Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹14.9 L
Closing Date
25 Nov 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
XEN ELECTRIC-II
JDA JODHPUR
GEAR BOX FIXING WORK ON FLUD LIGHT MAST INSTALLED AT BARKATULLAH KHAN STADIUM
2021_JDAJO_247308_1
JoDA/Nit-10/Elec-II/2021-22
Open Tender
Electrical and Maintenance Works
Percentage
120 days
JODHPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
SECRETARY JDAJODHPUR 500 and md risl jaipur 500
Exempted
26 Nov 2021
15 Nov 2021
26 Nov 2021
15 Nov 2021
25 Nov 2021
15 Nov 2021
50 days
Amount
Supply, Installation, testing 3T, Doubledrum Doublgaron modeltotally cudtomisedall fabricated job 60 MTR for servicing high mast lighting systems.it is used for lowering the lights down the mast for all servicing requirements. High factors of safety and top-grade materials ensure reliavility and safety for years. The winch has a number of unique features which make it a leader, namely: Independent drives for each drum which allow rope equalizing at any time by simply removing the spltter gearbox from the two input shafts, doing the necessary adjustment, replacing the splitter gearbox and continuing the operation. Sekf Sustaining worm gear drives which offer maximum safety and load control, Double ropes from the independent drums give maximum safety through load shring thus allowing the winch to be used to houst men up the mast for maintenance purpose. ( Permission for man hoisting must be obtained from the factory inspector). Grooved drums with undercut flanges facilities even rope laying which gives best rope life and helps ensure that the ropes will share the load once they have been levelled. Power Tools such as construction type drilling machines can be used to raise and lower the load. A reversible drive is not required as by using the power drive on the different input shafts the direction of rotation of rotation of the drums is reversed through extensive use of aluminum casting gs to keep the weight to a minimum. Gerase Filled work gear housing ensure years of maintenance free duty. Contractor have to maintain all safety measure according to height of mast tower.
SOLANKI ENTERPRISES AND SUPPLIERS
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .