Nandikotkur Municipality
Nandikotkur
Laying of CC Road from E Pole No51A/4 to D.No.10-876 at Vidya Nagar in Ward 11.
948672
1-02/15th F.C/ Engg/Works/NDKTR/2026.
OPEN - NCB
Road Work
NANDYAL
7 documents required · 7 mandatory
₹200
₹5,630
11 Jul 2026
22 Jun 2026
17 Jul 2026
17 Jul 2026
Earthwork excavation for road way in soil by mechanical means including cutting and loading in tippers trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections and transporting to the embankment location or disposal of unserviceable soil with all leads and lifts etc., complete for finished item of work for trench cutting as per MORT&H specification No.301 and as directed by the Engineer-in-Charge
Construction of Granular sub-base by providing HBT(Trap) material confirming to Grading - V of MoRT&H Table 400-1 including cost and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge. Excluding Seingorage Charges
Providing, Laying, Spreading and compacting graded HBT(Trap) crushed stone aggregate to Wet Mix macadem specification (5th Revision) as per Table 400-13, including cost of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with paver in base courses on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for finished item of work. Excluding Seingorage Charges
Construction of VCC M30 grade design mix un-reinforced, expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per IS codes , coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 21- days, and water finishing to lines and grade as per drawing and Technical Specification (Note: - Payment will be released only after satisfactory core results of the concrete strength for 28 days as per IS code) as directed by Engineer in Charge of work.
Collection, supply, and filling of Gravel from approved quary to work site and stacking at work site to Dept. gauge for premeasurements including cost and conveyance of all materials, labour charges etc., complete as per standard specifications. Clause 305.39 MORD & 304 MORTH etc., complete and as directed by Engineer in Charge of work
Assistant Engineer
Nandikotkur Municipality
Earthwork excavation for road way in soil by mechanical means including cutting and loading in tippers trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections and transporting to the embankment location or disposal of unserviceable soil with all leads and lifts etc., complete for finished item of work for trench cutting as per MORT&H specification No.301 and as directed by the Engineer-in-Charge
Construction of Granular sub-base by providing HBT(Trap) material confirming to Grading - V of MoRT&H Table 400-1 including cost and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge. Excluding Seingorage Charges
Providing, Laying, Spreading and compacting graded HBT(Trap) crushed stone aggregate to Wet Mix macadem specification (5th Revision) as per Table 400-13, including cost of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with paver in base courses on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for finished item of work. Excluding Seingorage Charges
Construction of VCC M30 grade design mix un-reinforced, expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per IS codes , coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 21- days, and water finishing to lines and grade as per drawing and Technical Specification (Note: - Payment will be released only after satisfactory core results of the concrete strength for 28 days as per IS code) as directed by Engineer in Charge of work.
Collection, supply, and filling of Gravel from approved quary to work site and stacking at work site to Dept. gauge for premeasurements including cost and conveyance of all materials, labour charges etc., complete as per standard specifications. Clause 305.39 MORD & 304 MORTH etc., complete and as directed by Engineer in Charge of work
stage.html
html • 0.01 MB
aoc.html
html • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.01 MB
1-2 BOQ.xls
TENDER_DOCUMENT • 0.05 MB
1-2 NIT.doc
TENDER_DOCUMENT • 0.14 MB
2 Online BOQ.xlsx
TENDER_DOCUMENT • 0.01 MB
Download all tender documents and submit your bid