Tender Value
₹45.9 L
EMD Value
₹91,780
Closing Date
20 Mar 2024, 4:00 pmClosed
Executive Engineer, PHE Division Kargil
Executive Engineer, PHE Division Kargil
providing of FHTC functional House Hold Connection to each holds, including construction of 20 No soakage pits and winter management under the up-gradation/ retrofitting of Water Supply Scheme Lamochan /Skutiyal/Youlboo Drass (under (JJM Winter Mana
2024_PWD_12719_6
E-Tender 333 of PHE Division Kargil of 2023-24
Open Tender
Pipes and Pipe related activities
Item Rate
30 days
Lamochan/Skutiyal/Youlboo
Refer to NIT
3 documents required · 3 mandatory
₹459
Payable To Executive Engineer, PHE Division Kargil
₹91,780
4 Apr 2024
13 Mar 2024
20 Mar 2024
13 Mar 2024
20 Mar 2024
13 Mar 2024
Amount
Earth work in excavation by manual means in trenches for foundation ,drains, pipes ,cables etc.(Not exceeding 1.5mtr in width ) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan ,depth up to 1.5mtr including disposal of excavated earth up to 1mtr from cutting edge, disposed earth to be leveled and neatly dressed in:
All kind of soil 60%
Ordanary rock 20%
Hard Rock (by Chesling)20%
Laying/fitting of pipes complete including cost of pipes and required fittings as per the direciton of site Engineer incharge including all carriage complete.
HDPE Pipe 50mm dia
HDPE Pipe 40mm dia
HDPE Pipe 32mm dia
HDPE Pipe 25mm dia
HDPE Pipe 20mm dia
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. Layers not exceeding 20cm in depth, consolidation each deposited layer by ramming and watering lead up to 50mtr and left up to 1.5m.
Earth filling from barrow pits in place of hard rock protion and behind R/ wall as per the direction of site Engineer, Incharge Including carriage complete.
Radum rubble masonry laid dry using nallah sotne with bound stone including all carriage complete.
Random rubble masonry with hard stone from nallah in foundation and plinth including leveling up with cement concrete 1:6: 12 (1 cement 6 coarse sand : 12 graded stone aggregate 20mm nominal size upto plinth level . Cement mortar 1:6 (1 cement 6 coarse sand.
Reinforced cement concrete work in beams, suspended floors, roofs having slope upto150, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centering shuttering, finishing and reinforcement with 1:2:4(1cement :2coarse sand:4 graded stone aggregate 20mm nominal size) including all carriage complete.
Centering and shuttering including strutting, propping etc. and removal form for:-
Suspended floors, roofs, landings, balconies and assess plate forms.
Providing/fixing of Reinforcement for RCC work including straightening cutting, bending, placing, in position and binding all complete. Hot rolled deformed bars.Incluidng all carriage complete.
Laying and fitting of MDPE pipe including trenching ,refilling and construction of cement concrete block in M-10 grade including form work and carriages complete.
Disposal of excavated earth by MT of 5 KM including all loading unloading complete.
M/S NIYAZ AHMAD QADRI
M/S TANMIR CONSTRUCTIONS
MOHD LATIF KHAN
M/S IRSHAD AHMAD
M/S KHALIL ULREHMAN
M/S FAROOQ AHMAD
shamim ahmad
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .