| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹53.1 LAccepted-AOC | L1 | Accepted-AOC AOC | |
| 2 | L2₹63.1 L+₹10.0 L (18.9%)Rejected-Finance | L2 | Rejected-Finance Second lowest bidder | |
| 3 | L3₹68.8 L+₹15.8 L (29.7%)Rejected-Finance GOVT CONTRACTOR DISTT CHAMBA HP 176303 | CHAMBA | HIMACHAL PRADESH | 176303 | L3 | Rejected-Finance Third lowest bidder | |
| 4 | L4₹71.6 L+₹18.5 L (34.9%)Rejected-Finance ESD NO II UHL STAGE III BVPCL CHULLAH | LANGNA | MANDYA | KARNATAKA | 571401 | L4 | Rejected-Finance Fourth lowest bidder |
Tender Value
₹45.3 L
EMD Value
₹90,700
Closing Date
14 Oct 2022, 12:00 pmClosed
Executive Engineer
HPSIDC Shimla
(SH- Development work i/c cutting, leveling and dressing etc).
2022_SIDC_66136_1
Job No. 2
Open Tender
Civil Works
Item Rate
120 days
Mandi
Please refer Tender documents.
10 documents required · 10 mandatory
₹5,300
₹90,700
16 Feb 2023
7 Oct 2022
14 Oct 2022
7 Oct 2022
14 Oct 2022
7 Oct 2022
Amount
Cutting in earth work and disposal of excavated earth upto a lead of 2km by mechanical transport including carriage of materials, labour ,tool and plants through all modes of transportation with in all leads and lifts, and as per direction of the Engineer-in-charge..
Excavation in foundation, trenches etc. in earth work in all kind of soil lifts upto 1.50 mtrs. Stacking the excavated soil not more than 3 mtrs. Clear from the edge of excavation and then returning the stacked soil in 15cm layers when required into plinths sides of foundation etc. consolidating each deposited layer by ramming, watering and then disposing of all surplus excavated earth as directed upto all leads and lifts including carriage of materials, labour ,tool and plants through all modes of transportation with in all leads and lifts, and as per direction of the Engineer-in-charge..
Providing & laying cement concrete 1:6:12 (1cement: 6sand: 12graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth including carriage of materials, labour ,tool and plants through all modes of transportation with in all leads and lifts, and as per direction of the Engineer-in-charge.
Construction of Toe wall for protection of slopes as per drawings and technical specifications clause 1302.50 PCC M20 (Nominal mix 1:3:6) i/c cost of form work including carriage of materials, labour ,tool and plants through all modes of transportation with in all leads and lifts, and as per direction of the Engineer-in-charge.
Steel work welded in built up sections, trusses and framed work, i/c cutting, hosting, fixing in position and appling a priming coat of red lead paint including carriage of materials, labour ,tool and plants through all modes of transportation with in all leads and lifts, and as per direction of the Engineer-in-charge.:-(a) In gratings framed guard bars, ladders, railing, brackets and similar works.
Providing and fixing hard drawn steel fabric 75X25 mm mesh of weight no less than 7.75 Kg/sqm to steeel frames etc i/c welding with sttel flat 12 mm/3mm thick,primer and all other accessoreis required complete in all respects as per IS standards including carriage of materials, labour ,tool and plants through all modes of transportation with in all leads and lifts, and as per direction of the Engineer-in-charge.
Painting two coat (excluding priming coat) on new steel and other metal surface under coat with ready mixed paint brushing to give an even shade including cleaning of all dirt, dust and other foresign matter with ready mixed paint otyher than white including carriage of materials, labour ,tool and plants through all modes of transportation with in all leads and lifts, and as per direction of the Engineer-in-charge.
Levelling and dressing of the gorund in two to three layers with suitable material i//c laying, spreading, compacting to hard surface complete including carriage of materials, labour ,tool and plants through all modes of transportation with in all leads and lifts, and as per direction of the Engineer-in-charge.
Kota stone slab flooring 20mm (average) thick base of cement mortar 1:4 (1cement: 4sand) laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab inlcuding rubbing and polishing complete 25mm thick including carriage of materials, labour ,tool and plants through all modes of transportation with in all leads and lifts, and as per direction of the Engineer-in-charge.
KHUB RAM
Narender Kumar
Anil Kumar
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .