Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹91.13Accepted-AOC | ₹91.13 Quoted ₹22.77 | L1 | Accepted-AOC l1 |
| 2 | L2₹22.59−₹0.18 (0.79%)Rejected-AOC | ₹22.59−₹0.18 (0.79%) | L2 | Rejected-AOC l2 |
| 3 | L3₹21.99−₹0.78 (3.43%)Rejected-AOC | ₹21.99−₹0.78 (3.43%) | L3 | Rejected-AOC l3 |
| 4 | L4₹12.50−₹10.27 (45.1%)Rejected-AOC | ₹12.50−₹10.27 (45.1%) | L4 | Rejected-AOC l4 |
| 5 | Rejected-Technical | - | - | Rejected-Technical shortfall in turnover hence not meeting criteria |
Tender Value
₹80 L
EMD Value
₹1.6 L
Closing Date
24 Apr 2019, 6:00 pmClosed
Senior Manager (Engg-Civil)
Airports Authority of India, Rajahmundry Airport, Madhurapudi Post, Rajahmundry-533102
Annual Rate Contract for Repairs and Maintenance of Civil Works for the Year 2019 20 at Rajahmundry Airport
2019_AAI_25212_1
AAI/RJY/ENGG(C)/AMC/19-20
Open Tender
Civil Works
Percentage
365 days
Airports Authority of India, Rajahmundry Airport.
Please refer Tender Document
8 documents required · 8 mandatory
₹1,180
Airports Authority of India
₹1.6 L
29 Jun 2021
12 Apr 2019
30 Apr 2019
13 Apr 2019
24 Apr 2019
13 Apr 2019
13 Apr 2019 - 22 Apr 2019
Schedule-A ( Part-1) DSR- 2016 (vol-I & vol-II items) and DSR 2016 (Horticulture) Schedule-A (Part-2) Additional Miscellaneous Items
Guidelnes for quoting the % rte by the bidder. 1) The rate shall be quoted by the bidder in % (Percentage) only on the DSR - 2016. 2. Bidder should note that the rates calculated for all the items in Part II are made at par with the rates of DSR 2016 items. 3) Bidder is reuired to quote only one value for percentage which will be applicable to Schedule A(Part I and Part-II) 4) Bidder shall quote rate only in %(Percentage) on Schedule"A"(part I and Part II) wherein 100 is base. 5) Bidder may please note that the the payment of DSR Items quoted shall be regulated as follows to arrive rates excluding GST. Rate of DSR Item = X, Add 6% GST =( X + 6% of X) Total = Y Rate to be considered for payment = Y/1.18 ( in case of 18% GST). Thereafter GST( as applicable ) shall be calculated on the gross value of work executed The percentage rate shall be quoted in digits only without applying any sign of (+) or (-) Following are some examples for quoting the % rate by the bidder:- a) If Bidder wants to quote 5% below the Schedule A(Part I and Part II) rates, then the bidder has to quote 95 inEnvelope-III/ Price Bid without any (+) or (-) sign.(Since 100 is base value of Schedule A(Part I & Part II) and as bidder wants to quote 5% below the SChedule"A" means value 5 is substracted from base value 100 and quote becomes 100-5 = 95) b) If Bidder wants to quote 4% above the Schedule A(Part I and Part II) rates, then the bidder has to quote 104 inEnvelope-III/ Price Bid without any (+) or (-) sign.(Since 100 is base value of Schedule A(Part I & Part II) and as bidder wants to quote 4% above the SChedule"A" means value 4 is added from base value 100 and quote becomes 100+4 = 104)
Kiran Infra
SAKA LAKSHMINARAYANA
Stanch Projects Private Limited
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .