| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAccepted-AOC | ₹1.8 Cr | L1 | Accepted-AOC Lowest Bidder |
| 2 | L2₹1.9 Cr+₹7.7 L (4.25%)Rejected-AOC | ₹1.9 Cr+₹7.7 L (4.25%) | L2 | Rejected-AOC Second lowest |
| 3 | L3₹2.0 Cr+₹13.4 L (7.36%)Rejected-AOC | ₹2.0 Cr+₹13.4 L (7.36%) | L3 | Rejected-AOC Third lowest |
| 4 | L4₹2.0 Cr+₹20.6 L (11.3%)Rejected-AOC BANKERS VILLA VAZHOTTUKONAM VATTIYOORKKAVU P O TRIVANDRUM 695 013 | TRIVANDRUM | THIRUVANANTHAPURAM | KERALA | 695013 | ₹2.0 Cr+₹20.6 L (11.3%) | L4 | Rejected-AOC Fourth lowest |
| 5 | L5₹2.1 Cr+₹23.6 L (12.9%)Rejected-AOC | ₹2.1 Cr+₹23.6 L (12.9%) | L5 | Rejected-AOC Fifth lowest |
Tender Value
₹2.1 Cr
EMD Value
₹1 L
Closing Date
23 Sept 2023, 5:00 pmClosed
Superintending Engineer
Irrigation South circle TVPM
GENERAL-Smart City - Upgradation of Azhankal walkway-Construction of toe wall on left side for widening of walkway-General Civil Work
2023_Irrig_602839_1
IRR/IA/TR/5134/2023_5_1_1/2
Open Tender
Civil Works - Water Works
Item Rate
150 days
Karamana
Please refer Tender documents.
7 documents required · 7 mandatory
₹9,759
Yes
₹1 L
Yes
9 Nov 2023
14 Sept 2023
28 Sept 2023
15 Sept 2023
23 Sept 2023
15 Sept 2023
15 Sept 2023 - 23 Sept 2023
Amount
Widening of walk way
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
60.6:PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete.
5.23:Smooth finishing of the exposed surface of RCC work with 6mm thick cement mortar 1:3 ( cement : 3 fine sand).
A RAMACHANDRAN
T Vinodkumar
Bankers Construction
RTF INFRA PRIVATE LIMITED
N Surendran
Bidder Name
Bankers Construction
T Vinodkumar
N Surendran
A RAMACHANDRAN
RTF INFRA PRIVATE LIMITED
GKS BUILDERS AND DEVELOPERS PRIVATE LIMITED
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_897103.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .