Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹23.2 L
EMD Value
₹29,000
Closing Date
26 Nov 2026, 6:00 pm2d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Laying of water supply pipe line from Borehole Nos. 3 and 4 of Sarpi Unit to the Sand Bunker for use in the Continuous Miner (CM) section of the underground mine and for supply to Shyamsundarpur Colony.
2026_ECL_368985_1
ECL/GM/BA/E TENDER/26-27/Civil/ 048 Dt 16.11.2026
Open Tender
Civil Works - Others
Percentage
21 days
Shyamsundarpur Colliery
Please refer to NIT document
4 documents required · 4 mandatory
₹29,000
16 Nov 2026
16 Nov 2026
27 Nov 2026
16 Nov 2026
26 Nov 2026
16 Nov 2026
16 Nov 2026 - 20 Nov 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 64 | cum | 188.75 | ₹12,080 |
| 2 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 1.6 | cum | 1,061.6 | ₹1,698.56 |
| 3 | Providing and laying P.C.C. excluding the cost of centering and shuttering - All work up to plinth level - 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 3.2 | Cum | 6,007.2 | ₹19,223.04 |
| 4 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) | 35 | cum | 5,737.7 | ₹2,00,819.5 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) reservoir base and reservoir top | 7.2 | cum | 6,903.9 | ₹49,708.08 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level: Thermo-Mechanically Treated bars of grade Fe-500D or more. | 576 | kg | 95.75 | ₹55,152 |
| 7 | Supplying HDPE (Materials grade PE-80) pipes conforming to IS 4984- 1995 with latest revision & amendments if any with necessary HDPE specials (excluding cost of CIDF valves) including labour charges for earth work in excavation in any kind of soil including mixed soil with boulder,road sub-grade and aits flank but excluding moorum laterite or sand stone / hard rock cutting with chisel required including cutting road flank/ brick pavement etc. without damaging the exisiting telephone/electrical cable line etc.(in case of damage of any type of cable line by the agency at the time of execution necessary damage charge as applicable by the respective authority will have to be brone by the agency at his own cost)upto the depth (av.) so as to maintain 1.10m.earth cushion from top of the pipe upto G.L. including loading unloading carrying lowering laying fitting fixing carefully pipes, valves and specials with the all types of jointing materials in trenches maintaining proper levels and alignment jointing the pipes and specials by butt welding/ adopting suitable method (But weld jointing with help of hydraulic tack and trimming machines, Hitter etc. for reaching at necessary melting point of HDPE pipe so that joint can be monolithic) so as to facilitate the maintenance of pipe line locally as per conventional method in future. (B) Pressure Rating : PN 10 (i) Laying of pipe line including cost of pipe & fittings/specials but excluding cost of valves. | 1,300 | mtr | 1,225 | ₹15,92,500 |
| 8 | 12 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) outsides | 110 | Sqm | 226.8 | ₹24,948 |
| 9 | Neat cement punning.outside | 132 | sqm | 56.6 | ₹7,471.2 |
| 10 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.65 MB
Tendernotice_2.pdf
PDF • 0.99 MB
BOQ_381982.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .