Additional Chief Engineer (P&C)
Design, Supply, Erection, Testing & Commissioning of conversion work of existing 132kV S/C Haldarwa-Bharuch line into D/C from Loc no-21 to Bharuch Gantry with ACSR Panther conductor and 24F OPGW cable
336348
ACE(P&C)/Contract/E-491/TL/132kV/S&E
Open
Electrical Works
Works
Vadodara
46 documents required · 37 mandatory · 9 optional
₹8,850
Gujarat Energy Transmission Corporation Limited
₹2.5 L
21 Aug 2026
21 Aug 2026
21 Aug 2026
11 Sept 2026
21 Aug 2026
Sr. No. Description of Works - SAC Code 9954 Estimated Cost in Rs.
PART-A Supply of Materials
Erection of line (Lattice towers)
Erection of line (Monopole towers)
TOTAL COST WITHOUT TAXES
Service of "Works Contracts" GST @ 18% (SAC 9954)
I am / we are willing to carry out this service package of works contract stated above at GST
18% (in figure) ______ % (in words _____ %) below / above the estimated TOTAL END COST for
all the items stated there in.
The amount of tender works out with above % (in figure) for TOTAL END COST Rs.
I / we confirm that our above quoted rates are ON firm price basis; except (i) Supply of Tower
Materials (Including Bolts-Nuts), (ii) Polygonal poles, (iii) Hardware & Accessories of conductor.
for which Price variation will be applicable.
1) Separation of the Contract into Supply of Goods, Services and Civil Work, is only for convenience and
better economical management and for the ease of Accountancy but the entire Contract, is to be
assessed under GST Law, as the Works Contract Service, which is, as per the provisions of Section 2(30),
read with, Section 2(119), further read with, Paragraph 6(a) of the Schedule II to the CGST Act, 2017 or
SGST Act, 2017 and similar provisions, applicable under the UTGST Act, 2017and the IGST Act, 2017 and
the entire activity, would be subjected to levy of Tax, at the rate of 9% CGST + 9% SGST or 18% IGST,
under the GST Law. However, Classification Codes for different segments or portions of the Works
Contract, may be specified separately, in the Supplies, with a final common Classification Code of Works
Contract Service.
2) The Bidder is hereby conveyed that only SAC Code and Tax rate for supply of Service Works Contract
i.e. 18% is relavant for the purpose of contract since the contract is works contract and any separation in
the works is for better management and convenience purpose.
It is to state that bidders are however requested to fill the HSN code item by item for the knowledge and
transparency purpose which shall have no bearing on price or taxation payment.
Signature of Authorized Representative of Company / Agency
SEAL & SIGNATURE Status _________________
OF BIDDER Name of bidder Company
ACE(P&C)/Contract/E-491/TL/132kV/S&E
Estimated Cost - SUPPLY (For reference only)
Design, Supply, Erection, Testing & Commissioning of conversion work of existing 132kV S/C Haldarwa-Bharuch line into D/C from Loc no-21 to Bharuch Gantry with ACSR
Panther conductor and 24F OPGW cable
Length of line: 2.24 Rkm
Sr. No. Description of Supply with Detail Specification of HSN / SAC Unit Quantity Unit Rate Unit Freight, Unit FOR Unit Rate FOR Total Cost
Service Package - Works Contract (SAC Code 9954) code for Packing & Insurance in Rs. (Excl. GST)
identification Forwarding Charges in in Rs.
only charges Rs.
A Supply of Materials
A.1 Tower Materials
A.2 Supply of Monopole towers
A.2.1 132 kV D/C Monopole having 1 peak for OPGW (including
designing, Non-Destructive & Proto testing and supply)
Tentative ht. of Botom X arm- 24 mtr.
(Note - Qty. to be decided depending on design by
bidder) Qty/pole (MT)
(Note - Qty. to be decided depending on design by
bidder) Qty/Pole (MT)
A.2.2 132 kV D/C Monopole having 1 peak for OPGW (including
designing, Non-Destructive & Proto testing and supply)
Tentative ht. of Botom X arm- 42 mtr.
(Note - Qty. to be decided depending on design by
bidder) Qty/pole (MT)
(Note - Qty. to be decided depending on design by
bidder) Qty/Pole (MT)
A.3 ACSR Panther conductor kM 0.000 234904.00 2867.00 1229.00 239000.00 -
A.4 Silicone Rubber insulators - 132kV
Sr. No. Description of Supply with Detail Specification of HSN / SAC Unit Quantity Unit Rate Unit Freight, Unit FOR Unit Rate FOR Total Cost
Service Package - Works Contract (SAC Code 9954) code for Packing & Insurance in Rs. (Excl. GST)
identification Forwarding Charges in in Rs.
only charges Rs.
A.4.1 132kV,90kN - Suspension SRI Nos. 0 2250.00 42.00 18.00 2310.00 -
A.5 Insulator hardware for ACSR Panther conductor
A.5.1 Single suspension Nos. 0 1564.00 17.00 7.00 1588.00 -
A.5.2 Double suspension Nos. 0 4413.00 34.00 15.00 4462.00 -
A.5.3 Single Tension Nos. 30 2178.00 27.00 11.00 2216.00
A.5.4 Double tension Nos. 60 4945.00 51.00 22.00 5018.00
A.5.6 Mid span joint Nos. 8 695.00 6.00 3.00 704.00
A.5.7 Vibration damper Nos. 168 572.00 11.00 5.00 588.00
A.5.8 Repair sleeve Nos. 1 252.00 6.00 3.00 261.00
A.6 OPGW - 24 Fibre
A.6.1 24 Fibre (DWSM) OPGW fibre Optic cable Km 2.240 145356.00 1999.00 857.00 148212.00
A.6.2 Installation Hardware set * & accessories for above OPGW Km 2.240 45351.00 502.00 215.00 46068.00
i.e. all cable fittings & accessories like suspension clamps,
tension clamps, vibration dampers, earthing clamps, down
lead clamps, in-line splice enclosures etc. including; Pigtails
a) Fibre Optic Approach Cable -
400 Mtrs - For 220KV S/S &
500 Mtrs - For 400KV S/S
(with installation hardware like ties/ clips / cleats, conduits,
ducts, supports, fittings, accessories etc).
(Any variation in quantities shall be absorbed by contractor)
TOTAL COST FOR MATERIALS
Service of "Works Contracts" GST @ 18% (SAC 9954)
1) Separation of the Contract into Supply of Goods, Services and Civil Work, is only for convenience and better economical management and for the ease of Accountancy but
the entire Contract, is to be assessed under GST Law, as the Works Contract Service, which is, as per the provisions of Section 2(30), read with, Section 2(119), further read
with, Paragraph 6(a) of the Schedule II to the CGST Act, 2017 or SGST Act, 2017 and similar provisions, applicable under the UTGST Act, 2017and the IGST Act, 2017 and
the entire activity, would be subjected to levy of Tax, at the rate of 9% CGST + 9% SGST or 18% IGST, under the GST Law. However, Classification Codes for different
segments or portions of the Works Contract, may be specified separately, in the Supplies, with a final common Classification Code of Works Contract Service.
Sr. No. Description of Supply with Detail Specification of HSN / SAC Unit Quantity Unit Rate Unit Freight, Unit FOR Unit Rate FOR Total Cost
Service Package - Works Contract (SAC Code 9954) code for Packing & Insurance in Rs. (Excl. GST)
identification Forwarding Charges in in Rs.
only charges Rs.
2) The Bidder is hereby conveyed that only only SAC Code and Tax rate for supply of Service Works Contract i.e. 18% is relevant for the purpose of contract since the contract
is works contract and any separation in the works is for better management and convenience purpose.
It is to state that bidders are however requested to fill the HSN code item by item for the knowledge and transparency purpose which shall have no bearing on price or taxation
Signature of Authorized Representative
of Company / Agency
SEAL & SIGNATURE Status _________________
OF BIDDER Name of bidder Company
ACE(P&C)/Contract/E-491/TL/132kV/S&E
Estimated Cost - Erection (For reference only)
SCHEDULE - 01 (132KV D/C Lattice Towers)
Design, Supply, Erection, Testing & Commissioning of conversion work of existing 132kV S/C Haldarwa-Bharuch line into D/C from Loc no-21
to Bharuch Gantry with ACSR Panther conductor and 24F OPGW cable
Length of line: 2.24 Rkm
Erection of line
S.N. Description of Supply with Detail Specification of Service HSN/ SAC Unit Quantity Unit Rate Total Cost
Package - Works Contract (SAC Code 9954) in Rs. (Excl. GST)
1 Check survey including detailed survey, preparation of profiles KM 2.240 9277.00
and revision in original route alignment, if any and as per
instruction of EIC
2 Excavation excluding back filling, but including shoring, -
shuttering, dewatering, tree cutting for tower footings etc. for:-
a) Normal soil either dry or wet/Sandy soil CMT 77.630 307.00
b) Black Cotton Soil either dry or wet CMT 310.520 614.00
c) Normal submerged / marine soil where dewatering is CMT 0.000 484.00 -
d) Black cotton submerged / marine soil / marshy soil where CMT 0.000 703.00 -
dewatering is necessary
e) Soft Rock CMT 0.000 1066.00 -
f) Hard Rock CMT 0.000 2212.00 -
3 Installation of steel reinforcement in concrete foundation MT 0.891 99900.00
including supply of M. S. bars, binding wire and their
cutting, bending, binding and laying in position as per
4 Stub-setting with prop or template including back-filling but MT 3.383 8206.00
excluding excavation and concreting etc. for all type of
tower/extensions except special towers. (Weight of stub,cleat &
templete with Bolt & Nuts of Stub & templete shall be counted)
up to 6 mtr extension
5 ---- Do ---- +9 to +25 mtr extension MT 0.000 9918.00 -
6 Stub-setting and/OR Anchor bolt-setting of River crossing tower MT 0.000 47059.00 -
/ 25 mtr. and above extension back filling but excluding
excavation and concreting.
7 Concreting of foundation by M25 / M20 / M15 mixture -
including shoring, shuttering, dewatering etc. for normal
tower/tower with extension upto 25 mtr. (Rates are with
8 Grounding of towers with pipe type earthing including Set. 7.000 8985.00
excavation and back filling and supply of all materials like 32mm
dia heavy duty 3 mtr.long G.I. Pipe & 50 x 6 mm G.I. flat, bolt-
nuts, salt, coal/charcoal etc. as per drawing.
9 Grounding of towers with COUNTER POISE TYPE including Set. 0.000 15756.00 -
excavation and back-filling and supply of all materials like GSS
wire, lugs, bolt-nuts, salt, coke/charcoal as per drawing.
S.N. Description of Supply with Detail Specification of Service HSN/ SAC Unit Quantity Unit Rate Total Cost
Package - Works Contract (SAC Code 9954) in Rs. (Excl. GST)
10 Erection of super structure upto 6 meter extension including MT 20.386 10076.00
tree cutting, fixing of tower accessories, attachments except
ACD /DP /NP /CIP /PP and excluding tack welding of bolts. This
includes taking delivery of tower materials and bolt-nuts from
Board's stores etc. for normal, extension & special towers at
destination and keeping them in safe custody and transporting
the same to erection site
11 Same as above but erection of 9/12/15/18/21/25 mtr. Extention MT 0.000 12694.00 -
12 Fixing of Anti-climbing devices including supply of barbed wire Loc. 7.000 3011.00
13 Fixing of DP / NP / PP / CIP including supply of plates and Loc. 7.000 3379.00
supply of G.I. bolt-nuts & tack welding as per drawings.
14 Tack welding of nuts upto approx. 10 mtrs. Height OR two Per Bolt 1500.000 15.00
bottom-most panel from ground level at three places on the nuts
diametrically and applying zinc rich paint immediately after tack
15 Stringing of ACSR Panther - 6 (Six) conductors for double RKM 2.240 112928.00
circuit including laying, jointing, tensioning, clamping with
armour rods, hoisting of insulator string, fixing of jumpers,
dampers etc. & with required tree cutting on entire length for
adequate clearance/safe charging of line
16 Complete installation of OPGW cable (24 F) including laying, KM 2.240 97193.00
providing required hardwares in line splices to be encased in
Fibre Optic Splice Enclosures, Laying and Termination of a fibre
optic approach cable required to connect Overhead Fibre Optic
Cable (OPGW) between the final in line splice enclosure on the
gantry/tower and the Fibre Optic Distribution Panel (FODP) to
be installed within the building at both the substation ends as
per technical specification
17 Link up of OPGW cable (24 F) including all related activities KM 2.240 8850.00
18 Dismantling of conductors and line materials of existing line RKM 2.230 33506.00
with 132kV ACSR Panther 3 conductors (S/C) cold condition
including transportation and crediting to nearest GETCO store
as per instruction of Engineer-in-Charge
19 Dismantling of one earth wire and earth wire hardware / RKM 2.230 9985.00
material of existing 132KV line in cold condition including
transportation and crediting to nearest GETCO store as per
instruction of Engineer-in-Charge
20 Dismantling of any type of tower including transportation and MT 18.549 8434.00
crediting to nearest Board's store as per instruction of Engineer
21 Cutting of Stub of Old tower to be dismatled including Per Tower 7.000 12618.00
breaking of Chimney/cutting of RCC up to 450mm below ground
level and credting stubs and steel bars to GETCO store
including back filling and levelling of site.
22 Painting of name of line, location number, colour code and Per Location 3.000 431.00
telephone number on tower (all four legs) for information of
concerned substation including supply of paints, etc.
TOTAL SCHEDULE-01 OF PART-B
S.N. Description of Supply with Detail Specification of Service HSN/ SAC Unit Quantity Unit Rate Total Cost
Package - Works Contract (SAC Code 9954) in Rs. (Excl. GST)
Service of "Works Contracts" GST @ 18% (SAC 9954)
TOTAL SCHEDULE-01 INCLUDING GST @18%
1) While calculating the weight of stub-setting, the weight of stub, cleat & templetes shall also be added in stub weight
2) Red oxide & zinc rich paint shall be applied after tack welding of nuts.
3) The above rates are with supply of cement by the contractor.
4) The rate indicated above includes taking delivery of all stringing materials from Board / Contractor store at destination keeping them in safe
custody and transporting the same to erection site.
1) Separation of the Contract into Supply of Goods, Services and Civil Work, is only for convenience and better economical management and for
the ease of Accountancy but the entire Contract, is to be assessed under GST Law, as the Works Contract Service, which is, as per the provisions
of Section 2(30), read with, Section 2(119), further read with, Paragraph 6(a) of the Schedule II to the CGST Act, 2017 or SGST Act, 2017 and
similar provisions, applicable under the UTGST Act, 2017and the IGST Act, 2017 and the entire activity, would be subjected to levy of Tax, at the
rate of 9% CGST + 9% SGST or 18% IGST, under the GST Law. However, Classification Codes for different segments or portions of the Works
Contract, may be specified separately, in the Supplies, with a final common Classification Code of Works Contract Service.
2) The Bidder is hereby conveyed that only only SAC Code and Tax rate for supply of Service Works Contract i.e. 18% is relavant for the purpose
of contract since the contract is works contract and any separation in the works is for better management and convenience purpose.
It is to state that bidders are however requested to fill the HSN code item by item for the knowledge and transparency purpose which shall have no
bearing on price or taxation payment.
Signature of Authorized Representative
of Company / Agency
SEAL & SIGNATURE Status _________________
OF BIDDER Name of bidder Company
ACE(P&C)/Contract/E-491/TL/132kV/S&E
Estimated Cost - Erection (For reference only)
SCHEDULE - 02 (132KV D/C Monopole Towers)
Design, Supply, Erection, Testing & Commissioning of conversion work of existing 132kV S/C Haldarwa-Bharuch line into D/C from Loc no-21
to Bharuch Gantry with ACSR Panther conductor and 24F OPGW cable
Length of line: 2.24 Rkm
Erection of line
S.N. Description of Supply with Detail Specification of Service HSN/ SAC Unit Quantity Unit Rate Total Cost
Package - Works Contract (SAC Code 9954) in Rs. (Excl. GST)
1 Construction of Caisson foundation for Monopole CMT 104.000 20025.00
having Tentative ht. of Botom X arm- 24 mtr. (Including
Excavation, Piling, reinforcement, setting of monopole
template, fixing of foundation bolts, concreting backfilling
etc) for all type of 132 kV Double Circuit Monopoles where
ever required including supply of cement, dewatering,
shuttering, forming & curing including cost of
reinforcement bars
with M25 mix concrete.
(Total 2 nos. of locations)
Note - Qty. to be decided depending on design by
2 Construction of Caisson foundation for Monopole CMT 126.000 20025.00
having Tentative ht. of Botom X arm- 42 mtr. (Including
Excavation, Piling, reinforcement, setting of monopole
template, fixing of foundation bolts, concreting backfilling
etc) for all type of 132 kV Double Circuit Monopoles where
ever required including supply of cement, dewatering,
shuttering, forming & curing including cost of
reinforcement bars
with M25 mix concrete.
(Total 2 nos. of locations)
Note - Qty. to be decided depending on design by
3 Erection of monopoles with complete bolts and nuts, MT 106.950 19622.83
Fixing with foundation including nut bolt, base plate etc.
(Total 4 nos. of locations)
Note - Qty. to be decided depending on design by
4 Tack welding of nuts upto approx. 10 mtrs. Height OR Per Bolt 600.000 21.85
two bottom-most panel from ground level at three places
on the nuts diametrically and applying zinc rich paint
immediately after tack welding.
Note - Qty. to be decided depending on design by
TOTAL SCHEDULE-02 OF PART-B
Service of "Works Contracts" GST @ 18% (SAC 9954)
TOTAL SCHEDULE-02 INCLUDING GST @18%
1) While calculating the weight of stub-setting, the weight of stub, cleat & templetes shall also be added in stub weight
S.N. Description of Supply with Detail Specification of Service HSN/ SAC Unit Quantity Unit Rate Total Cost
Package - Works Contract (SAC Code 9954) in Rs. (Excl. GST)
2) Red oxide & zinc rich paint shall be applied after tack welding of nuts.
3) The above rates are with supply of cement by the contractor.
4) The rate indicated above includes taking delivery of all stringing materials from Board / Contractor store at destination keeping them in safe
custody and transporting the same to erection site.
1) Separation of the Contract into Supply of Goods, Services and Civil Work, is only for convenience and better economical management and for
the ease of Accountancy but the entire Contract, is to be assessed under GST Law, as the Works Contract Service, which is, as per the provisions
of Section 2(30), read with, Section 2(119), further read with, Paragraph 6(a) of the Schedule II to the CGST Act, 2017 or SGST Act, 2017 and
similar provisions, applicable under the UTGST Act, 2017and the IGST Act, 2017 and the entire activity, would be subjected to levy of Tax, at the
rate of 9% CGST + 9% SGST or 18% IGST, under the GST Law. However, Classification Codes for different segments or portions of the Works
Contract, may be specified separately, in the Supplies, with a final common Classification Code of Works Contract Service.
2) The Bidder is hereby conveyed that only only SAC Code and Tax rate for supply of Service Works Contract i.e. 18% is relavant for the purpose
of contract since the contract is works contract and any separation in the works is for better management and convenience purpose.
It is to state that bidders are however requested to fill the HSN code item by item for the knowledge and transparency purpose which shall have no
bearing on price or taxation payment.
Signature of Authorized Representative
of Company / Agency
SEAL & SIGNATURE Status _________________
OF BIDDER Name of bidder Company
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2. TL Amend -I Part-I Conversion of 132kV Haldarwa-Bharuch E-491.pdf
3. L2 Loc no-21 to Bharuch Gantry.pdf
5. Price Bid E-491.pdf
6. 4R DAMPER FOR ACSR ALL COND.-Model.pdf
7. ON - Ammendment for ROW clause Tender Copy.pdf
8. RoW policy 2021.pdf
9. RoW Guideline of GETCO GoG.pdf
10. ERECTION Circular-1.pdf
11. ERECTION Circular-2.pdf
12. Safety_regulation_for_transmission_line.pdf
13. STD FQP TR LINE JUNE-2014.pdf
14. Public Procurement Circular of GOI.pdf
15. Letter for CBuD.pdf
16. 0036 - G - DSN PAN-Model.pdf
17. 132 kV Monopole_ PRINT Copy - specification 17.08.26.pdf
18. 132KV DOUBLE TENSION HARDWARE ACSR PANTHER CONDUCTOR.pdf
19. 132KV SINGLE SUSPENSION HAEDWARE FOR PANTHER ACSR Model (1).pdf
20. 132KV SINGLE TENSION HARDWARE PANTHER (ACSR) Model (1).pdf
21. Amendment- Structure weight.pdf
22. Ammendment for TTR validity 26.02.2026.pdf
23. HW n ACCS PANTHER CONDUCTOR.PDF
24. MQP SUPPLIER COPY.PDF
25. ON - Ammendment for ROW clause Tender Copy.pdf
26. OPGW (24F) specs final-R8-06.06.2023 final 1.pdf
27. PREFORMED ARMOUR ROD SUITABLE FOR ASCR CONDUCTOR-Model.pdf
28. R5 May 24- Silicon Rubber - Print Copy.pdf
29. REPAIR SLEEVE-Model.pdf
30. SUPPLY n ERECTION OF 132KV LINES.PDF
31. TOWER MATERIAL-132KV LINE-PANTHER-final.pdf
32. TUBULAR COMPRESSION JOINT-Model.pdf
33. Form of LD undertaking 1A.pdf
34. Form of LD undertaking 1B.pdf
35. ONLINE SCHEDULE_TECH - E-491.pdf
36. Online Schedule-QR-E-491.pdf
37. Public Procurement Circular of GOI.pdf
38. SD cum PBG Format.pdf
39. MAAT LA Networth Form.pdf
40. Annexure-B.pdf
41. Annexure-C.pdf
42. DC Tower - 132kV TL - E-491.pdf
43. FND VOL 132kV E-491.pdf
44. Tower Schedule Loc. 21 to Bharuch Gantry.pdf
4. Tender Notice E-491.pdf
1. Part-I Tender Spec - Conversion of 132kV Haldarwa-Bharuch E-491.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].