Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.6 LAdmitted-Finance | ₹10.6 L | L1 | Admitted-Finance |
| 2 | L2₹11.4 LAdmitted-Finance | ₹11.4 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | V K CONTRACTOR L2 | Amit Singh Dhillo L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in excavation of foundation in ordinary soil i/c all lead & reqd lifts with proper compaction as per site requirement and proper disposel of excavated surplus earth as directed by engineer in charge including cost of all labour T&P etc. required for proper completion of work | 90.97 | CUM | 70 ₹6,367.9 | 64 ₹5,822.08 |
| 2.00 | Laying of cement concrete M10 A40 (1:3:6) with Cement, Coarse Sand, Stone Grit (A-40) laid in foundation of abutment including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete or as directed By for proper completion of work Engineer-in-charge | 15.12 | CUM | 5,970 ₹90,266.4 | 5,599 ₹84,656.88 |
| 3.00 | Laying of Cement Concrete in M7.5 A40 (1:4:8) mix with Cement, Coarse Sand, Stone Grit (A-40) including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work | 2.08 | CUM | 5,775 ₹12,012 | 5,422 ₹11,277.76 |
| 4.00 | Ist class Brick work in 1:4, Cement Coarse Sand mortar in warping including cost of all material labour T&P etc. complete for proper completion of work | 71.44 | CUM | 5,920 ₹4,22,924.8 | 5,557 ₹3,96,992.08 |
| 5.00 | Struck Pointing in 1:2 Cement mortor including cost of all material, labour, T&P, Curing etc complete for proper completion of work | 67.04 | SQM | 103.4 ₹6,931.94 | 97 ₹6,502.88 |
| 6.00 | Providing centering & shuttering for bridge slab, bed block, dirt wallcement concrete work in foundation and transitions i/c all cost of labour & T&P etc complete for proper completion of work | 74.66 | SQM | 685 ₹51,142.1 | 643 ₹48,006.38 |
| 7.00 | Laying of reinforeced cement concrete in M20 A20 (1:1.5:2) mix with Cement, Coarse Sand, Stone Grit (A-20) in slab including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work | 14.64 | CUM | 7,229.75 ₹1,05,843.54 | 6,789 ₹99,390.96 |
| 8.00 | Laying of reinforeced cement concrete in M25 A20 (1:1:2) mix Cement, Coarse Sand (A-20) in dirt wall and bed block including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work | 6.3 | CUM | 7,445.4 ₹46,906.02 | 6,991 ₹44,043.3 |
| 9.00 | S/L of two coat tar Felt Painting including cost of all material, labour, T&P complete for proper completion of work | 3.92 | SQM | 41.65 ₹163.27 | 39 ₹152.88 |
| 10.00 | Providing & Fixing 20mm thick Expansion Joint with angle iron both side & M.S. plate carring & filling of filler material of bitumin soil dust & Coarse Sand (F.M. Not less than 2.00), etc complete for proper completion of work | 10.6 | RM | 1,817.15 ₹19,261.79 | 1,706 ₹18,083.6 |
Tender Value
₹11.5 L
EMD Value
₹23,000
Closing Date
30 Jun 2026, 5:00 pmClosed
EEMGCCD4 AMROHA
EEMGCCD4 AMROHA
CONSTRUCTION OF V.R.B AT KM. 7.045 OF KUNDARKI DY. UNDER PROJECT M.G.C. STAGE-II
2026_UPIDC_1158959_13
02/EE/2026-27
Open Tender
Civil Works - Canal
AMROHA
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹23,000
3 Jul 2026
25 Jun 2026
1 Jul 2026
25 Jun 2026
30 Jun 2026
25 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in ordinary soil i/c all lead & reqd lifts with proper compaction as per site requirement and proper disposel of excavated surplus earth as directed by engineer in charge including cost of all labour T&P etc. required for proper completion of work | 90.97 | CUM | - | - |
| 2 | Laying of cement concrete M10 A40 (1:3:6) with Cement, Coarse Sand, Stone Grit (A-40) laid in foundation of abutment including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete or as directed By for proper completion of work Engineer-in-charge | 15.12 | CUM | - | - |
| 3 | Laying of Cement Concrete in M7.5 A40 (1:4:8) mix with Cement, Coarse Sand, Stone Grit (A-40) including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work | 2.08 | CUM | - | - |
| 4 | Ist class Brick work in 1:4, Cement Coarse Sand mortar in warping including cost of all material labour T&P etc. complete for proper completion of work | 71.44 | CUM | - | - |
| 5 | Struck Pointing in 1:2 Cement mortor including cost of all material, labour, T&P, Curing etc complete for proper completion of work | 67.04 | SQM | - | - |
| 6 | Providing centering & shuttering for bridge slab, bed block, dirt wallcement concrete work in foundation and transitions i/c all cost of labour & T&P etc complete for proper completion of work | 74.66 | SQM | - | - |
| 7 | Laying of reinforeced cement concrete in M20 A20 (1:1.5:2) mix with Cement, Coarse Sand, Stone Grit (A-20) in slab including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work | 14.64 | CUM | - | - |
| 8 | Laying of reinforeced cement concrete in M25 A20 (1:1:2) mix Cement, Coarse Sand (A-20) in dirt wall and bed block including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work | 6.3 | CUM | - | - |
| 9 | S/L of two coat tar Felt Painting including cost of all material, labour, T&P complete for proper completion of work | 3.92 | SQM | - | - |
| 10 | Providing & Fixing 20mm thick Expansion Joint with angle iron both side & M.S. plate carring & filling of filler material of bitumin soil dust & Coarse Sand (F.M. Not less than 2.00), etc complete for proper completion of work | 10.6 | RM | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 9.05 MB
BOQ_2182177.xls
BOQ • 0.26 MB
lot10.pdf
Tender Documents • 2.70 MB
Download all tender documents and submit your bid