Loading…
Loading…
Tender Value
₹20.4 L
EMD Value
₹20,500
Closing Date
20 Feb 2026, 6:00 pmClosed
Superintending Engineer, Project Implementation Unit, Health & Family Welfare Department.
New Construction Of Compound wall at PHC LavkarTa.Kaprada Dist.Valsad.
276165
2025-26/153/02
Open
Civil Works - Buildings
Navsari
1 document required · 1 mandatory
₹900
Yes
PIU-General Fund A/c 11-114
₹20,500
Yes
13 Feb 2026
13 Feb 2026
13 Feb 2026
20 Feb 2026
13 Feb 2026
Name of work: New Construction Of Compound wall at PHC Lavkar Ta.Kaprada Dist.Valsad.
Estimated Rates
Total Qty Item Description Unit Amount
No. In Rupees In Words
Excavation for foundation upto 1.5 m depth including sorting out and
stacking of useful materials and disposing off the excavated stuff upto 50 Rupees One Hundred Forty Nine And Paise
Meter lead.(B) Dense or Hard soil Eighty Three Only
Providing and laying cement concrete 1:2:4 (1- Cement : 2- Coarse sand : 4-
graded stone aggregates 20 mm nominal size) and curing complete excluding Rupees Three Thousand Six Hundred Eighty
cost of formwork in (A) Foundation and Plinth (upto 10 ton) Three And Paise Thirty Four Only
Providing and laying cement concrete work 1:2:4 (1- Cement : 2- Coarse sand :
4- graded stone aggregates 20 mm nominal size) and curing complete
excluding cost of formwork and reinforcement for reinforced concrete work in Rupees Three Thousand Nine Hundred Forty
(A) Foundations, footings, Base or columns and Mass concrete (upto 10 ton) Eight And Paise Eighteen Only
Providing and laying cement concrete work 1:2:4 (1- Cement : 2- Coarse sand :
4- graded stone aggregates 20 mm nominal size) and curing complete
excluding cost of formwork and reinforcement for reinforced concrete work in Rupees Four Thousand Thirty Eight And Paise
(B) Slabs, landing, shelves, Balconis , Lintels, Beams, Girders and Cantilever Two Only
upto floor two level. (more than 10 ton)
Brick work using common burnt clay building bricks having crushing strength
not less than 35 kg./Sq.Cm. in foundation and plinth in Cement Mortar 1:6 (1- Rupees Four Thousand Twenty One And
Cement : 6 -fine sand)(B) Conventional (upto 10 ton) Paise Two Only
20mm thick sand faced cement plaster on walls upto height 10 metres above
ground level consisting of 12mm thick backing coat of C.M. 1:3 (1-cement : 3-
Rupees Three Hundred And Paise Sixty Six
6 1006.74 sand) and 8mm thick finishing coat of C.M. 1:1 (1-cement : 1-sand) etc. 300.66 Sqm
Finishing wall with weather proof exterior emulsion paint on wall surface (two
coats) to give an required shape even shade after thoroughly brushing the
Rupees One Hundred Fourteen And Paise
7 1459.82 surface to remove all dirt, and remains of loose powdered materials.etc 114.53 Sqm
Fifty Three Only
Estimated Rates
Total Qty Item Description Unit Amount
No. In Rupees In Words
Providing TMT Bar FE 500D reinforcement for R.C.C. work including bending,
Rupees Seventy Six And Paise Twenty One
8 4852.00 binding and placing in position complete upto floor two level 76.21 kg
Providing and fixing Y type 0.60 meter high fencing with 0.85 meter long M.S.
angle posts 40mmX40mmX6mm and oil painting 2 coats fixed at 2.5 mt. c/c
with four horizontal lines on both side galvanized steel barbed wire weighing Rupees Two Hundred Sixty Seven And Paise
9.38 Kg per 100 meter strained and fixed to posts with G.I. staples including Twenty Seven Only
fixing the posts in RCC copping etc. complete.
Providing and fixing 1.9mt wide Cattle trap using M.S.I- beam of ISMB
section with M.S. Angle 75x75x6 mm size on both ends and G.I. pipes 'c' class
of 65mmdia with 60mm c/c rested on brick masonary wall 23cm thick with Rupees Eleven Thousand Thirty One And
necessary excavation 15cm thick 1:3:6, 0.23x0.30 cm size beam & 10mm thick Paise Ninety Four Only
cement plastering etc.
I/We am/are willing to carry out the work at …………………………………………………………………………………….. % above / below percent (should be written in figures and words) of the estimated rate mentioned
above. Amount of my/our tender works out as under.
* Estimate Amount Estimate Amount
Put to tender Rs…………………………………… Put to tender Rs……………………………………
Deduct………..% below Rs…………………………………… Add……..% above Rs……………………………………
(* Please strike out whichever is not applicable).
All works shall be carried out as per Public Work Department Handbook and other specification of Division or as directed
All the columns in Schedules should be filled in ink and the total of the entries ink last column should be struck by the contractor under his signature
Dy. Executive Engineer Executive Engineer
PIU Zone-7, Valsad PIU Zone-7, Valsad
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Condition for cement.pdf
GR RnB Revise.pdf
GR-TMT-Lap Length.pdf
INSTRUCTIONS TO PERSON TENDERING.jpg
JPG
Performance Bond and SD-Paripatra-2023.pdf
PIU SPECIAL CONDITIONS.pdf
Inclusion of Insurance clause as per new SBD.pdf
6372 Make List HO 15.10.2025.pdf
Specification.pdf
Schedule B.pdf
SBD.pdf
Tender Document.pdf
Download all tender documents and submit your bid