| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 CrAccepted-Finance VILL KHEDLI PO BAHADRABAD DISTT HARIDWAR UTTARAKHAND | ₹3.2 Cr | L1 | Accepted-Finance QUALIFIED |
| 2 | L2₹3.2 CrRejected-Finance | ₹3.2 Cr | L2 | Rejected-Finance DISQUALIFIED |
| 3 | L3₹3.3 CrRejected-Finance MAHADEV COLONY BALIYAKHEDI BLOCK NEAR GUJAR BHAWAN HASANPUR CHUNGI DELHI ROAD SAHARANPUR | ₹3.3 Cr | L3 | Rejected-Finance DISQUALIFIED |
| 4 | L4₹3.3 CrRejected-Finance | ₹3.3 Cr | L4 | Rejected-Finance DISQUALIFIED |
| 5 | L5₹3.3 CrRejected-Finance 68 MOHIT VIHAR NIRANJANPUR DISTT DEHRADUN | ₹3.3 Cr | L5 | Rejected-Finance DISQUALIFIED |
| Sl No | Description | Qty | Unit | M/S Shiv Shankar Construction Co. L1 | daya sankar baluni L6 | NARAYAN SINGH L7 | K.K. Enterprises L5 | TARA CHAND L4 | M/S RAKESH KUMAR L2 | HARVIR SINGH L3 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in Soil with Dozer with lead upto 100 m Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. | 5,500 | Cum | 35.5 ₹2.0 L | 36.91 ₹2.0 L | 37.1 ₹2.0 L | 37 ₹2.0 L | 36.17 ₹2.0 L | 36 ₹2.0 L | 35.62 ₹2.0 L |
| 2.00 | Providing and Laying of Concrete with cement, coarse sand and 40 mm gauge stone ballast in proportion 1:4:8 in foundations including supply of all material, labour and T&P etc. required for proper completion of the work as per drawings and technical specifications and direction of engineer incharge. | 450 | Cum | 4,000 ₹18 L | 4,552.22 ₹20.5 L | 4,575.1 ₹20.6 L | 4,575 ₹20.6 L | 4,461.01 ₹20.1 L | 4,438 ₹20.0 L | 4,392.1 ₹19.8 L |
| 3.00 | Random Rubble Stone masonry in cement mortar (1:5) for Retaining Wall including all cost of labour,material and T&P complete as per drawing & technical specification Clauses 702, 704, 1202 of MORD Specification and direction of engineer incharge. | 3,700 | Cum | 3,540 ₹1.3 Cr | 3,659.81 ₹1.4 Cr | 3,678.2 ₹1.4 Cr | 3,678 ₹1.4 Cr | 3,586.24 ₹1.3 Cr | 3,570 ₹1.3 Cr | 3,531.07 ₹1.3 Cr |
| 4.00 | Random Coursed Rubble Stone masonry in cement mortar (1:4) for retaining Wall including all cost of labour,material and T&P complete as per drawing & technical specification and direction of engineer incharge. | 415 | Cum | 4,650 ₹19.3 L | 4,797.59 ₹19.9 L | 4,821.7 ₹20.0 L | 4,821 ₹20.0 L | 4,701.16 ₹19.5 L | 4,677 ₹19.4 L | 4,628.83 ₹19.2 L |
| 5.00 | 50 mm thick cement concrete1:2:4 on top of wall i/c all cost of material labour t&p etc complete as per drawing & technical specification and direction of engineer incharge. | 520 | Sqm | 290 ₹1.5 L | 294.86 ₹1.5 L | 296.34 ₹1.5 L | 296 ₹1.5 L | 288.93 ₹1.5 L | 287 ₹1.5 L | 284.49 ₹1.5 L |
| 6.00 | Struck cement pointing with cement mortar (1:3) i/c all cost of material labour t&p etc complete as per drawing & technical specification and direction of engineer incharge.. | 2,200 | Sqm | 69 ₹1.5 L | 71.64 ₹1.6 L | 72 ₹1.6 L | 72 ₹1.6 L | 70.2 ₹1.5 L | 70 ₹1.5 L | 69.12 ₹1.5 L |
| 7.00 | Refilling /Rehandling of earth mixed with boulder. (50% of excavation) complete as per drawing & technical specification and direction of engineer incharge. | 2,600 | Cum | 220 ₹5.7 L | 221.88 ₹5.8 L | 223 ₹5.8 L | 223 ₹5.8 L | 227.18 ₹5.9 L | 216 ₹5.6 L | 214.08 ₹5.6 L |
| 8.00 | Hand Packed stone filling in back of walls including cost of all materials, royalty, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) | 180 | Cum | 730 ₹1.3 L | 965.75 ₹1.7 L | 970.6 ₹1.7 L | 970 ₹1.7 L | 945.75 ₹1.7 L | 950 ₹1.7 L | 931.78 ₹1.7 L |
| 9.00 | Providing Plain cement concrete M-10 (Nominal mix 1:3:6) for apron complete as per drawings and technical specifications as per direction of Engineer-in- charge. | 2,720 | Cum | 5,000 ₹1.4 Cr | 5,389.02 ₹1.5 Cr | 5,416.1 ₹1.5 Cr | 5,200 ₹1.4 Cr | 5,280.6 ₹1.4 Cr | 4,900 ₹1.3 Cr | 5,199.46 ₹1.4 Cr |
| 10.00 | Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification as per direction of Engineer-in- charge. | 1,400 | Rmt | 170 ₹2.4 L | 170.24 ₹2.4 L | 171.1 ₹2.4 L | 171 ₹2.4 L | 166.92 ₹2.3 L | 170 ₹2.4 L | 164.26 ₹2.3 L |
Tender Value
Refer Docs
EMD Value
₹8 L
Closing Date
21 Jan 2026, 5:00 pmClosed
SANJAY RAJ
Superintending Engineer , Irrigation Work Circle ,Dehradun
Flood protection works both side along suswa river at Kudkawala Basti in doiwala block of Distt Dehradun,Uttarakhand
2026_IRDCE_90772_1
03/SE/2025-26
Open Tender
Civil Works
180 days
DOIWALA
REQUIRED DETAILS TO BE FILLING AS PER STANDARD BIDDING DOCUMENT
4 documents required · 4 mandatory
₹5,900
EXECUTIVE ENGINEER IRRIGATION DIVISION
₹8 L
Superintending Engineer , Irrigation Work Circle ,
18 Mar 2026
8 Jan 2026
24 Jan 2026
9 Jan 2026
21 Jan 2026
12 Jan 2026
12 Jan 2026
Excavation in Soil with Dozer with lead upto 100 m Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections.
Providing and Laying of Concrete with cement, coarse sand and 40 mm gauge stone ballast in proportion 1:4:8 in foundations including supply of all material, labour and T&P etc. required for proper completion of the work as per drawings and technical specifications and direction of engineer incharge.
Random Rubble Stone masonry in cement mortar (1:5) for Retaining Wall including all cost of labour,material and T&P complete as per drawing & technical specification Clauses 702, 704, 1202 of MORD Specification and direction of engineer incharge.
Random Coursed Rubble Stone masonry in cement mortar (1:4) for retaining Wall including all cost of labour,material and T&P complete as per drawing & technical specification and direction of engineer incharge.
50 mm thick cement concrete1:2:4 on top of wall i/c all cost of material labour t&p etc complete as per drawing & technical specification and direction of engineer incharge.
Struck cement pointing with cement mortar (1:3) i/c all cost of material labour t&p etc complete as per drawing & technical specification and direction of engineer incharge..
Refilling /Rehandling of earth mixed with boulder. (50% of excavation) complete as per drawing & technical specification and direction of engineer incharge.
Hand Packed stone filling in back of walls including cost of all materials, royalty, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications)
Providing Plain cement concrete M-10 (Nominal mix 1:3:6) for apron complete as per drawings and technical specifications as per direction of Engineer-in- charge.
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification as per direction of Engineer-in- charge.
Please Enable Macros to View BoQ information
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.02 MB
Tendernotice_2.pdf
PDF • 4.52 MB
Tendernotice_3.pdf
PDF • 0.43 MB
BOQ_107559.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid