| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.9 LAccepted-AOC GROUND FLOOR 2 171 ALAKAPURI HOUSE KARALANCHALIL KARUMALA POST BALUSSERY | BALUSSERY | KOZHIKODE | KERALA | ₹18.9 L | L1 | Accepted-AOC 1st Lowest, Accepted |
| 2 | L2₹19.6 LRejected-AOC MANNAPADIKKAL MALAYAMMA | ₹19.6 L | L2 | Rejected-AOC 2nd Lowest |
| 3 | L3₹22.2 LRejected-AOC | ₹22.2 L | L3 | Rejected-AOC 3rd Lowest, Rejected |
| 4 | L4₹23.9 LRejected-AOC | ₹23.9 L | L4 | Rejected-AOC 4th Lowest |
Tender Value
₹25.4 L
EMD Value
₹50,000
Closing Date
14 Jan 2026, 5:00 pmClosed
ASSISTANT EXECUTIVE ENGINEER
Office of Assistant Executive Engineer, Electrical sub Division, Thamarassery, Pin 673573
Deposit Work estimate for shifting HT/LTpoles and lines along Parappanpoyil to Karakunnath road under ES Koduvally
2025_KSEB_824876_1
06/AEE-ESD/TMSY/2025-26/ 31.12.2025
Open Tender
Electrical Works
Parappanpoyil to Karakkunnu
Minimum 1 Year Experience in similar kind of work execution
5 documents required · 5 mandatory
₹5,900
₹50,000
28 Jan 2026
3 Jan 2026
17 Jan 2026
3 Jan 2026
14 Jan 2026
5 Jan 2026
Dismantling (without damage) one km 11kV line (3 conductors), cross arm, insulators, disc, rolling the conductor and stacking.
Fitting and erecting one HT A type Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads.
Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit.
Fitting and providing one Strut using HT PSC pole incl. digging & back filling pit.
Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole incl. digging & back filling pits.
Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite.
Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite.
Additional rate for excavation of one Pit for HT Pole/HT Stay in Soft Rock.
Additional rate for excavation of Pit for A type pole in Laterite.
Dismantling of 1 No. 11kV CT/PT/ 11kV NCT from the already erected structure of above 1.5m height , leading to storage place carefully keeping at vertically not allowing tilting from vertical position more than the specified angles, keeping lines and levels as per the direction of the departmental officers, including all labour charges, hire charges of tools & tackles etc. (cost index(e) : 1 included in Rate)
Fitting 6 channel cross arms, AB switch, DO fuse, LA, HT & LT connections on existing DP, 3 LT fuses.
Erecting one 100kVA Transformer to existing DP and giving connections, incl. loading & unloading, excluding transportation.
Erection of 1 No. 11KV CT/PT/11KV NCT on the already erected structure after opening of crates at the place of storage leading to site carefully keeping at vertically not allowing tilting from vertical position more than the specified angles, keeping lines and levels as per the direction of the departmental officers. (cost
Fitting and erecting one HT DP using PSC pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads.
Fitting and erecting one HT DP using A type pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads.
Pole numbering using printed Aluminium sheets / Painting the surface of pole with anti algal yellow paint and painting Letters with black paint as specified incl. cost of paint.
Traffic signal painting of pole 1.5m height using black and white paints in alternate rings of 25cm width incl. cost of paint as specified.
Additional rate for excavation of one Pit for Coil Earthing in Hard Laterite.
Additional rate for excavation of Pit for A type pole in Soft Rock.
Additional rate for excavation of Pit for A type pole in Hard Laterite.
Installing one Border Meter with box on existing poles and giving the complete connections incl. conveyance of materials.
Erection of LT 4 way distribution box on existing cross arm giving connection incl. cable and earth connection (excluding earthing).
Loading HT A type pole from the stacking place and unloading the same at work site (transport by vehicle).
Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle).
Loading LT PSC pole from the stacking place and unloading the same at work site (transport by vehicle).
Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading.
Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.
Dismantling one damaged 11kV PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.
Dismantling one damaged 11kV A type pole after disconnecting stays, strut etc. and stacking the same.
Dismantling (without damage) one 11kV A type pole after disconnecting stays, strut etc. and stacking the same.
Dismantling one damaged HT PSC/RCC Strut pole incl. removal of clamps and stacking.
Dismantling (without damage) one HT stay incl. back filling, and bringing back to section store.
Dismantling (without damage) one HT PSC/RCC Strut pole incl. removal of clamps and stacking.
Dismantling (without damage) one AB switch from existing structure and bringing back to section store.
Dismantling one Channel cross arm from existing DP structure, and bringing back to section store.
Dismantling one V cross arm/Channel cross arm from existing Pole, and bringing back to section store.
Dismantling transformer station in DP structure excluding the rate of dismantling earthing
Fitting and erecting one HT PSC Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads.
Stringing of one km 11kV line with ACSR Raccoon (3 conductors) incl. cutting and removing tree branches wherever necessary.
Fitting and erecting one HT PSC DP, fitting all accessories (2 stays, 8 cross arms, AB, DO, LA etc.), mounting of 100kVA Transformer, fixing DB, DTR box and giving all HT & LT connections.
Erecting one 160kVA Transformer to existing DP and giving connections, incl. loading & unloading, excluding transportation.
Providing one Earth using earth pipe incl. digging separate pit at standard distance away from the pole/structure & backfilling.
Additional rate for excavation of one Earth Pit (2.5m depth) in Laterite.
Additional rate for excavation of one Earth Pit (2.5m depth) in Hard Laterite.
Additional rate for excavation of one Earth Pit (2.5m depth) in Soft Rock.
Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling.
Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole incl. conveyance of materials.
Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP incl. conveyance of materials.
Fitting one additional F top bracket
Fitting one Additional 2.4m Channel cross arm in existing single pole incl. conveyance of materials.
Additional rate for refitting/redoing one Disc set while renewing any type of 11kV cut pole
Additional rate for refitting/redoing one Shackle set and reshackling one span while renewing any type of pole.
Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion.
Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion.
Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole and reconnecting.
Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.
Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.
Insertion of one LT PSC pole in existing Sph OH line incl. digging & back filling pit, fitting cross arm, insulator, binding etc.
Providing Stay for LT poles incl. digging & back filling pit.
Providing WP support with PSC pole incl. digging & back filling pit.
Fitting Knee bracing or suitable support on existing HT or LT post.
Dismantling (without damage) one km LT 3ph 4 wire OH line, cross arms, insulators and stacking the conductors in rolls.
Dismantling (without damage) one km LT additional conductor line, cross arms, insulators and stacking the conductors in rolls.
Dismantling one section fuse
Dismantling one LT 4 line cross arm from existing pole.
Stringing one km LT 3ph 4 wire line (Rabbit for Ph, Weasel for N) incl. fitting cross arm etc. removing touchings and conveyance of materials.
Stringing one km LT 3ph 5 wire line (Rabbit for Ph and Weasel for N&St.main) incl. fitting cross arm etc. removing touchings and conveyance of materials.
Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material (as per specification).
Providing Strut using LT PSC pole incl. digging & back filling pit.
Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt&nut etc.
Fitting one Additional V cross arm in existing single pole incl. conveyance of materials.
Fitting one set AB switch and giving connection
Dismantling one HT pin insulator with pin and bring back to section store.
Fitting one additional HT pin with insulator
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
Specifications.pdf
Tender Documents • 2.51 MB
BOQ_1383163.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid