Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.1 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.1 L+₹147.42 (0.07%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.1 L
EMD Value
₹4,212
Closing Date
19 Aug 2026, 6:00 pmClosed
EXEN REW BARAMULLA
EXEN REW BARAMULLA
Construction of path from h/o Mazar hussain to gh hassan and const od drain from kundi kassi and plaster of kandi wall khul under ADP/PRI for year 2026-27 ,P/H Noorkhah Block -Bijhama
2026_RDPR_318404_12
166/Xen/Rew/Bla/2026-27 Dated 29/07/2026
Open Tender
Civil Works
Percentage
30 days
BARAMULLA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Rural Development and Panchayati Raj
₹4,212
2 Sept 2026
29 Jul 2026
20 Aug 2026
29 Jul 2026
19 Aug 2026
29 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manuall means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and
ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: all kinds of soil | 1 | cum | - | - |
| 2 | Providing and laying in position plain cement concrete 1:3:6 mix ratio M 10.using 20 mm nominal size agg excluding cost of shuttering i/c curing( all works upto lintel level) | - | cum | - | - |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form
forFoundations, footings, bases of columns etc. for mass concrete | - | sqm | - | - |
| 4 | 12mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 fine sand) | - | sqm | 1 | - |
| 5 | Hand-packing nalla split stones in wire-crates; including tipping charges,Equpiment charges and excluding cost of crates and stones | 1 | cum | - | - |
| 6 | carriage upto 400mtr by h/l of stone boulders and MT 10 km | 1 | cum | - | - |
| 7 | add cost of supply of wire crate box type size 16'x4'x4' | - | sqm | - | - |
| 8 | Chequerred precast cement concrete tiles dark shade 22mm thick in footpath and courtyard, jointed with neat cement slurry mixed with pigment to match the shade of the tiles, including rubbing, cleaning and curing complete on 20 mm thick bed of cement mortar 1:4 mix | - | sqm | 1 | - |
| 9 | Cost and Carriage of back filling behind the crate bund including carriage (complete job) | - | cum | - | - |
| 10 | Add for singn board and photographs | - | Job | - | - |
stage.html
html • 0.02 MB
finance_1048886.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
BOQ_1048886.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .