| 1 | L1₹4.2 LAccepted-AOC | ₹4.2 L Quoted ₹4.4 L | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | Joby Abraham L1 |
|---|---|---|---|---|
| 1.00Rectification of damaged syphon pipe | ||||
| 1.00 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 150 | sqm | 10.19 ₹1,528.50 |
| 1.00 | 60.1.2:RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete. | 18 | metre | 1,560 ₹28,080 |
| 1.00 | 60.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete | 72 | hour | 501 ₹36,072 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 81 | cum | 283.3 ₹22,947.30 |
| 1.00 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 12.23 | cum | 4,040.18 ₹49,427.56 |
| 1.01 | OD38846/2025-2026:Removing damaged RCC hume pipe of dia 700 m.m from the site and stacking within 50 metres lead as per direction of Engineer - in - Charges including cost of all labour charges etc. complete | 15 | metre | 934 ₹14,010 |
| 1.01 | 19.6.8:Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 ( 1 cement : 2 fine sand) including testing of joints etc. complete:700 mm dia R.C.C. pipe | 15 | metre | 3,626 ₹54,390 |
| 1.01 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 4.72 | sqm | 424 ₹2,003.40 |
| 1.01 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 34.97 | sqm | 923.5 ₹32,290.18 |
Tender Value
₹4.0 L
EMD Value
₹10,038
Closing Date
2 Feb 2026, 10:00 amClosed
Assistant Executive Engineer
PVIP Sub Division No.4 Aluva
Urgent rectification works of damaged syphon pipe
2026_Irrig_828928_2
IRR/PII/TR/32/2026_5_1_1/1
Open Tender
Civil Works - Canal
180 days
Manjapetty aluva
Please refer Tender document
7 documents required · 7 mandatory
₹885
₹10,038
16 Apr 2026
27 Jan 2026
3 Feb 2026
27 Jan 2026
2 Feb 2026
27 Jan 2026
27 Jan 2026 - 2 Feb 2026
Rectification of damaged syphon pipe
2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
60.1.2:RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete.
60.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
OD38846/2025-2026:Removing damaged RCC hume pipe of dia 700 m.m from the site and stacking within 50 metres lead as per direction of Engineer - in - Charges including cost of all labour charges etc. complete
19.6.8:Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 ( 1 cement : 2 fine sand) including testing of joints etc. complete:700 mm dia R.C.C. pipe
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
OD38845/2025-2026:Engaging man mazdoor for removing blocks
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
OD38972/2025-2026:filling with quarry sand to fill the collapsed bottom of existing pipe bed including all cost of materials and conveyance charge etc and as per the direction of department officers at site
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1396336.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.04 MB
BOQ_1396336.xls
BOQ • 0.24 MB
nit.pdf
Tender Documents • 0.02 MB
sbd.pdf
Tender Documents • 1.78 MB
Download all tender documents and submit your bid