Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.0 LAdmitted-Fee/PreQual/Technical/Finance | -27.30% | ₹4.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹4.3 L+₹24,499.15 (6.07%)Admitted-Fee/PreQual/Technical/Finance | -22.89% | ₹4.3 L+₹24,499.15 (6.07%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹4.7 L+₹68,330.98 (16.9%)Admitted-Fee/PreQual/Technical/Finance | -15.00% | ₹4.7 L+₹68,330.98 (16.9%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹4.9 L+₹85,608.16 (21.2%)Admitted-Fee/PreQual/Technical/Finance | -11.89% | ₹4.9 L+₹85,608.16 (21.2%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹5.6 L
EMD Value
₹11,120
Closing Date
19 Aug 2026, 4:00 pmClosed
Executive Engineer RnB Division Uri
Executive Engineer RnB Division Uri
Upgradation of Activity Hall at Children Park Uri
2026_PWDJK_318575_1
enit no 48 of 2026-27
Open Tender
Civil Works
Percentage
30 days
URI
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
Executive Engineer RnB Division Uri
₹11,120
22 Aug 2026
30 Jul 2026
20 Aug 2026
30 Jul 2026
19 Aug 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing & fixing of vinyl sports flooring of 6mm thickness Laminated interlock rubber flooring with adhesive including all cost and carriage complete jo as per direction of Engineer Incharge at site complete job. | - | Sqm | 3,000 | - |
| 2 | Hire charges of labour for cleaning of site, diposing of garbage and dismantling of broken tiles etc complete job as per direction of Engineer Incharge at site | - | No | 700 | - |
| 3 | Supply , Installation , Testing and commissioning of 30 Watts high power LED Focus lights (indoor) with coloured lights to be fitted on movable channel incl cost of powder coated GI Channel and necessary wiring and underground pvc conduiting under floors complete jo as per direction of Engineer Incharge at site | - | No | 3,300 | - |
| 4 | Providing and fixing LED Flood lights of approved Brand /Manufacture Design and pattern and incld. All neccesary wiring conduiting control units switches etc complete job with service connection comlete Job as d perirected by engineer in charge at site | - | No | 2,500 | - |
| 5 | 12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand) including all cost and carriage complete job | 1 | Sqm | 283.8 | ₹283.52 |
| 6 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade. Two or more coats on steel work including primer of approved brand and manufacture including all cost and carriage complete job | 1 | Sqm | 131.85 | ₹131.72 |
| 7 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade on New work (two or more coats) over and including priming coat with water thinnable cement primer | - | Sqm | 164.6 | - |
| 8 | Carrying out Artistic wall paintings /mural paintings using weather proof paints/silica based acrylic epoxy paints and or synthetic enamel paint of brand and finished with weather coat finisher manufacture and shade as per the pattern, design and graphics approved by engineer Incharge at site on walls at selected and approved location inclusive of all labour, materials and carriages complete job. | 1 | Sqm | 1,191.55 | ₹1,190.36 |
| 9 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand) Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level including all cost and carriage complete job | - | Cum | 9,027.2 | - |
| 10 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Welded including all cost and carriage complete job | - | Kg | 138.2 | - |
stage.html
html • 0.02 MB
finance_1050592.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
BOQ_1050592.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .