Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.9 LAccepted-AOC | L1 | Accepted-AOC LOWEST | |
| 2 | L2₹8.1 L+₹19,493.87 (2.45%)Rejected-AOC MOOTHAMKUNNATH RAMAMANGALAM PAMPPAKADA | ERNAKULAM | KERALA | 680667 | L2 | Rejected-AOC SECON LOWEST | |
| 3 | L3₹8.5 L+₹57,870.60 (7.28%)Rejected-AOC | L3 | Rejected-AOC THIRD LOWEST | |
| 4 | L4₹8.7 L+₹72,931.77 (9.18%)Rejected-AOC | L4 | Rejected-AOC FORTH LOWEST | |
| 5 | L5₹8.9 L+₹99,942.24 (12.6%)Rejected-AOC | L5 | Rejected-AOC FIFTH LOWEST |
Tender Value
₹9.8 L
EMD Value
₹14,700
Closing Date
8 Jul 2021, 1:00 pmClosed
asst executive engineer
Office of Assistant Executive Engineer Irrigation Sub Division No.2, Chittur Chittur College P O 678104
CPP MLBC renovation and modernisation of naduvathu field channel oftakes from vembath distributary of vilayanchathanoor branch canal at ch 2/300
2021_Irrig_427966_1
11/ET/AEEII/CTR/2021-2022
Open Tender
Civil Works - Canal
Item Rate
180 days
chitoor
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,000
Yes
₹14,700
Yes
6 Oct 2021
29 Jun 2021
12 Jul 2021
29 Jun 2021
8 Jul 2021
29 Jun 2021
Amount
Naduvath Field channel
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.3.2 : Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
4.1.5 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.22.1 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelMild steel and Medium Tensile steel bars
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
2.25 : Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
BIJOY M V
NIJO P SEBASTIAN
SURESH M
sasikumar
Bidder Name
sasikumar
NIJO P SEBASTIAN
Krishnamoorthy
BIJOY M V
SURESH M
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .