| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.2 Cr+₹9.8 L (8.97%)Admitted-Finance NO 51 5 AMMAN NAGAR SUNDAR NAGAR TIRUCHIRAPPALLI 620021 | TIRUCHIRAPPALLI | TAMIL NADU | 620021 | ₹1.2 Cr+₹9.8 L (8.97%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | R MURUGAN L1 | R RENGASAMY L2 |
|---|---|---|---|---|---|
| 1.00 | STRENGTHENING OF AYYAMPALAYAM TO KALLANKUTHU VIA KARUNGAU KM 0/0-2/1 Clearing the Scrub jungle including all labour charges for burrying and burning etc.,(0/0-2/0) | 1,452 | sqm | - | - |
| 2.00 | Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m km 0/0-2/0 | 2,365.75 | sqm | - | - |
| 3.00 | Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A Km 0/0-2/0 | 280.5 | cum | - | - |
| 4.00 | Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approed souces to work site including labour for spreading, watering and compacting by power roller to achieve the required proctor density at 100% compaction km 0/0-1/0 | 178.43 | cum | - | - |
| 5.00 | KM 1/0-2/0 | 162.23 | cum | - | - |
| 6.00 | Providing and laying Water Bound Macadam Grading - III ( 63mm to 11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I (Mix - in - place method) km 0/0-1/0 | 278.8 | cum | - | - |
| 7.00 | KM 1/0-2/0 | 253.49 | cum | - | - |
| 8.00 | Providing and laying Tack Coat over the W.B.M surface using 4.00Kg of Emulsion Bitumen as Blinder for 10Sqm. area including cost and conveyance of bitumen which will be supplied departmentaly at departmental section store at union office and cost of the same which will be recovered from the contractors bill at the rates specified in the special condition appended here with including conveyance of bitumen from section store to work site handling charges of bitumen at both ends and including all labour charges for clearing surface before the application of bitumen blinder and heating the bitumen to the required temperature including labour charges for applying tack coat uniformly including hire charges bitumen sprayer (with self heating and pumping arrengment) and all other tools and plants employed and also as directly by the engineer incharge and all other incidental charges etc. complete as per clause 505 of most specification. km 0/0-2/0 | 7,162.5 | sqm | - | - |
| 9.00 | Providing and laying premix carpet with seal coat Type ‘ A for 20 thickness using 0.18cum of 13.2mm IRC,HBG metal and 0.09cum of 11.2mm IRC,HBG metal with 14.60Kg . of bitumen for premixing 10sqm . of premix carpet and 0.09cum of 6.7mm IRC, HBG metal with 9.80Kg . of bitumen for seal coat type ‘A per 10sqm . including cost and conveyance of materials to be work site and stacking them to the departmental metric gauge for pre mesurment, heating the bitumen in bitumen boilur , heating the aggregates , and mixing them with bitumen in mini hot mix plant for pre mix carpet only rolling by 80-100 KN power of premix carpet and seal coat separately including labour charges for spreading the mix for premix carpet, including labour charges for spreading seal coat separately over premix carpet etc., including hire charges and fuel charges for mini hot mix plant, bitumen boiler, power roller and all other tools and plant employed etc., complete as per clause 509 of MOST specification. KM 0/0 - 1/0 | 3,750 | sqm | - | - |
| 10.00 | KM 1/0-2/0 | 3,412.5 | sqm | - | - |
Tender Value
₹1.1 Cr
EMD Value
₹1.1 L
Closing Date
14 Oct 2020, 3:00 pmClosed
Project Director
DRDA Tiruchirappalli
Strengthening of 2 roads in Mannachanallur Block of Tiruchirappalli District under Tamil Nadu Rural Roads Improvement Scheme 2020-21 Package No.6
2020_RDTN_180425_6
DIPR/3344/TENDER/2020 Dated 08.09.2020
Open Tender
Civil Works - Roads
Item Rate
180 days
Tiruchirappalli
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹1.1 L
DRDA Tiruchirappalli
19 Oct 2020
21 Sept 2020
14 Oct 2020
21 Sept 2020
14 Oct 2020
21 Sept 2020
23 Sept 2020
Amount
STRENGTHENING OF AYYAMPALAYAM TO KALLANKUTHU VIA KARUNGAU KM 0/0-2/1 Clearing the Scrub jungle including all labour charges for burrying and burning etc.,(0/0-2/0)
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m km 0/0-2/0
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A Km 0/0-2/0
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approed souces to work site including labour for spreading, watering and compacting by power roller to achieve the required proctor density at 100% compaction km 0/0-1/0
Providing and laying Water Bound Macadam Grading - III ( 63mm to 11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I (Mix - in - place method) km 0/0-1/0
Providing and laying Tack Coat over the W.B.M surface using 4.00Kg of Emulsion Bitumen as Blinder for 10Sqm. area including cost and conveyance of bitumen which will be supplied departmentaly at departmental section store at union office and cost of the same which will be recovered from the contractors bill at the rates specified in the special condition appended here with including conveyance of bitumen from section store to work site handling charges of bitumen at both ends and including all labour charges for clearing surface before the application of bitumen blinder and heating the bitumen to the required temperature including labour charges for applying tack coat uniformly including hire charges bitumen sprayer (with self heating and pumping arrengment) and all other tools and plants employed and also as directly by the engineer incharge and all other incidental charges etc. complete as per clause 505 of most specification. km 0/0-2/0
Providing and laying premix carpet with seal coat Type ‘ A for 20 thickness using 0.18cum of 13.2mm IRC,HBG metal and 0.09cum of 11.2mm IRC,HBG metal with 14.60Kg . of bitumen for premixing 10sqm . of premix carpet and 0.09cum of 6.7mm IRC, HBG metal with 9.80Kg . of bitumen for seal coat type ‘A per 10sqm . including cost and conveyance of materials to be work site and stacking them to the departmental metric gauge for pre mesurment, heating the bitumen in bitumen boilur , heating the aggregates , and mixing them with bitumen in mini hot mix plant for pre mix carpet only rolling by 80-100 KN power of premix carpet and seal coat separately including labour charges for spreading the mix for premix carpet, including labour charges for spreading seal coat separately over premix carpet etc., including hire charges and fuel charges for mini hot mix plant, bitumen boiler, power roller and all other tools and plant employed etc., complete as per clause 509 of MOST specification. KM 0/0 - 1/0
Provision for 1.50m span Culvert CH 1/690 Earth work excavation in all classes of soils except hard rock requiring blasting soils such as hard stiff clay ordinary gravel etc., with initial led and lift as per SS 20B including shoring baling out water where necessary etc.. Complete for foundation---culvert
Supplying and filling of foundation and basement with good river sand in layers not more than 15cm thick well rammed, watered and compacted complying with standard specification
Cement concrete 1:4:8 mix using 40mm ISS HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complee complying with standard specifications and as directed.
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90x60cm & 10 gauge stiffened, welded with steel angle
With support
CC 1:3:6 MIX using 40mm HBG Metal including cost & conveyance of all materials to site all labour charges with simultaneous pointing etc. complete
CC 1:2:4 MIX using 20mm HBG Metal including cost & conveyance of all materials to site all labour charges with simultaneous pointing etc. complete
Reinforce cement concrete 1:1 5:3 using 20mm gauge machine broken hard granite stone jelly for all RCC items of works excluding cost of reinforcement and fabricating charges but including curing including all labour charges etc.,
Supplying, fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002,1010 and 1202 for culvert 0/900
Providing and fixing of 20mm bitumen belt for expansion joint between dirt wall and deck slab
Providing and fixing of tar paper for bearing between bed block and deck slab
Providing Weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100mm dia AC pipe extending through the full width of the structure with slope of 1(v):20(H) towards drawing face complete as per drawing
Name board charges
STRENGTHENING OF GST road - Sridevimangalam road 0/0-3/4 (R36) Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approed souces to work site including labour for spreading, watering and compacting by power roller to achieve the required proctor density at 100% compaction km 0/0-1/0
Providing and laying Water Bound Macadam Grading - III ( 63mm to 11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I (Mix - in - place method) km 0/0-1/0
Providing and laying Tack Coat over the W.B.M surface using 3.00Kg of Emulsion Bitumen as Blinder for 10Sqm. including labour for spraying, hire charges for bitument sprayer etc. compl km 0/0-3/332
Providing and laying premix carpet with seal coat Type ‘ A for 20 thickness using 0.18cum of 13.2mm IRC,HBG metal and 0.09cum of 11.2mm IRC,HBG metal with 14.60Kg . of bitumen for premixing 10sqm . of premix carpet and 0.09cum of 6.7mm IRC, HBG metal with 9.80Kg . of bitumen for seal coat type ‘A per 10sqm . including cost and conveyance of materials to be work site and stacking them to the departmental metric gauge for pre mesurment, heating the bitumen in bitumen boilur , heating the aggregates , and mixing them with bitumen in mini hot mix plant for pre mix carpet only rolling by 80-100 KN power of premix carpet and seal coat separately including labour charges for spreading the mix for premix carpet, including labour charges for spreading seal coat separately over premix carpet etc., including hire charges and fuel charges for mini hot mix plant, bitumen boiler, power roller and all other tools and plant employed etc., complete as per clause 509 of MOST specification. KM 0/0 - 1/0
Provision for KM stone
Provision for HM stone
CONSTRUCTION OF 1.5M RCC SLAB CULVERT Earth work excavation in all classes of soils except hard rock requiring blasting soils such as hard stiff clay ordinary gravel etc., with initial led and lift as per SS 20B including shoring baling out water where necessary etc.. Complete for foundation - culvert @ ch 3330m
Supplying and filling in foundation and basement with filling sand in layers not more than 15cm thick well rammed watered and compacted complying with std., speciication charges etc., culvert @ ch 3330m
Cement concrete 1:4:8 mix using 40mm ISS HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complee complying with standard specifications and as directed. culvert @ ch 3330m
CC 1:3:6 MIX using 40mm HBG Metal including cost & conveyance of all materials to site all labour charges with simultaneous pointing etc. complete for Abutement and wing - culvert @ ch 3330m
CC 1:2:4 MIX using 20mm HBG Metal including cost & conveyance of all materials to site all labour charges with simultaneous pointing etc. complete - culvert @ ch 3330m
Reinforce cement concrete 1:1 5:3 using 20mm gauge machine broken hard granite stone jelly for all RCC items of works excluding cost of reinforcement and fabricating charges but including curing including all labour charges etc., culvert @ ch 3330m
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90x60cm & 10 gauge stiffened, welded with steel angle - culvert @ ch 3330m
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90x60cm & 10 gauge stiffened, welded with steel angle - culvert @ ch 3330m
Supplying fabricating and placing in position mild steel or ribbed tor steel for reinforced cement concrete woks standard speciication (MS rodsd or RTS bars will b supplied departmentally at section stores and cost will be recovered at issue rate). The Contractor shall supply the binding wire. culvert @ ch 3330m
Providing and fixing 20MM Bitumen felt for expansion joint Between Dirtwall & Deck slab - culvert @ ch 3330m
Providing and fixing Tar paper for bearing Between Bed Block & Deck slab - culvert @ ch 3330m
Providing Weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100mm dia AC pipe extending through the full width of the structure with slope of 1(v):20(H) towards drawing face complete as per drawing - culvert @ ch 3330m
Name board charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
R RENGASAMY
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.16 MB
PriceBid6.pdf
Additional Documents • 0.23 MB
BOQ_216250.xls
BOQ • 0.26 MB
TechBid6.pdf
Tender Documents • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .