| 1 | L1₹1.4 CrAccepted-AOC | ₹1.4 Cr | L1 | Accepted-AOC WORK AWARDED TO L1 BIDDER |
| 2 | Rejected-Technical | - | - | Rejected-Technical L2 |
Tender Value
₹1.5 Cr
EMD Value
₹50,000
Closing Date
18 Mar 2024, 5:00 pmClosed
CHIEF ENGINEER, KSCADC
KSCADC Building, Kamalewsaram , Manacaud P.O. Thiruvananthapuram Pin-695009
NABARD RIDF XXIX-Integrated Aqua Project at Kuthiravattomchira, Chengannur-Desilting Chira, Walkway formation and Elevated Walking Bridges -General Civil Work
2024_SCADC_668654_1
ET-70/2023-24
Open Tender
Civil Works - Buildings
Item Rate
180 days
NABARD RIDF XXIX-Integrated Aqua Project at Kuthir
Please refer Tender documents.
6 documents required · 6 mandatory
₹5,900
₹50,000
17 Jul 2024
11 Mar 2024
20 Mar 2024
11 Mar 2024
18 Mar 2024
11 Mar 2024
Amount
Desilting Chira
65.81 Deepening the harbour basin and mouth by using sand pumps mounted on barges or any other suitable method and dumping the spoil with a flow rate of 500m3 slurry per hour with a solid output of not less than 75 m3/hour at location already pointed out by the departmental officers with a lead up to a radial distance of 500m, including hire charges of sand pump, all tools and plants and accesories , fuel charges,idling and mobilisation charges, providing and shifting the pipe lines including all labour charges, incidental charges and service tax etc. complete for a depth upto (-) 3.50m with a tolerance of +/- 20cm.
Walkway formation
2.1 Clearing Grass and Removal of Rubbish Clearing grass and removal of rubbish up to a distance of 30m outside the periphery of the area as per Technical Specification Clause 201. By Manual Means
3.3 Construction of Embankment with Material Obtained from Roadway Cutting <br> Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5
Walkway formation (continued)
19.35.1 Providing and laying Non Pressure NP-3 class (Medium duty) R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete.450 mm dia RCC pipes.
OD27382/2023-2024 Supplying and laying Coir Geotextile membrane of 600 GSM or nearest thickness and mesh size 25mm or nearest, as per the direction of departmental officers at site.
OD35095/2023-2024 Engaging Coolie for miscellaneous works
Elevated Walking bridges
2.8.1 Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
60.1.1 RING BUND Type-I-Putting up ring bund as per approved shape 2.5m bottom width, 1m top width using empty gunny/polythene bags filled with earth placed in 2 rows at 0.6m apart and filled in between with puddle clay to form bund for an average height 2.00m including labour dismantling the bund after completion of the work etc. complete.
60.2.3 Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water with engine and pump set above 5HP and up to 10HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
60.64.1 Coconut Pile - Supplying and stacking well matured straight coconut post for driving down throug various strata bellow bed level including cost coveyance labour charges etc complete.
OD27893/2023-2024 Cocunut pile- Driving down coconut pile to lines and levels through soft to medium clay soil strata including all hire charges and labour and all other appliances necessary for pile driving down after pointing the bottom end .Details for one post of 6m long 15 nos per day. 6X15=90m Details for 90m length
60.64.6 Cutting and removing the excess length of wooden piles to lines and levels and removing the cut end of piles and stacking within 150m
60.7.1 DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
OD28366/2023-2024 Random rubble masonry with hard stone in foundation and plinth up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
4.1.8 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.33.1 Providing and laying in position machine batched and machine mixed design mix M25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work upto plinth level
5.33.2 Providing and laying in position machine batched and machine mixed design mix M25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work above plinth level upto floor V level
5.9.1 Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.3 Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.9.5 Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.9.6 Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.9.16.1 Centering and shuttering including strutting, etc. and removal of form for: Edges of slabs and breaks in floors and wallsUnder 20 cm wide
13.16.1 6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand)
5.22.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.22A.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more
13.46.1 Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
10.26.3 Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approves steel primer.G.I. pipes
OD27890/2023-2024 Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @ 0.80 ltr/10 sqm of approved brand and manufacture excluding priming coat
OD28491/2023-2024 Filling with Quarry Muck Filling up low lying and water logged areas with quarry muck, spreading in layers, leveling the top at site and consolidation by smooth wheeled roller, etc complete for improving the CBR value of subgrade. Details of cost for 300 cum ( as per common approved OD by CTE InspTech1/273/2021-FIN)
SOJANFRANCIS
Bidder Name
Haridas.A.K
SOJANFRANCIS
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1039721.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .