Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹25 L
EMD Value
₹25,120
Closing Date
30 Nov 2026, 5:00 pm4d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
I/C Managing Director
Modification of 50 KL Homogenizer to increase flow rate from 35KL to 50 KL with melted butter addition facility as a Turnkey Project at Dudhmotisagar Dairy, Haryana-Unit of Dudhsagar Dairy, Mehsana
361255
MDCMPUL/ 2026-27/ 120 / DHD/ Homogenizer Modification
Open
Machineries/ Mechanical Equipment
Supply
Mehsana
21 documents required · 15 mandatory · 6 optional
₹2,120
Mehsana District Co-operative Milk Producers’ Union Ltd., Mehsana
₹25,120
30 Nov 2026
4 Nov 2026
1 Dec 2026
4 Nov 2026
23 Nov 2026
4 Nov 2026
90 days
Section VIII Collaborators' Authorization Form 148-149
1 Form of BG for Performance Security 151-153
2 Contract Form 154-154
3 Pro forma of Completion Certificate 155-156
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
INSTRUCTIONS TO BIDDER
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
1. Cost of Bidding
2. Contents of Bidding Document
3. Clarification of Bidding Document
4. Amendment of Bidding Document
5. Pre Bid Meeting
6. Language of Bid
7. Documents Comprising the Bid
10. Price Adjustment
11. Bid Currency
12. Documents Establishing Bidder/Supplier's Qualifications
13. Documents Establishing Goods' Conformity to Bidding Document
14. Bid Security (Earnest Money Deposit)
15. Period of Validity of Bids
16. Format and Signing of Bid
17. Sealing and Marking of Bids
18. Deadline for Submission of Bids
20. Modification and Withdrawal of Bids
21. Opening of Bids by Purchaser
22. Clarification of Bids
23. Preliminary Examination
24. Evaluation and Comparison of Bids
25. Contacting the Purchaser
26. Post-qualification
27. Right to Vary Quantities at the Time of Award
28. Right to Accept any Bid and to Reject Any or All Bids
29. Notification of Award
30. Signing of Contract
31. Performance Security
32. Import License
33. Turn-key Contract
34. Break-up prices
35. Delivery Schedule of items
Table 1 Check List of Bid Submission
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
1. Cost of Bidding
1.1 The Bidder/Supplier shall bear all costs associated with the preparation and submission
of its bid, and the “Purchaser", will in no case be responsible or liable for those costs,
regardless of the conduct or outcome of the bidding process.
2. Contents of Bidding Document
2.1 The goods required, bidding procedures and contract terms are prescribed in the
Bidding Document. The contents of the Bidding Document are organized in sections as
given in the Table Contents at the beginning of this document.
2.2 The Bidder/Supplier is expected to examine all instructions, forms, terms and
specifications in the Bidding Document. Failure to furnish all information required as per
the Bidding Document or submission of a bid not substantially responsive to the Bidding
Document in every respect will be at the Bidder/Supplier's risk and may result in the
rejection of its bid.
3. Clarification of Bidding Document
3.1 A prospective Bidder/Supplier requiring any clarification on the Bidding Document may
notify the Purchaser in writing by fax/E-Mail at the Purchaser's mailing address
indicated in the Invitation for Bids. The Purchaser will respond in writing to any request
for clarification on the Bidding Document, which it receives not later than 7 days prior to
the deadline for the submission of bids prescribed by the Purchaser. Written copies of
the Purchaser's response (including an explanation of the query but without identifying
the source of inquiry) will be sent to all prospective Bidder/Suppliers, which have
received the Bidding Documents. However, the Bidder/Suppliers cannot consider delay
in receipt of clarifications, as a cause for requesting extension in the due date of
submission of the bids.
4. Amendment of Bidding Document
4.1 At any time prior to the deadline for submission of bids, the Purchaser may, for any
reason, whether at its own initiative or in response to a clarification requested by a
prospective Bidder/Supplier, modify the Bidding Document by amendment.
4.2 The amendment will be notified in writing or by fax or Email to all prospective
Bidder/Suppliers, which have received the Bidding Documents and will be binding on
them. The amendment will be attached to the bidding document sold subsequently.
4.3 In order to afford prospective Bidder/Suppliers reasonable time, in which to take the
amendment into account in preparing their bids, the Purchaser may, at its discretion,
extend the deadline for the submission of bids.
5. Pre Bid Meeting
The bidder or his official representative is advised to attend a pre bid meeting which will
be convened at the office of purchaser.
Venue of the meeting: As per NIT
Date of Pre Bid meeting: As per NIT
Subsequent Corrigendum, if any, will be uploaded on N-procure portal.
6. Language of Bid
6.1 The Bid prepared by the Bidder/Supplier and all correspondence and documents
relating to the bid exchanged by the Bidder/Supplier and the Purchaser shall be written
in the English language. Any printed literature furnished by the Bidder/Supplier may be
written in another language so long as accompanied by an English translation of its
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
pertinent passages in which case, for the purposes of interpretation of the bid, the
English translation shall govern.
7. Documents Comprising the Bid
7.1 The bid prepared by the Bidder/Supplier shall comprise the following Components:
be uploaded as commercial bid
Technical Bid (to be submitted online)
Documentary evidence established in accordance with Clause 10 that the
Bidder/Supplier is qualified to perform the contract if its bid is accepted.
Documentary evidence established in accordance with Clause 11 that the goods
and ancillary services to be supplied by the Bidder/Supplier conform to the Bidding
Bid security (Earnest Money Deposit) furnished in accordance with Clause 12 along
with the bid security details form.
A statement of deviation and exception to the provision of bidding documents.
furnished in the Bidding Document, indicating for the goods to be supplied, a
brief description of the goods, their, technical specification, quantity and prices.
document the total bid prices of the goods it proposes to supply, install and commission
under the contract. Bidder/Suppliers must submit a bid for the complete requirement of
goods and services specified under each pack, failing which, such bids will not be taken
into account for evaluation & comparison and will not be considered for award.
Charges for packing and forwarding, inland transportation, insurance, unloading at
our site and other local costs incidental to delivery of the goods to their destination;
will be considered as all Inclusive.
The cost of installation and commissioning as described in the technical
specifications and in accordance with Special conditions of Contract with regard to
erection, testing and putting the equipment into satisfactory operations, including
successful completion of performance and guarantee tests to be performed at the
destination by Bidder/Supplier will be considered as all Inclusive.
9.3 The Bidder/Supplier's separation of price components in accordance with above will be
solely for the purpose of facilitating the comparison of bids by the Purchaser and will not
in any way limit the Purchaser's right to contract on any of the terms offered.
9.4 Price of spare parts All the Bidder/Suppliers are required to submit the following
details about the spare parts, along with their bids:
Spare parts required for the items quoted by the Bidder/Suppliers, as mentioned in
Item wise prices of all the spare parts valid, for acceptance by the Purchaser and
placement of orders, for one year from the date of bid opening.
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
The prices of the spares shall be optional for evaluation
10. Price Adjustment
Please note that this is a fixed price PO and once the order placed, no price
escalation shall be entertained with respect to exchange rate variation and/or
custom duty variation.
11. Bid Currency
Prices shall be quoted in Indian Rupees only if a contract is awarded against this
invitation for bid. Please note that this is a fixed price PO. No price adjustment shall be
allowed on account of any changes in the landed cost due to variation in the Exchange
rates and / or Customs Duty (combined effect).
12. Documents Establishing Bidder/Supplier's Experience and Qualifications (Hard
copy to be submitted in physical documents)
12.1 Pursuant to Clause 7 the Bidder/Supplier shall furnish, as part of its bid, documents
establishing the Bidder/Supplier's qualifications to perform the Contract if its bid is
accepted. The Bidder/Supplier should also give information in the format attached to the
Bidding Document.
The documentary evidence of the Bidder/Supplier's qualifications to perform the
Contract if its bid is accepted, shall establish to the Purchaser's satisfaction
That in the case of a Bidder/Supplier offering to supply goods and services under the
Contract which the Bidder/Supplier did not manufacture or otherwise produce, the
Bidder/Supplier has been duly authorised by the goods' manufacturer or producer to
supply the goods. The bid shall include manufacturer‟s authorisation form given in the
bidding documents.
The Bidder/Supplier has the financial, technical and production capability necessary to
perform the Contract. To ascertain this, all bids submitted shall include the information
as per the pro forma along with qualification application (Table 1, 2 & 3) in Appendices
Copies of original documents defining the constitution or legal status, place of
registration and principal place of business of the company or firm or partnership, etc;
Details of experience and past performance of the Bidder/Supplier on equipment
offered and those of similar nature and those of similar nature within the past 5 years
and details of current contracts in hand and other commitments.
Major items of plant and equipment available/ installed in the Bidder/Supplier's factory
Qualification and experience of key personnel for successful execution of the contract.
Reports on financial standing of the Bidder/Supplier such as profit and loss statements,
balance sheets and, auditor's report of the past three years, bankers‟ certificates etc.
Information regarding any current litigation in which the Bidder/Supplier is involved
12.2 Bidder/Suppliers who meet the criteria given above are subject to be disqualified if they
have made untrue or false representations in the forms, statements and attachments
submitted in proof of the qualification requirements or have record of poor performance
such as abandoning the work, not properly completing the contract, inordinate delays in
completion or financial failures etc.
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
13. Documents Establishing Goods' Conformity to Bidding Document (Hard copy to
be submitted in physical documents)
13.1 Pursuant to Clause 6 the Bidder/Supplier shall furnish, as part of its bid, documents
establishing the conformity to the Bidding Document of all goods and services, which
the Bidder/Supplier proposes to supply under the Contract.
The documentary evidence of the goods' and services' conformity to the Bidding
Document may be in the form of literature, drawings and data, and shall furnish:
A detailed description of the goods' essential technical and performance
characteristics
A list giving full particulars, including available sources and current prices, of all
spare parts, special tools, etc. necessary for the proper and continuing functioning
of the goods for a period of two years, following commencement of the goods' use
by the Purchaser; and
A clause-by-clause commentary on the Purchaser's Technical Specifications
demonstrating the goods and services' substantial responsiveness to those
specifications or a statement of deviations and exceptions to the provisions of the
Technical Specifications.
All the above document shall be submitted according to mentioned in NIT of e
tender website.
13.2 The purposes of the commentary to be furnished pursuant to above, the
Bidder/Supplier shall note that standards for workmanship, material and equipment, and
references to brand names or catalogue numbers designated by the Purchaser in its
Technical Specifications are intended to be descriptive only and not restrictive. The
Bidder/Supplier may substitute alternative standards, brand names and/or catalogue
numbers in its bid, provided that it demonstrates to the Purchaser's satisfaction that the
substitutions are substantially equivalent or superior to those designated in the
Technical Specifications.
14. Bid Security (Earnest Money Deposit)
14.1 Bid security proof to be uploaded online and also to be submitted in the office of
purchaser as mentioned in the NIT.
14.2 Pursuant to Clause 6 the Bidder/Supplier shall furnish, as part of its bid, bid security
(Earnest Money Deposit) as specified in the NIT (Notice Inviting Tender).
14.3 The bid security is required to protect the Purchaser against the risk of
Bidder/Supplier's conduct, which would warrant the security forfeiture.
14.4 The bid security shall be denominated in Indian Rupees of value as specified.
14.5 Any bid not accompanied with bid security in accordance with clause 14.1 and
above will be rejected by the purchaser as non-responsive.
14.6 Unsuccessful Bidder/Suppliers' bid security will be discharged/ returned as promptly as
possible after award of Project/on completion of purchase process/ as prescribed in
Part A document /General guidelines for e tender and e auction. The successful
Bidder/Supplier's bid security will be discharged upon the Bidder/Supplier's complete
execution of Purchase order or on completion of Project.
14.7 The bid security may be forfeited:
If a Bidder/Supplier withdraws its bid during the period of bid validity specified by the
Bidder/Supplier on the Bid Form; or
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
In the case of the successful Bidder/Supplier, if the Bidder/Supplier fails:
To sign the Contract in accordance with Clause
To furnish performance security in accordance with Clause
15. Period of Validity of Bids
15.1 Bids shall remain valid for As per NIT after the last date of submission of the bids
prescribed by the Purchaser, pursuant to Clause 16. A bid valid for a shorter period
may be rejected by the purchaser as non-responsive.
15.2 In exceptional circumstance, the Purchaser may prior to expiry of the initial validity
period, solicit the Bidder/Suppliers' consent to an extension of the period of validity. The
request and the responses thereto shall be made in writing (or by cable or telex/fax).
The bid security provided under Clause 12 shall also be suitably extended. A
Bidder/Supplier may refuse the request without forfeiting its bid security. A
Bidder/Supplier granting the request will not be required nor permitted to modify its bid.
16. Format and Signing of Bid
16.1 The Bidder/Supplier shall submit the tender online
16.2 All the technical document as well as eligibility criteria documents shall be submitted in
Hard copy in Physical bid documents.
17. Sealing and Marking of Bids
17.1 As per NIT.
18. Deadline for Submission of Bids
18.1 The bid must be submitted online before the tender closing date as per NIT. According
to NIT Physical documents submission shall be completed before the closing date
mentioned in NIT.
18.2 The Purchaser may, at its discretion, extend this deadline for the submission of bids by
amending the Bidding Document in accordance with Clause 4 above in which case all
rights and obligations of the Purchaser and Bidder/Suppliers previously subject to the
deadline will thereafter be subject to the deadline as extended.
Any bid uploaded by the Purchaser after the deadline for submission of bids shall be
rejected as per e tender procedure.
20. Modification and Withdrawal of Bids
20.1 The Bidder/Supplier may modify or withdraw its bid after the bid's submission as per e
tender terms and conditions before the dead line of the bid submission.
21. The Bidder/Supplier's modification or withdrawal notice shall be prepared, sealed,
marked and dispatched in accordance with the provisions of Clause15. A withdrawal
notice may also be sent by fax or e mail but followed by a signed confirmation copy,
post marked not later than the deadline for submission of bids.
21.1 Opening of Bids by Purchaser
21.2 The Purchaser will download the “technical bid” as per e tender procedure. After
through scrutiny of technical bid including qualification criteria, only eligible bidder‟s
(qualify the technical requirement of the bid) commercial bid shall be opened as per e
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
22. Clarification of Bids
To assist in the examination, evaluation and comparison of bids the Purchaser may, at
its discretion, ask the Bidder/Suppliers for a clarification of its bid. The request for
clarification and the response shall be in writing and no change in the price or
substance of the bid shall be sought, offered or permitted.
23. Preliminary Examination
23.1 The Purchaser will examine the bids to determine:
Whether they are complete,
Whether any computational errors have been made,
Whether required sureties have been furnished,
Whether the documents have been properly signed,
Whether the bids are generally in order.
23.2 Arithmetical errors will be rectified on the following basis:
If there is a discrepancy between the unit price and the total price that is obtained
by multiplying the unit price and quantity, the unit price shall prevail and the total
price shall be corrected. If the Bidder/Supplier does not accept the correction of the
errors, its bid will be rejected. If there is a discrepancy between words and figures,
the amount in words will prevail.
23.3 Prior to the detailed evaluation, pursuant to Clause 22, the Purchaser will determine the
substantial responsiveness of each bid to the Bidding Document. For purposes of these
clauses, a substantially responsive bid is one, which conforms to all the terms and
conditions of the Bidding Document without material deviations. The Purchaser's
determination of a bid's responsiveness is to be based on the contents of the bid itself
without recourse to extrinsic evidence.
23.4 If the prices of certain components/subassemblies/spare parts are not included, the
Purchaser will load the offer with the cost of these in evaluation if
goods/equipment/plant is functional. If the Purchaser considers that without these the
goods/equipment is not functional, then the bid will be treated as incomplete and non-
23.5 To facilitate loading incomplete bids, the highest cost of such components offered by
other Bidder/Suppliers or the estimated cost of such components in the opinion of the
Purchaser or other Purchases similarly made based on past experience shall be
considered for loading incomplete bids.
23.6 Since the bid is invited for the complete job of design, supply, installation and
commissioning of the equipment/plant, the incomplete or part bids submitted by any
Bidder/Supplier may not be considered for evaluation and may be liable for rejection.
23.7 A bid determined as not substantially responsive will be rejected by the Purchaser and
may not subsequently be made responsive by the Bidder/Supplier by correction of the
23.8 The Purchaser may waive any minor informality or nonconformity or irregularity in a bid,
which does not constitute a material deviation, provided such waiver, does not prejudice
or affect the relative ranking of the Bidder/Supplier.
24. Evaluation and Comparison of Bids
24.1 The Purchaser will evaluate and compare the bids previously determined to be
substantially responsive, pursuant to Clause 21. No bid will be considered if the
complete requirement covered under this work is not included in the bid. However, the
discounts offered by the Bidder/Suppliers, during negotiations, if any, will be taken into
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
account in the evaluation of bids so as to determine the bid offering the lowest
evaluated cost for the Purchaser in deciding award of contract/s.
24.2 The Purchaser's evaluation of a bid will include and take into account, in the case of
goods manufactured in India or goods of foreign origin already located in India, sales
and other similar taxes, which will be payable on the goods if a contract is awarded to
the Bidder/Supplier. Also, applicable excise duty payable by the Purchaser will be
added to the bid price for evaluation.
24.3 The comparison shall be of free delivery at site basis including unloading and inclusive
of all taxes (sales, works contract etc.) and duties (customs, countervailing, excise etc.)
of the goods offered from within India, such price to include all costs as well as duties
and taxes paid or payable on components & raw material incorporated in the goods as
well as taxes & duties payable on finished goods and the installation and
commissioning costs as per the provisions in the technical specification.
24.4 The Purchaser's evaluation of a bid will take into account, in addition to the bid price
and the price of incidental services, the following factors, in the manner and to the
extent indicated in this Clause 22 and in the Technical Specifications:
Cost of inland transportation, insurance and other costs within India incidental to
delivery of the goods to their final destination.
Delivery schedule offered in the bid.
The cost of components and service;
The availability of spare parts and after-sales services for the equipment offered in
Deviation in payment schedule from that specified in the Special Conditions of
The quality and adaptability of the equipment offered.
The performance and productivity of the equipment offered
24.5 If it is found that any Bidder/Supplier for any reason indicates impractical or impossible
data to arrive performance guarantees, such data shall be corrected and all the
calculations shall be based on the data furnished by the highest Bidder/Supplier for the
purpose of comparison.
25. Contacting the Purchaser
25.1 Subject to Clause 21, no Bidder/Supplier shall contact the Purchaser on any matter
relating to its bid, from the time of the bid opening to the time the Contract is awarded.
25.2 Any effort by a Bidder/Supplier to influence the Purchaser in the Purchaser's bid
evaluation, bid comparison or contract award decisions may result in the rejection of the
Bidder/Supplier's bid.
26. Post-qualification
26.1 In the absence of pre-qualification, the Purchaser will determine to its satisfaction
whether the Bidder/Supplier selected as having submitted the lowest evaluated
responsive bid is qualified to satisfactorily perform the Contract.
26.2 The determination will take into account the Bidder/Supplier's financial, technical and
production capabilities. It will be based upon an examination of the documentary
evidence of the Bidder/Supplier's qualifications submitted by the Bidder/Supplier,
pursuant to Clause 10 as well as such other information as the Purchaser deems
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
necessary and appropriate including details of experience and records of past
26.3 An affirmative determination will be a prerequisite for award of the Contract to the
Bidder/Supplier. A negative determination will result in rejection of the Bidder/Supplier's
bid, in which event; the Purchaser will proceed to the next lowest evaluated bid to make
a similar determination of that Bidder/Supplier's capabilities to perform satisfactorily.
26.4 After following the procedure mentioned in the Tender Document Part A and General
guidelines for E tender and E-Auction, the Purchaser will award the contract to the
successful Bidder/Supplier whose bid has been determined to be substantially
responsive and has been determined as the lowest evaluated bid provided further that
the Bidder/Supplier is determined to be qualified to perform the contract satisfactorily as
per Clause 22 and
27. Right to Vary Quantities at the Time of Award
The Purchaser reserves the right at the time of award of Contract to increase or
decrease by up to 15% (Fifteen percent) the quantity of goods and services specified in
the Schedule of Requirements without any change in unit rates as specified in the price
break – up or other terms and conditions.
28. Right to Accept any Bid and to Reject Any or All Bids
The Purchaser reserves the right to accept or reject any bid, and to annul the
bidding process and reject all bids at any time prior to award of Contract, without
thereby incurring any liability to the affected Bidder/Supplier or Bidder/Suppliers
or any obligation to inform the affected Bidder/Supplier or Bidder/Suppliers of the
grounds for the Purchaser's action.
29. Notification of Award
29.1 The Purchaser may notify the successful Bidder/Supplier in writing by registered letter
or by email or fax to be confirmed in writing by registered letter, that its bid has been
29.2 The notification of award will constitute the formation of the Contract.
29.3 Upon the successful Bidder/Supplier's acceptance of the Purchase Order and signing of
the contract agreement, the Purchaser will promptly notify each unsuccessful
Bidder/Supplier and will discharge its bid security.
Signing of Contract
30.1 At the same time as the Purchaser notifies the successful Bidder/Supplier that its bid
has been accepted, the Purchaser will send the Bidder/Supplier the Purchase Order.
30.2 Within 30 days of receipt of the Contract, the successful Bidder/Supplier shall return the
duplicate copy of the Order duly signed and sealed in token of acceptance of the order
to the Purchaser.
30 Performance Security
30.1 the successful Bidder/Supplier shall furnish the performance security in accordance
with the special conditions of Contract, in the Performance Security Form provided in
the Bidding Document or another form acceptable to the Purchaser.
31 Turn-key Contract
All the Bidder/Suppliers should quote for the design, supply, installation, testing and
commissioning of equipment as detailed in this bidding document on turn-key basis
within the scope specified in the technical specification. The Purchaser shall, however,
be at liberty to award the contract for the part or whole of the work.
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
32 Delivery Schedule of items
Bidder/Suppliers should submit a detailed item wise delivery schedule keeping in view
the completion period of the contract. Such items shall be grouped under monthly
delivery schedule with total value of such items. This will facilitate for ensuring the cash
flow requirement for the project.
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
Check List of Bid Submission
SN Requirement Tick
1 Bid Form, Copy of Online Bid submitted on N-procure portal.
3 Manufacturers‟ Authorisation Form or Manufacturing License
issued by Government authority
4 Technical Deviation Statement form (in case of deviation)
5 Commercial Deviation Statement form (in case of deviation)
6 Bid Security (Earnest Money Deposit)
7 Power-of-attorney for authorised signatory
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
General Conditions of Contract
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
3. Definition of Country of origin
5. Use of Contract Documents and Information
6. Patent Rights
7. Performance Security
8. Inspection and Tests
9. Packing and Marking
10. Delivery and Documents
12. Transportation
13. Incidental Services
14. Spare Parts
15. Warranty/Guarantee
18. Change Orders
19. Contract Amendment
21. Sub-contracts
22. Delays in the Bidder/Supplier's Performance
23. Liquidated Damage
24. Termination for Default
25. Force Majeure
26. Termination for Insolvency
27. Termination for Convenience
28. Resolution of Disputes
29. Governing Language
30. Applicable Law
32. Taxes and Duties
33. Right to use defective equipment
34. Income Tax and Other Taxes
35. Jurisdiction
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
1.1 In this Contract, the following terms shall be interpreted as indicated:
1.2 "The Contract" means the agreement entered into between the Purchaser and the
Bidder/Supplier, including all attachments and appendices thereto and all documents
incorporated by reference therein.
1.3 "The Contract Price" means the price payable to the Bidder/Supplier under the
Contract for the full and proper performance of its contractual obligations.
1.4 "The Goods" means all of the equipment, machinery, and/or other materials, which the
Bidder/Supplier is required to supply to the Purchaser under the Contract.
1.5 "Services" means services ancillary to the supply of the Goods, such as transportation
and insurance, and any other incidental services, such as installation, commissioning,
provision of technical assistance, training and other such obligations of the
Bidder/Supplier covered under the Contract.
1.6 "The Purchaser" means the Organization purchasing the Goods and services and
would include the term "Owner".
1.7 "The Bidder/Supplier" means the individual or firm supplying the Goods and services
under this Contract would include also the terms “contractor” or “Bidder/Supplier”.
1.8 Engineer-in-charge means the Engineer designated as such or other Engineer
appointed from time to time by the Purchaser and notified in writing to the
Bidder/Supplier to act as Engineer-in-charge for the purposes of contract.
2.1 These General Conditions shall apply to the extent that provisions in other parts
of the Contract do not supersede them.
3 Definition of Country of origin
3.1 For purpose of this Clause "origin" means the place where the Goods were mined,
grown or produced, or from which the Services are supplied. Goods are produced
when, through manufacturing, processing or substantial and major assembling of
components, a commercially recognized new product results that is substantially
different in basic characteristics or in purpose or utility from its components. The origin
of Goods and Services is distinct from the nationality of the Bidder/Supplier.
4.1 The Goods supplied under this Contract shall conform to the standards mentioned in
the Technical Specifications, and, when no applicable standard is mentioned, to the
latest Indian Standards.
Use of Contract Documents and Information
5.1 The Bidder/Supplier shall not, without the Purchaser's prior written consent, disclose
the Contract, or any provision thereof, or any specification, plan, drawing, pattern,
sample or information furnished by or on behalf of the Purchaser in connection
therewith, to any person other than a person employed by the Bidder/Supplier in the
performance of the Contract. Disclosure to any such employed person shall be made in
confidence and shall extend only so far as may be necessary for purposes of such
5.2 The Bidder/Supplier shall not, without the Purchaser's prior written consent, make use
of any document or information except for purposes of performing the Contract.
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
5.3 Any document, other than the Contract itself, shall remain the property of the Purchaser
and shall be returned (in all copies) to the Purchaser on completion of the
Bidder/Supplier's performance under the Contract if so required by the Purchaser.
6 Patent Rights
6.1 The Bidder/Supplier shall indemnify the Purchaser against all third-party claims of
infringement of patent, trademark or industrial design rights arising from use of the
Goods or any part thereof.
Performance Security
7.1 The Bidder/Supplier shall furnish performance security to the Purchaser in the amount
specified in the Special Conditions of Contract.
7.2 The proceeds of the performance security shall be payable to the Purchaser as
compensation for any loss resulting from the Bidder/Supplier's failure to complete its
obligations under the Contract.
7.3 The Performance Security shall be denominated in Indian Rupees and shall be in one
of the following forms:
A bank guarantee issued by a Nationalized Bank in India and in the form
provided in the Bidding Document. Such bank guarantee shall be valid till the
expiry of the warranty period.
Demand Draft from a Nationalised Bank in favor of Mehasana District Co-
operative Milk Producers’ Union Ltd. payable at Mehsana. No interest shall be
paid on the security deposit, which shall be retained till the completion of the
warranty period.
7.4 The performance security will be discharged by the Purchaser and returned to the
Bidder/Supplier not later than 30 days following the date of completion of the
Bidder/Supplier's performance obligations, including any warranty obligations, under the
8 Inspection and Tests
8.1 The Purchaser or its representative shall have the right to inspect and/or test the
Goods to confirm their conformity to the Contract. The Special Conditions of Contract
and/or the Technical Specifications shall specify what inspections and tests the
Purchaser requires and where they are to be conducted. The Purchaser shall notify the
Bidder/Supplier in writing of the identity of any representatives, if retained for these
8.2 The inspections and tests may be conducted on the date of delivery and/or at the Good's
final destination. Where conducted on the premises of the Bidder/Supplier or its
subcontractors(s), all reasonable facilities and assistance including access to drawings
and production data shall be furnished to the inspectors at no charge to the Purchaser.
In case of any defects or deficiency notified by the Purchaser's inspection authority, the
Bidder/Supplier will rectify and make good the same without delay and not proceed with
further processing of such item(s) of Goods without obtaining approval from the
inspection authority.
8.3 Should any inspected or tested Goods fail to conform to the Specifications, the
Purchaser may reject them and the Bidder/Supplier shall either replace the rejected
Goods or make all alterations necessary to meet specification requirements free of cost
to the Purchaser.
8.4 The Purchaser's right to inspect, test and, where necessary, reject the Goods after the
Goods' arrival at the destination shall in no way be limited or waived by reason of the
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
Goods having previously been inspected, tested and passed by the Purchaser or its
representative prior to the Goods shipment from the country of origin.
8.5 Nothing in this clause shall in any way release the Bidder/Supplier from any warranty or
other obligations under this Contract.
9 Packing and Marking
9.1 The Bidder/Supplier shall provide such packing of the Goods as is required to prevent
their damage or deterioration during transit to their final destination as indicated in the
Contract. The packing shall be sufficient to withstand, without limitation, rough handling
during transit and exposure to temperature, salt and precipitation during transit and open
storage. Packing case size and weights shall take into consideration, where appropriate,
the remoteness of the Goods' final destination and the absence of heavy handling
facilities at all points in transit.
9.2 The packing, marking and documents within and outside the packages shall comply
strictly with such special requirements as shall be expressly provided for in the Contract
and, subject to Clause 18, in any subsequent instructions ordered by the Purchaser.
9.3 Each package shall be marked to indicate a) Name of the Bidder/Supplier, b) Details of
items in the package, c) Name of the Consignee, d) Purchase Order Number, e) Gross,
net and tare weights of the item, f) Destination.
10 Delivery and Documents
10.1 Delivery of the goods shall be made by the Bidder/Supplier in accordance with the
terms specified by the Purchaser in its Schedule of Requirements and the Special
Conditions of Contract. For the purpose of the Contract, "FOB", "C&F", "CIF", "FOR
Destination", "Free delivery at site" and other trade terms used to describe the
obligations of the parties shall have the meanings as per the common trade practices.
11.1 The goods supplied under the Contract shall be fully insured in Indian Rupees against
loss or damage incidental to manufacture or acquisition, transportation, storage and
delivery in the manner specified in the Special Conditions of Contract. Where the
Purchaser requires delivery of the Goods on free delivery at site basis; the
Bidder/Supplier shall arrange and pay for marine insurance naming the Purchaser as
the beneficiary. The Bidder/Supplier shall provide a copy of the insurance policy along
with invoice to the Purchaser who will make arrangements to extend the validity of the
policy, if necessary. The Bidder/Supplier shall initiate and pursue claim till settlement
and promptly make arrangements for repair and/or replacement of any damaged item/s
irrespective of settlement of claim by the underwriters.
12 Transportation
12.1 The Bidder/Supplier is required under the Contract to deliver the Goods FOR
destination, specified in the Schedule of Requirement. Transport of the Goods, up to
the destination shall be arranged and paid for by the Bidder/Supplier and the cost
thereof shall be included in the Contract Price. Where the Bidder/Supplier is required to
effect delivery under any other terms, for example, by post or to another address in the
source country, the Bidder/Supplier shall be required to meet all transport and storage
expenses until delivery. In all the above cases, transportation of the Goods after
delivery shall be the responsibility of the Purchaser.
Incidental Services
13.1 As specified in the Special Conditions of Contract, the Bidder/Supplier shall be required
to provide any or all of the following services:
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
Performance or supervision of on-site assembly and/ or start-up of the supplied
Furnishing of tools required for assembly and/or maintenance of the supplied goods
Furnishing of a detailed operations and maintenance manual for each appropriate
unit of the supplied Goods; and manuals covering the operation and maintenance of
automation software and control systems.
Performance or supervision or maintenance and/or repair of the supplied Goods, for
a period of time agreed by the parties, provided that this service shall not relieve the
Bidder/Supplier of any warranty obligations under this Contract and
Conduct of training of the Purchaser's personnel, at the Bidder/Supplier's plant
and/or on-site, in assembly, start-up operation, maintenance and/or repair of the
supplied Goods.
14.1 As specified in the Special Conditions of contract, the Bidder/Supplier may be required
to provide any or all of the following materials and notifications pertaining to spare parts
manufactured or distributed by the Bidder/Supplier:
Such spare parts as the Purchaser may decide to purchase from the
Bidder/Supplier, provided that this decision shall not relieve the Bidder/Supplier of
any warranty obligations under the Contract; and
In the event of termination of production of the spare parts:
Advance notification to the Purchaser of the pending termination, in sufficient time
to permit the Purchaser to procure its needed requirements; and
Following such termination, furnishing at no cost to the Purchaser, the soft-copies,
the blueprints, drawings and specifications of the spare parts, if and when
Warranty/Guarantee
15.1 The Bidder/Supplier warrants that the Goods and equipment supplied, installed and
commissioned under the Contract are new, unused, of the most recent or current
models and incorporate all recent improvements in design and materials unless
provided otherwise in the Contract. The Bidder/Supplier further warrants that the Goods
supplied under this Contract shall have no defect arising from design, materials or
workmanship (except in so far as the design or material is required by the Purchaser's
Specifications) or from any act or omission of the Bidder/Supplier, that may develop
under normal use of the supplied Goods in the conditions obtaining in the country of
final destination. The Bidder/Supplier also guarantees that the Goods supplied shall
perform satisfactorily as per the designed/rated/installed capacity as provided for in the
Contract. The warranty will not cover normal wear and tear of consumables and minor
15.2 This warranty/guarantee shall remain valid for not less than 12 months after the
Goods or any portion thereof as the case may be, have been successfully
commissioned and plant handed over to the purchaser.
15.3 The Purchaser shall promptly notify the Bidder/Supplier in writing of any claims arising
under this warranty.
15.4 Upon receipt of such notice, the Bidder/Supplier shall, with all reasonable speed, repair
or replace the defective Goods or parts thereof, without costs to the Purchaser other
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
than, where applicable, the cost of inland delivery of the repaired or replaced Goods or
parts from the port of entry to the final destination.
15.5 If the Bidder/Supplier, having been notified, fails to remedy the defect(s) within a
reasonable period, the Purchaser may proceed to take such remedial action as may
be necessary, at the Bidder/Supplier's risk and expense and without prejudice to any
other rights which the Purchaser may have against the Bidder/Supplier under the
15.6 This warranty/guarantee shall not cover any damage/s resulting from normal wear and
tear or improper handling by the Purchaser or his authorized representatives.
15.7 The Bidder/Supplier shall guarantee the complete installation for satisfactory
performance for a minimum period of twelve months from the date of commissioning.
The Bidder/Supplier at his own cost shall rectify any defect arising out of faulty
installation or use of substandard material or workmanship.
16.1 The method and conditions of payment to be made to the Bidder/Supplier under the
Contract shall be specified in the Special Conditions of Contract.
16.2 The Bidder/Supplier's request(s) for payment shall be made to the Purchaser in writing,
accompanied by an invoice describing, as appropriate, the Goods delivered and
Services performed, and by shipping documents, submitted pursuant to Clause 10, and
fulfilments of other obligations stipulated in the Contract.
16.3 Payments shall be made promptly by the Purchaser as per payment terms in PO on
submission of an invoice/claim by the Bidder/Supplier.
Prices charged by the Bidder/Supplier for Goods delivered and Services performed
under the Contract shall not, with the exception of price adjustments authorized by the
special conditions of the contract, vary from the prices quoted by the Bidder/Supplier in
its bid and the Contract shall be on fixed price basis.
18.1 The Purchaser may, at any time, by a written order given to the Bidder/Supplier make
changes within the general scope of the Contract in any one or more of the following:
Drawings, designs or specifications, where Goods to be furnished under the
Contract are to be specifically manufactured for the Purchaser
The place of delivery or
The Services to be provided by the Bidder/Supplier.
18.2 If any such change causes an increase or decrease in the cost of, or the time
required for, the Bidder/Supplier's performance of any part of the work under the
Contract, whether changed or not changed by the order, an equitable adjustment
shall be made in the Contract Price or delivery schedule, or both, and the
Contract shall accordingly be amended. Any claims by the Bidder/Supplier for
adjustment under this clause must be asserted within thirty (30) days from the
date of the Bidder/Supplier's receipt of the Purchaser's change order.
19. Contract Amendment
19.1 No variation in or modification of the terms of the Contract shall be made except
by written amendment signed by the parties.
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
20.1 The Bidder/Supplier shall not assign, in whole or in part, its obligations to
perform under the Contract, except with the Purchaser's prior written consent.
21.1 The Bidder/Supplier shall notify the Purchaser in writing of all sub-contracts awarded
under the Contract if not already specified in his bid. Such notification, in his original
bid or later, shall not relieve the Bidder/Supplier from any liability or obligation under
21.2 Sub-contracts must comply with the provisions of Clause
Delays in the Bidder/Supplier's Performance
22.1 Delivery of the Goods and performance of Services shall be made by the
Bidder/Supplier in accordance with the time schedule specified by the Purchaser in
its Schedule of Requirements.
22.2 An unexcused delay by the Bidder/Supplier in the performance of its delivery
obligations shall render the Bidder/Supplier liable to any or all of the following sanctions:
Forfeiture of its performance security,
Imposition of liquidated damages, and/or
Termination of the Contract for default
22.3 If at any time during performance of the Contract, the Bidder/Supplier or its
subcontractor(s) should encounter conditions impeding timely delivery of the Goods
and performance of Services, the Bidder/Supplier shall promptly notify the
Purchaser in writing of the fact of the delay, its likely duration and its cause(s). As
soon as practicable after receipt of the Bidder/Supplier's notice, the Purchaser shall
evaluate the situation and may at its discretion extend the Bidder/Supplier's time for
performance, in which case the extension shall be ratified by the parties by
amendment of the Contract.
Liquidated Damages
23.1 Subject to Clause 25, if the Bidder/Supplier fails to deliver any or all of the Goods or
perform the Services within the time period(s) specified in the Contract, the Purchaser
shall, without prejudice to its other remedies under the Contract, deduct from the
Contract Price, as liquidated damages as under:
a. For the Supply Component:
A sum equivalent to 0.5% of the delivered price of the delayed goods (As per the
price break up furnished by the supplier and accepted by the Purchaser, which the
supplier fails to supply within the time period specified in the contract for each
b. For the Erection and Commissioning Component:
A sum equivalent to 0.5% of the un – executed portion of each week of delay or
part thereof beyond the time specified in the contract for the successful completion
The total amount so deducted as per above, shall not exceed 10% of the Contract
The total amount so deducted as per above, shall not exceed 10% of the Contract
value. Once the maximum is reached, the Purchaser may consider termination of the
23.2 Any incremental taxes and levies on account of delay in performance of the Contract by
the Bidder/Supplier shall be to the Bidder/Supplier's account.
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
Termination for Default
24.1 The Purchaser may, without prejudice to any other remedy for breach of contract, by
written notice of default sent to the Bidder/Supplier, terminate the Contract in whole or
If the Bidder/Supplier fails to deliver any or all of the Goods within the time period(s)
specified in the Contract, or any extension thereof granted by the Purchaser
pursuant to Clause 22 or
If the Bidder/Supplier fails to perform any other obligation(s) under the Contract.
24.2 In the event the Purchaser terminates the Contract in whole or in part, pursuant to
Clause 24, the Purchaser may procure, upon such terms and in such manner, as it
deems appropriate, Goods similar to those undelivered, and the Bidder/Supplier shall
be liable to the Purchaser for any excess costs for such similar Goods. However, the
Bidder/Supplier shall continue performance of the Contract to the extent not terminated.
24.3 Consequent to such termination of Contract, the Purchaser shall recover the advance
paid, if any, to the Bidder/Supplier along with interest @ 18% per annum
compounded quarterly on the last day of March, June, September and December on
the advance paid for the entire period for which the advance was retained by the
Bidder/Supplier.
25.1 Not withstanding the provisions of Clauses 22, 23 and 24, the Bidder/Supplier shall not
be liable for forfeiture of its performance security, liquidated damages or termination for
default, if and to the extent that, its delay in performance or other failure to perform its
obligations under the Contract is the result of an event of Force Majeure.
25.2 For purposes of this clause, "Force Majeure" means an event beyond the control of the
Bidder/Supplier and not involving the Bidder/Supplier's fault or negligence and not
foreseeable. Such events may include, but are not restricted to, acts of the Purchaser
either in its sovereign or contractual capacity, wars or revolutions, fires, floods,
epidemics, quarantine restrictions and freight embargoes.
25.3 If a Force Majeure situation arises, the Bidder/Supplier shall promptly notify the
Purchaser in writing of such condition and the cause thereof. Unless otherwise directed
by the Purchaser in writing, the Bidder/Supplier shall continue to perform its obligations
under the Contract as far as is reasonably practical, and shall seek all reasonable
alternative means for performance not prevented by the Force Majeure event.
Termination for Insolvency
26.1 The Purchaser may at any time terminate the Contract by giving written notice to the
Bidder/Supplier, without compensation to the Bidder/Supplier, if:
The Bidder/Supplier becomes bankrupt or otherwise insolvent,
The Bidder/Supplier being a Company is wound up voluntarily by the order of a
Court receiver, liquidator or Manager appointed on behalf of the debenture holders
or circumstances shall have arisen which entitle the court or debenture holders to
appoint a receiver, liquidator or a Manager, provided that such termination will not
prejudice or affect any right of action or remedy which has accrued or will accrue
thereafter to the Purchaser.
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
Termination for Convenience
27.1 The Purchaser, may by written notice sent to the Bidder/Supplier, terminate the
Contract, in whole or in part, at any time for its convenience. The notice of termination
shall specify that termination be for the Purchaser's convenience, the extent to which
performance of work under the Contract is terminated, and the date upon which such
termination becomes effective.
27.2 The Purchaser shall purchase the Goods that are complete and ready for dispatch
within 30 days after the Bidder/Supplier‟s receipt of notice of termination at the Contract
terms and prices. For the remaining Goods, the Purchaser may decide:
To have any portion completed and delivered at the Contract terms and prices and/or
To cancel the remainder and pay to the Bidder/Supplier an agreed amount for partially
completed Goods and for materials and parts previously procured by the
Bidder/Supplier.
Both Purchaser and Supplier shall mutually settle all terminations as per clause 24,
Resolution of Disputes
28.1 The Purchaser and the Bidder/Supplier shall make every effort to resolve amicably by
direct informal negotiation any disagreement or dispute arising between them under or
in connection with the Contract.
28.2 If, after thirty (30) days from the commencement of such informal negotiations, the
Purchaser and the Bidder/Supplier have been unable to resolve amicably a Contract
dispute, either party may require that the dispute be referred for resolution to the formal
mechanisms specified in the Special Conditions of Contract. These mechanisms may
include, but are not restricted to, conciliation mediated by a third party, adjudication in
an agreed national or international forum, and/or international arbitration. The
mechanism shall be specified in the Special Conditions of Contract.
Governing Language
29.1 The Contract shall be written in the language of the bid, as specified by the Purchaser
in the Instructions to Bidder/Suppliers. Subject to Clause 30, that language version of
the Contract shall govern its interpretation. All correspondence and other documents
pertaining to the Contract, which are exchanged by the parties, shall be written in that
30.1 The Contract shall be interpreted in accordance with the laws of the Union of India.
31.1 Any notice given by one party to the other pursuant to the Contract shall be sent in
writing or by telegram or telex/cable and confirmed in writing to the address specified
for that purpose in the Special Conditions of Contract.
31.2 A notice shall be effective when delivered or on the notice's effective date, whichever is
Taxes and Duties
32.1 The Bidder/Supplier shall be entirely responsible for all taxes, duties, license fees,
etc. incurred until delivery of the contracted Goods to and taking over of the works by
the Purchaser. The onus of paying all the statutory levies as per the applicable tariff
heads and norms shall be on the Bidder/Supplier.
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
Right to use defective equipment
33.1 If after delivery, acceptance and installation and within the guarantee and
warranty period, the operation or use of the equipment proves to be
unsatisfactory, the Purchaser shall have the right to continue to operate or use
such equipment until rectification of defects, errors or omissions by repair or by
partial or complete replacement is made without interfering with the Purchasers'
Income Tax and Other Taxes
34.1 The Bidder/Supplier shall be liable to pay all corporate taxes, income tax and other
taxes that shall be levied according to the laws and regulations applicable from time to
time and the price bid by the Bidder/Supplier shall include all such taxes. Wherever the
laws and regulations require deduction of such taxes at the source of payment, the
Purchaser shall effect such deductions from the payment due to the Bidder/Supplier.
The remittance of amounts so deducted and issuance of certificate for such deductions
shall be made by the Purchaser as per the laws and regulations in force. Nothing in the
Contract shall relieve the Bidder/Supplier from his responsibility to pay any tax that may
be levied on income and profits made by the Bidder/Supplier in respect of the Contract.
The Bidder/Supplier's staff, personnel and labour will be liable to pay personal income
taxes in respect of such of their salaries and wages as are chargeable under the laws
and regulations for the time being in force, and the Bidder/Supplier shall perform such
duties in regard to such deductions thereof as may be imposed on him by such laws
and regulations. The Purchaser shall not, in any way, be responsible for such payments
by the Bidder/Suppliers' staff.
35.1 Settlement of any dispute out of the purchase order/ contract against this bid shall be
subject to the courts at address mentioned in “invitation for bid”
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
Special Conditions of Contract
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
2. Performance Security
3. Inspection and Tests
4. Delivery and Documents
6. Incidental services
8. Warranty/Guarantee
10. Resolution of Disputes
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
The following special conditions of contract shall supplement the General conditions of
contract. Whenever there is a conflict, the provisions herein shall prevail over those in
the General conditions of contract. The corresponding clause number of the General
conditions is indicated in parentheses:
4.1 Definitions (Clause 1)
4.1.1 The Purchaser is Mehsana District Co-operative Milk Producers‟ Union Limited (
herein after referred as Dudhsagar Dairy ) and would include the term "Owner"
4.1.2 The Bidder/Supplier is (Name of Bidder/Supplier).
4.1.3 Equivalency of Standards and Codes (Clause 4)
4.1.4 Wherever reference is made in the contract to the respective standards and
codes in accordance with which goods and materials are to be furnished, and
work is to be performed or tested, the provisions of the latest current edition or
revision of the relevant standards and codes in effect shall apply, unless
otherwise expressly set forth in the Contract. Where such standards and codes
are national in character, or relate to a particular country or region, other
authoritative standards which ensure an equal or higher quality than the
standards and codes specified will be accepted subject to the Purchaser's prior
review and written approval. Differences between the standards specified and the
proposed alternative standards must be fully described in writing by the
Bidder/Supplier and submitted to the Purchaser at least 30 days prior to the date
when the Bidder/Supplier desires the Purchaser's approval. In the event the
Purchaser determines that such proposed deviations do not ensure equal or
higher quality, the Bidder/Supplier shall comply with the standards set forth in the
4.2 Performance Security (Clause 7)
4.2.1 The Performance Security shall be in the amount of 10% of the contract price up
and shall be released after the date of completion of performance obligations
including warranty obligations.
4.3 Inspection and tests (Clause 8)
4.3.1 The inspection of the goods shall be carried out to check whether the goods are in
conformity with the technical specifications attached to the purchase order form
and shall be in line with the inspection/test procedures laid down in the schedule
of specifications and the contract conditions.
4.4 Delivery and Documents (Clause 10)
Original and seven copies of:
a) the supplier‟s invoice showing purchase order no., Goods‟ description,
quantity, unit price, total amount;
quantity, unit price, total amount;
b) Delivery note/packing list/lorry receipt;
c) Manufacturer‟s/Supplier‟s guarantee certificate;
d) Inspection Certificate issued by the nominated inspection agency, and the
Supplier‟s factory inspection report;
e) Certificate of origin ( As applicable )
f) Insurance policy;
g) Any other document evidencing payment of statutory levies.
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
Note: The nomenclature used for the item description in the invoice/s, packing list/s
and delivery note/s etc. should be identical to that used in the purchase
order/contract. The dispatch particulars including name of transporter, LR no.
and date should also be mentioned in the invoice/s.
4.5 Insurance (clause 11)
4.5.1 The marine/transit insurance shall cover an amount equal to 110% of the FOR
destination value of the goods from “warehouse to warehouse” on “All Risks”
basis including War Risks and Strike clauses valid for a period not less than
months after the date of arrival of Goods at final destination.
4.5.1 The Insurance charges shall be paid by successful Bidder/Supplier towards all
risks during storage, erection, testing, commissioning and up to acceptance of
4.6 Incidental services (Clause 13)
4.6.1 The incidental services shall be provided as per the requirements outlined in the
Schedule of Specifications and as covered under Clause 3.13. The cost shall be
included in the contract price, if provided for in the scope of the scope of the
4.7 Spare Parts (Clause 14)
4.7.1 Suppliers shall carry sufficient inventories to assure ex-stock supply of
consumable spares such as gaskets, plugs, washers, belts, etc. other spare
parts and components shall be supplied as promptly as possible but in any case
within one months of placement of order.
4.7.2 Losses during Trial :(Clause 23)
Not applicable in this tender
4.8 Warranty/Guarantee (Clause 15)
4.8.1 The warranty/guarantee shall be as per provision under clause
4.9 Payment (Clause16)
4.9.1 Payment for supply, installation and commissioning contracts:
Payment of Supply component;
- 20% advance on supply value shall be payable against submission of
Advanced Bank Guarantee of equivalent amount valid till schedule date
of delivery/ actual delivery of materials.
- 60% of the contract price of the goods (against detailed break up cost to
be furnished in advance and accepted by the Purchaser) on safe receipt
of goods at site and after inspection and approval of the purchaser.
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
- The balance 20% of the contract price of the goods shall be paid on
continuous satisfactory running of the complete plant/ equipment for
days i.e., on commercial product trial on completion of the contracted
services and acceptance by the purchaser‟s representative within the
scope of this contract and against submission of performance bank
guarantee of 10% of contract value valid for 13 Months. Last date of
defaulter‟s claim period should be min 3 months beyond PBG validity
Payment for Labour charges
for installation, testing and commissioning:
- On progress of work: 80% of the contract price for installation and
commissioning shall be paid on prorate basis on actual completion of
installation/erection and after due inspection and approval by the
purchaser (against detailed break up cost to be furnished by the Supplier
in advance and accepted by the Purchaser) as per Joint Measurement
- On commissioning: 10% of the contract price for installation and
commissioning shall be paid on actual completion of commissioning and
after due inspection and approval by the purchaser (against detailed
break up cost to be furnished by the Supplier in advance and accepted
by the Purchase)..
- On final acceptance:
The balance 10% shall be paid on continuous satisfactory running of the
complete plant/equipment for one month, on completion of other
contracted services and accepted by the purchaser's representative,
within the scope of this contract, AGAINST SUBMISSION OF
PERFORMANCE BANK GUARANTEE OF 10% of contract value valid
for 13 Months. Last date for defaulter/s claim should be min 3 months
beyond BG validity date.
Notes : (Refer NIT Part A document also)
a) Payment shall be made on complete supply of an item/group of items specified
in the contract. No payment specified in the contract. No payment shall be made
if supply of an item/group of items is incomplete.
b) The bank guarantee shall be issued by a Nationalized Bank or schedule banks
c) Bank Guarantees, where obtained for advance payment, shall be released not
later than 30 days after the date of delivery of all the Goods at their final
d) During project execution, If additional quantity of any item covered in attached
price table is required either for completion of turnkey project or capacity
expansion, bidder will have to supply and install respective item at same
approved rate of our purchase order.
e) Basic rates are inclusive of P and F, freight, insurance, unloading, installation,
testing and commissioning i.e. FOR our site, but, exclusive of GST.
f) Refer NIT Part A document for additional terms
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
4.10 Resolution of Disputes (Clause 3.28)
4.10.1 All disputes or differences in respect of which the decisions not final and
conclusive shall, on the initiative of either party, be referred to the receipt the
dispute to arbitration, the purchaser shall refer the dispute to arbitration, the
purchaser shall finalize a panel of three Arbitrators and intimate the same to the
supplier. The supplier shall within fifteen days of receipt of this list select and
confirm his acceptance to the appointment of one from the panel as Arbitrator. If
the supplier fails to communicate his selection of name, within the stipulated
period , the purchaser shall within the stipulated period, the purchaser shall
without delay select one from the panel and appoint him as the sole Arbitrator. If
the purchaser fails to send such a panel within thirty days, ass stipulated, the
supplier shall send a similar panel to the purchaser within fifteen days. The
purchaser shall then select one from the panel and appoint him as the sole
Arbitrator within fifteen days. If the purchaser fails to do so, the supplier shall
communicate to the purchaser the name of one from the panel who shall than
be the sole Arbitrator. The appointment of sole Arbitrator so made shall be final
and conclusive. The Arbitration shall be conducted in accordance with the
provisions of the Indian Arbitration Act, 1940 and rules there under or any
statutory modifications thereof for the time being in force. The Arbitration
proceedings shall be held in Address mentioned in “Invitation for Bid” at the time
as the sole Arbitrator may decide. The decision of the sole Arbitrator shall be
final and binding upon the parties and the expenses of the Arbitrator shall be
paid as may be determined by the Arbitrator.
Performance under the contract shall, if reasonably possible, continue during
the Arbitration proceedings and payments due to the supplier by the purchaser
shall not be withheld, unless they are the subject of the Arbitration proceedings.
All awards for claims equivalent to Rupees thirty thousand or more shall be in
writing and state the reasons for the amounts awarded.
Neither party is entitled to bring a claim to Arbitration if its Arbitrator has not
been appointed within thirty days after expiration of the warranty/guarantee
4.11 Notices (Clause 3.31)
4.11.1 For the purpose of all the notices, the following shall be the address of the
purchaser and supplier.
Purchaser:– Address as mentioned in Invitation for Bid
Supplier: (To be filled in at the time of contract signature.)
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
Technical Specifications
Special Condition of Contract for
Mechanical Work
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
2. General Installation
3. Service Piping Installation
4. Special Instructions and Specifications
5. Insulation of Piping and Equipment
6. Interconnections of Services
7. Guidelines for Expansion Work
8. Cleaning Chemicals and Lubricants
9. Testing, Commissioning and Start-Up
10. Trouble shooting during the trial period
12. Training of Personnel
13. Code of Practice for Painting Service Pipelines
Table 1 Painting of Equipment & Structural Work
Table 2 Colour Code for Pipelines as per BIS 2379-1963
Table 3 Testing Pressures for Various Pipelines
Table 4 Makes of Bought Out Items
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
The scope of mechanical works, but not limited to shall be as follows;
1.1 General installation i.e. positioning and installing all the production, miscellaneous and
service equipment as per approved layout drawings and as per the contract.
1.2 Supply and installation of structural platforms and tables.
1.3 Supply and installation of all service and product piping including ancillary items.
1.4 Insulation and cladding of piping, equipment including supply of materials.
1.5 Interconnections of services and Electrical with equipment.
1.6 Guideline for expansion work.
1.7 Clean up of work site.
1.8 Supply of all cleaning chemicals and lubricants.
1.9 Testing, commissioning and start-up.
1.10 Painting including supply of paints as approved by the Purchaser.
1.11 Training of personnel.
1.12 Detailed specifications are given in the subsequent clauses.
2. General Installation
2.1 Positioning of Equipment
The work involves preparation of access for moving of the plant and equipment
including their fittings from the work site godown or from the place within the site where
they have been unloaded, to the place of erection, de-crating and placing on the
foundation wherever required. The Purchaser shall arrange all the civil foundations as
per the manufacturer Supplier‟s drawings. The Supplier shall place the equipment and
carry out final adjustment of the foundations including alignment and dressing of
foundation surface, embedding and grouting of anchor bolts and bedplates. The
Supplier shall be responsible for obtaining correct reference lines for the purpose of
fixing the alignment of various equipment from master benchmarks provided.
Tolerances shall be as specified in equipment manufacturer's drawings or as stipulated
by the Purchaser's Engineer. No equipment shall be permanently bolted down to
foundations or structure until the Supplier has checked the alignment and witnessed by
the Purchaser. The Supplier shall carry out minor alterations in the anchor bolts,
pockets etc., at no extra cost and set the equipment properly as per approved layout,
drawings and manufacturer's instructions. The Supplier shall supply all the necessary
foundation/anchor bolts and bedplates if required without extra cost if these have not
been provided with main equipment.
The Supplier shall supply, fix and maintain, at his own cost, during the erection work, all
the necessary centering, scaffolding, staging required not only for proper execution and
protection of the said work but also for protection of the surrounding plant and
equipment. The Supplier shall take out and remove any or all such centering,
scaffolding, staging planking etc., as occasion shall require or when ordered to do so
and shall fully reinstate and make good all things disturbed during execution of the
work, to the satisfaction of the Purchaser. The Supplier shall be paid no additional
amount for the above.
2.2 Structural Platforms and Tables
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
Structural platforms shall be required to provide access for various equipment. Tables
shall be required for handling products. These platforms and tables shall be fabricated
keeping stability and other functional as well as aesthetic requirements into
consideration as approved by the Purchaser. The payment shall be made on the basis
of the actual weight executed and the unit rates agreed upon or as per provisions made
in the contract for such items.
3. Service Piping Installation
3.1 General Guidelines
All piping systems shall comply with the latest editions of the following regulations
wherever applicable:
Indian Boiler Regulations
Regulations of explosives inspectorate
All applicable Indian Standards
All applicable State Government/ Central Government Laws/ Acts
3.2 Scope of Supply
The Supplier shall supply all piping materials like pipes, fittings, flanges, measuring
instruments and all other items as shown in the P&I diagram/specifications and
schedule of quantities. All the pipes & fittings and insulation material etc. should be of
class and make as approved by the Purchaser. The Supplier, for the class and make of
all materials, must obtain prior approval of the Purchaser. The Supplier should furnish
the details of makes selected by him, in the pro forma given in Table
3.3 Scope of Piping Erection
The scope of erection for piping, includes all system covered in the flow diagrams and
specifications. The Supplier's work commences/ terminates at the pipe connections with
valves or flanges as specified in flow diagrams/ battery limits.
The Supplier shall also install necessary piping and any specialties furnished with or for
equipment such as relief valves, built-in-bypass, primary elements for flow
measurements, control valves and on-line metering equipment.
The Supplier shall perform necessary internal machining of pipes for installing orifices,
flow nozzles, control valves etc. The Supplier shall install all pipes, valves and
specialties being procured from other sources.
3.4 Testing of Piping
The Supplier shall test all piping systems including valves and specialties and
instruments as per procedure mentioned in Table
All piping shall be internally cleaned and flushed by the Supplier after erection in a
manner suited to the service and as directed by the Purchaser.
For hydrostatic testing and water flushing, the Supplier shall furnish necessary
pumps, equipment, instruments and piping etc.
3.5 Other Guidelines
Color code/ Flow direction indicator shall be used to identify pipe material. The
Supplier shall be able to identify on request all random piping prior to field fabrication.
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
The Supplier shall be responsible for the quality of welding done by them and shall
conduct tests to determine the suitability of the welding procedure by him.
All piping supports, guides, anchors, hangers, rollers with structural framework shall be
supplied and erected by the Supplier. The kinds of pipe support like CI clamps, wooden
saddles, roller supports, and support framework shall be as per the design approved by
the Purchaser prior to taking up the work.
All piping shall be suspended, guided and anchored with due regard to general
requirements and to avoid interference with other pipes, hangers, electrical conduits
and their supports, structural members and equipment and to accommodate insulation
and conform to buildings structural limitations. It is the responsibility to the piping
Supplier to avoid all interference while locating hangers and supports.
Anchors and/or guides for pipelines or for other purposes shall be furnished, when
specified, for holding the pipeline in position for alignment. Hangers shall be designed
fabricated and assembled in such a manner that any movement of the support pipes
cannot disengage them.
All piping shall be wire brushed and purged with air blast to remove all rust, mill scale
from inner surface. The method of cleaning shall be such that no material is left on the
inner or on outer surfaces, which will affect the serviceability of the pipes.
Effective precautions such as capping and sealing shall be taken to protect all pipe
ends against ingress of dirt and damage during transit or storage. The outside of the
steel pipes (black) shall be painted with two coats of red oxide paint or as directed by
Dead ends of Milk & Product lines / Valves / Valve Cluster must be plugged sanitarily so
as maintain hygiene of product.
4. Special Instructions and Specifications
4.1 Steam Piping
Steam piping work can be classified into two categories:
High-pressure steam piping when the working pressure of steam is more than
kg/cm2 (50 psi).
Low-pressure steam piping when the working pressure of steam is up to 3.1 kg/cm2
All the pipes and fittings used for high pressure steam piping work should conform to
IBR and they should be IBR certified and also to be identified with number and mark
showing that they are tested by the Boiler Inspector and supported with duly authentic
certificates to this effect. ALL HIGH-PRESSURE STEAM PIPES SHALL BE
SEAMLESS TYPE, SCHEDULE
The high-pressure steam piping after installation should be hydraulically tested in
presence of the Boiler Inspector for his approval.
The high-pressure steam piping work should also include fabrication and installation of
pressure reducing stations strictly conforming to IBR.
4.2 Other Piping
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
ALL THE PIPING FOR CHILLED WATER, GLYCOL, AMMONIA, SOFT AND RAW
WATER, H.P. AND L.P. STEAM, AIR AND FURNACE OIL/ LSHS PIPING SHALL
GENERALLY BE OF WELDED CONSTRUCTION. Whenever welding is done for pipes
of smaller size special care should be exercised to avoid clogging of flow area with the
welding material.
5. Insulation of Piping and Equipment
5.1 Cold Insulation of Chilled Water, Glycol and Ammonia Pipeline
All the chilled water, glycol & ammonia pipelines shall be insulated by PUF pipe
sections. The insulation shall be carried out in the following manner:
Before starting insulation work all pipelines shall be tested as specified
The surface of the pipes to be insulated should be properly cleaned
Hot bitumen of 85/40 or 85/25 conforming to IS 702 should be applied uniformly @
kg/m2 on the surface of the pipes
A similar layer of bitumen should be applied on the inner surface and on the edges of
the insulation sections
The sections should then be stuck to the coated pipes with joints staggered. Adjacent
sections should be tightly pressed together. All joints should be properly sealed with
bitumen and or Insulating Tape
A thick vapor seal with hot bitumen @ 2.5 kg/m2 should be applied uniformly on the
outer surfaces of the pipe sections and allowed to dry
In case the insulation sweats or the specified/required insulation, properties are not
attained, the entire insulation in such region shall be redone with fresh material, entirely
at the Supplier's cost
The thickness of PUF insulation shall be as required. Density shall be minimum
Kg/M3 to be used
Outer cover shall be aluminum cladding of not less than 22-gauge thickness with SS
screwing at regular interval
5.2 Insulation of Chilled Water Tank
The surfaces shall be cleaned with the help of brushes to remove any loose particles
A coat of bitumen of 85/40 or 85/25 conforming to IS 702 @1.0 kg/m2 shall be applied
over the flooring and walkathon sheets shall be press-laid to act as a vapour barrier
Bitumen shall then be applied on the PUF sheets (min 36 Kg/M3 Density) and one side
and edges of the insulation slabs to ensure total rate of 2.00 kg/m2 between contacting
surfaces. The slabs shall then be fixed in position, making sure that there shall be no
joints between slabs
For double layers insulation bitumen shall again be applied on all contacting surfaces
to ensure a total rate of 1.5 kg/m2 between contacting surfaces
A coat of bitumen at 1.5 kg/m2 shall be applied over the insulation surfaces
5.3 Hot Insulation of Steam, Condensate & Hot Water Pipelines
All the steam and hot water pipelines shall be insulated with mineral wool or equivalent
of specified thickness. The insulation shall be carried out in the following manner and
should be supplied in the form of properly required sizes.
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
Clean the surfaces to be insulated. Apply a coat of red oxide primer and fix glass
wool/mineral wool of specified thickness, tightly to the pipes, butting all joints and tie
with lacing wire.
It should then be covered with GI wire netting of 20 mm x 24 SWG
In case the insulation does not have the desired insulation properties, the entire
insulation will have to be redone at the Supplier's cost to give the desired results
In case of condensate return piping all the steps mentioned above shall be executed
except that thickness of the insulation shall be 25 mm
5.4 Aluminium Cladding
The chilled water, glycol, ammonia, water, steam & hot water lines after insulations may
be covered by Aluminum cladding
Aluminum cladding will be done with 22-gauge aluminum sheet with proper grooves
and overlaps and screwed in position with 12 mm self-tapping parker screws.
6. Interconnections of Services
6.1 The Supplier shall lay service piping and provide connections with the equipment
complying strictly with the equipment manufacturers' instructions. The Supplier shall
also carry out all the interconnecting service piping with the various items of
plant/system. The work shall be complete with capillary piping if required and
connections with instruments and controls supplied with the equipment
6.2 The Supplier shall also carry out electrical connections for equipment with the control
panels including equipment lighting as per the wiring diagrams of the equipment
Suppliers. Connection shall be made for small electrically operated devices on
equipment installed as accessories to or assembled with equipment. Connections
regarding instruments, float switches, limit switches, pressure switches, thermostats
and other miscellaneous equipment shall be done as per manufacturers' drawings &
7. Guidelines for Expansion Work
Plant shutdown shall be required for making tapings/ interconnections of the new
equipment/ piping, to be installed under expansion, with the existing equipment/piping.
These shutdowns should be planned carefully well in advance to enable the Purchaser
to take suitable actions for ensuring normal Plant operations. The details of
shutdowns, the numbers and duration should be worked out and intimated to the
Purchaser for approval. The Supplier should ensure completion of all the necessary
works well within the allowed time so that no inconvenience is caused in regular
operation and working of the existing plant
7.2 Cleanliness
Wherever the Supplier is required to work in existing plant area he should take due care
and extra precautions to ensure absolute cleanliness and minimum hindrance for proper
working of the existing plant
7.3 Change over
The programmers for change over from existing plant system to new plant system
should be prepared by the Supplier and should be got approved by the Purchaser
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
7.5 Clean Up of Works Site
All soils, filth or other matters of an offensive nature taken out of any trench, drain or
other places shall not be deposited on the surfaces, but shall at once be carted away by
the Supplier from the site of work for proper disposal
The Supplier shall not store or place the equipment, materials or erection tools on the
drive ways and passages and shall take care that his work in no way restricts or
impedes traffic or passage of men and materials during erection, the Supplier shall
without any additional payment, at all-time keep the working and storage area used by
him free from accumulation of dust or combustible materials, waste materials rubbish
packing, wooden planks to avoid fire hazards and hindrance to other works
If the Supplier fails to comply with these requirements in spite of written instructions
from the Purchaser, the Purchaser will proceed to clear these areas and the expenses
incurred by the Purchaser in this regard shall be payable by the Supplier. Before
completion of the work, the Supplier shall remove or dispose off in a satisfactory
manner all scaffolding, temporary structures, waste and debris and leave the promises
in a condition satisfactory to the Purchaser. Any packing materials received with the
equipment shall remain as the property of the Purchaser and may be used by the
Supplier on payment of standard charges to the Purchaser and with prior approval of
the Purchaser. At the completion of his work and before final payment, the Supplier
shall remove and shall restore the site to neat workman like conditions at his cost
8. Cleaning Chemicals and Lubricants
8.1 The necessary quantities of cleaning chemicals, lubricants etc., required for the installation,
commissioning, testing and start-up of all the equipment till handing over are to be supplied
the Supplier and nothing extra would be paid for these
9. Testing, Commissioning and Start-up
9.1 The Supplier shall operate, maintain and give satisfactory trial run of the plant for the
design product satisfactorily for a maximum period of one week or as mutually agreed
by Supplier/purchaser/Purchaser of the plant at the rated output. The Supplier should
carry out all rectification of damages/defects and routine troubleshooting during
commissioning with the help of purchaser‟s staff
9.2 During this period, Supplier shall incorporate/execute necessary minor modifications
during the trial period for maximizing operational efficiency. The Supplier should also
execute minor modifications as may be suggested by the manufacturer/Purchaser, if
required. The Supplier shall suggest recommended log sheet proofread for recording
necessary operating data and pass it on to the Purchaser in proof of satisfactory rated
output and performance of the equipment/plant
9.3 The commissioning shall also include, for all the equipment, the following:
Field disassembly and assembly
Clean out of lubrication system including chemical cleaning wherever required.
Circulation of lubricant to check flow
Clean out and check out of all the service lines
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
Check out and commissioning of instruments, equipment and plants, filtering of
transformer and other oils so that if deteriorated, they shall attain the required
properties/standards, specified tests in this regard must be carried out by approved
authorities and their satisfactory reports submitted to the Purchaser before start-up
Recharging or make-up filling of lubricant oil up to the desired level in the lubrication
system of individual machine
Operation in empty condition to check general operation details wherever required
and wherever possible
Closed loop dynamic testing with water wherever required
Operation under load and gradual load increase to attain maximum rated output.
10. Trouble shooting during the trial period
10.1 The Supplier shall demonstrate proper working of all mechanical and electrical controls;
safety and protective device, in presence of the Purchaser's engineer and the same
should be duly recorded
10.2 After conducting testing, in case a particular equipment is not working properly or not
giving rated output the Supplier shall furnish a detailed report to the Purchaser stating
therein the detailed account on the performance of the equipment with possible reasons
for improper or not working of the same.
10.3 The Purchaser after receipt of report from the Supplier would take up the matter with
the manufacturers and if required would invite the representative of original
manufacturers. In case the Purchaser considers that the non-performance of equipment
is only due to inexperience of the Supplier, then the charges incurred for the
manufacturer's representative visit would be debited to the Supplier's account
10.4 Further, before the commencement of testing or commissioning, the Purchaser
reserves the right to invite the original manufacturer's representative at the cost of
the Supplier for start-up help, assist and guide the Supplier during commissioning in the
following cases:
The Supplier has no previous experience of commissioning and start-up of the
similar equipment
The Purchaser is of the opinion that the Supplier is not capable to commission
and start-up of certain specific equipment
10.5 However, in either of the cases the manufacturer's representatives would be called with
prior information to the Supplier and the Supplier will have to extend all co-operation to
such representatives in good spirit and in the interest of the work
10.6 After satisfactory commissioning and start-up the Supplier shall keep his
representatives under whose supervision the Purchaser's staff shall be operating
and maintaining the plant and equipment for a minimum period of one month. The
Supplier's representatives should be present at all times during the running and
operation of plant and equipment. During this period the Supplier shall ensure proper
working of complete plant and equipment and attend any works required to be done
and shall also take complete responsibility for proper operation and maintenance of the
complete plant and equipment
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
11.1 All the equipment/ machineries like motors, pumps, HT/ LT panel, transformer, switch
boards, starters, junction boxes, isolators, storage tanks, supporting structures, pipe
supports and MS/ GI pipes and all exposed and visible iron parts included in the scope
of erection/ commissioning shall be given double coat of paint of approved shade
over a double coat of anticorrosive primer, wherever necessary; irrespective of the
condition of original paint of equipment/ machineries/ structures/ supports. All surfaces,
wherever required, must be properly cleaned from scale, dirt and grease prior to
painting. Spray painting must preferably be used on all the equipment/ machineries
and wherever practicable. Suitable and necessary cleaning/ wiping of sight/ dial
glasses, other non-metallic parts, flooring, walls and other surfaces which have been
spoiled by paint during painting must also be carried out by the Supplier
11.2 Lettering and other markings, including capacity and flow direction markings, shall
also be carried out by the Supplier on the tanks, pipelines, starters, motors, isolators
and wherever else necessary, as directed and as per the standard practice of
installation. ISI colour codes and colour charts as mentioned in Table 3 & Table
must be adhered to.
11.3 Supply of all paints and all other materials required is included in the scope of supply of
the Supplier under this contract/order
12. Training of Personnel
12.1 The Supplier shall train necessary staff of purchaser for operation and maintenance.
The personnel will be associated for the training during the installation; testing,
commissioning and start-up period and the training tenure shall be extended for a
minimum period of one month from the date of commissioning and start-up
13. Code of Practice for Painting Service Pipelines
13.1 On Non-insulated Pipeline & Insulated Pipeline without Aluminium Cladding
Ground colour to be applied throughout the length of the pipeline
Colour bands to be applied near every valve and branch connection as well as in
every room near the entry
The 1st band should be 4" wide and the second band should be 1" wide
On the 1st band a white arrow to be put to indicate the direction of flow
The arrows should be put on the bottom of the pipelines so that the same are visible
from below in case of horizontal bank of pipes and on sides in case of vertical bank
The valves should be painted with the same colour as the ground colour of the
13.2 On Insulated Pipeline with Aluminium Cladding
Ground colour to be applied in a length of 500 mm of the pipe all round near every
valve and branch connections as well as in every room near the entry. The
complete length of the pipeline should not be painted
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
Colour bands should be applied in the middle of every ground colour strip. The 1st
colour band should be 4" wide and the second band should be 1" wide
On the 1st band a white arrow is to be put to indicate the direction of flow of the
The arrows should be put on the bottom of the pipelines, so that the same are
visible from below in case of horizontal bank of pipes and on sides in case of
vertical bank of pipes
The valves should be painted with the same colour as the ground colour
The ground colours and the colours of the 1st and 2nd colour bands have been
indicated on the enclosed list for the pipelines carrying various types of fluids and
gases. The list also indicates the shade nos. of the colours to be used. In case the
exact shade is not available, the nearest possible shade in the same colour may be
Only synthetic enamel paint should be used for the painting and band markings
on the pipelines and it should be ensured that the finish should be glossy
Where no colour bands have been recommended, only the ground colour is to be
applied as per the above procedure. If only one colour band is recommended the
same should be 4" wide and applied on the ground colour. In case of 2 nos. colour
bands, the 1st band should be 4" wide and second band 1" wide and should be
applied on the ground colour
To avoid mixing of colours, it is recommended to apply the bands only after the
ground colour paint is dry and subsequently to apply the arrow only after the 1st
band paint is dry
Table 1 Painting of Equipment & Structural Work
SN Item Painting Shade
1 All M.S. platforms/pipe supports/ pipe Dark admiral grey shade No.632 of
bridges and any other structures ISI
2 Water Pumps, Geared Motor of tanks and Original colour
3 HT & LT panels Original colour
4 LT distribution switchboards Dark admiral grey
5 Boiler Chimney, Powder Plant Chimney, & High temperature resistant
Generator Exhaust Aluminium Paint
6 Refrigeration Compressor, air Compressor Original colour
7 Air Handling Units of Cold Store, Deep Aluminium Paint
Freeze, Packing, Machine room &
Laboratory including Ducting
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
8 Refrigeration Plant Receiver Dark Red
9 Atmospheric Condensers Bitumen Paint
Table 2 Colour Code For Pipelines as per BIS 2379-1963
SN Services Ground Colour First Band Second Band
1 Cooling Water French Blue 166 -
2 Boiler Feed Water - Light Brown 410 -
3 Condensate Light Brown 410 -
4 Hot Water Light Brown 410 -
5 Drinking Water French Blue 166 Signal Red
6 Treated Water Light Orange 557 -
7 Cold Water French Blue 166 Canary Yellow
8 Untreated Water White
9 Compressed Air
10 Vacuum Black
11 Steam Silver Grey
12 Diesel Brilliant
13 Lubricating Oil Light Grey
14 Drainage Black
15 Ammonia Signal Red
Table 3 Testing Pressures for Various Pipelines
Sr Name Test Test Duration of Allowable
No Pressure medium Test (Hour) pressure Drop
1 H.P. Steam pipe 27 (minimum) Water 1/2
2 L.P. Steam pipe 8 Water 1/2
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
3 Water pipe lines 8 Water 1/2
4 Furnace oil/ LSHS 16 Water ½
5 SS pipes for dairy 6 Water 1/2
7 Ammonia pipe lines
7a Suction 16 N2 24
7b Discharge 24 N2 24
7c Vacuum Test of Absolute Vacuum 48 NIL
Ammonia Lines Zero
8 Molasses pipe lines 16 Water 1/2
Engineer-in-charge shall provide water at available supply point from which the Supplier
shall connect temporary piping for testing water.
Table 4 Makes of Bought Out Items (Applicable)
1a MS C class pipes (Seamless)
1b Cast steel globe valves
1c Bronze globe valves
1d Non-return valves
1e Pressure reducing valves, safety valves, expansion
joints and other steam fittings
1f Pressure & temperature gauge
2 Furnace oil piping/ air piping
2a MS C class pipes (seamless/ ERW as approved)
2b Cast steel globe/bronze globe/ Gun metal gate valve
2c Pressure gauge
Soft, Raw, Chilled and Glycol
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
3a GI `B' class pipe
3b CI globe valve
3c Gun metal gate valve
3d Gun metal globe valves/ strainers/ non return valves
4 Insulation materials
4a Expanded polystyrene
4c Glass/ mineral wool
Please select reputed established makes only. Actual supply shall be based on makes
approved by us.
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
Special Condition of Contract for
Electrical Work
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
3. Equipment And Accessories Specifications
4. Power Cables (HT)
5. Power Cables (LT)
6. Control Cables
8. Cable Glands
9. Cable Connectors
10. Cable Route Markers
11. Cable Indicators
12. Pipes for Cables
13. Motor Isolators
14. Motor Junction Box / Control Junction box
15. Remote Push Button Stations (for other projects)
16. Erection Of Equipment
17. Power Control Centres, Distribution Boards, Control Panels & Bus Ducts
18. Seal Maintenance Free Batteries & Battery Charger
19. Erection and Testing of Motors
20. Installation of Cable Network
21. General Requirements for handling of Cables
22. Laying of Cable Network
23. Laying of Cable (Underground System)
24. Laying of Cable Under Floors
25. Laying of Cable in Masonry trenches
26. Laying of Cable in Cable Trays
27. Laying of Cables on Building Surface/Structure
28. Termination & Jointing of cables
29. Dressing of Cables Inside the Equipment
30. Cable between Isolators/Junction Box and Motor/Control
31. Testing of cables
32. Earthing Network
33. Earth Pit with Electrode
34. Earth Bus, Earthing Lead and Earth Wire/Strip
35. Two/Four Pole Structure
36. Erection Procedure Guidelines for Instrumentation & Control System
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
Table 1 Bureau Indian Standards (BIS)
Table 2 Pro forma for PCC, DB, Motor Control Centre‟s Test
Table 3 Pro forma for motor testing
Table 4 Pro forma for Testing Cables
Table 5 Recommended Cables Sizes For Industrial Wiring
Table 6 Sizing of Earthing Lead/ Wire
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
1.1 The intent of this specification is to define the requirements for the installation, testing
and commissioning of the electrical system like high-tension switchyard with
accessories and equipment, transformers, HT. Panels, oil circuit breakers, LT. panels
and power control centres, distribution boards, capacitor banks & panels, power &
control cables, remote push button stations, motors, earthing network, etc. Requirement
of a particular project shall be as specified in schedule of quantities/approved drawings
or as per the battery limits fixed in the contract
2.1 The work shall be carried out in the best workmanship in conformity with this
specification, the relevant specification/codes of practice of the Bureau of Indian
Standards, approved drawings and the instructions issued by the Engineer-in-charge or
his authorized representative, from time to time. Some of the relevant Bureau of Indian
Standards is listed in Table
2.2 In addition to these standards, all works shall also confirm to the requirements of the
Indian Electricity Act and Rules framed thereunder
Fire Insurance Regulations
Regulations lay down by the Chief Electrical Inspector of the State/State Electricity
Regulations lay down by the Factory Inspector of the State
Any other regulations lay down by the local authorities
Installation & operating manuals of original manufacturers of equipment
3. Equipment and Accessories Specifications
3.1 This defines specifications and requirements mainly for the equipment and accessories
which are generally supplied by the erection agency and do not cover the specification
of main electrical equipment such as Transformers, HT and LT panels, switchboards
and motors etc. which may be supplied by the Owner
3.2 All materials, fittings and appliances to be supplied by the Supplier shall be of best
quality and shall conform to the specification given hereunder. The equipment shall be
manufactured in accordance with current Bureau of Indian Standard Specifications
wherever they exist or with the BS or NEMA specifications, if no such BIS are available.
In the absence of any specification, the materials shall be as approved by the Owner or
his authorized representative
3.3 All similar materials and removable parts shall be uniform and interchangeable with one
3.4 Supplier must furnish makes of bought out items.
4. Power Cables (HT)
4.1 Specifications as per Section IV Sub-Section
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
5. Power Cables (LT)
5.1 Specifications as per Section IV Sub-Section
6. Control Cables
6.1 Specifications as per Section IV Sub-Section
7.1 Specifications as per Section IV Sub-Section
8. Cable Glands
8.1 These shall be provided at both ends of armoured/ unarmoured electrical cables. Cable
glands to be manufactured as per performance requirements of BS 6121 amended as
on date, with BRASS material accurately machined and NICKEL finish. Single
compression cable glands to be complete with checkout, gland body, 3 nose metal
washers, and outer seal rubber ring and compression nut. Double compression glands
to be complete with checkout, gland body, neoprene outer ring, Armour clamping cone,
Armour clamping ring, Armour clamping nut, neoprene outer ring, skid washer & outer
seal nut. Sample of cable gland to be got approved from the Site In charge before
supply. For instruments MOC of cable gland shall be polyamide
9. Cable Connectors
9.1 Cable connectors, lugs/sockets, shall be of copper/Aluminium alloy, suitably tinned,
soldering less, crimping type. These shall be suitable for the cable being connected and
type of function (such as power, control or connection to instruments, etc.)
10. Cable Route Markers
10.1 These shall be galvanized Cast Iron plate with marking (LT/HT) diameter 150 mm with
600 mm long 25x25 mm MS. angle riveted/bolted with this plate. Sample to be got
approved before use
11. Cable Indicators
11.1 Individual symbols / numbers printed on yellow strips of glossy PVC should be used for
cable indicator
12. Pipes for Cables
12.1 For lying of cables under floor, G.I. class 'A' pipes shall be used. MS. conduits are not
acceptable for this purpose. For laying cable in air whereas cable trays are not being
used, MS `B' class pipe shall be used. Size of pipe shall depend upon the overall outer
diameter of cable to be drawn through pipe. To determine the size of pipe, assume that
40% area of pipe shall be free after drawing of cable. In dairy's process area and
powder plant wherever required SS-304 pipe, 1.6 mm thick shall be used
13. Motor Isolators
13.1 These shall be in Aluminum cast housing/ Poly carbonate housing completely dust,
vermin and weather proof (IP 55), suitable for 30/25 A, 415 volts, 50 Hz with rotary type
switch complete with cable gland for incoming and outgoing cables. For dairy's process
area and powder plant SS-304 motor isolator shall be used. Final finish of housing to
be buffer mirror for SS and powder coated gray for Aluminum housing. Sample to be
got approved before supply.
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
14. Control Junction Box
14.1 These shall be in Aluminum cast housing / Poly Carbonate housing, completely dust,
vermin and weather proof (IP 55). For dairy's process area and powder plant SS-304
junction box shall be used. Final finish of housing to be buffer mirror for SS and powder
coated gray for Aluminum housing. Sample to be got approved before use
15. Remote Push Button Stations
15.1 These shall be used for remote OFF for motors, away from MCC. These shall be
suitable for surface/structure mounting in Cast Aluminum housing/Poly Carbonate
housing having IP-55 class of protection i.e. completely weather proof. For dairy's
process area and powder plant SS-304 push button shall be used. Final finish of
housing to be buffer mirror for SS and powder coated gray for Aluminum housing.
Sample to be got approved before supply
15.2 Riveted type bi-color plastic nameplate to be provided for each feeder
15.3 For outdoor installation suitable canopy to be provided
16. Erection of Equipment
16.1 The cases containing the equipment (being supplied by the purchaser shall be handed
over to the Supplier. The Supplier shall make his own arrangements for safe
transportation of all the items to the erection site and also carry out complete
loading/unloading during transportation. Equipment shall not be removed from packing
cases unless the floor has been made ready for installing them. The cases shall be
opened in presence of the Engineer-in-charge or his authorized representative. These
empty packing cases shall be returned to the storage space identified by engineer in
charge and any document if found with the equipment shall be handed over to the
Engineer-in- charge. Any damage or shortage noticed shall be reported to the
Engineer-in-charge in writing immediately after opening of packing cases
17. Power Control Centres, Distribution Boards, Control Panels & Bus Ducts
17.1 Erection: The manufacturers shall deliver electrical panels and bus duct in convenient
shipping section. The Supplier shall be responsible for final assembly and inter-
connection of bus bars/wiring. The Supplier shall grout foundation channel in the
flooring. Switchgears shall be aligned and leveled on their base channels and bolted or
tack welded to them as per the instructions of the Engineer-in-charge. The earth bus
shall be made continuous throughout the length. Loosely supplied relays and
instruments shall be mounted and connected on the switchgears. The contacts of the
draw out circuit breakers shall be checked for proper alignment and inter-changeability
17.2 After erection the switchboard shall be inspected for dust and vermin proof ness. Any
hole, which might allow dust or vermin etc. to enter the panel, shall be plugged suitably
at no extra cost
17.3 If the instrument transformers are supplied separately they shall be erected as per the
direction of the Engineer-in-charge. The Supplier shall fix the cable glands after drilling
the bottom top plates of all switchboards with suitable holes at no extra cost
17.4 Range of overload relays/timers etc. shall be checked with requirement of
motor/systems actually to be connected at site and if the same is under-
sized/oversized, it shall be brought to the notice of Engineer-in-charge, who shall
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
arrange procurement of correct rated components. However, the Supplier shall not
charge anything extra for labour for such replacements
17.5 The bus duct shall be suitably supported between switchgear and transformer. The
opening in the wall where the duct enters the switchgear room shall be sealed to avoid
rainwater entry. The foundation of the switchgear shall be raised suitably for minor
adjustment to ensure proper alignment and connection of the bus duct at no extra cost.
Expansion joints, flexible connection, etc. supplied by the manufacturer of the bus duct
shall be properly connected
17.6 Testing: Before electrical panel is energized, the insulation resistance of each bus shall
be measured from phase to ground. Measurement shall be repeated with circuit
breakers in operating positions and contact open. Before switchgear is energized, the
insulation resistance of all DC control circuits shall be measured from line to ground.
Tests shall be performed on all circuit breakers during erection as per Table
17.7 Contact alignment and wipe shall be checked and adjusted where necessary in
accordance with the breaker manufacturer's instructions. Each circuit breaker shall be
drawn out of its cubicle, closed manually and its insulation resistance measured from
phase to phase and phase to ground. All adjustable direct acting trip devices shall be
set using values given by the Engineer-in-charge / manufacturer. The dielectric strength
of insulating oil wherever applicable shall be checked. Before switchgear is energized
tests shall be performed on each circuit breaker in its test position as per Table
17.8 Close and trip the circuit breaker from its local control switch, push button or operating
handle. Switchgear control bus may be energized to permit test operation of circuit
breaker with AC closing with prior permission of the Engineer-in-charge
17.9 Carry out tripping test of the electrically operated circuit breaker by operating
mechanical trip device. Test operation of circuit breakers latch, check carriage limit
switch if provided. Test proper operation of lockout device in the closing circuit,
wherever provided by simulating conditions that would causes a lockout to occur. Trip
breaker either manually or by applying current or voltage to each of its associated
protective relays. Before switchgear is energized, the test covered above shall be
repeated with each breaker in its normal operating position.
17.10 Capacitor banks in capacitor control panel shall be tested as per manufacture's
instructions. In addition, test for output and/or capacitance, insulation resistance test
and test for efficiency of discharge device shall be carried out if required during detailing
17.11 All electrical equipment alarms shall be tested for proper operation by causing alarms to
sound under simulated abnormal conditions.
17.12 The Supplier shall arrange testing and calibrations of relays. The testing equipment
including primary and secondary injection sets (if required) etc shall also have to be
arranged by the Supplier. Payment for above work shall be deemed to have been
included in the erection of switch boards/ control panels
18. Not Relevant to this tender
19. Erection and Testing of Motors
19.1 Erection and coupling of motors with machines will be done under the mechanical
erection. However, earthing, cable termination, testing and commissioning are covered
under this section. Before starting, the alignment and coupling of motors with
machines and the insulation resistance of the motors will be measured and recorded by
the Supplier. The direction of the rotation of the motor shall also be checked before the
driven equipment is finally coupled. Motor bearings are to be checked and rectified
including supply and changing of grease if required, checking of fans coupling with
bodies etc. The Supplier shall take adequate precaution and care while executing the
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
work. For all damage due to negligence etc. the Supplier shall be responsible to
replace/repair at his own cost
19.2 Before connecting power cables to motors the insulation resistance of all motor
windings shall be measured. Measurement shall be repeated after power cable
terminations are completed and before first charging
19.3 Motors shall be operationally tested together with the starting gear and auxiliary
apparatus such as push button stations, the contractors, level and pressure controls,
signal and alarm apparatus, power and control circuits etc.
19.4 Check the anti-condensation heater and its circuit (if installed)
19.5 Check the setting of the thermal overload protection / single phase prevent or. Testing
of these devices is to be done wherever required as per the instructions of the
Engineer-in-charge
19.6 Run all motors uncoupled for a maximum period of 4 hours before the driven
equipment is placed in regular service. Fill up Test Certificate as per Table
19.7 All outdoor-installed motors must be shrouded with cover made out of 14 gauge GI
sheet with lifting hook and louvers as approved by purchaser
20. Installation of Cable Network
20.1 Cable network shall include power, control and lighting cables which shall be laid in
underground trenches, home pipes, open trenches, cable trays, GI pipes, or on building
structure surfaces as detailed in the relevant drawings, cable schedules or as per the
Engineer-in-charge's instructions. Supply and installation of cable trays, GI pipes/
conduits, cable gland sockets at both ends, isolators, junction boxes, remote push
buttons stations, etc shall be under the scope of the Supplier. For selection of cable
size please refer to Table
21. General Requirements for Handling of Cables
21.1 Before laying cables, these shall be tested for physical damage, continuity absence of
cross phasing, insulation resistance to earth and between conductors. Insulation
resistance tests shall be carried out with 500/1000 volt Meggar
21.2 The cables shall be supplied at site, wound on wooden drum as far as possible. For
smaller length and sizes, cables in properly coiled form can be accepted. The cables
shall lie by mounting the drum of the cable on drum carriage. Where the carriage is not
available, the drum shall be mounted on a properly supported axle, and the cable laid
out from the top of the drum. In no case the cable will be rolled on, as it produces kinks,
which may damage the conductor
21.3 Sharp bending and kinking of cables shall be avoided. The bending radius for PVC
insulated and sheath armoured cable shall not be less than 10 D Where `D' is overall
diameter of the cable
21.4 While drawing cables through GI pipes, conduits, RCC pipe, ensure that size of pipe is
such that, after drawing cables, 40 % area is free. After drawing cable, the end of pipe
shall be sealed with cotton/bituminous compound
21.5 High voltage (11 kV and above), medium voltage (230 V and above) and other control
cables shall be separated from each other by adequate spacing or running through
independent pipes/trays
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
21.6 Armored cables shall never be concealed in walls/floors/roads without GI pipes,
conduits RCC pipes
21.7 Joints in the cable throughout its length of lying shall be avoided as far as possible and
if unavoidable, prior approval of site engineer shall be taken. If allowed, proper straight
through epoxy resin type joint shall be made, without any additional cost
21.8 A minimum loop of 3 M shall be provided on both ends of the cable, or after every 50 M
of uncounted length of cable and on both ends of straight through cable joint. This
additional length shall be used for fresh termination in future. Cable for this loop shall be
paid for supply and lying
21.9 Cable shall be neatly arranged in the trenches/trays in such a manner so that crises
crossing are avoided and final take off to the motor/switchgear is facilitated.
Arrangement of cables within the trenches/trays shall be the responsibility of the
21.10 All cable routes shall be carefully measured and cable cut to the required lengths and
undue wastage of cables to be avoided. The routes indicated in the drawings are
indicative only and the same may be rechecked with the Engineer-in-charge before
cutting of cables. While selecting cable routes, interference with structures, foundations,
pipeline, future expansion of buildings, etc. should be avoided
21.11 All temporary ends of cables must be protected against dirt and moisture to prevent
damage to the insulation. For this purpose, ends of all PVC insulated cables shall be
taped with an approved PVC or rubber insulating tape. Use of friction type or other
fabric type tape is not permitted. Lead sheathed cables shall be plumbed with lead alloy
21.12 Wherever cable rises from underground/concrete trenches to motors/switchgears/push
buttons, these shall be taken in G.I./MS pipes of suitable size, for mechanical protection
unto 300 mm distance of concerned cable gland or as instructed by the Engineer-in-
21.13 Where cables pass through foundation/walls of other underground structures, the
necessary ducts or openings will be provided in advance for the same. However, should
it become necessary to cut holes in existing foundations or structures the electrical
Supplier shall determine their location and obtain approval of the Engineer-in-charge
before cutting is done
22. Not relevant to this tender
23. Not relevant to this tender
24. Not relevant to this tender
25. Laying of Cables in Cable Trays
25.1 Cable trays and supporting steel members such as MS angle/ channel/ flats etc shall be
provided and fixed by the Supplier
25.2 Cables shall be fixed in cable trays in single tier formation and cables shall be clamped
with Aluminum flat clamps and galvanized bolts/unit
25.3 Earthing flat/ wire can also be laid in cable tray along with cables
25.4 After lying of cables minimum 20 % area shall be spare
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
26. Laying of Cables on Building Surface/ Structure
26.1 Such type of cable lying shall be avoided as far as possible and will be allowed only for
individual cables or small group of cables, which run along structure
26.2 Cables shall be rigidly supported on structural steel/masonry using individual
cast/malleable iron galvanized saddles and these supports shall be approximately
to 500 mm for cables unto 25 mm overall diameter and maximum 1000 mm for cables
larger than 25 mm. Unsightly sagging of cables shall be revenged. Only/GI clamps with
GI bolts/nuts shall be used
26.3 If drilling of steel structure must be resorted to, approval must be secured from the
Engineer-in-charge and steel must be drilled where the minimum weakening of the
structure will result
27. Termination & Jointing of Cables
27.1 Use of Glands: All PVC cable unto 1.1 kV grade, armoured or Unarmoured shall be
terminated at the equipment/junction box/ isolators/push buttons/control accessories,
etc. by means of suitable size single compression type cable glands. Armour of cable
shall be connected to earth point. The Supplier shall drill holes for fixing glands
wherever necessary. Wherever threaded cable gland is to be screwed into threaded
opening of different size, suitable galvanized threaded reducing bushing shall be used
for approved type
27.2 In case of termination of cables at the bottom of the panel over a cable trench having no
access from the bottom, a close fit holes should be drilled in the bottom plate for all the
cables in one line, then bottom plate should be split in two parts along the centre line of
holes. After installation of bottom plate and cables with glands, it shall be sealed with
cold sealing compound
27.3 Use of Lugs/ Sockets: All cable leads shall be terminated at the equipment terminals, by
means of crimped type solder less connectors unless the terminals at the equipment
ends are suitable for direct connecting without lugs/sockets
27.4 The following is the recommended procedure for crimped joints and the same shall be
Strip off the insulation of the cable end with every precaution, not to severe or
damage any strand. All insulation to be removed from the stripped portion of the
conductor and ends of the insulation should be clean and square
The cable should be kept clean as far as possible before assembling it with the
terminal/socket. For preventing the ingress of moisture and possibility of re-
oxidation after crimping of the aluminum conductors, the socket should be fitted with
corrosion inhibiting compound. This compound should also be applied over the
stripped portion of the conductor and the palm surface of socket
Correct size and type of socket/ ferrule/ lug should be selected depending on size of
conductor and type of connection to be made. Make the crimped joint by suitable
crimping tool. If after crimping the conductor in socket/ lug, some portion of the
conductor remains without insulation the same should be covered sufficiently with
28. Dressing of Cable inside the Equipment
28.1 After fixing of cable glands, the individual cores of cable shall be dressed and taken
along the cableways (if provided) or shall be fixed to the panels with polyethylene
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
straps. Cable shall be dressed in such a manner that small loop of each core is
available inside the panel
28.2 For motors of 20 HP and above, terminal box if found not suitable for proper dressing of
Aluminium cables, the Supplier shall modify the same without any additional cost
29. Identification of Cables/ Wires/ Cores
29.1 Power cables shall be identified with red, yellow & blue PVC tapes for trip circuits
Identification, additional red ferrules shall be used only in the particular cores of control
cable at the termination points in the switchgear/control panels and control switches
29.2 In case of control cables all cores shall be identified at both ends by their wire numbers
by means of PVC ferrules or self-sticking cable markers, wire numbers shall be as per
schematic/connection drawing. For power circuit also wire numbers shall be provided if
required as per the drawings of switchgear manufacturer
30. Cable between Isolators/ Junction box & Motors/ Controls
30.1 Wherever possible Copper cables with glands shall be used between isolator/junction
box (installed near motor/controls) and motors/controls. If terminal box of the motor or
control switch is not suitable for accepting armored cable or it is difficult to lay, copper
conductor, multi-core, Unarmored flexible cable in PVC flexible conduit steel
(reinforced) with flexible conduit glands shall be used
31. Testing of Cables
31.1 Before energizing, the insulation resistance of every circuit shall be measured from
phase to phase and from phase to ground. This requires 3 measurements if one side is
grounded and 6 measurements for 3 phase circuits
31.2 Where splices or terminations are required in circuits rated above 650 volts, measure
insulation resistance of each length of cable before splicing and/or terminating. Report
measurements after splices and/or terminations are complete
31.3 DC High Voltage test shall be made after installation on all 1100 Volts grade cables in
which straight through joints have been made and all cables above 1100 V grade
31.4 For record purposes test data shall include the measured values of leakage current
31.5 Cables shall be installed in final position with the entire straight through joints complete.
Terminations shall be kept unfinished so that motors, switchgear, transformer etc are
not subjected to test voltage
31.6 The test voltage and duration shall be as per relevant codes and practices of Indian
Standards Institution. Fill up the Test Certificate as per Table
32. Earthing Network
32.1 The entire earthing installation shall be done in accordance with the earthing drawings,
specification and instructions of the Engineer-in-charge. The entire earthing system
shall fully comply with the Indian Electricity Act and Rules framed thereunder. The
Supplier shall carry out any changes desired by the electrical inspector or the Owner in
order to make the installation conform to the Indian Electricity Rules, at no extra cost.
The exact location of the earth pits, earth electrode and conductors and earthing points
of the equipment shall be determined at site, in consultation with the Engineer-in-
charge. Any change in the methods, routing, size of conductor etc. shall be subject to
approval of the owner/engineer-in-charge before execution
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
33. Earth Pit with Electrode
33.1 Plate or pipe type earth electrode with earth pit shall be provided for this work unless
otherwise advised by the Engineer-in-charge due to typical site conditions. Earthing
electrode and pit shall be as per IS: 3043-1966 (code of practices for Earthing). All
earth electrodes shall preferably be driven to a sufficient depth to reach permanent
33.2 Prior approval of the engineer-in-charge shall be taken for selecting type of earth
electrode (pipe or plate).
33.3 Earth pit Centre shall be at a minimum distance of 2 m from nearest building, unless
otherwise advised. The minimum 3 m distance shall be maintained between centres of
34. Earth Bus, Earthing Lead & Earth Wire/ Strip
34.1 All electrical equipment is to be doubly earthed by connecting two-earth strip/ wire
conductor from the frame of the equipment to an earthing pit/ main earthing ring. The
earthing ring will be connected via links to several earth electrodes. The cable
armoured will be earthed through the cable glands. Conductor size for connection to
various equipments shall be as specified in the drawing or as instructed by the
Engineer-in-charge. However, the length of the branch leads from equipment to
earthing grid/ ring shall not be more than 10 to 15 meters
34.2 All hardware for earthing installation shall be hot dip galvanized. Spring washers shall
be used for all earthing connections of equipment having vibrations
34.3 Size of earthing lead/ wire shall be as specified in schedule of quantities/ drawings.
Table 6 may be considered as general guidelines
34.4 When earthing wire is to be drawn under floor/in underground, Aluminium wire 10 mm
dial. With PVC insulation shall be used. Instead of GI wire, PVC insulated copper
conductor wires can also be used
34.5 However, while deciding type & size of earth lead, the resistance between the earthing
system and the general mass of the earth shall be as per IS code of practice. The earth
loop impedance to any point in the electrical system shall not be in excess of 1.0 ohms
in order to ensure satisfactory operation of protective devices
34.6 G.I. wire/ Aluminum wire shall be connected to the equipment by providing crimping
type socket/ lug
34.7 Wherever earthing strip to be provided in cable tray, it shall be suitably bolted on cable
tray and electrically bonded to the cable tray at regular interval
34.8 Excavating & refilling of earth, necessary for laying underground earth bus loops shall
be the responsibility of the Supplier
34.9 Wherever earth leads/ strips/ wire are laid in cable trenches, these shall be firmly and
suitably cleared to the walls/ supporting steel structure on which cable is clamped
34.10 The neutral of the transformer shall be connected to earth pit independently and earth
pit shall have copper earth plate
34.11 Long runs of GI strip shall be connected at each end with lap type welding to ensure
35. Not relevant to this tender
36. Erection Procedure Guidelines of Instrumentation & Control System
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
The erection of Instrumentation & Control System shall be carried out generally
conforming to General Technical Standards as described herein. However, the Bidder
shall select and adopt methods and procedures for equipment erection to suit the
nature of equipment and erection work, involved according to the best modern practice
and his own experience
Shop tests as well as Site tests shall be performed to ensure that all equipment / sub-
systems / systems furnished are manufactured and tested conforming to the
requirements of the specification and approved Quality Assurance Program
All assembly and erection procedures adopted by the supplier shall be open for
inspection and approval by the Client. Acceptance of erection procedures shall not in
any way relieve the supplier of his responsibility for proper erection of the equipment.
Transmitters, converters and pressure & temperature switches shall generally be
installed on Instrument Stands made of 2” SS pipes located at convenient points. Level
transmitters shall normally be flanged for direct mounting in the tank / equipment
Temperature / Pressure Stub on equipment and pipelines shall preferably be of same
material or higher grade of material
Suitable Root Valves shall be provided with every tap-off point
Installation of Pressure and Differential Pressure Transmitter shall be as per standard
engineering practice incorporating Drain Valves, Isolation Valves, 2/3-Valve Manifold,
Syphon etc. as applicable
For instrument air, SS. Pipe shall be used for air distribution from Battery Limit to the
designated point of use. Take-off connections to instruments / actuators shall be with
suitable size nipples and shut-off valves. Individual air supply shall be provided by 6 mm
OD PU tube through an isolating needle valve and air filter regulator
Perforated GI Trays (minimum 2 mm thick) shall be utilized for routing of signal tubing /
cables in field. All cables / tubes in the supporting trays / channels shall be tagged
properly. The loading of the cable trays shall not exceed 60 % of the available space.
Proper gap between the electrical trays, as per the voltage level, shall be maintained in
the cable tray layout. Tray numbers shall be provided at suitable intervals.
Rigid and flexible conduits along with necessary fittings shall be used for cable laying
from instrument to JB or instrument to trays etc.
Table 1 Bureau Indian Standards (BIS)
SN Description BIS
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
1 PVC insulated cables (light duty) for working voltage unto 1100 694-1977 Part I
2 PVC insulated cables (heavy duty) for voltage unto 1100 volts 1554-1976 Part I
3 -- Do -- for voltage 3.3 kV to 11 kV 1554-1976 Part
4 Specification for polyethylene insulated PVC sheathed heavy 5959-1970 Part I
duty electric cables, voltage not exceeding 1100 V
5 -- Do -- voltage 3.3 kV to 11 kV 5959-1970 Part
6 Guide for marking of insulated conductors 5578-1970
7 Code of practice for installation and maintenance of paper 1255-1967
insulated power cables
8 Code of practice for earthing 3043-1966
9 Guide for safety procedures and practices in electrical work 5216-1969
10 Code of practice for installation and maintenance of AC 5214-1969
induction motor starters
11 Code of practice for installation and maintenance of induction 900-1965
12 Code of practice for installation and maintenance of switchgears 372-1975
13 Code of practice for installation and maintenance of 1886-1967
14 Code of practice for electrical wiring installation, voltage not 732-1963
exceeding 650 V
15 Code of practice for electrical wiring installation (system voltage 2274-1963
exceeding 650V)
16 Guide for testing three phase induction motor 4029-1967
Table 2 Pro forma for PCC, DB, Motor Control Centres Test
1 Circuit (Breaker/Supplier Module Designation/Bus Number)
2 Insulation resistance (Contacts open, breaker Racked in position)
a. Between each Phase & Bus (Mega Ohm)
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
b. Between each phase and earth (Mega Ohm)
c. DC and AC control & auxiliary circuits (Mega Ohm)
d. Between each phase of CT/PT and between CT & PT circuit if
b. CT secondary resistance
c. CT polarity check
4 Check for contact alignment and wipe
5 Check/test all releases/ relays
6 Check mechanical interlocks
7 Check electrical interlocks
8 Check switchgear/control panel wiring
9 Checking breaker/Supplier circuits for
a. Closing- local and remote (wherever applicable)
b. Tripping-local and remote (wherever applicable)
10 Opening time of breaker/ contactor
11 Closing time of breaker/ contactor
Signature and seal of Engineer-in-charge Signature and seal of Engineer-in-charge of
of Purchaser Supplier
Pro forma for motor testing
1 Name plate details
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
2 Insulation test (before cable connection)
A Between Phase and Earth (Mega Ohms)
B Between each Phase (Mega Ohms)
3 Insulation test (after cable connection)
A Between Phase and Earth (Mega Ohms)
B Between each Phase (Mega Ohms)
4 No load current
5 Full load current
6 Temperature rise after 4 hours run
A On no load degree C
B On full load degree C
C Ambient temperature during test degree C
7 Operation of thermal overload relay
A At normal Full Load current of motor
B At twice Full Load current of motor trips in
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
Signature and seal of Engineer-in-charge of Signature and seal of Engineer-in-
Purchaser charge of Supplier
Pro forma for Testing Cables
2 Drum Number (from which cable
3 Cable From -> To
4 Length of run of this cable
5 Insulation resistance test (In Mega Ohm)
A Voltage of Megger Volts
B Between core-1 to earth
C Between core-2 to earth
D Between core-3 to earth
E Between core-1 to core-2
F Between Core-2 to Core-3
G Between Core-3 to Core-1
6 High Voltage Test (Voltage Duration)
A Between Cores and Earth
B Between Individual Cores
Signature and seal of Engineer-in- Signature and seal of Engineer-in-charge of
charge of Purchaser Supplier
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
Recommended Cables Sizes For Industrial Wiring
3Ø Aluminium Conductor Cable Size (in mm2)
Motor Rotor Resistance Starter Star Delta Starter
Supply Motor Side (2 Cables) Supply Motor Side
side side (2 Cables)
For up to 10 HP Motor, 2.5 mm2 copper flexible cables should be used.
Sizing of Earthing Lead/ Wire
Sr No ITEM Size
1 Control switches G.I. wire 14 SWG
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
2 Motor upto 10 HP G.I. wire 8 SWG
3 Motor above 10 HP unto 125 HP G.I. strip 25 x 3 mm
4 Motor above 125 HP G.I. strip 25 x 6 mm
5 Switch Board G.I. strip 25 x 6 mm
6 Power control centre/ G.I. strip 40 x 6 mm
LT panel of sub-station
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
Special Condition of Contract for
Erection & Commissioning Work
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
1. Sufficiency Of Tender
2. Program Of Installation & Commissioning
3. Preparation of Drawings for Approval
4. Superintendence, Team And Conduct
5. Purchaser's Instructions
6. Right Of The Purchaser
7. Bidder/Supplier‟s Functions
9. Duties of the Bidder/Supplier Vis-a-Vis the Purchaser
10. Supply Of Tools, Tackles And Materials
11. Protection Of Plant
12. Unloading, Transportation And Inspection
13. Storage Of Equipment
15. Review & Co-Ordination of Erection Work
16. Extension of Time for Completion
Table 1 List of Drawings required Submission
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
1. Sufficiency of Tender
1.1 The Bidder/Supplier by bidding shall be deemed to have satisfied himself as to all the
conditions and circumstances affecting the Contract Price, as to the possibility of
executing the works as shown and described in the Contract, as to the general
circumstances at the site of the works, as to the general labor position at site and to
have determined the prices accordingly
1.17 Programme of Installation & Commissioning
2.1 As soon as practicable after the acceptance of the bid, the Bidder/Supplier shall submit
to the Purchaser for his approval a comprehensive programmed in the form of PERT
network/ bar chart and any other form as may be required by the Purchaser showing
the sequence of order in which the Bidder/Supplier proposes to carryout the works
including the design, manufacture, delivery to site, erection and commissioning thereof.
After submission to and approval by the Purchaser of such programmed, the
Bidder/Supplier shall adhere to the sequence of order and method stated therein. The
submission to and approval by the Purchaser of such programmed shall not relieve the
Bidder/Supplier of any of his duties or responsibilities under the Contract. The
programmed approved by the Purchaser shall form the basis of evaluating the pace of
all works to be performed by the Bidder/Supplier. The Bidder/Supplier shall update the
PERT Network every month, submit it to the Purchaser and shall inform the Purchaser
the progress on all the activities falling on schedule for the next reporting date
2. Preparation of Drawings for Approval
3.1 The Bidder/Supplier should visit the site to acquaint him self in respect of existing site
conditions and to know the details/information required for understanding the nature
and type of civil construction works involved in the project. The Bidder/Supplier shall
submit to the Purchaser for approval:
Within the time given in the specification or in the program, such drawings, samples,
patterns and models as may be called for therein, and in numbers therein required
During the progress of works and within such reasonable times as the Purchaser
may require such drawings of the general arrangement and details of the works as
the Purchaser may required
3.2 Wherever necessary, the Bidder/Supplier would be provided with a set of architectural
drawings for the buildings where the erection works would be carried out and also the
equipment details/ drawings of various equipment handed over to the Bidder/Supplier
by the Purchaser
3.3 The specifications/ conditions concerning the submission of drawings by the
Bidder/Supplier are detailed as under:
3.4 Within four weeks from the date of receipt of the order, Bidder/Supplier shall furnish a
list of all necessary drawings, which the Bidder/Supplier shall submit for approval,
identifying each drawing by a serial number and descriptive title and expected date of
submission. A brief list of drawings is given in Table 1. This list shall be revised and
extended if necessary, during the progress of work depending on the nature of the
3.5 The Purchaser shall signify his approval or disapproval of all drawings or such drawings
that would affect progress of the contract as per the agreed program
3.6 The purchaser shall issue, within four weeks of time in all circumstances, any drawing
requested by the Bidder/Supplier and required to be provided by us. If the
Bidder/Supplier suffers delay and/ or incurs costs due to delay on purchaser‟s part in
this regard, then the Purchaser shall take such delay into account in determining any
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
extension of time to which the Bidder/Supplier is entitled under Clause 15 hereof and
the Bidder/Supplier shall be paid the amount of such cost as shall be reasonable
3.7 P&I Drawings, Plant Layout and GA Drawings submitted for approval shall be signed by
responsible representative of Bidder/Supplier and shall be to any one of the following
sizes in accordance with Indian Standards: “A0, A1, A2, A3 and A4.
3.8 All drawings shall show the following particulars in the lower right hand corner in
addition to Bidder/Supplier‟s name:
Name of the Purchaser Date of drawing
Project Title Drawing number
Title of drawing Space for drawing number
3.9 In addition to the information provided on drawings, each drawing shall carry a revision
number, date of revision and brief description of revision carried out. Whenever any
revision is carried out, correspondingly revision number must be updated
3.10 All dimensions on drawings shall be in metric units
3.11 Drawings (three sets) submitted by the Bidder/Supplier for approval will be checked,
reviewed by the Purchaser, and comments, if any, on the same will be conveyed to the
Bidder/Supplier. It is the responsibility of the Bidder/Supplier to incorporate correctly all
the comments conveyed by the Purchaser on the Bidder/Supplier's drawings. The
drawings, which are approved with comments, are to be re-submitted to the Purchaser
for purpose of records. Such drawings will not be checked/reviewed by the Purchaser to
verify whether the Bidder/Supplier has incorporated all the comments. If the
Bidder/Supplier is unable to incorporate any comments in the revised drawings,
Bidder/Supplier shall clearly state in his forwarding letter such non-compliance along
with the valid reasons
3.12 Drawings prepared by the Bidder/Supplier and approved by the Purchaser shall be
considered as a part of the specifications. However, the examination of the drawings by
the Purchaser shall not relieve the Bidder/Supplier of his responsibility for engineering
design, workmanship, and quality of materials, warranty obligations and satisfactory
performance on installation covered under the contract
3.13 If at any time before completion of the work, changes are made necessitating revision
of approved drawings, the Bidder/Supplier shall make such revisions and proceed in the
same routine as for the original approval
3.14 Date of submission: In the event, the drawings submitted for approval require many
revisions amounting to redrawing of the same, and then the date of submission of the
revised drawings would be considered as the date of submission for approval
3.15 The Bidder/Supplier shall furnish to the Purchaser before the works are taken over,
Operating and Maintenance instructions together with Drawings of the works as
completed, in sufficient detail to enable the Purchaser to maintain, dismantle,
reassemble and adjust all parts of the works. Unless otherwise agreed, the works shall
not be considered completed for the purposes of taking over until such instructions and
drawings have been supplied to the Purchaser
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
3. Superintendence, Team and Conduct
4.1 The Bidder/Supplier shall employ one or more competent representatives, whose name
or names shall have previously been communicated in writing to the Purchaser by the
Bidder/Supplier, to superintend the carrying out of the works on the site. The said
representative or if more than one shall be employed, then one of such representatives
shall be present on the site during all times, and any orders or instructions which the
Purchaser may give to the said representative of the Bidder/Supplier shall be deemed
to have given to the Bidder/Supplier. The said representative shall have full technical
capabilities and complete administrative and financial powers to expeditiously and
efficiently execute the work under the contract
4.2 The Bidder/Supplier shall, execute the works with due care and diligence within the time
for completion and employ Bidder/Supplier‟s team comprising qualified and experienced
engineers together with adequate skilled, semi-skilled and unskilled workmen in the site
for carrying out the works. The Bidder/Supplier shall ensure adequate workforce to
keep the required pace at all times as per the schedule of completion. Bidder/Supplier
shall also ensure availability of competent engineers during commissioning/start up, trial
runs, Operation of the plant/equipment till handing over of the plant
4.3 The Bidder/Supplier shall furnish the details of qualifications and experience of their
senior supervisors and engineers assigned to the work site, including their experience
in supervising erection and commissioning of plant and equipment of comparable
4.4 When the Bidder/Supplier or Bidder/Supplier's representative is not present on any part
of the work where it may be desired to give directions in the event of emergencies,
orders may be given by the Purchaser and shall be received and observed by the
supervisors or foremen who may have charge of the particular part of the work in
reference to which orders are given. Any such instructions, directions or notices given
by the Purchaser shall be deemed given to the Bidder/Supplier
4.5 The Bidder/Supplier shall furnish to the Purchaser a fortnightly labor force report
showing by classifications the number of employees engaged in the work. The
Bidder/Supplier's employment records shall include any reasonable information as may
be required by the Purchaser. The Bidder/Supplier should also display necessary
information as may be required by statutory regulations
4.6 None of the Bidder/Supplier‟s supervisors, engineers, or laborers may be withdrawn
from the work without notice to the Purchaser and further no such withdrawals shall be
made if in the opinion of the Purchaser, it will adversely affect the required pace of
progress and/or the successful completion of the work
4.7 The Purchaser shall be at liberty to object to any representative or person, skilled, semi-
skilled or unskilled worker employed by the Bidder/Supplier in the execution of or
otherwise about the works who shall, in the opinion of the Purchaser, misconduct
himself or be incompetent, or negligent or unsuitable, and the Bidder/Supplier shall
remove the person so objected to, upon receipt of notice in writing from the Purchaser
and shall provide in that place a competent representative at Bidder/Supplier's own
expense within a reasonable time
4.8 In the execution of the works no persons other than the Bidder/Supplier, sub-
Bidder/Supplier and their employees shall be allowed on the site except by the written
permission of the Purchaser
4. Purchaser's Instructions
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
5.1 The Purchaser may, in his absolute discretion, issue from time to time drawings and/ or
instructions, directions and clarifications, which are collectively referred to as
Purchaser's instructions in regard to:
Any additional drawing and clarifications to exhibit or illustrate details
Variations or modifications of the design, quality or quantity of work or the additions
or omissions or substitution of any work
Any discrepancy in the drawings or between the schedule of quantities and/or
Removal from the site of any material brought there by the Bidder/Supplier, which
are unacceptable to the Purchaser and the substitution of any other material thereof
Removal and/or re-execution of any work erected by the Bidder/Supplier, which are
unacceptable to the Purchaser
Dismissal from the work of any persons employed there upon who shall in the
opinion of the Purchaser, misconduct him, or be incompetent or negligent
Opening up for inspection of any work covered up
Amending and making good of any defects
5. Right of the Purchaser
6.1 Right to direct works
The Purchaser shall have the right to direct the manner in which all works under this
contract shall be conducted, in so far as it may be necessary to secure the safe and
proper progress and specified quality of the works. All work shall be done and all
materials shall be furnished to the satisfaction and approval of the Purchaser
Whenever in the opinion of the Purchaser, the Bidder/Supplier has made marked
departures from the schedule of completion or when circumstances or requirement
force such a departure from the said schedule, the Purchaser, in order to ensure
compliance with the schedule, shall direct the order, pace and method of conducting
the work, which shall be adhered to by the Bidder/Supplier
If in the judgment of the Purchaser, it becomes necessary at any time to accelerate
the overall pace of the plant erection work, the Bidder/Supplier, when directed by
Purchaser, shall cease work at any particular point and transfer Bidder/Supplier‟s
men to such other point or points and execute such works, as may be directed by
the Purchaser and at the discretion of the Purchaser
6.2 Right to order modifications of methods and equipment
If at any time the Bidder/Supplier's methods, materials or equipment appear to the
Purchaser to be unsafe, inefficient or inadequate for securing the safety of workmen
or the public, the quality of work or the rate of progress required, the Purchaser may
direct the Bidder/Supplier to ensure safety, and increase their efficiency and
adequacy and the Bidder/Supplier shall promptly comply with such directives. If at
any time the Bidder/Supplier's working force and equipment are inadequate in the
opinion of the Purchaser, for securing the necessary progress as stipulated, the
Bidder/Supplier shall if so directed, increase the working force and equipment to
such an extent as to give reasonable assurance of compliance with the schedule of
completion. The absence of such demands from the Purchaser shall not relieve the
Bidder/Supplier of Bidder/Supplier's obligations to secure the quality, the safe
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
conducting of the work and the rate of progress required by the contract. The
Bidder/Supplier alone shall be and remain liable and responsible for the safety,
efficiency and adequacy of Bidder/Supplier‟s methods, materials, working force and
equipment, irrespective of whether or not the Bidder/Supplier makes any changes
as a result of any order or orders received from the Purchaser
6.3 Right to inspect the work
The Purchaser‟s representative shall be given full assistance by Bidder/Supplier in
the form of the necessary tools, instruments, equipment and qualified operators to
facilitate inspection.
The Purchaser reserves the right to call for the original test certificates for all the
materials used in the erection work.
In the event the Purchaser's inspection reveals poor quality of work/materials, the
Purchaser shall be at liberty to specify additional inspection procedures if required,
to ascertain Bidder/Supplier's compliance with the specifications of erection work
Even though inspection is carried out by the Purchaser or Purchaser's
representatives, such inspection shall not, however, relieve the Bidder/Supplier of
any or all responsibilities as per the contract, nor prejudice any claim, right or
privilege which the Purchaser may have because of the use of defective or
unsatisfactory materials or bad workmanship
6. Bidder/Supplier’s Functions
7.1 The Bidder/Supplier shall provide everything necessary for proper execution of the
works, according to the drawings, schedule of quantities and specifications taken
together whether the same may or may not be particularly shown or described therein,
provided that the same can reasonably be inferred there from and if the Bidder/Supplier
finds any discrepancy therein, Bidder/Supplier shall immediately refer the same to the
Purchaser whose decision shall be final and binding on the Bidder/Supplier
7.2 The Bidder/Supplier shall proceed with the work to be performed under this contract in
the best and workman like manner by engaging qualified and efficient workers and
finish the work in strict conformance with the drawings and specifications and any
changes/modifications thereof made by the Purchaser
8.1 The Purchaser shall make any variation of the form, quality or quantity of the Works or
any part thereof that may, in his opinion, be necessary and for that purpose, or if for any
other reason it shall, in his opinion be desirable, he shall have power to order the
Bidder/Supplier to do and the Bidder/Supplier shall do any of the following:
Increase or decrease the quantity of any work included in the contract
Omit any such work
Change the character or quality or kind of any such work
Change the levels, lines, position and dimensions of any part of the works
Execute additional work of any kind necessary for the completion of the works and
no such variation shall in any way vitiate or invalidate the contract, but the value, if
any, of all such variations shall be taken into account in ascertaining the amount of
the Contract price
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
8.2 The Bidder/Supplier shall make no such variations without an order in writing of the
Purchaser. Provided that no order in writing shall be required for increase or decrease
in the quantity of any work where such increase or decrease is not the result of an order
given under this clause, but is the result of the quantities exceeding or being less than
those stated in the Contract/Bill of Quantities. Provided also that if for any reason the
Purchaser shall consider it desirable to give any such order verbally, the
Bidder/Supplier shall comply with such order and any confirmation in writing of such
verbal order given by the Purchaser, whether before or after the carrying out of the
order, shall be deemed to be an order in writing within the meaning of this clause.
Provided further that if the Bidder/Supplier shall within seven days confirm in writing to
the Purchaser and the Purchaser shall not contradict such confirmation in writing within
14 days, it shall be deemed to be an order in writing by the Purchaser
8.3 Not applicable
8.4 Provided that if the nature or amount of any omission or addition relative to the nature
or amount of the whole of the works or to any part thereof shall be such that, in the
opinion of the Purchaser, the rate or price contained in the contract for any item of the
works is, by reason of such omission or addition, rendered unreasonable or
inapplicable, then a suitable rate or price shall be agreed upon between the Purchaser
and the Bidder/Supplier. In the event of disagreement the Purchaser shall fix such other
rate or price as shall, in his opinion, be reasonable and proper having regard to the
8.5 Provided also that no increase or decrease mentioned above or variation of rate or
price shall be made unless, as soon after the date of the order as is practicable and, in
the case of extra or additional work, before the commencement of the work or as soon
thereafter as is practicable, notice shall have been given in writing:
By the Bidder/Supplier to the Purchaser of his intention to claim extra payment or a
varied rate or price, or
By the Purchaser to the Bidder/Supplier of his intention to vary a rate or price
8.6 If, on certified completion of the whole of the works, it shall be found that a reduction or
increase greater than 15 per cent of the sum named in the Letter of Acceptance results
from the aggregate effect of all Variation Orders but not from any other cause, the
amount of the contract price shall be adjusted by such sum as may be greed between
the Bidder/Supplier and the Purchaser or, failing agreement, fixed by the Purchaser
having regard to all material and relevant factors, including the Bidder/Supplier's site
and general overhead costs of the contract
8.7 The Bidder/Supplier shall send to the Purchaser‟s representative once in every month
an account giving particulars, as full and detailed as possible, of all claims for any
additional payment to which the Bidder/Supplier may consider himself entitled and of all
extra or additional work ordered by the Purchaser which he has executed during the
preceding month
8.8 No final or interim claim for payment for any such work or expense will be considered
which has not been included in such particulars. Provided always that the Purchaser
shall be entitled to authorize payment to be made for any such work or expense,
notwithstanding the Bidder/Supplier's failure to comply with this condition, if the
Bidder/Supplier has, at the earliest practicable opportunity, notified the Purchaser in
writing that he intends to make a claim for such work
8.9 The work shall be carried out as approved by the Purchaser or his authorized
representative/s from time to time, keeping in view the overall schedule of completion of
the project. The Bidder/Supplier‟s job schedule must not disturb or interfere with
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
Purchaser‟s or the other Bidder/Supplier‟s schedules of day-to-day work. The
Purchaser will provide all reasonable assistance for carrying out the jobs
8.10 Night work will be permitted only with prior approval of the Purchaser. The Purchaser
may also direct the Bidder/Supplier to operate extra shifts over and above normal day
shift to ensure completion of contract as per schedule. Adequate lighting wherever
required should be provided by the Bidder/Supplier at no extra cost. The
Bidder/Supplier should employ qualified electricians and wiremen for these facilities. In
case of Bidder/Supplier‟s failure to provide these facilities and personnel, the Purchaser
has the right to arrange such facilities and personnel and to charge the cost thereof to
the Bidder/Supplier
8.11 In order to enable the Purchaser to arrange for insurance of all items received at the
site including the items of supply covered under this contract, the Bidder/Supplier shall
furnish necessary details of all the equipment immediately on its receipt at site, to the
Purchaser. Any default on the part of the Bidder/Supplier due to which any item does
not get covered under the insurance of the Purchaser; the consequential losses shall be
charged to the Bidder/Supplier
8.12 The Purchaser shall not be liable for or in respect of any damages or compensation
payable at law in respect or in consequence of any accident or injury to any workman or
other person in the employment of the Bidder/Supplier or any sub-Bidder/Supplier, save
and except an accident or injury resulting from any act or default of the Purchaser, his
agents, or servants. The Bidder/Supplier shall indemnify and keep indemnified the
Purchaser against all such damages and compensation, save and except as aforesaid
and against all claims, proceedings, costs, charges and expenses whatsoever in
respect thereof or in relation thereto
8.13 The Bidder/Supplier shall ensure against such liability with an insurer approved by the
Purchaser, which approval shall not be unreasonably withheld, and shall continue such
insurance during the whole of the time that any persons are employed by him on the
works shall, when required, produce to the Purchaser or Purchaser‟s representative
such policy of insurance and the receipt for payment of the current premium. Provided
always that, in respect of any persons employed by any sub-Bidder/Supplier, the
Bidder/Supplier's obligations to ensure as aforesaid under this sub-clause shall be
satisfied if the sub-Bidder/Supplier shall have insured against the liability in respect of
such persons in such manner that the Purchaser is indemnified under the policy, but the
Bidder/Supplier shall require such sub-Bidder/Supplier to produce to the Purchaser or
Purchaser's representative, when required such policy of insurance and the receipt for
the payment of the current premium
8.14 Whenever proper execution of the work under the contract depends on the jobs carried
out by some other Bidder/Supplier, the Bidder/Supplier should inspect all such erection
and installation jobs and report to the Purchaser regarding any defects or
discrepancies. The Bidder/Supplier's failure to do so shall constitute as acceptance of
the other Bidder/Supplier's installation/jobs as fit and proper for reception of
Bidder/Supplier's works except those defects which may develop after execution.
Bidder/Supplier should also report any discrepancy between the executed work and the
drawings. The Bidder/Supplier shall extend all necessary help/cooperation to other
Bidder/Suppliers working at the site in the interest of the work
8.15 Bidder/Supplier shall carryout final adjustments of foundations, leveling and dressing of
foundation surfaces, bedding and grouting of anchor bolts, bedplates etc. required for
seating of equipment in proper position. The Bidder/Supplier shall be responsible for the
reference lines and proper alignment of the equipment. However, all civil works like
making cutouts in walls, floors and ceilings for pipelines shall be done by the purchaser.
Adjustment & leveling are to be carried out by the Bidder/Supplier at no extra cost. The
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
Purchaser shall arrange the necessary refilling/repairs of these cutouts and pockets.
The Bidder/Supplier should arrange for laying the supports, cutouts, grouting of bolts,
etc. When the civil works are in progress, so as to avoid refilling/repair works. The
Purchaser at Bidder/Supplier‟s costs shall make the damages occurring to civil and
other works good. For fixing of piping/equipment supports on wall/beams/roof floor etc.,
preferably anchor bolts shall be used by the Bidder/Supplier. Drilling of holes for fixing
anchor bolts & supply of anchor bolts is in the scope of Bidder/Supplier without any
8.16 The Bidder/Supplier shall keep a check on deliveries of the equipment covered in the
scope of erection work and shall advise the Purchaser well in advance regarding
possible hold-up in Bidder/Supplier's work due to the likely delay in delivery of such
equipment/components to enable him to take remedial actions
8. Duties of the Bidder/Supplier Vis-à-Vis the Purchaser
9.1 The equipment and the items, if any, to be supplied by the Purchaser for erection,
testing and commissioning shall be as listed in the contract
9.2 Besides the utilities/ services as specified in battery limits, Purchaser shall also provide
the following assistance/ facilities to the Bidder/Supplier for carrying out the installation
Plant building ready for installation of equipment/items
Necessary temporary water for carrying out the installation shall be supplied at only
one point within the project site by the Purchaser free of charge. All necessary
distribution tapings from this point onwards shall be the Bidder/Supplier's
Necessary temporary power for carrying out the installation shall be arranged by the
Bidder/Supplier at Bidder/Supplier's own cost. The Purchaser on written request by
the Bidder/Supplier will issue the necessary authorization letter
9.3 If the power is provided to you, it shall be as per the subsection “Responsibility” .
However, the Bidder/Supplier shall supply all the items such as energy meter,
switchgear etc. required for getting temporary power.
9.4 The details of temporary water and power requirements shall be furnished one month in
advance by the Bidder/Supplier to enable the Purchaser to make timely arrangement
9.5 If the Bidder/Supplier suffers delay and/or incurs costs from failure on the part of the
purchaser to give possession of the civil works in accordance with the mutually agreed
schedule, the purchaser shall determine:
Any extension of time to which the Bidder/Supplier is entitled under GCC (General
Conditions of Contract) of Tender part -1 and
The amount of such costs, which shall be added to the contract price, and shall
notify the Bidder/Supplier accordingly
9. Supply of Tools, Tackles and Materials
10.1 The Bidder/Supplier shall, at his own expense, provide all the necessary equipment,
tools and tackles, haulage power, consumables necessary for effective execution and
completion of the works during erection and commissioning
10. Protection of Plant
11.1 The Purchaser shall not be responsible or held liable for any damage to person or
property consequent upon the use, misuse or failure of any erection tools and
equipment used by the Bidder/Supplier or any of Bidder/Supplier's Sub-
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
Bidder/Suppliers even though such tools and equipment may be furnished, rented or
loaned to the Bidder/Supplier or any of Bidder/Supplier‟s Sub-Bidder/Suppliers. The
acceptance and/or use of any such tools and equipment by the Bidder/Supplier or
Bidder/Supplier's Sub-Bidder/Supplier shall be construed to mean that the
Bidder/Supplier accepts all responsibility for and agrees to indemnify and save the
Purchaser from any and all claims for said damages resulting from the said use, misuse
or failure of such tools and equipment
11.2 The Bidder/Supplier and Bidder/Supplier‟s Sub-Bidder/Supplier shall be responsible,
during the works, for protection of work, which has been completed by other
Bidder/Suppliers. Necessary care must be taken to see that the Bidder/Supplier‟s men
cause no damage to the same during the course of execution of the work
11.3 All other works completed or in progress as well as machinery and equipment that are
liable to be damaged by the Bidder/Supplier's work shall be protected by the
Bidder/Supplier and protection shall remain and be maintained until the Purchaser
directs its removal
11.4 The Bidder/Supplier shall effectively protect from the effects of weather and from
damages or defacement and shall cover appropriately, wherever required, all the works
for their complete protection
11.5 The Bidder/Supplier shall carry out the work without damage to any work and property
adjacent to the area of Bidder/Supplier's work to whomsoever it may belong and without
interference with the operation of existing machines or equipment
11.6 Adequate lighting, guarding and watching at and near all the storage handling,
fabrication, pre-assembly and erection sites for properly carrying out the work and for
safety and security shall be provided by the Bidder/Supplier at Bidder/Supplier's
cost. The Bidder/Supplier should adequately light the work area during nighttime also.
The Bidder/Supplier should also engage adequate electricians/wiremen, helper etc to
carry out and maintain these lighting facilities. If the Bidder/Supplier fails in this regard,
the Purchaser may provide lighting facilities as he may deem necessary and charge the
cost thereof to the Bidder/Supplier
11.7 The Bidder/Supplier shall take full responsibility for the care of the works or any section
or portions thereof until the date stated in the taking over certificate issued in respect
thereof and in case any damage or loss shall happen to any portion of the works not
taken over as aforesaid, from any cause whatsoever, the same shall be made good by
and at the sole cost of the Bidder/Supplier and to the satisfaction of the Purchaser. The
Bidder/Supplier shall also be liable for any loss of or damage to the works occasioned
by the Bidder/Supplier or the Bidder/Supplier‟s Sub-Bidder/Supplier in the course of any
operations carried out by the Bidder/Supplier or by the Bidder/Supplier‟s Sub-
Bidder/Suppliers for the purpose of completing any outstanding work or complying with
the Bidder/Supplier's obligations
11. Unloading, Transportation and Inspection
12.1 The Bidder/Supplier shall be required to unload all the materials/equipment from the
carriers, those received at site after Bidder/Supplier's team arrives at
site. Bidder/Supplier shall be paid extra for unloading of the equipment being supplied
by the purchaser whereas no extra payment for unloading of the equipment/piping shall
be paid to Bidder/Supplier for the equipment being supplied by the Bidder/Supplier. The
Bidder/Supplier shall plan in advance, based on the information received from the
Purchaser, Bidder/Supplier's requirement of various tools, tackles, jacks, cranes,
sleepers etc. required to unload the material/equipment promptly and efficiently. The
Bidder/Supplier shall ensure that adequate and all measures necessary
to avoid any damage whatsoever to the equipment at the time of unloading are taken
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
12.2 Any demurrage/detention charges incurred due to the delay in unloading the
material/equipment and releasing the carriers shall be charged to the Bidder/Supplier's
12.3 The Bidder/Supplier shall be responsible for the reception on site of all plant and
Bidder/Supplier's equipment delivered for the purposes of the contract
12.4 The Bidder/Supplier shall safely transport/shift the unloaded materials/equipment by the
Bidder/Supplier to the storage area
12.5 All the materials/equipment received by the Purchaser prior to arrival of the
Bidder/Supplier at site shall be handed over to the Bidder/Supplier and there upon the
Bidder/Supplier shall inspect the same and furnish the receipt to the Purchaser. The
manner in which the inspection shall be carried out is enumerated below:
12.6 The materials/equipment would be carefully unpacked by opening the wooden
cases/other modes of pickings as the case may be
12.7 Detailed inventory of various items would be prepared clearly listing out the shortages,
breakage/damages after checking the contents with respect to the Bidder/Supplier's
packing list, the Purchaser's purchase order and approved equipment drawings. The
Bidder/Supplier shall also check each & every equipment for any shortage/shortcoming
that may eventually create difficulty at the time of installation or commissioning
12.8 All the information and observations by the Bidder/Supplier shall be furnished in the
form of `INSPECTION REPORT' to the Purchaser with specific mention/suggestions
which in the opinion of the Bidder/Supplier should be given due consideration and
immediate necessary actions, to enable the Purchaser to arrange repair or replacement
well in time and avoid delays due to non-availability of equipment and parts at the time
of their actual need
12.9 The inspection for all the equipment handed over to the Bidder/Supplier shall be
completed within three week's period
12.10 The protection, safety and security of the materials so taken over from the Purchaser
shall be the responsibility of the Bidder/Supplier, until they are handed over to the
Purchaser after erection, commissioning and testing as per the terms of the Contract
12. Storage of Equipment
13.1 The Bidder/Supplier shall be responsible for the proper storage and maintenance of all
materials/equipment under Bidder/Supplier's custody. Bidder/Supplier shall take all
required steps to carry out frequent inspection of equipment/materials stored as well as
erected equipment until the same are taken over by the Purchaser. The following
procedure shall apply for the same
13.2 The Bidder/Supplier‟s inspector shall check stored and installed equipment/materials to
observe signs of corrosion, damage to protective coating to parts, open ends in pipes,
vessels and equipment, insulation resistance of electrical equipment etc. The
Bidder/Supplier shall immediately arrange a coat of protective painting whenever
required. A record of all observations made on equipment, defects noticed shall be
promptly communicated to the Purchaser and Purchaser's advice taken regarding the
repairs/rectification. The Bidder/Supplier shall there upon carry out such repairs/
rectification at Bidder/Supplier‟s own cost. In case the Bidder/Supplier is not competent
to carry out such repairs/ rectification, the Purchaser reserves the right to get this done
by other competent agencies at the Bidder/Supplier's responsibility and risk and the
entire cost for the same shall be recovered from the Bidder/Supplier's bills
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
13.3 The Bidder/Supplier's inspector shall also inspect and provide lubrication to the
assembled equipment. The shafts of such equipment shall be periodically rotated to
prevent rusting as well as to check freeness of the same
13.4 The Inspector shall check for any signs of moisture or rusting in any equipment
13.5 If the commissioning of equipment is delayed after installation of the equipment, the
Bidder/Supplier shall carry out all protective measures suggested by the Purchaser
during such period
13.6 Adequate security measures shall be taken by the Bidder/Supplier to prevent theft and
loss of materials handed over to the Bidder/Supplier by the Purchaser. The
Bidder/Supplier shall carry out periodical inventory checks of the materials received,
stored and installed by the Bidder/Supplier and any loss noticed shall be immediately
reported to he Purchaser. The Bidder/Supplier shall maintain a proper record of these
inventories. The Bidder/Supplier should not sell, assign, mortgage, hypothecate or
remove equipment or materials which has been installed or which may be necessary for
completion of the work without the written consent of the Purchaser
13.7 Suitable grease recommended for protection of surfaces against rusting (refined from
petroleum oil with lanolin minimum (70 0C) and water in traces) shall be applied over all
equipment as required once in every six months
13.8 All equipment shall be stored inside a closed shed or in the open depending upon
whether they are of indoor or outdoor design. The space heaters where provided into
the electrical equipment shall be kept connected with power supply irrespective of their
type of storage. Where space heaters are not provided adequate heating with bulb is
recommended. For transformers heating of oil shall be done by giving 440 V supply and
short-circuiting the LT terminals. Frequent checks on insulation resistance are essential
for all electrical equipment and record of the inspection reports and mugger readings
shall be maintained equipment wise. Such records shall be presented to the Purchaser
whenever demanded
13.9 All the necessary items/goods required for the Bidder/Supplier as described above shall
arrange protection and such cost shall be included in the Contract price
14.1 The Bidder/Supplier shall obtain the necessary approvals of the Factory Inspector,
Boiler Inspector, Electrical Inspector, Weights & Measures Inspector, Explosive
Inspector and any other state and local authorities as may be required and the cost of
obtaining such approvals shall be included in the contract price
14.2 The Bidder/Supplier will furnish all the necessary details, drawings, and submission of
application and proofreads to the Purchaser for verification/ signature. The
Bidder/Supplier on behalf of the Purchaser shall submit the necessary application duly
filled-in, together with the prescribed fees to the appropriate authorities. However all the
actual statutory prescribed fees paid by the Bidder/Supplier shall be reimbursed by the
Purchaser upon production of the receipt/vouchers
14.3 Wherever necessary or required, the Bidder/Supplier shall furnish the necessary test
and/or inspection certificates etc. from the appropriate authorities as per IBR, IER and
other statutory regulations and the cost for obtaining these certificates shall be
included in the contract price
15 Review & Co-ordination of Erection Work
15.1 The Bidder/Supplier shall depute senior and competent personnel to attend the site
co-ordination meetings that would generally be held at the site at regular interval. The
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
Bidder/Supplier shall take necessary action to implement the decisions arrived at such
meetings and shall also update the erection schedule
16 Extension of Time for Completion
16.1 Should the amount of extra or additional work of any kind or any cause of delay
referred to in these conditions, or exceptional adverse climatic conditions, or other
special circumstances of any kind whatsoever which may occur, other than through a
default of the Bidder/Supplier, be such as fairly to entitle the Bidder/Supplier to an
extension of time for the completion of the works, the Purchaser shall determine the
amount of such extension and shall notify the Bidder/Supplier accordingly. Provided
that the Purchaser is not bound to take into account any extra or additional work or
other special circumstances unless the Bidder/Supplier has within twenty-eight days
after such work has been commenced, or such circumstances have arisen, or as soon
thereafter as is practicable, submitted to the Purchaser full and detailed particulars of
any extension of time to which he may consider himself entitled in order that such
submission may be investigated at the time
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
List of Drawings required Submission (Applicable according to Technical
1 Equipment drawings for fabricated items.
2 Equipment layout for production and service blocks.
3 Flow diagrams for PROCESS/ CLEANING and various services.
4 Service piping layouts in production and service blocks.
5 SS piping layout in production blocks, WHEREVER REQUIRED.
6 Electrical cable, conduit/ cable tray layout.
7 Standard Installation Drawings for Equipment.
8 PLC/Automation networking drawings, Cabling drawings etc.
9 Automation logic write-up along with logical flow network.
10 Other miscellaneous drawings as required for erection work.
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
Instruction to Bidder
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
1 INSTRUCTIONS TO BIDDER
1.1 This Sub - Section of the tender defines the way that bidder is required to structure the
presentation of the technical section of their bid
1.2 All technical data required by the tender is to be provided in the format given in this
Sub - Section. If no format is given for any specific item the bidder may submit bid in
1.3 Any bidder not following the required bid document structure of presenting technical
data that is not in the required format is liable to be deemed non- responsive
2 BID STRUCTURE OF TECHNICAL SECTION
2.1 The technical section of the bid is to be structured in the same order as Tender
Document. Each statement is to be numbered with the same Sub-section and
paragraph number as in the Tender Document. Every page of the technical section of
the bid is to be numbered. Section number is also indicated in every page. The
general structure, therefore, is to be as follows:
2 Instruction to the Bidders
4 Responsibilities
5 Project Management
Scope of Supply and Technical Specifications (Tender
7 List of Preferred Makes of Major Bought Out Items
8 Battery Limits
9 Deviations from Technical Requirements
10 Optional Items
11 Drawings, data and Documentation Submission
12 Process Performance and Consumption Guarantee
13 Criteria for Technical Evaluation of Bid
14 Bidder meeting
15 Layout Drawings
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
2.2 The bidder is to cover each requirement of the Tender Document by statements,
technical data and descriptive material and, in particular to detail the following section-
3 SUB - SECTION 1 INTRODUCTION
Brief Introduction of the tender is given including the site working conditions.
4 SUB - SECTION 2 INSTRUCTIONS TO THE BIDDER
Instructions are provided but not limited to, to the bidder to provide the technical bid in
line with the tender sequence and details
5 SUB - SECTION 3 DESIGN BASIS
The bidder is to describe his technical proposal in detail, stating the processes and
systems, which he has applied in designing the plant. Also to highlight any special
technical innovations that the bidder proposes to include in the plant that will improve
the performance, reduce operating cost or improve product quality and consistency.
The “Preamble” should commence at the start of the process and work logically
through the process. Any such highlights should be cross-referenced with the Bid sub-
Section and paragraph number to which they apply.
The bidder is required to follow the Basic of Design in the tender and indicate
clearly where additional processes or alternative processes of equipment are
considered to be necessary or desirable to achieve optimum plant operation
efficiency, Highest product quality within the standards specified, and plant
operation convenience.
Under the utilities section, the peak and daily loads of each utility has been quantified.
6 SUB – SECTION 4 RESPONSIBILITIES
Responsibilities of the Bidder
The bidder is required to specifically state his acceptance or non-acceptance of each
clause in this sub-section. Non-acceptance shall be deemed a deviation from the
tender and should be mentioned in deviations, Sub - Section
Responsibilities of Client
The bidder is required to state here any additional responsibilities that he consider are
to be borne by Client besides those described in the tender
7 SUB – SECTION 5 PROJECT MANAGEMENT
Time Schedule
The bidder is to state in this subsection the proposed program of implementation from
receipt of order to commencement of product trials, to be provided as per Sub -
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
Management Team
The bidder is to provide detail of the management team in terms of designation,
accordance with this Sub - Section of the tender. Also to quantify the support that will
be given by foreign collaborators, with designation and man months of attendance in
India and at site.
This bidder is to ensure that the following Sub - Sections are fully detailed and
quantify the duration and manpower supplied to each.
Commissioning
Product trials
8 SUB – SECTION 6 SCOPE OF SUPPLY & TECHNICAL SPECIFICATIONS
(TENDER PACKAGE)
The bidder is required to follow the sequence of the tender Document and to make a
statement on each paragraph. Do not leave any item without a clarify statement
9 SUB – SECTION 7 LIST OF PREFERRED MAKES OF BOUGHT OUT ITMES
Bidder to strictly follow the list of preferred makes of Bought out items and shall select
a make for supply out of the list only. Make selected by the bidder other than the said
list shall be considered as Deviation from the tender. Such items shall be mentioned in
Deviation Statement. All given makes are preferred however, the bidder to get the
approval from the consultant/client before placement of order to the sub-vendor during
10 SUB – SECTION 8 BATTERY LIMITS
Battery limits for the plant are mentioned in this sub-Section
11 SUB – SECTION 9 DEVIATIONS
All Technical Deviations are to be stated. This is mandatory, and failures to
comply with make the bid liable to be deemed non-responsive
12 SUB – SECTION 10 OPTIONAL ITEMS
Items that the bidder includes in this Sub - Section that are considered by evaluation
team to be essential to the satisfactory operation of the plant, shall be included in the
commercial evaluation of the bid
13 SUB – SECTION 11 DRAWINGS, DATA & DOCUMENTS SUBMISSION
The list of drawings and technical documents required for technical evaluation is
included in this Sub - Section. These include a number of data sheet formats to be
completed by the bidder. The completion of this format is mandatory, and failure to
comply will make the bid liable to be deemed non-responsive
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
Introduction & Design Basis
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
Mehsana District Co-Operative Milk Producers‟ Union Limited called as Dudhsagar Dairy is
one of member union of GCMMF Ltd. The dairy, as it grew, became the largest co-
operative dairy in the whole of Asia and handles more than 45 Lakh litres of milk per day in
peak season. The union has two satellite dairies and three chilling centres to collect and
supply raw chilled milk to the dairy. The product range of the Mehsana District Co-operative
Milk Producers' Union Ltd. includes liquid milk in pouches, butter, ghee, infant milk
substitute, dairy whitener, whole milk powder, skimmed milk powder, sweetened
condensed milk, sterilized flavoured milk, Chhach (butter milk), ice cream, Dahi (yoghurt),
Paneer, Sweets and UHT milk in pouches.
Mehsana District Co-operative Milk Producers‟ Union Ltd. has set down as tapping stone to
provide good quality, pure and safe milk to the consumers in Delhi NCR market also. To
achieve this, it has established Dudhmansagar Dairy in Manesar, Gurgaon, Haryana to
handle 12 LLPD milk with product making facilities.
The Organization further expands its wings by establishing ultramodern & state-of-the art
Dudhmotisagar Dairy in Dharuhera Haryana (near NCR, Delhi Suburb) to handle 15 LLPD
milk expandable up to 30 LLPD milk handling capacity.
Dharuhera Plant was established in 2012 with a processing capacity of 15.0 LLPD
expandable up to 30.0 LLPD and manufacturing Pouch Milk, Dahi, Butter Milk, Paneer,
Yoghurt and Sweets with brand name of Amul. Dharuhera Plant is certified by DNV GL with
With the increasing demand of Milk and Dahi, there is a need for expansion of Milk and
Dahi, processing, packing & storage capacity in the existing dairy plant. This E-Tender is
for Design, Supply, Installation, Testing & Commissioning of Modification of existing
50 KLPH Homogenizer to increase the flow rate from 35KLPH to 50 KLPH at
Dudhmotisagar Dairy along with the facility to add melted White butter in Milk.
The design and layout of the facilities, selection of equipment and services, methodology of
execution, testing and commissioning shall be carefully planned and executed with the
knowledge of normal operational & processing routines of the composite Dairy plant.
The general technical specification of the major components and the ancillary items
described in the technical section, its capacities and quantities proposed by the Purchaser
are furnished in the „Basis of Design‟ and „Bill of Quantities (BOQ)‟. These are only for
the guidance of the bidder to quote their prices on comparable basis. However, it shall be
construed and understood that bidder is familiar / acquainted about the nature and the
quantum of work involved and has submitted his offer without deviating and fulfilling
complete “end to end” requirement and the basic configuration of the plant, for Proposed
The quantity of all equipment’s, tanks, Valves, pipes, fittings, insulation, cables,
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
cable trays, earthing, instruments, structural and supports etc. are to be offered
based on the actual requirement at site. The bidder shall have to work out the details
based on the system offered but not lower than that specified in the bid document.
1.2 REQUIREMENTS OF THE PROCESS PLANT:
Plant basis and Utility basis:
Plant operations 24 hours a day
Electricity Charges Rs. 8.5 /KW unit
Steam Charges Rs. 3 / Kg of steam Eq.
Boiler Fuel Natural Gas
Source of Water Ground Water
Building Free space reserved in
Existing Building
Past. Std. Milk for Received from existing
Processing Processing section at PMST
1.3 WORKING CONDITIONS:
Site work of every nature has to be planned and executed with the knowledge of site
conditions that it is running dairy plant. The design and layout of the new facilities,
selection of equipment and services, methodology of project execution, testing and
commissioning should all be carefully planned with this point in mind.
1.4 PROJECT TIME SCALE:
The Plant should be completed in time as specified in the NIT (Notice of Inviting
Tender) of this tender. Product trials shall be commenced at the end of this period.
1.5 SITE CONDITIONS:
To be referred for Dudhmotisagar Plant, Dharuhera, Haryana
1.6 SITE ADDRESS:
The plant shall be installed at Dudhmotisagar Dairy, Dharuhera, Haryana State (India)
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
The Plant design shall be automatic considering certain operations shall be controlled
through PLC SCADA. Being a large capacity plant, the bidders are required to offer the
state of the art technology suitable for Indian Product with comparable Body & Texture
and Composition exactly as per the Indian Taste, approved standards under GCMMF
1. Functional Requirement
This 50KLPH homogenizer is utilised for the manufacturing of Homogenizer Milk
variants (Like Homogenized DTM, Cow Milk) at flow rate of 35KLPH. We want to
increase its flow rate from 35KLPH to 50KLPH along with the facility to add melted
White butter in Milk.
After modification, It is responsibility of supplier/bidder to achieve HI (creaming Index) of
homogenized milk less than equal to 10 value i.e., Output milk form Homogenizer must
be less than equal to 10 creaming index (% CI) without fail for processed Milks -TM,
DTM, COW MILK, reconstituted milk and other milk having fat% 0.2% to 10%. This shall
be considered Process performance guarantees.
1.1 Broad Plan and Capacities:
We propose to utilise the full capacity of Homogeniser and utilize this for blending of
melted white butter in milk as per the requirement.
1.2 SCOPE OF SUPPLY
1.3 MODIFICATION WORKS FOR HOMOGENIZER FLOW RATE
Present Flow Rate of Homogenizer-35 KLPH
Flow Rate After modification works-50 KLPH ± 5%
Modification works include
a. Supply & Installation of Balance Tank with instruments
b. Supply & installation, Modification of Piping, Valves & fittings (Product, CIP, utility)
c. Instruments & Valves shall be terminated in existing IO Panel
d. Logic Modification in existing PLC
e. Scada Screen Modification
f. Laying & termination of Cables (control & ASI) from IO Panel to field instruments.
The complete operations shall be considered from existing SCADA system.
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
4 Addition of Melted White Butter at Required/ measured quantity: _
Modification is proposed to allow addition of measured melted White butter from
Pasteurized cream tanks (05 KL x 03 Nos capacity) directly into balance tank of
Homogeniser or any other suitable location in feed line of Homogenizer to minimise the
Bidder shall consider metered dosing in balance tank from melted butter storage tank
with flow rate of 1500-2000 Kg/hr melted butter per hour using mass flow meter. So that
Milk TS of RCM (reconstituted milk) shall not increase more than 20%, Bidder shall
install VFD for the existing melted butter transfer pump with mass flowmeter and SS
piping & fittings with automated control from existing SCADA system, The required CIP
of this transfer line shall be scope of this tender
Modification works include:
a. Supply & Installation of mass flow meter
b. Supply & installation of new or modification of Piping, Valves & fittings (Product, CIP,
c. Instruments & Valves shall be terminated in existing IO Panel
d. Logic Modification in existing PLC
e. Scada Screen Modification
f. Laying & termination of Cables (control & ASI) from IO Panel to field instruments as
The complete operations shall be considered from existing SCADA system.
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
The scope covers:
Design, project engineering, control philosophy, software development,
manufacture, assembly, shop testing, packing, transportation to site, unloading at
site, storage, erection, site testing & pre-commissioning, commissioning, initial &
successful operation and performance testing of the entire Control &
Instrumentation package of the plant for safe, reliable, consistent, optimum and
efficient operations
Development of application software including data base graphics, mimics, logs
and report format generation, alarm management, model development (MIS Data /
Reports with historian‟s logs for at least 15 Months data repository for verifications
and print outs)
Factory and site testing, performance guarantee testing in coordination with client‟s
automation engineer and verification / validation thereof.
Erection and commissioning of the entire control & instrumentation system
Commissioning for the system
Providing guarantee for performance of the equipment supplied
Training of operators, systems engineers and maintenance engineers
Manuals and documentation, including submission of I/O List, loop diagram, logic
diagram, specification/data sheets and other necessary drawings in printed and
electronic medium for approval of owner in multiple sets
Exchange of information related to MIS reporting, SAP information/historian data`s,
alarms, process parameters and SCADA screens for inter-transfer sections of the
plant with main plant
The process parameter i.e. temperature, pressure, steam control, flow control, level
control, etc. shall be controlled automatically through PID controllers of automation
The automatic control should include starting operation, operation on product, shut
down, emergency shutdown and CIP. The conductivity and other CIP parameters
for CIP tanks shall be controlled automatically
The entire Control & Automation(C&A) system shall be designed, supplied and
commissioned to enable the operator to operate the plant in a safe, efficient and
reliable manner, without exceeding plant operational limits and ensuring the overall
performance with respect to capacity, quality and consumption. The C&A System
shall be designed utilizing state-of-the-art technology to ensure:
The C &A System shall be configured to perform the following basic functions: -
Start-up and shut down of plant maintaining the operating conditions
Ease in operation
Acquisition display and archiving of plant data and generation of reports and
transferring it in to existing MIS system
The entire operation and monitoring under all regimes of operation i.e. start-up,
normal operation, shut down etc. shall be possible through operator‟s consoles in
control room located in Milk Processing Plant area with dynamic animation.
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
Selection of all instruments shall meet the requirement of continuous monitoring
and process functionality. All process transmitters shall be 4-20 mA type.
CONTROL PHILOSOPHY
The contractor is required to submit the control philosophy during detail engineering
for finalization.
TECHNICAL REQUIREMENTS
All equipment, system and accessories furnished shall be from latest proven product
range of established/reputed manufacturers and shall conform to applicable national
and international standards.
The design of various control systems and related equipment shall adhere to the
principle of failsafe operation implying that loss of signal, loss of power supply or
failure of any component will not lead to hazardous conditions/ product losses, while
at the same time, prevent occurrence of false and unrelated trips.
Climatic Condition
The instruments / control system shall be suitable for environmental conditions that
are normally encountered in western part of India. All equipment / system / sub-
system etc. shall be fully tropicalized accordingly.
Ambient Temp.55 °C.
Relative humidity – 95% at <55 °C.
System power supply condition
For applications requiring AC power, 240 V AC, 50 Hz uninterrupted power supply
shall be made available by supplier from UPS (3 phase input / 1 phase output)
complete with a common servo stabilizer. The UPS battery bank may be common.
In case of power failure, the UPS (3 phase input / 1 phase output) should be capable
of delivering power for min. 30 Minutes to control/ instrumentation system including
valve actuation power. The UPS shall have a static by-pass switch. Necessary filters
should be considered to protect the system from harmonics, which may be generated
12/24 V DC power supply shall be used wherever applicable for Control System and
will be derived from the UPS. Any other voltage level required for the system shall
also be the responsibility of the Supplier along with all required hardware. DC voltage
system for Main CPU & all I/O stations/panels shall be with dual channel & kept
separate for different step downs as per requirement. Each filed I/O stations shall
have separate voltage step down/standard power converter module system from
220V AC to duel channel 12/24 V DC to meet the requirement.
Control & Instrument (C&I) equipment furnished shall incorporate necessary
techniques for protection against electrostatic discharge and radio frequency
interface, as per international codes and standards.
Electrical earthing and C&I System earthing shall be separate. Safety earth bus shall
be connected to main plant earth pit. Separate earth pit/s shall be provided for system
earth bus (electronic earth). Electronic earth shall be cabled directly to the
corresponding earth bar. The earthing for automation/C&I system shall be of copper
All instruments shall have clear access for maintenance, removal, lay-down,
calibration etc. The sensors & display units should be separate.
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
All readable instruments shall be clearly visible unassisted.
Portable SS access ladder with platform shall be provided for easy access of
instruments, valves and actuators.
All prefabricated plugged cables, power supply cable for Supplier‟s System.
System Cabinet, Marshalling Cabinet and Power Supply Cabinet to fulfill the
system requirement.
Power Distribution Cabinet for extension of power supply to field instruments.
GENERAL FOR SERVICE SS PIPES, VALVES, FITTINGS & ACCESSORIES
The main supply pipe sizes of various utilities shall be designed keeping in view the
future expansion/ modifications.
MATERIALS FOR PIPING
Filtered, soft & chilled water distribution lines: Galvanized steel (ERW) IS
3589, 3601,4736 (medium duty)
RO water distribution lines: AISI 304 with seamed joints.
For Steam/Hot Water system: MS „C‟ class pipes (ERW) IS 1239/3601/4736
Compressed air lines: Compressed air lines shall be of SS
Service Size Specification Remarks
CS body, 13% Cr trim 800#, Lift Check
15 mm to valve with SW ends (NRV)
CS body, SS ball, special PTFE seats,
800# with SW ends ball valve Pressure
LP steam < 3.5Kg/
CS body, 13% Cr trim 150#, Gland less Sq.cm
50mm to piston type valve with flanged ends
300mm CS body, 13% Cr trim 150#, flanged swing
15mm to CS body, SS ball, PTFE seats, 800# with
40mm SW or SCD ends ball valve
Water / 50mm to CI body 13% Cr disc, 125# wafer type < 3.5 Kg /
Air 300mm butterfly Sq.cm
CS body 13% Cr trim, wafer type check
15mm to CS body, SS ball, PTFE seats, 800# with
40mm SW or SCD ends ball valve
Butterfly type flanged construction.
Flanges/counter flanges shall be as per BS tables:
Table D for water
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
Table E for air
For pipeline sizing following velocities of the fluid shall be considered
Hot water : 3 m/s
SS / MS/ GI STRUCTURALS
SS-304 structural for platforms, product/ CIP / utility pipes, cable tray supports,
crossover/ working table etc.
All cable tray supports inside the plant/corridor & tanker bay shall also be of SS-304
box section (2 mm thk.). Supports outside the plant shall be of GI.
Below mentioned areas are to be considered for SS-304 structural and fabrication
SS304 structural supports for all product/ CIP/ Utility piping, cable trays/conduits
SS304 structural supports for all product/ CIP/ Utility piping, cable trays/conduits
etc. all production area, CIP area, Indoor plant corridor etc.
Self-supported SS304 platforms for approach of all Indoor product tanks of milk,
Yoghurt, CIP etc. with staircase and SS railing.
SS 304 cross over platforms for easy movement, maintenance and access
around the Process production line.
In addition to all above mentioned requirement required SS structural platform &
supports shall be provided as per functional requirements of the plant operation and
Training shall form an important component of Project Management and shall be
undertaken by the contractor for a period of three months. The contractor would train
all levels of staff of the client in operating the plant and automation systems including
managers, engineers, supervisors, operators and maintenance personnel
Training would be given both at site and at the manufacturer's works, and a schedule
should be proposed by the contractor, together with the content of training programs,
their duration and venue.
Training should commence during the erection period Six months include 30 man
days of trainer‟s time as follows:
Management operations and factory control using automated systems and
automated process- 10 man days <1>.
Supervision of personnel and plant operations in an automated plant -10 man
Familiarization with automation systems hardware and automated equipment
operation 15 man days <3>.
Fault finding & maintenance on control systems & control equipment, including
electronic circuits & microprocessor -20 man days <3>.
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
Familiarization with the basic principles of control systems software, process
coding, programming & instructions on how to correct, modify and re-write
programs -15 man days <3>.
Familiarization with start-up procedures, control during operation &
adjustment- 20 man days <3>.
<1> Managers & Senior personnel training.
<2> Supervisors & Section heads training.
<3> Supervisors, operators and maintenance staff.
The objective of the training is to provide selected staff members of the dairy with
necessary knowledge of dairy technology and maintenance to ensure a sound and
suitable operations of the plant. Emphasis will be given on application as well as
operation and not on basics.
Dairy staff for:
- Operation of process, services utilized and process technology
- Operation of machinery and equipment
Maintenance & Electrical staff for:
- On the job training for technical personnel
- Maintenance of plant and equipment
Instrumentation staff:
- On job training covering calibration
- On the job training for technical personnel regarding set points
- Fault finding and maintenance
- Training of hardware & software.
- Process logic
- Fault finding and maintenance
Services to be provided by Purchaser:
Classrooms with chairs and tables for theoretical training
Persons selected for training will have a good basic technical education
Continuity in training and their assistance during start up of the plant
GENERAL SPECIFICTIONS:
The following shall apply to all the equipment in various sections of the Dairy Plant.
All MS/.GI structures and equipment to be given one coat of anti-corrosive
paint followed by two coats of paint of approved shade.
All motors in production units shall be covered with SS shrouds. Shrouds
should be easily removable and should allow free air circulation as well as
entry of electrical cables. All motors installed outside the building shall have
Suitable safety guards should be provided wherever required.
All weld joints shall be ground smooth. All corners should be well-rounded. In
case of SS surfaces, external & internal surfaces shall be polished to
grits. DP tests shall be carried out for all welds after polishing for all holding
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
All equipment surfaces coming in contact with milk shall be made of SS
or SS 316 depending on the application as subsequently desired.
All fittings/equipment are to conform to SMS standard.
Detailed preventive maintenance schedules as well as operational manuals
of all equipment shall be provided by the Bidder in the form of Soft Copies
after commissioning along with printed copies.
The manual shall cover the following aspects:
Brief Process Description & Flow sheet.
Unit-wise function and description.
Equipment-wise details, operational instructions, maintenance procedures
Plant start-up, commissioning, normal operation, and emergency operation.
Trouble-shooting.
As built drawings of the equipment as build drawing connection diagrams.
Spares inventory and services of supply.
The manuals and drawings are to be supplied as follows:
4 sets of manuals and drawings in hard copy.
3 set of above in soft copy in CDs.
3 Set of CDs of Automation Backup for reinstallation during any failure
Following documents in the list for the manual should be added to the
mentioned list:
1) 3D Model of complete plan including piping to save time installation and future
expansion is must
2) Isometric drawings for process and utility piping.
3) Plan layout with sections , Floor wise plant layout , GA drawing
4) As built P&IDs with complete equipment list with specifications.
LIST OF DRAWING AND DOCUMENTS
The following drawings & documents shall be enclosed by the bidder with the
Machinery layout for the Milk Processing plant, allied services based on the
tentative layout enclosed with the tender document
Product flow diagram including production equipment, service and product piping,
controls, instruments etc.
CIP equipment arrangement and flow diagram
Service utilities flow diagram including utility equipment, inter connecting piping,
controls, instrument, automation etc.
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
Single line diagram for electrical distribution system
Detailed automation system configuration/architecture proposed
Load diagram for all the services viz. steam, power, raw and soft water,
chilled water, compressed air on 24 hours basis showing hourly
consumption, total daily consumption, peak load and average load
Hourly equipment-wise service consumption data on 24 hour basis
Bar chart for project execution
Literature covering general and technical information for all equipment
covered within the scope of tender
Technical details of any other equipment /item which is not mentioned but is
considered to be required as per the description in the text
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
Responsibilities
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
3. RESPONSIBILITIES OF BIDDER
3.0.1 Developing the process design, complete engineering design, manufacturing
and/or supply of respective equipment/goods/services as per the technical
specifications and ensuring best performance of individual
equipment/systems/process plant as a whole. The bidder shall avail the
assistance of reputed specialists in the respective field wherever required as
well as past experiences gained during installation/ commissioning of the
3.0.2 Development of automation services, software, interfaces etc. wherever
applicable and its incorporation in the project.
3.0.3 Providing technical data, technical literature, production and service load
3.0.5 Arranging for approvals from various Statutory Authorities on behalf of the
Purchaser. The statutory fees will be reimbursed by Purchaser on production
3.0.6 First charge of oil/lubricants/gas.
3.0.7 Execution of project in accordance with prevailing Indian standards IER & IBR,
wherever applicable & relevant to this project.
3.0.8 Testing and commissioning satisfactorily and performance of all equipment in
bidder‟s scope and after sales service at mutually agreed terms.
3.0.9 Test equipment, test kits, instrumentation and materials required for
establishing performance parameters.
3.0.10 Provide necessary manpower during positioning, pre-commissioning, testing
and commissioning along with tests.
3.0.11 Testing, commissioning of the system under scope as per agreed performance
parameters and utility consumption.
3.0.12 Training Purchaser's personnel in the field of instrumentation automation,
management system, plant operation & control, maintenance & repair of
systems & equipment.
3.0.13 Dry Chemical Powder type fire extinguishers shall be provided at strategic
points by purchaser as per BOQ.
3.1 RESPONSIBILITIES OF PURCHASER
3.1.1 Details of civil design, building layout and drainage and sewage details.
3.1.2 Documents on local site conditions related to climate, access and
communications.
3.1.3 Water: Water shall be provided by Purchaser at Free of Cost at one Point.
Power: Power shall be provided by Purchaser at Free of Cost at one Point.
3.1.4 Lighting and domestic wiring system and internal telephone system including
the switch boards for lighting. Engineering personnel to liaison with the
supplier, Project Manager and the execution team.
3.1.5 Permanent water and power supply at the time of pre-commissioning of the
MEHSANA DISTRICT CO-OPERATIVE MILK PRODUCERS’ UNION LIMITED
E-Tender cum Reverse Auction Document: MDCMPUL/2026-27/120/DHD/Homogenizer
3.1.6 Adequate staff including operators, supervisors and engineers for product
3.1.7 All civil works including buildings, roads, cable trench, underground
condensate piping and drainage.
3.1.8 Provision of and cost of services, raw products, packaging materials
3.1.9 Timely provision of personnel for training.
3.1.10 Provide open storage area, lockable store during erection and commissioning
3.1.11 Suitable Site fabrication yard
3.1.12 Telephone and fax on chargeable basis.
3.1.13 Payment as per agreed terms and conditions.
3.1.14 Approval of drawing
3.1.15 Project manager with team throughout the implementation.
3.1.16 Lightening protection system & protection against rain.
3.1.17 Readiness of Civil Building, clear civil fronts in all respects along with
necessary utilities within agreed schedule to enable commencement of
erection activities to meet the overall completion schedule.
3.1.18 Availability of required quantity of milk for the designed product to conduct the
first run of product trials at the rated plant capacity.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
tutorial.pdf
SITE VISIT CERTIFICATE.pdf
SFMS field.pdf
ITB and OBT Final 021126.pdf
Part_B_Homogenizer-Modification Tender_DHD_27.10.26 (1).pdf
120 DHD Modification of 50 KL Homogenizer NIT.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .