| Sl No | Description | Qty | Unit | SIDHIKH A L1 | Kannan L2 |
|---|---|---|---|---|---|
| 1.00Compound Wall Construction | |||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 2,250 | sqm | 16.75 ₹37,687.5 Lowest | 17.85 ₹40,162.5 |
| 1.00 | 2.33.1:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth | 6 | each | 507.3 ₹3,043.8 Lowest | 540.52 ₹3,243.12 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 78.63 | cum | 331.32 ₹26,053.02 Lowest | 353.01 ₹27,758.59 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.43 | cum | 7,306.37 ₹3,156.35 Lowest | 7,784.81 ₹3,363.04 |
| 1.00 | OD39307/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good
quality blasted rubble including packing to compactness to lines and levels cost and conveyance
of all labour charges etc complete. | 73.6 | cum | 3,678.07 ₹2,70,705.95 Lowest | 3,918.92 ₹2,88,432.51 |
| 1.01 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 55.2 | cum | 7,684.54 ₹4,24,186.61 Lowest | 8,187.74 ₹4,51,963.25 |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 8.4 | sqm | 355.66 ₹2,987.54 Lowest | 378.95 ₹3,183.18 |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.9 | cum | 9,660.4 ₹18,374.08 Lowest | 10,292.99 ₹19,577.27 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 372.24 | kilogram | 103.54 ₹38,541.73 Lowest | 110.32 ₹41,065.52 |
Tender Value
₹20.5 L
EMD Value
₹50,000
Closing Date
10 Oct 2025, 5:00 pmClosed
Superintending Engineer
The Superintending Engineer, LID-EW Section, Thiruvananthapuram Muncipal Corparation Office
TMC-OF- 55823/2024 - Construction of Compound wall At Corporation own land at Chempaka Raman Pillai Nagar(CRP Nagar)-in Sreekariyam Ward
2025_LSGD_794667_8
DB/62983/2025-26(66a)
Open Tender
Civil Works - Others
Item Rate
180 days
Thiruvananthapuram Municipal Corparation
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,760
Yes
₹50,000
Yes
11 Nov 2025
3 Oct 2025
13 Oct 2025
3 Oct 2025
10 Oct 2025
3 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1338389.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .