| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.8 LAccepted-AOC PARADEEP | L1 | Accepted-AOC The bid of Amulya Kumar Sahoo A Class contractor is declared as 1st winner in the lottery process held on 29.09.2020 | |
| 2 | L1₹44.8 LRejected-AOC | L1 | Rejected-AOC Rejected | |
| 3 | L1₹44.8 LRejected-AOC | L1 | Rejected-AOC Rejected | |
| 4 | L1₹44.8 LRejected-AOC | L1 | Rejected-AOC Rejected | |
| 5 | L1₹44.8 LRejected-AOC AT KHARIAR PO KHARLAR DIST NUAPADA | L1 | Rejected-AOC Rejected |
Tender Value
₹44.8 L
EMD Value
₹44,800
Closing Date
19 Jun 2020, 5:00 pmClosed
Executive Engineer,M.I.Division,Khariar
O/o the Executive Engineer,M.I.Division,Khariar,Nuapada
Laying HDPE main Pipe line,UGPL I and UGPL II Pipe line with construction of different structures for pipe line Network at Cluster No-II in Budhipali Check dam under NAFCC Project Nuapada
2020_CEMIB_61537_2
01/EEMIDKHR/2020-21
Open Tender
Civil Works - Water Works
Percentage
240 days
Nuapada
Please refer DTCN
2 documents required · 2 mandatory
₹6,000
₹44,800
Yes
27 Nov 2020
10 Jun 2020
24 Jun 2020
10 Jun 2020
19 Jun 2020
10 Jun 2020
10 Jun 2020 - 18 Jun 2020
eProcurement System Government of Odisha Created By: PRABHAKAR MOHANTY Created Date/Time: 20-Jul-2020 08:05 PM Tender Title: Laying HDPE main Pipe line,UGPL I and UGPL II Pipe line with construction of different structures for pipe line Network at Cluster No-II in Budhipali Check dam under NAFCC Project Nuapada Tender ID: 2020_CEMIB_61537_2
Tender Inviting Authority: EXECUTIVE ENGINEER,M.I.DIVISION,KHARIAR
Name of Work: Laying HDPE main Pipe line,UGPL-I & UGPL-II Pipe line with construction of different structures for pipe line Network at Cluster No-II in Budhipali Check dam under NAFCC Project,Nuapada
Contract No: ONLINE/01/EEMIDKHR /2020-21
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 Chandrakant Singh Thakur 4476340.62 0.00 4476340.62 Fourty Four Lakh Seventy Six Thousand Three Hundred and Fourty
2.00 prasanta kumar sahu, prop-of nilamadhaba construction 4476340.62 0.00 4476340.62 Fourty Four Lakh Seventy Six Thousand Three Hundred and Fourty
3.00 GIRIDHARI LAL AGRAWAL 4476340.62 0.00 4476340.62 Fourty Four Lakh Seventy Six Thousand Three Hundred and Fourty
4.00 AMAN ULLA KHAN 4476340.62 0.00 4476340.62 Fourty Four Lakh Seventy Six Thousand Three Hundred and Fourty
5.00 AMULYA KUMAR SAHOO 4476340.62 0.00 4476340.62 Fourty Four Lakh Seventy Six Thousand Three Hundred and Fourty
6.00 RUPESH AGRAWAL 4476340.62 0.00 4476340.62 Fourty Four Lakh Seventy Six Thousand Three Hundred and Fourty
7.00 ABHIJIT SINGH THAKUR 4476340.62 0.00 4476340.62 Fourty Four Lakh Seventy Six Thousand Three Hundred and Fourty
8.00 ROHIT KUMAR TRIVEDI 4476340.62 0.00 4476340.62 Fourty Four Lakh Seventy Six Thousand Three Hundred and Fourty
9.00 RYTHAM AGRAWAL 4476340.62 0.00 4476340.62 Fourty Four Lakh Seventy Six Thousand Three Hundred and Fourty
10.00 RAJU AGRAWAL HUF 4476340.62 0.00 4476340.62 Fourty Four Lakh Seventy Six Thousand Three Hundred and Fourty
11.00 ANURAG NIGAM 4476340.62 0.00 4476340.62 Fourty Four Lakh Seventy Six Thousand Three Hundred and Fourty
12.00 HIMANSU SEKHAR PADHI 4476340.62 -14.99 3805337.16 Thirty Eight Lakh Five Thousand Three Hundred and Thirty Seven
13.00 ABHILASH RANJAN PATTNAIK 4476340.62 0.00 4476340.62 Fourty Four Lakh Seventy Six Thousand Three Hundred and Fourty
14.00 HITESH AGRAWAL 4476340.62 0.00 4476340.62 Fourty Four Lakh Seventy Six Thousand Three Hundred and Fourty
15.00 ABDUL RAFIK 4476340.62 -4.00 4297286.99 Fourty Two Lakh Ninty Seven Thousand Two Hundred and Eighty Six
16.00 SHASHIRAM MANGARAJ 4476340.62 0.00 4476340.62 Fourty Four Lakh Seventy Six Thousand Three Hundred and Fourty
17.00 ABHIJEET BOSE 4476340.62 0.00 4476340.62 Fourty Four Lakh Seventy Six Thousand Three Hundred and Fourty
Lowest Amount Quoted BY: HIMANSU SEKHAR PADHI(3805337.16)
BOQ Summary Details Tender Title: Laying HDPE main Pipe line,UGPL I and UGPL II Pipe line with construction of different structures for pipe line Network at Cluster No-II in Budhipali Check dam under NAFCC Project Nuapada Tender ID: 2020_CEMIB_61537_2
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 HIMANSU SEKHAR PADHI 3805337.16 L1
2 ABDUL RAFIK 4297286.99 L2
3 RYTHAM AGRAWAL 4476340.62 L3
4 prasanta kumar sahu, prop-of nilamadhaba construction 4476340.62 L3
5 RAJU AGRAWAL HUF 4476340.62 L3
6 AMAN ULLA KHAN 4476340.62 L3
7 ANURAG NIGAM 4476340.62 L3
8 ABHIJIT SINGH THAKUR 4476340.62 L3
9 HITESH AGRAWAL 4476340.62 L3
10 ABHIJEET BOSE 4476340.62 L3
11 ABHILASH RANJAN PATTNAIK 4476340.62 L3
12 GIRIDHARI LAL AGRAWAL 4476340.62 L3
13 SHASHIRAM MANGARAJ 4476340.62 L3
14 Chandrakant Singh Thakur 4476340.62 L3
15 RUPESH AGRAWAL 4476340.62 L3
16 AMULYA KUMAR SAHOO 4476340.62 L3
17 ROHIT KUMAR TRIVEDI 4476340.62 L3
stage.html
html • 0.08 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_323261.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .