Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.1 LAccepted-Finance | 1 | Accepted-Finance L1 | |
| 2 | 2₹1.3 L+₹14,840 (13.4%)Accepted-Finance | 2 | Accepted-Finance L2 | |
| 3 | 3₹1.3 L+₹22,850 (20.7%)Accepted-Finance | 3 | Accepted-Finance L3 |
Tender Value
₹1.7 L
EMD Value
₹3,460
Closing Date
18 Jul 2022, 6:55 pmClosed
EXECUTIVE ENGINEER MECHANICAL DIVISION BARAMULLA
THE EXECUTIVE ENGINEER MECHANICAL DIVISION BARAMULLA
Re-tensioning and other repairs to Deptt. Truck No. JK05B-3083 and 733/JK05A of Work-shop Sub-Div Baramulla.
2022_PWDJK_178283_1
MDB/TS/e-TENDER/2022-23/43
Open Tender
Machineries/ Mechanical Engg Items
Item Rate
7 days
Baramulla
Please refer Tender documents.
6 documents required · 6 mandatory
₹200
EXECUTIVE ENGINEER MECHANICAL DIVISION BARAMULLA
₹3,460
23 Jul 2022
8 Jul 2022
19 Jul 2022
8 Jul 2022
18 Jul 2022
8 Jul 2022
Amount
Re-Tensioning of leaf springs: Truck No. JK05B-3083
Reinforcement to suspension system of truck by way of dismantling complete leaf spring assembly and then re-arching/retensioning of leaf springs. The job shall include dismantling of the wheel spring assembly of the truck completely with the help of jacks. The leaf spring shall be cleaned and hammered / temperred by jack devices upto the required shape and requisite tension followed by greasing. The whole operation shall comprise replacement of below mentioned items. The whole assembly shall be fitted back to truck and greased properly to make the assembly work smoothly. a) Main leaf spring = 1no b) Auxiliary leaf spring=1no c) Centre bolt=1 no d) U-bolt with nut=4 no e) U clamps=1 no f) Bushes with shims=1no g) Banjo bolts=1no h ) Hub bolt with nut and washers=1 no i) Frame bolts=1 no
Four wheel checking and preventive maintenance of vehicle by way of p/f of following items:-Truck No. JK05B-3083 & 733/JK05A
a) Oil seal front & rear = 6 nos b) Wheel bearing grease = 5 kg c) Brake booster kit = 2 kit d) Brake lining set =4 set e) Tie rod end set = 2 set f)Return Spring-Brake Shoe g)Repair Kit For Rear Brake Chamber=1kit h)Brake hose=2 No i) Drag link end set = 2 set j) Split pins = 1pkt k) wheel bearing inner =2 no l) wheel bearing outer = 2 no m) Brake oil = 2 ltr n) Fan belt =1 no
Repairs to clutch side by way of replacement of following items.:Truck No. JK05B-3083
a) Clutch Withdrawal Sleeve=1No. b)Clutch withdrawal Bearing=1No.
Repairs to Electric side: Truck No. JK05B-3083
P/F of pressure Horn (01No), Side Indicator (02 No), 1141 Lamp (05 No.), Head Light Assembly (02 No.), Head Light Relay (01No) Horn relay (01 No), wiper Blade (01 Set), Cabin Light (01 No.) wire 1.5 sqmm (10mtr), Battery Terminals (02 No) one Complete job.
Providing and fitting of front wind shield of size (33"x27") with rubber lining complete. Truck No. JK05B-3083
Providing and fitting of drying and distribution unit after dismantling of damaged unit. Truck No. JK05B-3083
M Y ENTERPRISES
NARINDER SINGH
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .