Loading…
Loading…
Tender Value
₹64.2 L
EMD Value
₹65,000
Closing Date
30 Sept 2026, 6:00 pm3d left
Executive Engineer, Panchayat (R&B) Division, Dang - Ahwa
New Gujarat Pattern Year 2025-26. Construction of Box Culvert near Kavadiya Gadh At Village Taklipada ( Piplaidevi) Taluka. Ahwa, Dist. Dang.
344891
18 OF 2026 - 27
Open
Civil Works - Others
Works
Dang
7 documents required · 6 mandatory · 1 optional
₹2,400
Executive Engineer, Panchayat (R & B) Division, Ahwa
₹65,000
15 Sept 2026
15 Sept 2026
15 Sept 2026
30 Sept 2026
15 Sept 2026
Name of Work:-New Gujarat Pattern 10% Year 2025-26. Construction of Box Culvert near Kavadiya
Gadh At Village Taklipada ( Piplaidevi) Taluka. Ahwa, Dist. Dang.
: : BILL OF QUANTITY.' : :
Percentage Rate Tender
It. Description of Item (with brief Specification Rate In
Quantity Unit Amount
No. and reference to book of specifications) Figures
1 Clearing and grubbing road land including uprooting rank 0.05 Hect 34889.44
vegetation grass bushes,shrubs,sapling and trees girth up
to 300 mm removal of stumps of trees cut earlier and
disposal of unserviceable materials(D) By mechanical
means in area of thorny jungle
2 Earthwork in cutting in all sorts of soil and soft murrum 81.00 Cum. 112.02
including conveying and putting the stuff in spoil bank
maintaining minimum distance of five meter between top
edge and cutting and toe of spoil bank.
3 Earthwork for embankment including breaking clods, 737.96 Cum. 182.14
dressing with all lead and lift and including watering
rolling and consolidation of subgrade in layers at O.M.C.
to required dry density including filling the depression
which occur during the process using power roller 8T to
10T.(E) From Borrow area within 3.0KM. lead
4 Construction of granular sub-base by providing coarse 126.00 Cum. 1293.52
graded material grading-II, spreading in uniform layers
with motor grader on prepared surface, mixing by mix in
place method with rotavator at OMC, and compacting
with vibratory roller to achieve the desired density,
complete as per clause 401.B
5 Construction of Granular Sub Base by providing coarse 113.00 Cum. 1347.52
graded machine crushed B. T. material satisfying MOST
Specification of Grading - I using 53 mm to 26.5 mm @
30% (M.C. Metal), 26.5 mm to 4.75 mm @ 60%
(M.C.Metal), 2.36 mm below @ 10% (Stone Dust)
including spreading in uniform layer with motor grader
on prepared surface, mixing by mix in place method with
rotavator at OMC and compacting with vibratory roller to
achieve the desired density with C.B.R. > 30% etc.
6 Providing, laying, spreading and compacting graded stone 105.00 Cum. 1430.06
aggregate to Wet Mix Macadam specification including
premixing the Material with water at OMC in mechanical
mix plant carriage of mixed Material by tipper to site,
laying in uniform layers with paver in sub- base / base
course on well prepared surface and compacting with
vibratory roller to achieve the desired density.
7 Providing and applying evenly Priming coat with emulsion 675.00 Sqmt 72.61
asphalt at the rate of 7.50 Kg/ 10 Sq.m on road surface
using emulsion SS-1 (Himcol Made) pressure spreayer etc.
complete including the cost of asphalt
8 Providing and laying bituminous base course 37.5mm 50.60 MT 2501.32
thick compacted in one layer with tack coat of Emulsion
RS1 at the rate of 2.5 Kg / 10 Sqmt. and using B.T. stone
aggregate or required gradation and asphalt (VG-30)
grade for mixing @ 1.99 % by weight of total mix for
mixing including heating the aggregate and asphalt by
drum mix plant and spreading the same by paver finisher
and consolidation with vibratory roller including
providing all meterials, equipments, tools and plants, oil,
kerosene, fire wood, labour chrges etc. complete..
9 Providing & laying 50 mm. thick compacted Bituminous 74.30 MT 3121.14
Macadam with using RS1 Emulsion for tack coat at
Kg / 10 Sq.Mt. using stone aggregate as per gradation and
aspahlt grade VG-30 at 3.40 % by weight of total mix hot
laid process with drum mix plant including consolidation
with vibrating roller including operating plant and
machinery cost of asphalt, fuel, oil, lubricant and labour
charges etc. complete.
10 Providing & laying 25 mm. thick SDBC using B.T. stone 38.80 MT 3819.20
chips as per MORTH gradation and specification with
asphalt VG-30 at the rate of 50.00 kg. / M.Tone of total
wt. for mix i.e. (5.00 % ) by weight of total mix of bitumen
including mixing aggregates & asphalt by continuous
batching drum mix plant & spreading the same by paver
finisher including rolling & consolidation with 10 -
tonnes vibratory roller & providing tools 7 plants, fire
wood, oil, kerosene, labour charges using contractor's
own machineries etc. complete.
11 Providing and laying asphalt painting on B.T. surface with 675.00 Sqmt 36.75
bitumen VG-30 at rate 5.00Kg / 10Sq.mt. including
spreading stone dust for painting surface at rate of
12 Dismentaling the existing structure including removing 300.00 Cum. 978.15
and stacking the dismentelled materials as and where
directed. (B) R.C.C Work
13 Excavation in large boulders and soft rock by welding 313.00 Cum. 754.14
including shoring, strutting and dewatering as necessary
and disposing of the excavated stuff as directed.
14 Providing and casting in situ Ordinary cement concrete 48.90 Cum. 3816.61
M-150 for R.C.C. Raft and cut-off walls including
necessary shuttering laying, vibrating, ramming and
curing complete. (more than 10 ton)
15 Providing and Casting in situ controlled Cement Concrete 200.40 Cum. 4640.23
M-200 for R.C.C. Raft and cutt-off walls including
necessary shuttering laying, vibrating, ramming and
curing complete. (more than 10 ton)
16 Providing and casting in situ controlled cement concrete 75.40 Cum. 5475.63
M-250 for R.C.C. solid slab including centering,
scaffolding, curing and finishing complete. (more than
17 Providing and casting in situ controlled cement concrete 33.90 Cum. 4992.64
M-250 for Kerb/ kerb blocks including formwork curing
and finishing, complete (more than 10 ton)
18 Providing and casting in situ controlled cement concrete 21.30 Cum. 5425.97
M-250 for average 100 mm thick wearing coat laid as
directed dincluding tamping, vibrating, finishing, curing
and fillingin joints with bitumen complete (more than
19 Providing and casting in situ ordinary cement concrete 147.70 Cum. 4308.35
M. 200 mix and providing necessary pin headers including
shuttring scaffolding laying vibrating curing and finishing
complete. Without V-Grooves. (A) Height from 0.0 M to
20 Providing and fixing in position IS mark steel bar 27.28 MT 73243.02
reinforcement of bar grade FE-500/500D including
cutting, bending, hooking and tying complete as per
detailed drawing for raft slab, pier, solid slab, kerb block,
wearing coat etc.
21 Provding P.V.C. 100 mm diameter water spouts including 24.00 Nos. 159.37
necessary iron gratings as per drawings. (more than
22 Providing weep holes in abutment, returns using 100 67.00 Nos. 91.32
mm. dia A.C. pipe with C.I. grating including cutting,
placing the pipe in required slope and position as
directed etc. complete. (As per detailed specification)
23 Providing and laying - Fitter Media 600mm thick directed 80.00 Sqmt 1342.40
at the back of abutments, returns and wing walls as per
detailed specifications
24 Providing and fixing guard stone as per I.R.C. type design 38.00 Nos. 350.80
including white washing etc. complete.(ii) Fixing in C.C.
25 Providing and filling sand behind abutments and 186.00 Cum. 571.92
between returns in layers as directed
26 Wall painting (two coats) with plastic emulsion paint of 129.30 Sqmt 85.35
approved brand and manufacture on undecorated wall
surface to give an even shade including throughly
brushing the surface free from mortar droppings and
other foreign matter and sand papered smooth.
I / Weam / are willing to carryout the work at…………………. % above/ below percent (Should Be written in
figures and words) of the estimated rate mentioned above Amount of my / our tender works out as
*Estimated amount put to tender *Estimated amount put to tender
Deduct ……. % below Rs…………………… Add ………........% Above
*( please strike out whichever is not applicable)
1 The Contractor shall exhibition board with detailed specification and details of works directed by the
Engineer – In – Charge for which no extra payment shall bemade.
2 The labourcess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills.
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt G.R.: PRC-
10/2017 Cement Consumption/16/C Date: 11/05/2017 as stated in S.O.R. therefore in R.C.C. items where
the reisa change as per actual mix design the cost of difference of cement consumption have been deducted
from the rate of original item at the rate of input rate mentioned in all the tender.
Deputy Executive Engineer Executive Engineer
Panchayat ( R & B) Sub Division Panchayat (R & B) Division
Signature of the contractor
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ Box Taklipada.pdf
SBD Box Taklipada.pdf
Specification.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .