nos of lighting 90.00 Smt
arrangement through out the work with
necessary required arrangement. ..The
same shall be removed after completion of
work. (Only for break down work from
start to complete) (Based on Drainage
Reinstatement of Asphalt road/any kind of
paving/flooring using the same material. (As
per previous ARC tender rates)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
tender 133.pdf
BOQ 133.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .