Executive Engineer Junagadh Irrigation Project Division junagadh
Sherdi Water Reso. Project. Flood Damage repairs of Untadi-Jinjari approach road at Sheradi Dam Site during the year 2024.
366161
Tender Notice No. 07 of 2026-27
Open
Civil - All
Works
Junagadh
12 documents required · 12 mandatory
₹3,600
executive engineer junagadh irrigation project division junagadh
₹1.1 L
18 Nov 2026
18 Nov 2026
18 Nov 2026
2 Dec 2026
18 Nov 2026
120 days
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr. )
Item Description of Item (with brief Quantity Unit Rate In Amount
No specification and reference to book figures
of specifications)
1 Excavation in all sorts of strata and 1122.00 Cum 79.00
formations incl. depositing the
unuseful excavated stuff as and where
directed incl. sorting and stacking
useful materials as directed upto
mt lead and all lift etc. complete incl.
(IN OVERBURDEN INCL. HARD
2 Excavation in all sorts of strata and 331.00 Cum 176.00
formations incl. depositing the
unuseful excavated stuff as and where
directed incl. sorting and stacking
useful materials as directed upto
mt lead and all lift etc. complete incl.
3 Dismantling C.C. foundation or 227.00 Cum 828.00
flooring sorting & stacking useful and
unuseful material in lead upto 200 mt
as directed etc. complete.
4 dismantling the existing RCC pipes 23.00 Rmt 214.00
including sorting out and stacking of
the useful material (pipe) measurable
conditions upto lead 200 mt as
directed under the specification.
(iii) 650 mm to 900 mm diameter
5 Providing and laying in position 733.00 Cum 3816.00
"NOMINAL MIX " cement concrete
using cement, sand and crushed
aggregate by mass and machine mix
for C.C. work incl. necessary
formworks centering, scaffolding
compaction by mechanical vibrator,
curing as directed with all lead & lift
For General Purpose.
(c) concrete Grade 1:2:4 and MSA-40
6 Prov. and Laying in position 86.00 Cum 5926.00
controlled cement concrete using
cement, sand and crushed aggregate
by mass and machine mix for
R.C.C/CC work including necessary
formworks centering scaffolding
compaction by vibrator, curing as
directed with all lead & lift etc.
complete. Excluding the cost of
FOR CSY & DSY BARREL.
(b)Concrete grade M-25 & MSA-
Item Description of Item (with brief Quantity Unit Rate In Amount
No specification and reference to book figures
of specifications)
7 Prov. and Laying in position 12.00 Cum 4540.00
controlled cement concrete using
cement, sand and crushed aggregate
by mass and machine mix for
R.C.C/CC work including necessary
formworks centering scaffolding
compaction by vibrator, curing as
directed with all lead & lift. FOR
WEARING COATS. Concrete grade M-
20 and MSA-20mm
8 Providing, cutting, bending, binding 6.70 M.T. 76574.00
and fixing in position as per drawing
T.M.T. bar reinforcement for R.C.C.
works and anchor bars including cost
of black annealed 16 to 18 BWG M.S.
Wire etc. complete with all lead & lift.
9 Providing and fixing in position 16.00 Rmt. 358.00
100/110 mm dia. PVC Pipe weep
holes in the retaining walls.
10 Providing and fixing G.I. pipe railing 126.00 Rmt. 1942.00
(B-Class medium duty) as per design
of 1.0mt. height using 75 mm x
mm x 10 mm size M.S. angle and at
2.0mt. C/C for vertical posts and
38mm dia. G.I. pipe for 4 horizontal
rows including one coat of red oxide
primer and two coats of paints etc.
11 Quarrying, Transporting & Spreading 1800.00 Cum 203.00
selected materials from borrow area
for raising of embankment work in
homogeneous section in uniform
layers of specified thickness (up to
cm) as directed including dressing
breaking clods and rolling at requisite
moisture contents to required dry
density with roller of suitable type
and watering at OMC for lead upto
km and all lifts etc. complete.
12 Reusing selected materials from 561.00 Cum 62.00
excavated material for raising of
embankment work in homogeneous
section in uniform layers of specified
thickness (up to 23 cm) as directed
including spreading, dressing
breaking clods and rolling at requisite
moisture contents to required dry
density with roller of suitable type
and watering at OMC for lead upto
200 m lead and all lifts etc. complete.
13 Box cutting the road surface to proper 2321.00 Cum
slope and camber for making a base
for road work including removing the
excavated stuff and depositing on the
road side slope as directed upto 50 mt
Item Description of Item (with brief Quantity Unit Rate In Amount
No specification and reference to book figures
of specifications)
14 Collecting carting and stacking of 2593.00 Cum 656.00
graded stone aggregate of following
size. (3) Crushed stone aggregate of
hard quality 40 mm to 63 mm size
15 Collecting carting and stacking of BT 1671.00 Cum 885.0.
Metal 25 to 40 MM & Aggregate
and down chips & SD including
16 Providing murrum including 1300.00 Cum 253.00
spreading the same and dressing the
side slope & top surface in required
grade and camber with lead upto
km etc. complete.
17 Spreading the stone aggregate for 4264.00 Cum 262.24
Rolling and W.B.M. including filling
the interstices to required camber
(excluding spreading of Blindage)
(ii) 40 to 63 mm size aggregates and
(iv)Chipping varying from 6mm to
18 Rolling and consolidating of soling 30938.00 Sqm. 22.75
including filling in depressions which
occur during the process, with power
roller 8 tonne to 12 tonne.
19 Providing and laying Dry Rubble 867.00 Sqm. 544.00
Stone Pucca Pitching Without Base,
Inverted Filter and header stone but
with 10 cms thick Murrum layer (for
base) including hand packing &
trimming & Dressing Slopes etc.
(c) 30 cms thick Stone Pitching with
pointing in C.M. 1:2
20 Informatory Signs:-Providing and 3.00 No. 3856.90
fixing sing boards made out of 2mm
aluminum sheet; size 80 x 60cms.
rectangle as per the design of IRC-67-
1977 pre treated with phospheting
process & acid teching; coated with
one coat of epoxy primer and two
coats of best quality epoxy paint;
reflectorized with retro reflective
sheeting as per latest M.O.S.T.
Specifications; 3.1m long stand
postand frame fabricated from
suitable size iron angle of 35 x 35 x
mm 75 x 75 x 6mm as required;
painted with best quality epoxy
coatings in black and white bends the
details of symbol for each board shall
details of symbol for each board shall
be as per the instruction of engineer
in charge. The fixing at site shall be in
1:2:4 CC block of size 45 x45 x 60cms
Item Description of Item (with brief Quantity Unit Rate In Amount
No specification and reference to book figures
of specifications)
for each leg. Including excavation
curing tec. complete under the
supervision of engineer in charge.
(A) Engineer Grade(VR).
I/We am/are willing to carry out the work at… .................................... % above/below percent (Should be
written in figures and words) of the estimated rate mentioned above. Amount of my /our tender works
Estimated amount put to tender Estimated amount put to tender
Deduct……….……% below Add……….……% Above
(B) For Item Rate Tender (For above INR 50 Cr.):
Item Description of Item (with Quantity Unit Rate Amount
No brief specification and
reference to book of In In
specifications) figures Words
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure) ……………………………… (in
(C)Net Tendered Amount (A-B) (in figure) ………………………………
1 The Contractor shall exhibit a board with detailed specification and details of work as directed by
the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.:
No. MIS 102010/17/K1, dtd. 30/07/2018 as stated in S.O.R. therefore in R.C.C. items where there is a
change as per actual mix design the cost of difference of cement consumption have been deducted
from the rate of original item at the rate of input rate mentioned in all the tender.
Signature of Contractor Deputy Executive Engineer Executive Engineer
Irrigation Project Sub Dn.No.7/1, Junagadh Irrigation Project Division
Junagadh Junagadh
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2-SBD sherdi-FINAL.pdf
DOCUMENT LIST.pdf
NOTICE NO 7.pdf
SCH-B.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .