Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.5 CrAdmitted-Fee/PreQual/Technical/Finance DWS DIVISION UDAIPUR GOMATI DISTRICT TRIPURA | +2.75% | ₹1.5 Cr | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.5 Cr+₹4.7 L (3.16%)Admitted-Fee/PreQual/Technical/Finance SHIB BARI ROAD PO R K PUR UDAIPUR GOMATI DISTRICT TRIPURA | UDAIPUR | GOMATI | TRIPURA | +6.00% | ₹1.5 Cr+₹4.7 L (3.16%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.5 Cr
EMD Value
₹2.9 L
Closing Date
21 Aug 2026, 3:00 pmClosed
Executive Engineer, PWD (RnB), Bishramganj
O/o the Executive Engineer, PWD (RnB), Bishramganj
Road Development
2026_CEPWD_75881_1
07/R/DNIeT/SE-IV/PWD/2026-27
Open Tender
Civil Works - Roads
Percentage
180 days
Jampuijala
Please refer Tender documents.
5 documents required · 5 mandatory
₹4,000
₹2.9 L
21 Aug 2026
14 Aug 2026
21 Aug 2026
14 Aug 2026
21 Aug 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Water Bound Macadam Sub-Base / Base using Jhama Brick Aggragate 2) WBM Grading - 3 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness,hand packing rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming stone screening to fill up the interstices of coarse aggregate, watering and compacting to the required density 'Grading- 3' as per MoRD Technical Specification Clause 405.
B) By Mechanical Means | 1 | cum | 7,739.32 | ₹7,731.58 |
| 2 | ii) Medium porosity
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90- 1.20 kg/sqm using mechanical means as per MoRD Technical Specification Clause 502. | - | sqm | 91.15 | - |
| 3 | Tack coat
Providing and applying tack coat with bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per MoRD Technical Specification Clause 503. | - | sqm | 23.43 | - |
| 4 | 25 mm thick Open-Graded Premix Carpet using Bituminous (Viscosity grade/ modified bitumen) Binde. Providing, laying and rolling of open-graded premix carpet of 25 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using Viscosity grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80 - 100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C or Type D as per MoRD Technical Specification Clause 508. Case - II By Mechanical Means (I)Bitumen of VG-30 | - | sqm | 412.08 | - |
| 5 | Seal Coat Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A or Type B or Type C or Type D as per MoRD Technical Specification Clause 510. A By Manual Means Case - IV : Type D (premix with fine sand) (I) Bitumen of VG-30 | - | sqm | 78.36 | - |
| 6 | Excavation for Structures A.Without dewatering. Earthwork in excavation for structures as per drawing and MoRD technical specifications Clause 305.1 including setting out, construction of shoring & bracing, removal of stumps & other deleterious material and disposal upto a lead of 50 m, dressing of sides & bottom and backfilling in trenches with excavated suitable material. I Ordinary Soil (i) Upto 3 m depth | 1 | cum | 458.2 | ₹457.74 |
| 7 | Filling in foundation trenches as per drawing & MoRD technical specification Clause 305.3.9, 1200. I Sand filling | 1 | cum | 1,299.5 | ₹1,298.2 |
| 8 | Providing concrete for plain concrete (using jhama brick aggregate) in open foundations complete including formwork as per drawings & MoRD technical specifications Clauses 802, 803, 900, 1202 and 1203. (including centering, shuttering, staging etc. but excluding reinforcement) III P.C.C grade M 20 (using jhama brick aggregate) (i) Nominal mix 1:2:4 | 1 | cum | 10,308.22 | ₹10,307.19 |
| 9 | Brick masonry work in cement mortar in foundation completed excluding pointing & plastering as per drawing & MoRD technical specifications Clauses 600, 1202 & 1203. II Brick masonry in 1:4 cement mortar. | 0.2 | cum | 9,690.98 | ₹1,928.51 |
| 10 | Plastering with cement mortar (1:4) 12 mm thick on brickwork/ C.C. work including a finishing coat of neat cement punning with 2.75 kg of cement per sqm in substructure as per MoRD technical specification Clauses 613.4 & 1204. | - | sqm | 230.16 | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
jampuijalatoudaipur.pdf
Tender Documents • 3.00 MB
BOQ_77247.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .