Executive engineer Panchayat Irrigation Division Valsad
Package No-5 (1) construction of Community Well at village Chavra Ta-Dharampur, Dist-valsad (2) construction of Community Well at village Moti korval Ta-Dharampur, Dist-valsad (3) construction of Community Well at village Tutarkhed(upla f.) Ta-Dharampur, Dist-valsad (4) construction of Community Well at village Nani kosbadi Ta-Dharampur, Dist-valsad (5) construction of Community Well at village Moti korval,Ta-Dharampur, Dist-valsad
325305
05 of 2026-27
Open
Civil Works
Works
Valsad
9 documents required · 8 mandatory · 1 optional
₹1,500
Executive Engineer panchayat Irrigation Division ,Valsad
₹40,000
17 Jul 2026
17 Jul 2026
17 Jul 2026
6 Aug 2026
17 Jul 2026
Name of work: (1) construction of Community Well at village Chavra, Ta-Dharampur, Dist-valsad
(2) construction of Community Well at village Moti korval-1 , Ta-Dharampur, Dist-valsad
(3) construction of Community Well at village Tutarkhed (upla F.) , Ta-Dharampur, Dist-valsad
(4) construction of Community Well at village Nani kosbadi, Ta-Dharampur, Dist-valsad
(5) construction of Community Well at village Moti korval-2, Ta-Dharampur, Dist-valsad
Memorandum Schowing the item of work to be carried out
Qty. Unit Description of Item In figures Amount
Item No. 1 :Excavation for well including Removing
and spreading the excavted stuff as directed with
(i) 0.00 Meter to 1.50 Meter depth
(Rupees One Hundred
152.00 m3 (a) In all soils of soils incl Soft Murrum 140.80 Forty and Eighty Paisa
(Rupees Two Hundred
303.95 m3 (ii) In Hard murrum. 204.60 Four and Sixty Paisa
(ii) 1.5 Meter to 3.00 Meter depth
3 (Rupees Three Hundred
445.60 m (a) In Soft Rock 314.60
Fourteen and Sixty
(iii) 3.00 Meter to 4.50 Meter depth
435.45 m3 (iv) In hard rock with blasting & chiselling 760.10
(Rupees Sixty and
290.30 m3 (b) Extra for dewatering in all strata. 35.20
Twenty Paisa Only)
(iv) 4.50 Meter to 6.00 Meter depth
3 (Rupees Seven
425.35 m (a) In hard Rock with Blasting And chiselling 777.70
Hundred Seventy
(Rupees Forty Seven
425.35 m3 (b) extra for Dewatering in all Strata 47.30
and Thirty Paisa Only)
(v) 6.00 Meter to 7.50 Meter depth
219.75 m3 (a) In hard Rock with Blasting And chiselling 798.60
Hundred Ninety Eight
219.75 m3 (b) extra for Dewatering in all Strata 66.00 (Rupees Sixty Six Only)
(vi) 7.50 Meter to 9.00 Meter depth
(Rupees Eight Hundred
178.10 m3 (a) In hard Rock with Blasting And chiselling 822.80
(Rupees and Eighty
178.10 m3 (b) extra for Dewatering in all Strata 84.70
and Seventy Paisa
(vii) 9.00 Meter to 10.50 Meter depth
(Rupees Eight Hundred
171.70 m3 (a) In hard Rock with Blasting And chiselling 856.90
(Rupees andHundred
171.70 m3 (b) extra for Dewatering in all Strata 105.60
Five and Sixty Paisa
(viii) 10.50 Meter to 12.00 Meter depth
(Rupees Eight Hundred
165.40 m3 (a) In hard Rock with Blasting And chiselling 893.20
Ninety Three and
(Rupees One Hundred
165.40 m3 (b) extra for Dewatering in all Strata 122.10
Twenty Two and Ten
(ix) 12.00 Meter to 13.50 Meter depth
(Rupees Nine Hundred
159.20 m3 (a) In hard Rock with Blasting And chiselling 928.40
159.20 m3 (b) extra for Dewatering in all Strata 152.90
Fifty Two and Ninety
(x) 13.50 Meter to 15.00Meter depth
(Rupees Nine Hundred
147.20 m3 (a) In hard Rock with Blasting And chiselling 965.80
(Rupees andHundred
147.20 m3 (b) extra for Dewatering in all Strata 204.60
Four and Sixty Paisa
Item No. 2 :Providingand laying Plain / Reinforced
cement concrete of cement, sand and metal (20mm
to 25mm size) in following proportion laid in situ (Rupees Five Thousand
205.80 m3 including centering, shuttering, temping,smooth 5380.00 Three Hundred Eighty
finishing, curingetc. complete as directed for all Only)
leads and lifts (Manually With Conventional Mixer
Item No. 3 :Providing and laying Plain / Rein forced
cement concrete of cement , sand and metal (20
mm to 25 mm size ) in following proportion laid in
Thousand One Hundred
18.00 m3 situ including centering , shuttering ,temping , 4110.50
Ten and Fifty Paisa
smooth finishing , curing etc. completes directed for Only)
alllead sand lifts (Manually With Conventional
Mixer)(iii)1:3:6
Item No. 4 : Providing and placing in position
reinforcement bars including cutting, bending (Rupees Seven
53.90 Qtl welding, joints where necessary,hooking 7194.00 Thousand One Hundred
etc.complete as per drawing for all lead and lifts. Ninety Four Only)
Item No. 5 : Providing and fixing in position 110 (Rupees Two Hundred
105.00 Rmt mm dia PVC Pipe weep holes in abutment wing 263.70 Sixty Three and
wall , and laying training etc complete . Seventy Paisa Only)
Item No. 6 :Providing Supplying and fixing at site of
(Rupees Seventy Three
work with railway freight loading, unloading carting
0.17 MT etc. complete. Such as joints chenals angles iron 73361.00
Hundred Sixty One
etc .Medium weight channels (ISMC series) 75 x 40 Only)
Item No. 7 : Back filling the foundation trenches a
round the structures etc. with selected excavated (Rupees Nineteen and
stuff including watering, ramming, compacting etc. Fifty Paisa Only)
complete.(By machinery)
Item No. 8 : Providing ISI 2.5 " Sprinkler Pipe (Rupees Six Hundred
including loading unloading transportation etc comp Fifty Only)
Item No. 9 : Providing and fixing marble plate of 2 (Rupees Two Hundred
67.50 cm thickness including engraving and filling paint for 250.60 Fifty and Sixty Paisa
letters as directed. Only)
100 Item No. 10 : Electification -meter connection and (Rupees Five Thousand
cm2 GEB charges etcComp Only)
Item No. 11 : Providing,Supplying and fixing 3HP
submersible motor including grid controller(TP (Rupees Twenty Two
Heavy DOL SET) and HDPE pipe,CABLEand all Thousand Seven
accessories and fitting including all labour carting Hundred Seventy Five
loading unloading etc comp For 3.00 HP sub- Only)
mersible motor with all accessories.
Item No. 12 : Providing & fixing in position sign
board of standard size of 0.60mx0.45m with M.S
angle 40mmx40mmx6mm with 3mm thick iron plate
5.00 Job 3011.30 Thousand Eleven and
including fixing in 1:5:10 prop. Concrete block size
Thirty Paisa Only)
40cmx40cmx75 cm including painting existing data
on the board etc. complete as directed.
(Rupees One Thousand
Item No. 13 : Hiring JCB-4CX for Approach Road &
40.00 No. 1348.00 Three Hundred Forty
other allied misc. activites for Well Construction
(Rupees Thirty Nine Lakh Twenty Two Thousand Seven Hundred Fifty Six and Fifteen Paisa Only)
I/We am/are Willing to carry out the work at……………………………...…………………% above/below Percent(should be written in
figures and words) of the estimated rates mentioned above.Amount of my/our tender works out as under.
Estimated amount Put ter Rs.
Rs. Add…….% above Rs.
Net Rs.`` Net Rs.
In words…………………….. In words……………………..
*(Please strike out whichever is not applicable)
Note 1 All works shall be carried out as per Public Works Department Handbook and other specifications of Division or as directed.
GM\Wv! AW]\ H SFD AF\WSFD lJEFUGL 5]l:TSF VG[ l0lJhGGL ALÒ BF; lJUT D]HA VYJF ;}RGF 5|DF6[ SZL VF5JFG]\ ZC[X[P
Note-2 All the columns is Schedule should be filled in ink and the total of the entries in the last column should be struck by the contractor
under his signature.
GM\WvZ VG];}lRDF\ AWF BFGFGL lJUTM ;CLYL EZJL VG[ K[<,F BFGFGL GM\WMGM ;ZJF/M SZL S\8=FS8Z[ 5MTFGL ;CL SZJLP
Note-3 Rates quotes include clearance of site (prior commencement of work and at its close) in all respects and hold good for work under all
conditions, site, moisture, weather etc.
GM\Wv# 8F\S[,F NZDF\4 :Y/GL sSFDGF VFZ\E[ VG[ 5]~ YFI T[ JBT[f NZ[S ZLT[ ;FO;}OL SZJFGM ;DFJ[X YFI K[4 VG[ T[ NZ TDFD 5lZl:YlT4 :Y/4 E[H4 CJFDFG JU[Z[ C[9/ SFD
Note-4 To be continued on additional sheets, if found necessary.
GM\Wv$ H~Z H6FI JWFZFGF SFU/M HM0L RF,]\ ZFBJ]\P
cluded 1 % Labour Cess & shall be deducted from contractor all bills.
Deputy Executive Engineer, Executive Engineer,
Tribal Area Sub Division, Panchayat Irrigation Division,
Dharampur Valsad.
Signature of contractor
Package No :-05
Name of work : (1) construction of Community Well at village Chavra, Ta-Dharampur, Dist-valsad
(2) construction of Community Well at village Moti korval-1 , Ta-Dharampur, Dist-valsad
(3) construction of Community Well at village Tutarkhed (upla F.) , Ta-Dharampur, Dist-valsad
(4) construction of Community Well at village Nani kosbadi, Ta-Dharampur, Dist-valsad
(5) construction of Community Well at village Moti korval-2, Ta-Dharampur, Dist-valsad
CEMENT & STEEL CONSUMPTION
Sr. No. Item Cement Required
in CM consumption
1 Item No. 2 :Providingand laying Plain / Reinforced
cement concrete of cement, sand and metal (20mm to
25mm size) in following proportion laid in situ including
centering, shuttering, temping,smooth finishing,
curingetc. complete as directed for all leads and lifts
(Manually With Conventional Mixer (V)1:1.5:3
2 Item No. 3 :Providing and laying Plain / Rein forced
cement concrete of cement , sand and metal (20 mm to
25 mm size ) in following proportion laid in situ
18.00 4.40 Bags / CM
including centering , shuttering ,temping , smooth
finishing , curing etc. completes directed for alllead
sand lifts (Manually With Conventional Mixer)(iii)1:3:6
Deputy Executive Engineer
Tribal Area Sub Division,
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1.SBD Package-05.pdf
2.Schedule-B Well Package-05.pdf
3.Nivida No. 5 - 2026-27 - Well.pdf
4. ANEXURE-II.pdf
6.Bid Capacity.pdf
5.clause No 4.5.4 and 4.5.5.pdf
7.TYPICAL DWR.pdf
8.Nivda No. 05- 2026-27 Amedment-1.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].