Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹144.3 CrAccepted-AOC H NO 66 SECTOR 27A CHANDIGARH 160019 | CHANDIGARH | CHANDIGARH | 160019 | ₹144.3 Cr | L1 | Accepted-AOC Awarded being L1 |
| 2 | L2₹145.2 CrRejected-Finance CHANDANI CHOWK RAIGARH CHHATTISGARH 496001 | RAIGARH | CHHATTISGARH | 496001 | ₹145.2 Cr | L2 | Rejected-Finance Rejected being L2 |
| 3 | L3₹168 CrRejected-Finance CHAMOGURI SATRA KAMALABARI CITY TOWN MAJULI P O KAMALABARI P S MAJULI DIST MAJULI PIN 785110 | MAJULI | MAJULI | ASSAM | 785110 | ₹168 Cr | L3 | Rejected-Finance Rejected being L3 |
| 4 | L4₹169.7 CrRejected-Finance | ₹169.7 Cr | L4 | Rejected-Finance Rejected being L4 |
| 5 | L5₹170.5 CrRejected-Finance BATHINDA | BATHINDA | PUNJAB | 151001 | ₹170.5 Cr | L5 | Rejected-Finance Rejected being L5 |
| Sl No | Description | Qty | Unit | HES INFRA PRIVATE LIMITED L4 | RK Infracorp Private Limited L6 | BRN INFRASTRUCTURES PRIVATE LIMITED L3 | HILL BROW METALLICS AND CONSTRUCTION PRIVATE LIMITED L2 | RAJINDER INFRASTRUCTURE PVT LTD L1 | GURBACHAN SINGH CONSTRUCTIONS PRIVATE LIMITED L5 | Nidhi Creative Infrastructure Private Limited L8 | Bharat Constructions (India) Pvt. Ltd. L7 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | CONSTRUCTION/IMPROVEMENT OF ROAD RISHI - RONGLI – KUPUP FROM KM 53.00 (DESIGN CHAINAGE KM 55.440) TO KM 70.00 (DESIGN CHAINAGE KM 74.575) (NET DESIGN LENGTH-19.135 KM) FROM EXISTING CL-9 TO NHDL SPECIFICATIONS THROUGH EPC MODE IN SIKKIM UNDER PROJECT SWASTIK (JOB NO. D-BR-I/05/SWK/2024-25)” (SECOND CALL) | 1 | EPC | 1,69,73,67,992 ₹169.7 Cr | 1,74,16,58,828 ₹174.2 Cr | 1,68,00,00,000 ₹168 Cr | 1,45,15,24,410 ₹145.2 Cr | 1,44,25,83,841 ₹144.3 Cr | 1,70,51,88,000 ₹170.5 Cr | 2,14,54,11,000 ₹214.5 Cr | 1,94,00,00,000 ₹194 Cr |
Tender Value
₹223.7 Cr
EMD Value
₹4.5 Cr
Closing Date
19 Jun 2025, 5:00 pmClosed
Chief Engineer Project Swastik
Chief Engineer Project Swastik Pin 737101 Upper Burtuk Sikkim
Construction improvement of Rishi Rongli Kupup from Km 53 design chainage Km 55.44 to Km 70 design chainage Km 74.575 Net design length 19.135 Km from existing CL 9 to NHDL specifications through EPC mode in Sikkim under Project Swastik
2025_BRO_706797_1
CE (P) SWTK/01/2025-26/EPC
Open Tender
Civil Works - Roads
1095 days
Between Km 53.00 to Km 70.00 on RRK Road
As per RFP document
2 documents required · 2 mandatory
₹30,000
Chief Engineer Project Swastik
₹4.5 Cr
HQ CE (P) Swastik
18 Nov 2025
5 May 2025
20 Jun 2025
5 May 2025
19 Jun 2025
4 Jun 2025
5 May 2025 - 30 May 2025
30 May 2025
stage.html
html • 0.08 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid