| 1 | L1₹38.5 LAccepted-AOC BMC 1 54 GANTI NETAJI PALLY PO GANGANAGAR KOLKATA 700 132 INDIA | 24 PARAGANAS NORTH | WEST BENGAL | 700132 | L1 | Accepted-AOC L1 BIDDER. | |
| 2 | L2₹42.3 L+₹3.1 L (7.89%)Rejected-AOC 1ST FLOOR PRABHA SHOPPING COMPLEX OLD PAHARGAON DOLLYGUNJ PORT BLAIR SOUTH ANDAMAN ANDAMAN NICOBAR 744103 UDYAM AN 01 0000143 | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744103 | L2 | Rejected-AOC NOT L1 BIDDER. | |
| 3 | L3₹43.3 L+₹4.1 L (10.6%)Rejected-AOC SHOP NO 6 BENGALI CLUB MIDDLE POINT SRI VIJAYA PURAM 744101 | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744101 | L3 | Rejected-AOC NOT L1 BIDDER. | |
| 4 | L4₹44.1 L+₹4.9 L (12.5%)Rejected-AOC MB 58 JUNGLIGHAT KATHIR MARKETING SERVICE MB 58 JUNGLIGHAT NEAR TCI OFFICE SOUTH ANDAMAN ANDAMAN NICOBAR 744103 | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744103 | L4 | Rejected-AOC NOT L1 BIDDER. | |
| 5 | L5₹44.5 L+₹5.4 L (13.7%)Rejected-AOC 290 NEW PLOT JAWAHAR NAGAR JAMMU JAMMU JAMMU KASHMIR 180005 | JAMMU | JAMMU AND KASHMIR | 180005 | L5 | Rejected-AOC NOT L1 BIDDER. |
| Sl No | Description | Qty | Unit | M/s Pooja Enterprises L7 | AMR TRADERS L6 | Kathir Marketing Services L4 | Prasur Electricals & Engineering Co. L9 | KT CONSTRUCTIONS L1 | Allied Trading Company L5 | M/s OM HINDUSTAN CONSTRUCTION PVT. LTD. L10 | Island Agency L2 | Bharat Udyog L3 | City Constructie Pvt Ltd L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Taking down/dismantling loose/damage concrete including plaster of any description and in any position from RCC structures like chajja, fins, roof ceiling,louvers, parapet, column, beam, and of lintel by hammering with wooden mallets carefully chipping off the old concrete surface with necessary scaffolding including cutting of rusted reinforcement if so required and disposal of old debris to outside the premises complete all as specified and as directed. | 6 | Cum | 1,648 ₹9,888 | 1,606.69 ₹9,640.12 | 1,564.27 ₹9,385.6 | 1,695 ₹10,170 | 600 ₹3,600 Lowest | 1,572 ₹9,432 | 1,701 ₹10,206 | 1,500 ₹9,000 | 1,537.5 ₹9,225 | 1,656.11 ₹9,936.66 |
| 2.00 | Demolition of reinforced Concrete as in Roofs, floors (other than ground floors), beams, staircases, landing, and similar suspended work (reinforcement cut as required to facilitate demolition) with necessary scaffolding and protection as required complete all as specified and as directed. | 2 | Cum | 1,976.87 ₹3,953.74 | 1,928.03 ₹3,856.05 | 1,877.12 ₹3,754.24 | 2,033 ₹4,066 | 1,880 ₹3,760 | 1,886 ₹3,772 | 2,041 ₹4,082 | 1,800 ₹3,600 Lowest | 1,845 ₹3,690 | 1,987.33 ₹3,974.66 |
| 3.00 | Cleaning the existing surface of concrete and reinforcements as obtained after execution of item No. 1 & 2 here in before by wire brush including scrapping & cleaning with emery paper and washing down with water as required and applying “Solvent free epoxy concrete bonding agent” as per manufacturer’s instructions on old concrete surfaces for bonding with new concrete complete all as specified and as directed. | 120 | Sqm | 54.91 ₹6,589.57 | 53.56 ₹6,426.75 | 52.14 ₹6,257.07 | 56 ₹6,720 | 55 ₹6,600 | 52 ₹6,240 | 57 ₹6,840 | 50 ₹6,000 Lowest | 51.25 ₹6,150 | 55.2 ₹6,624.44 |
| 4.00 | Applying two coats of “Epoxy zinc rich primer” as protective coat to expose surface of old and new reinforcement over 10 mm dia as per manufacturer's instructions complete all as specified and as directed. | 180 | RM | 19.77 ₹3,558.37 | 19.28 ₹3,470.44 | 18.77 ₹3,378.82 | 20 ₹3,600 | 35 ₹6,300 | 19 ₹3,420 | 20 ₹3,600 | 18 ₹3,240 Lowest | 18.45 ₹3,321 | 19.87 ₹3,577.2 |
| 5.00 | All as per item No. 4 above but reinforcement upto 10mm dia. Note for item No 3 to 4: (i) Cost of chemical i.e. Solvant free epoxy, Epoxy zinc rich primer and cement shall be measured and paid separately under appropriate item here in below. (ii) The work shall be carried out by the trained person as per manufacturer's instructions i.e. FOSROC/SIKA/ PIDILITE | 100 | RM | 23 ₹2,300 | 21.42 ₹2,142.25 | 20.86 ₹2,085.69 | 23 ₹2,300 | 36 ₹3,600 | 21 ₹2,100 | 23 ₹2,300 | 20 ₹2,000 Lowest | 20.5 ₹2,050 | 22.08 ₹2,208.15 |
| 6.00 | Supply only epoxy zinc rich primer.
Make : Nitozinc primer of FOSROC/Friazinc R of SIKA/ or equivalent in PIDILITE | 5 | Ltr | 1,208.09 ₹6,040.44 | 1,178.24 ₹5,891.19 | 1,147.13 ₹5,735.65 | 1,243 ₹6,215 | 300 ₹1,500 Lowest | 1,153 ₹5,765 | 1,247 ₹6,235 | 1,100 ₹5,500 | 1,127.5 ₹5,637.5 | 1,214.48 ₹6,072.4 |
| 7.00 | Supply only Solvant free Epoxy concrete bonding agent.
Make : Nitobond EP of FOSROC/Carbodur of SIKA/ or equivalent in PIDILITE | 7 | Ltr | 1,043.35 ₹7,303.44 | 1,017.57 ₹7,122.98 | 990.7 ₹6,934.92 | 1,073 ₹7,511 | 350 ₹2,450 Lowest | 996 ₹6,972 | 1,077 ₹7,539 | 950 ₹6,650 | 973.75 ₹6,816.25 | 1,048.87 ₹7,342.08 |
| 8.00 | Material and labour for mild steel TMT bars 10mm dia and over, cut to length, bent to shape required, including cranking, bending lapping etc as required and welding with existing bar complete all as specified and as directed | 155 | Kg | 164.74 ₹25,534.59 | 160.67 ₹24,903.66 | 156.43 ₹24,246.15 | 169 ₹26,195 | 120 ₹18,600 Lowest | 157 ₹24,335 | 170 ₹26,350 | 150 ₹23,250 | 153.75 ₹23,831.25 | 165.61 ₹25,669.69 |
| 9.00 | Material and labour for mild steel TMT bars 6 to 8mm bar, cut to length, bent to shape required, including cranking, bending, lapping etc as required and welding with existing bar complete all as specified and as directed. | 160 | Kg | 164.74 ₹26,358.29 | 160.67 ₹25,707 | 156.43 ₹25,028.28 | 169 ₹27,040 | 125 ₹20,000 Lowest | 157 ₹25,120 | 170 ₹27,200 | 150 ₹24,000 | 153.75 ₹24,600 | 165.61 ₹26,497.75 |
| 10.00 | Material and labour for mild steel TMT deformed bar or twisted bars upto 10mm dia as in stirrups cut to lenth bent to shape required including cranking ,bending etc and lapping ,welding as directed to the existing one complete all as specified and as directed. | 100 | Kg | 164.74 ₹16,473.93 | 160.67 ₹16,066.87 | 156.43 ₹15,642.67 | 169 ₹16,900 | 150 ₹15,000 Lowest | 157 ₹15,700 | 170 ₹17,000 | 150 ₹15,000 Lowest | 153.75 ₹15,375 | 165.61 ₹16,561.09 |
Tender Value
₹39.2 L
EMD Value
₹78,380
Closing Date
5 Jun 2026, 6:00 pmClosed
GE NORTH KOLKATA
GE NORTH KOLKATA, 46 BT ROAD, KOLKATA-700050
SPL REPAIR TO BLDG NO OTM-15 (HQ COMPANY BARRACK) OF INF BN AT SALT LAKE UNDER GE(N) KOLKATA
2026_MES_765329_1
8612/26-27/E8 (GE(N)/KOL/ OF 2026-27
Open Tender
Miscellaneous Works
Item Rate
210 days
SALT LAKE
AS PER TENDER DOCUMENTS
8 documents required · 8 mandatory
₹500
GE NORTH KOLKATA
₹78,380
Yes
9 Jul 2026
14 May 2026
8 Jun 2026
15 May 2026
5 Jun 2026
29 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking down/dismantling loose/damage concrete including plaster of any description and in any position from RCC structures like chajja, fins, roof ceiling,louvers, parapet, column, beam, and of lintel by hammering with wooden mallets carefully chipping off the old concrete surface with necessary scaffolding including cutting of rusted reinforcement if so required and disposal of old debris to outside the premises complete all as specified and as directed. | 6 | Cum | - | - |
| 2 | Demolition of reinforced Concrete as in Roofs, floors (other than ground floors), beams, staircases, landing, and similar suspended work (reinforcement cut as required to facilitate demolition) with necessary scaffolding and protection as required complete all as specified and as directed. | 2 | Cum | - | - |
| 3 | Cleaning the existing surface of concrete and reinforcements as obtained after execution of item No. 1 & 2 here in before by wire brush including scrapping & cleaning with emery paper and washing down with water as required and applying “Solvent free epoxy concrete bonding agent” as per manufacturer’s instructions on old concrete surfaces for bonding with new concrete complete all as specified and as directed. | 120 | Sqm | - | - |
| 4 | Applying two coats of “Epoxy zinc rich primer” as protective coat to expose surface of old and new reinforcement over 10 mm dia as per manufacturer's instructions complete all as specified and as directed. | 180 | RM | - | - |
| 5 | All as per item No. 4 above but reinforcement upto 10mm dia. Note for item No 3 to 4: (i) Cost of chemical i.e. Solvant free epoxy, Epoxy zinc rich primer and cement shall be measured and paid separately under appropriate item here in below. (ii) The work shall be carried out by the trained person as per manufacturer's instructions i.e. FOSROC/SIKA/ PIDILITE | 100 | RM | - | - |
| 6 | Supply only epoxy zinc rich primer.
Make : Nitozinc primer of FOSROC/Friazinc R of SIKA/ or equivalent in PIDILITE | 5 | Ltr | - | - |
| 7 | Supply only Solvant free Epoxy concrete bonding agent.
Make : Nitobond EP of FOSROC/Carbodur of SIKA/ or equivalent in PIDILITE | 7 | Ltr | - | - |
| 8 | Material and labour for mild steel TMT bars 10mm dia and over, cut to length, bent to shape required, including cranking, bending lapping etc as required and welding with existing bar complete all as specified and as directed | 155 | Kg | - | - |
| 9 | Material and labour for mild steel TMT bars 6 to 8mm bar, cut to length, bent to shape required, including cranking, bending, lapping etc as required and welding with existing bar complete all as specified and as directed. | 160 | Kg | - | - |
| 10 | Material and labour for mild steel TMT deformed bar or twisted bars upto 10mm dia as in stirrups cut to lenth bent to shape required including cranking ,bending etc and lapping ,welding as directed to the existing one complete all as specified and as directed. | 100 | Kg | - | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
TENDERDOCUMENTS.pdf
Tender Documents • 1.22 MB
BOQ_857162.xls
BOQ • 0.66 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .