| Sl No | Description | Qty | Unit | VIRAT CONSTRUCTION L1 | M/S RAM NATH SHUKLA L2 |
|---|---|---|---|---|---|
| 1.01 | Dismentaling Reinforcement cement concrete including stacking of dismantled material with in 60M distance. as directed by Engineer-in-Charge | 137.13 | cum | 708.75 ₹97,190.89 | 700 ₹95,991 Lowest |
| 1.02 | Dismentaling Brick work including stacking of material with in a distance of 60M as directed by Engineer-in-Charge | 419.85 | cum | 538.65 ₹2,26,152.2 | 500 ₹2,09,925 Lowest |
| 1.03 | Dismentaling cement concrete including stacking of dismantled material with in 60M distance. as directed by Engineer-in-Charge | 129.01 | cum | 538.65 ₹69,491.24 Lowest | 570 ₹73,535.7 |
| 1.04 | E/W in foundation in all kind of soil with all lead and lift and including back filling, watering, ramming of excavated earth into the trenches and removal and disposal of surplus earth as directed by Engineer-in-charge within a distance of 30M from the foundation trenches. | 2,235.43 | cum | 80.32 ₹1,79,549.74 Lowest | 85 ₹1,90,011.55 |
| 1.05 | Making sub-grade for lining work including watering compaction and preparationof surface. as directed by Engineer-in-charge | 2,215.86 | sqm | 18.9 ₹41,879.75 Lowest | 20 ₹44,317.2 |
| 1.06 | Centering and shuttering for C.C/R.C.C. work including cost of all materials, labour and T&P etc for proper completion of work as per direction by Engineer-in-Charge | 3,482.92 | sqm | 850.5 ₹29,62,223.46 Lowest | 900 ₹31,34,628 |
| 1.07 | Centering & shuttering of plain C.C work in different part of structure with all leads & lifts required for proper completion of work including cost of all material, labour scaffolding, T&P & labour etc. | 654.89 | sqm | 198.45 ₹1,29,962.92 Lowest | 210 ₹1,37,526.9 |
| 1.08 | Laying of C.C in (1:2:4) with stone ballast (12.5mm to 20mm) size and coarse sand FM not less than 2 including all cost of materials labour and T&P complete.as per direction by Engineer in charge. | 496.3 | cum | 10,308.06 ₹51,15,890.18 Lowest | 10,908 ₹54,13,640.4 |
| 1.09 | Bending, binding ,cutting,placing in position steel reinforcement including materials with cost of binding wire and tack welding for proper completion of work. As per direction of Engineer in Charge. | 79.42 | MT | 81,112 ₹64,41,915.04 Lowest | 85,832 ₹68,16,777.44 |
| 1.10 | Laying R.C.C (1:1:2), M25 grade with coarse sand FM not less than 2 and hard crushed Aggregate of specified grade including all lead, lift, machanical mixing, labour and T&P complete.as per direction by Engineer in charge. | 1,036.28 | cum | 11,771.96 ₹1,21,99,046.71 Lowest | 12,457 ₹1,29,08,939.96 |
Tender Value
₹3.3 Cr
EMD Value
₹6.6 L
Closing Date
1 Jun 2026, 11:00 amClosed
Superintending Engineer
Office Superintending Engineer 14th Circle Irrigation Work Azamgarh
Box Culvert Construction Work
2026_UPIDC_1147928_14
04/S.E./2026-27
Open Tender
Civil Works
Item Rate
180 days
Azamgarh
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,650
₹6.6 L
Yes
Azamgarh
25 Jun 2026
25 May 2026
1 Jun 2026
25 May 2026
1 Jun 2026
25 May 2026
26 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Dismentaling Reinforcement cement concrete including stacking of dismantled material with in 60M distance. as directed by Engineer-in-Charge | 137.13 | cum | - | - |
| 1.02 | Dismentaling Brick work including stacking of material with in a distance of 60M as directed by Engineer-in-Charge | 419.85 | cum | - | - |
| 1.03 | Dismentaling cement concrete including stacking of dismantled material with in 60M distance. as directed by Engineer-in-Charge | 129.01 | cum | - | - |
| 1.04 | E/W in foundation in all kind of soil with all lead and lift and including back filling, watering, ramming of excavated earth into the trenches and removal and disposal of surplus earth as directed by Engineer-in-charge within a distance of 30M from the foundation trenches. | 2,235.43 | cum | - | - |
| 1.05 | Making sub-grade for lining work including watering compaction and preparationof surface. as directed by Engineer-in-charge | 2,215.86 | sqm | - | - |
| 1.06 | Centering and shuttering for C.C/R.C.C. work including cost of all materials, labour and T&P etc for proper completion of work as per direction by Engineer-in-Charge | 3,482.92 | sqm | - | - |
| 1.07 | Centering & shuttering of plain C.C work in different part of structure with all leads & lifts required for proper completion of work including cost of all material, labour scaffolding, T&P & labour etc. | 654.89 | sqm | - | - |
| 1.08 | Laying of C.C in (1:2:4) with stone ballast (12.5mm to 20mm) size and coarse sand FM not less than 2 including all cost of materials labour and T&P complete.as per direction by Engineer in charge. | 496.3 | cum | - | - |
| 1.09 | Bending, binding ,cutting,placing in position steel reinforcement including materials with cost of binding wire and tack welding for proper completion of work. As per direction of Engineer in Charge. | 79.42 | MT | - | - |
| 1.1 | Laying R.C.C (1:1:2), M25 grade with coarse sand FM not less than 2 and hard crushed Aggregate of specified grade including all lead, lift, machanical mixing, labour and T&P complete.as per direction by Engineer in charge. | 1,036.28 | cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.63 MB
BOQ_2160326.xls
BOQ • 0.24 MB
NIT4LOT10.pdf
Additional Documents • 0.11 MB
Biddocument10.pdf
Tender Documents • 1.93 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].