Loading…
Loading…
Tender Value
₹9.9 L
EMD Value
₹9,870
Closing Date
29 Jun 2026, 6:00 pm
Similar tender results from the same govt authority in the past 3 years.
Assistant Manager (South West Zone)
Providing and Supplying Menpower & Machinary for water logging removing work at diff locations during monsoon season in Bopal Ghuma area Of South West Zone.(Reinvite)
316204
05/2026-27
Open
Civil - All
Ahmedabad
3 documents required · 3 mandatory
₹900
Municipal Commissioner, Ahmedabad
₹9,870
20 Jun 2026
20 Jun 2026
20 Jun 2026
29 Jun 2026
20 Jun 2026
4 Estimated Cost put to tender Rs.
5 Earnest Money Deposit Rs. 9870.00 Demand Draft, Pay order, or Cheque ,Bank Guarantee (As
per finance circular no. 12 Dt.14/06/2021 in favour of Municipal
Commissioner, Ahmedabad) To be submitted as prescribed below.
Demand Draft or Bank Guarantee shall be from Nationalized Bank and
valid for 120 days.
6 (A) Security Deposit: 5% of Tender Amount
(B) Retention 2% of the value of work done will be deducted from each RA bill. It will be
released along with release of payment of Final Bill.
7 Tender fees Rs.900/- Demand Draft / Pay order in favour of Municipal Commissioner,
(Non refundable) Ahmedabad)
8 Submission of EMD and In separate sealed cover each for EMD and Tender Fees along with
Tender Fees Tender as described in the invitation of tender and submitted to Office of
Assistant Manager (South West Zone) Office, Late Shri Tushar Bhavan,
Near Shelby Hospital, Jodhpur, Ahmedabad-380015.
9 Tenders issue date Tenders from the website http://amc.nprocure.com & http://nprocure.com
shall be down loaded.
10 Last date of receiving Tenders. Dt. 29.06.2026 up to 18;00 hrs The tenders received after this date and
time will not be entertained under any circumstances.
11 Date of Opening Dt.30.06.2026 at 17;00 hrs to Assistant Manager "South West Zone
Office", Late Shri Tushar bhavan, Near Shelby Hospital, Jodhpur,
Ahmedabad-380015
12 Mode of sending the Tender Document shall be submitted in sealed envelope systems By RPAD/
Documents Speed post/ Hand Delivery/ Courier in sealed covers as described in
submission of the tender.
13 Terms, Condition, & Specification All general condition of contract of Form B1 condition of contract shall be
Conditional tenders will not be accepted. Municipal Commissioner reserves the rights to reject any or all the tenders without assigning any reasons thereof.
Contractor's Signature Addl. City Engineer
& Stamp (South West Zone)
ybœtJtœ BgwÂlÂmvj ftuvtuohuNl
bntldh muJtmœl - œrûtK vrùb Ítul
œrûtK vrùb Ítul Ítulj ytuVem,
MJ. ©e <w»tth œuNbwF CJl, NuÕce ntuMvexj vtmu, stu^vwh, ybœtJtœ-380015
œrûtK vrùb Ítul xuLzh ltuxem lk - 05/2026-27 btk ytJhe juJtguj ftbtule ÂJd<tu / Nh<tu:-
1. Wvhtuf< xuLzhtu su <u Jdobtk btLg hSMx[uNl ^htJ<t ftuLx[tfxh©eytuyu ChJt.
2. xuLzhle rlg< xuLzh Ve <&t R.yub.ze. ck^ fJhbtkk Wvh lt mhltbu ÁcÁ / hSMxh yu.ze./ MvezvtuMx/ fwhegh&e rlg< mbgbtk btufjJtlt hnuNu.
3. ftuLx[tfxh©eytuyu xuLzhle mt&u BGþrlrmvj btLg hSMx[uNlle/ dJobuLx hSMx[uNlle ftuve, (xuLzh ftuve <&t yLg vwhtJt mt&u) yawf mtbuj fhJtle hnuNu ylu fJh Wvh
xuLzh lkch <&t ftuLxufx lkch sYh MvÐ œNtoJJtltu hnuNu.ck^ fhJh Wvh xuLzh ltuxem lkch, xuLzh lkch, ftblwk ltb <&t, ftuLx[[tfxhle mkM&tlwk ltb <&t ftuLxufx lkc<
yJ~g œNtoJJtlt hnuNu. su ftuLx[tfxh©eytuyu hSMx[uNl heLgw fhtJuj l ntug <u ftuLx[tfxh©eyu xuLzh ChJt lnek.
4. ftuLx[tfxhtuyu xuuLzhbt cukfl wltb, Ft<t lkch, btRfh lkch ylu mhltb wMvÐ yûthtubtk jFJw.
5. xuLzh Ve vu ytuzoh / zebtLz z[tVx&e aqfJJtlehnuNu. œhuf xuLzh œeX yjd xuLzh xuLzhVe ChJtle hnuNu.
6. ytuAe hfble xuLzh Ve, R.yub.ze. fu xuLzh Ve, R.yub.ze. ÂJltlt xuLzhtu hœct<j (fuLmj) dKtNu.
7. xuLzh mt&u BþfJtbtk ytJ<e yluoMxble, xuLzhle hfblt 1% «btKu cukf duhLxe / zebtLz z[tVx / vu ytuzoh / jtufj btRfh auf&e s MJefthJtbtk ytJNu. œhuf xuLzh œeX yjd
R.yub.ze. ChJtle hnuNu. R.yub.ze. hfb Yt. yuf fhtuz mwDele ykœtS< hfblt ftb btxu htufzt, jtufj btRfh auf, rzbtLz z[tVx, vu ytuzoh fu cukf duhkxelt MJYvbtk <&t
Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb btxu R.yub.ze.le hfb btºt rzbtLz z[tVx, vu ytuzoh fu ckuf duhkxelt MJYvbtk ytvJtle hnuNu.
8. cukf duhuLxe btºt ybœtJtœ Nnuhle s MJefthJtbtk ytJNu.
9. xuLzh Ve <&t R.yub.ze.le hfblt ze.ze./ aufle vtA¤ ftuLx[tfxh©eyu vtu<tle mkM&tlwk ltb <&t btuctRj lkch yJ~g jFJtltu hnuNu.
10. Nh<e xuLzhtu hœ ct<j dKtNu.
11. stu xuLzhbtk MvÐ WÕjuF fhtguj ntug <tu atubtmtlu fthKu Ft<tfeg MËalt yLJgu ßgthu ßgthu ftb ck^ htFJtLþk &tg <u mbglu ftble BþÆ<btk bshu ytvJtbtk ytJNu. vhkðþ
yt yLJgu ftuE CtJ J^thtu ytvJtbtk ytJNu lne. sule ltuk^ xuLzhhu juJe.
12. xuuLzhtu ftuEvK fthK ytÃgt rmJtg MJefthJt fu lrnk MJefthJt <ule mkÃËKo m•tt BGþrlrmvj frbNlh©ele hnuNu.
13. xuLzhbtk stu ftuR mwDtht JDtht ntug <tu <u ykd xuLzh Ch<t vnujt AuÕju œJmu rlg< JucmtRx y&Jt fauheyu sYhe <vtm fhelu s xuLzh btufjJw.
14. mefgtuhexe zevtuÍex/ vVtuboLm duhuLxele hfb Yt. yuf fhtuz mwDele ykœtS< hfblt ftb btxu htufzt, jtufj btRfh auf, rzbtLz z[tVx, vu ytuzoh fu cukf duhkxelt MJYvbtk <&t
Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb btxu mefgtuhexe zevtuÍex/ vhVtuboLm duhkxele hfb btºt rzbtLz z[tVx, vu ytuzoh fu ckufduhkxelt MJYvbtk ytvJtle hnuNu.
15. ytuljtRl yul-«tufgwh JucmtRx vh&e ChJtlt &<t xuLzhbtk ftuLx[tfxh/ yusLmeyu xuLzhle ntzo ftuvebtk CtJ Cgto Jdhle mne mefft fhe mcbex fhJtle hnuNu. stu <ubtk
CtJ Chuj nNu <tu <uJt xuLzh hœ fhJtbtk ytJNu.
16. mœh xuLzhle ytRxbtult CtJtu ltKt Ft<t lt mhfgwjh lk.38, <t.21/11/22 <&t mûtb m•ttle b¤uj bkswhe bwsc GST rmJtg dKºtebtk juJtbt ytJuj <&t «Jo<btl
rlgb bwsc GST awfJJt vtºt &Nu su&e <btb cezomu <u bwsc dK<he fhe xuLzhtu ChJtlt hnuNu.
17. mœh xuLzh yk<od<lt ftb mkjøl y.Bgw.ftu.btk vJo<btl <btb rlgbtu/mhfgwjhtu jtdw vzNu <ubs JF<tu JF< <h mw^thtytu vK jtdw vzNu. sule ltuk^ jR xuLzhtu
zebtLz z[tVx / auf “BgwÂlÂmvj fÂb§h, ybœtJtœ” lt ltbltu fZtJJtu.
18. œrûtK vr©b Ítulltk Jtr»tof huRx xuLzhbtk bhtb<-rlCtJltk z[ulus, vtKe, htuz, rcÕz´dlt swœt swœt ftbtu <&t Mxu.f.X.lk.
<t.27.07.2012 &e JtÕbefe mbtsle bkz¤eytulu ytvJtbtk ytJ<t z[ulus zemeÕx´dlt ftbtu btxu ltdrhf yr^fth vºtfbtk sKtJuj mbg
bgtoœtbtk Vrhgtœltu rlftj fhJt <ubs muJtfeg ftbdehe mbg bgtoœtbtk vwKo &tg <u btxu R-dJolLm me.me.yth.yum. «tusufx
yk<od<<t.21.08.2021lt mh¾gwjh <&t mexe Rsluh Ft<w vrhvºt lk.2 <t. 07.10.2023 lt vrhvºt,Bgw.frb.©ele <theF
23.04.2026 le belexm ytuV bexekd ltk bwœTt lk.21 ylwkm^tlu z[tVx btk mtbuj vulÕxe Nh<tu xuLzhbtk htFJtle ylu <u bwsc le vulÕxe
JmwjJtle xuLzh Nh<tu leau bwsc Au.
1. me.me.yth.yum.btk ltuk^t<e Vrhgtœ Jtuzoltk Rsluh MxtV îtht ftuLx[tfxh/yusLmelu Jtuxmyuv/xujeVtulef btægb&e y&Jt YcY juFe<btk
Vrhgtœ ytvJtbtk ytJNu.mœh Vrhgtœle ftbdehe yum.yuj.yu. le mbg bgtoœtbtk fhJtle hnuNu.
2. ftbdehe vwKo > ctœ <ult Vtuxtud{tV,mxeoVefux ylu ftbdehe vwKo > le òK yum.yuj.yu. mbg bgtoœtbtk Jtuzolt MxtVlu fhJtle hnuNu.
3. stu ytvlu ytvuj Vrhgtœ yum.yuj.yu. mbg bgtoœtbtk vwKo lne &tg <tu yt mtbuj ftuÐf bwscle vulÕxe le hfb ytvltk cej btk&e
Jmwj fhJtbtk ytJNu.
4. ytvlu mtukvJtbtk ytJuj me.me.yth.yum. Vrhgtœtu ltu hevtuxo yXJtzef ^tuhKu rlg< Vtubuoxbtk «btKe< fhe Jtuzo yturVmu hsw fhJtltu
5. ftuLx[tfxh îtht yhsœth lu Vtul fgto ctœ mœh Vrhgtœ yLg Jtuzo fu yLg rzvtxobuLx fu y.Bgw.ftuvtuohuNl lt ftgoûtuºt btk l ytJ<e ntuR <ule
òK Jtuzo MxtVo lu <tðftrjf fhJtle hnuNu.
me.me.yth.yum Vrhgtœ mbg bgtoœt btk rlftj l &Jtlt mkstudtu btk fhJtle &<e 5uluÕxe le rJd< leau Bþsc Au.
Sr. Department Category Problem SLA Penalty per
No. one Problem
1 Engineering Water>>Engineering Inadequate water or low inflow 240
pressure - Eng Hours
2 Engineering Water>>Engineering Leakage In Pipe Line - Eng 48 Hours
3 Engineering Water>>Engineering Water quality-Polluted water - 24 Hours
4 Engineering Water>>Engineering No Water - Eng 240
5 Engineering Drainage>>Engineering Drain Blockage or Choking on 48 Hours
6 Engineering Drainage>>Engineering Overflowing of main line and 48 Hours
distribution line on road - Eng
7 Engineering Drainage>>Engineering No Drainage Manhole cover - 24 Hours
8 Engineering Drainage>>Engineering Frequent Breakdown & Blockage 96 Hours
9 Engineering Road Pot holes on the Road 24 Hours
10 Engineering Road Patch work Relaying of a portion 72 Hours
11 Engineering Road Deep Pit - Large settlement of 48 Hours
12 Engineering Road Removal of waste-Dust Lying on 72 Hours
both side of the road after re
13 Engineering Footpath Footpath Repairing Required 168
14 Engineering Public Building No Water Supply In A Public 24 Hours
15 Engineering Public Building Public Toilets and Urinals - 360
Repairing of Doors, Windows, Hours
Tiles or Sheets
16 Engineering Public Building Other Maintenance 168
17 Engineering Drainage>>Engineering Contractor Had not disposed off 48 Hours
the Manhole Silt Properly - Eng
18 Engineering Drainage>>Engineering Raising the Manhole Cover & 168
Catch Pit Up To the Road Level - Hours
19 Engineering Drainage>>Engineering Lowering the Manhole cover & 168
Catch pit - Eng Hours
20 Engineering Drainage>>Engineering Public Toilets and Urinals - 72 Hours
Drainage Line Blockage or
21 Engineering Drainage>>Engineering Public Toilets and Urinals - 168
Drainage Line Breakage Hours
22 Engineering Water>>Engineering Public Toilets and Urinals - Non- 168
Availability of Water/Cleaning of Hours
Water Tank/Broken Tank Cover
Contractor's Signature Addl. City Engineer
& Stamp (South West Zone)
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL CONDITION
1. Contractor shall produce the relevant registration certificate of AMC / State Govt /Central Govt.
2. Contractor shall register the work to labour commissioner as per labour act.
3. Contractor shall not sub-let the work without permission of the authority
4. Contractor should have sufficient skilled and unskilled laborers so that he shall start work at different sites simultaneously. Contractor's
having labour force available during festivals shall only apply. Contractor cannot stop the work due to non availability of labour force.
In case progress is delayed, contractor shall be penalized 0.10% of Tender amount per day for work done after time limit, maximum
up to 10% for remaining value of work.
6. Advance payment / machinery advance will not be paid.
7. Payment of running bill will be made as per recent A.M.C. policy in force.
8. No extra payment will be made due to increase of central / state Govt. Taxes.
9. If the work is not completed within time limit the penalty will be recovered from immediate bills of Contractors.
10. If the material i.e. MH cover C.C block etc. supplied from Municipal Corporation store then contractor shall not claim for any extra rate for non
execution of such item, partly/fully.
11. In the specifications, "as directed"/"Approved" shall be taken to mean, "as directed"/approved" by the Engineer-in-charge.
12. Wherever a reference to any Indian Standard appears in the specifications, it shall be taken to mean as a reference to the latest edition of the
same in force on the date of agreement.
13. In "Mode of Measurement" in the specifications wherever a dispute arises in the absence of specific mention of a particular point or aspect,
the provisions on these particular points, or aspects in the relevant Indian Standards shall be referred to.
14. All measurements and computations, unless otherwise specified, shall be carried out nearest to the following limits:
(i) Length, width and depth (height)------- 0.01 Meter. (RMT)
(ii) Areas -----0.01 Sq. Mt. (SMT)
(iii) Cubic Contents ------0.01 Cu.Mt. (CMT)
18. The distance, which constitutes lead, shall be determined along the shortest practical route and not necessarily the route actually taken. The
decision of the Engineer-in-charge in this regard shall be taken as final.
16. Where no lead is specified, it shall mean "all leads"
17. Lift shall be measured from plinth level.
18. Definite particulars covered in the items of work, through not mentioned or elucidated in it, specifications
shall be deemed to be included there in.
19. Reference to specifications of materials as made in the detailed specification of the items of work is in the form of a designation containing
the number of the specification of the material and prefix 'M' e.g. 'M-5'.
20. Approval to the samples of various materials given by the Engineer-in-charge shall not absolve the contractor from the responsibility of
replacing defective material brought on site or materials used in the work found defective at a later date.
21. The contract rate of the item of work shall be for the work completed in all respects.
22. No collection of materials shall be made before it is got approved from the Engineer-in-charge.
23. Collection of approved materials shall be done at site of work in a systematic manner. Materials shall be stone at site of work in a systematic
manner. Materials shall be stored in such a manner as to prevent damage, deterioration or intrusion of foreign matter and to-ensure the
preservation of their quality and fitness for the work.
24. Materials, if and when rejected by the Engineer-in-charge, shall be immediately removed from the site of work within 24 hours.
25. No materials shall be stored prior to, during and after execution shall be kept in sufficient numbers and in good working condition on the site
26. All works shall be carried out in workmanlike manners per the best techniques for the particular item.
27. All tools, templates, machinery and equipment for correct execution of the work as well as for checking lines, levels, alignment of the works
during execution shall be kept in sufficient numbers and in good working condition on the site of the work.
28. The mode, procedure and manner of execution shall be such that it does not cause damage or over loading of the various components of the
structure during execution or after completion of the structure.
29. All necessary safety measures and precaution (including those laid down in the various relevant Indian Standards) shall be taken to ensure
the safety of men, materials and machinery on the works as also of the work itself.
30. The testing charges of all materials shall be borne by the Contractor unless recovery at one percent towards testing charges is separately
31. The tenderer is required to check the web site for Addendum if any, before 48 hours of tender submission date and time. The tenderer who
quotes the tender without attaching the addendum will be rejected.
32. As per City Engineer’s circular no.-6/2011-12 Dt.24.6.2011 all terms & conditions will be applied.
33. Contractor has to follow Planning Department Circular No 10 Dt. 07/09/2018 strictly.
34. As per AMC’s Finance department circular no.38/ Dt.21/11/022 and approval of competent authority, rate of all the items are taken without
GST and prevailing GST will be payable.
35. All the relevant prevailing AMC circulars/ its time to time revisions are applicable for this work and all the bidders are bound to follow the
same, so the bidder must check before applying for the tender.
INSTRUCTION TO TENDERERS
TENDER VALIDITY PERIOD:
The tender shall be kept valid for acceptance for a period of One Hundred Twenty Calendar days (90) from opening of price bids.
SECURITY DEPOSIT
Within 10 days of receipt of Acceptance from the Corporation, the successful tender shall furnish to the Corporation Security Deposit of 5%
(Five percent) of the contract price Cheque or Bank Guarantee, pay order, or demand draft of Nationalized Banks and Schedule Banks only.
Contractor's Signature Addl. City Engineer
& Stamp (South West Zone)
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL SPECIFICATION
Time limit for the work shall be 12 Month after the order to start the works. Progress of work should be in proportion to time limit.
The contractor shall be remain responsible for Workmen’s compensation if any accident. The contractor shall arrange for barricading at night and arrangement of
Pagi at night to direct the traffic. He shall be responsible for any damage to public, If any incident happen, during the execution of work. In case of dispute for
unseen or overlooked items the decision of the Dy.City Engineer shall be final. The contractor shall have to give site clean of all rubbish during the work and at the
time of completion of work and hand over the site with final finishing of the work as directed. All the rejected materials shall be removed from site within 24 hours by
contractor at this risk and cost. Debris shall have to cart daily from site.
If any extra item crops up during the progress of work the same shall be carried out by the contractor and he shall be paid at the rate fixed by Add.C.E. as
per the rate analysis based on latest SOR or if item is not available in SOR than based on current market rates. In case of extra item decision of Add. City
Engg. shall remain final regarding rate.
If in the interest of the Corporation it is necessary to change either any site or the design of the propose work the contractor shall carry out the same at his
quoted rates without charges any extra and the contractor will have to carry out the works and he will be paid at the rate quoted by him. No claim for extra
rate for subsequent changes in site and design is entertained.
Octroi exemption passes shall not be given for any materials required for the work. Contractor will be fully responsible for compliance of the various
provisions under contract Act. 1970 and the Rules framed the to under.
The tender for the work shall remain open for a period (120) days from the date of opening of the tenders for this work and that the tenderer shall not be
allowed to withdraw on modify the offer on his own during the period. If any tenderer withdraw or makes any modifications or addition in the terms and
conditions of his tender not acceptable to the Municipal Corporation the Municipal Corporation shall without prejudice to any right or remedy be at liberty to
forfeit in full the said earnest money and black list the contractor.
If the work is not carried out within the specified time limit. from the date of order to start the work the penalty of Rs.- ( As per Form - B1) per day of delay
shall be recovered from the immediate bills payable to the contractor. Contractor has to make his own arrangement for procurement of steel and cement.
Contractors should note the following conditions carefully:-
i) Conditional tender shall not be accepted.
ii) All tenders are to be submitted in duplicate without which the tenders are liable to be rejected.
iii) In case of tender downloaded from website, tender fee & EMD should be submitted in form of demand draft or in cash.
iv) Condition of Form - B1 Standard Specification of material & code of practice will be applicable. Form B1 can be is available in website. Specification
shall be as per ' R& B Dept. - Govt. of Gujarat booklets of Building Works & and Road Works Specifications published by Gujarat Book Depot, Sector-
21. Gandhinagar.
Contractor's Signature Addl. City Engineer
& Stamp (South West Zone)
bu.Bgwrl. frb§h©e, ybœtJtœ Bgwrl. ftuvtuhuNllt mhfgwjh lk.-81, <t.26.02.2015 bwsc <btb «fthle fLmx[fNlle yufxeJexebtk bwÏg
ftuLx[tfxh, mc ftuLx[tfxhlt su bswhtu ftbdehe fh<t ntug <u <btb bswhtulwk dwsht< rcÕzekd yuLz y^h fLmx[fNl Jfombtk hSMx[uNl fhtJJwk VhSgt<
Contractor's Signature Addl. City Engineer
& Stamp (South West Zone)
DETAILS OF BANK ACCOUT
1 Contractor's name
3 Telephone/ mobile no.
4 Permanent account no. (PAN no.)
5 Name of the bank
6 Branch name and address
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
PERCENTAGE RATE TENDER AND CONTRACT FOR WORKS ADDITIONAL INSTRUCTIONS TO PERSONS TENDERING
1. Competency of Tendered: No contract will be awarded except to responsible bidder capable for performing the class of work completed. Before the
award of the contract, any bidder may be required to show that he has the necessary facilities, experience, ability and financial resources to perform
the work in satisfactory manner within the time stipulated. Contractor may be required to furnish the department with the statement as to their
experience and their financial status.
2. Tenderer will be deemed to have inspected the site and to have satisfied himself as to the nature of all works, all existing roads water - way and
other means of communication and access to and from the site of work and the building that may be required for temporary purpose in connection
with the construction, completion and maintenance fo the works and must make his own enquiries as to work yard, sites, depot and dumps and as
to the acquisition of such additional sites and areas as may be necessary for temporary purpose for constructing, completing and maintaining the
3. Payment: - The tenderer must understand clearly the rates quoted are for completed works and include all cost due to labour, scaffolding plant,
supervision, service work, power, royalties and octroi etc. and include all extras to cover the cost of night work if an when required. No claim for additional
payment beyond the prices or rates quoted will be entertained and the tender will not be entitled subsequently to make may claim on the ground of
misrepresentation or on the ground that he was supplied with information given by any person (whether the member is the employee of Engineering
Department of Corporation or not). Any failure on his part to obtain all necessary information for the purpose of making his tender and filling the several
prices and rates therein shall not relieve him from any risks or liabilities arising out o, or consequent upon the submission of the tender.
4. Tender Forms: - the tenderer must fill up every blank in the form of tender and in the schedule and he must return the documents sent here with.
5. Erasures: - Persons tendering are informed that no erasures of alternations by them in the text of the documents sent herewith will be allowed and any
such erasures or alternations will be disregarded. If there is any error in writing no over-writing should be done, the wrong words or a figure should be
struck out and the correct one written above or near it in unambiguous way, each correction should be initialed.
CONTRACTORS TO PLEASE READ THIS CAREFULLY
1. The rate for items must be given in words and figures. Amount of each item must also be entered in columns and the tenderer must strike out grand total
1. The rate for items must be given in words and figures. Amount of each item must also be entered in columns and the tenderer must strike out grand total
2. If the tender is taken in favor of the company, a power of attorney in favour of the person who may have signed the tender for the company must
accompany the tender.
3. Solvency Certificate of a Bank or a Revenue Officer of an amount upto 20% of the tendered cost plus the amount of works on hand still to be executed
will have to be reduced by the Contractor.
4. Challan for earnest money must accompany the tender. Tenderer may pay earnest money in the form of CROSSED Demand Draft in favour of the
Municipal Commissioner of Municipal Corporation, Ahmedabad. Earnest money in cash or by cheque shall not be accepted.
5. The Contractor shall have to furnish Income Tax Clearance Certificate before tender is accepted and intimate assessment number and ward under which
6. Copies of certificate as regards previous experience if any must accompany the tender.
7. Declaration showing all works on hand with the Contractor and the value of works that remain to be executed in each case must accompany tender.
8. All pages should be initial
9. The Contractor should initial all corrections, erasures and over writing.
10. Discrepancies and Adjustment of Errors: Any error in quantity or amount in schedule 'B' showing items of works to be carried out shall be adjusted in
accordance with the following rules :
(a) In the event of a discrepancy between description in words and figures quoted by a tenderer in the 'rates' column, the description in words shall
(b) In the event of an error occurring in the 'amount' column of the schedule 'B' showing items of work, as a result of wrong multiplication of the unit- rate
and quantity, the units - rate shall be regarded as firm and multiplication shall be amended on the basis of the rates.
(c) All errors in totaling in amount column and in carry forward totals shall be corrected.
(d) Any rounding off of amounts against 'items' or 'totals' shall be ignored.
11. (i) It any please be noted that tender will be considered as invalid especially, if the requirements as per instruction. No. 1 to 10 above is not complied with
before submitting the tender. Also please read carefully the face-sheet and General Rules and Directions for the guidance of Contractors of this form.
(ii) Right is reserved to reject any or all tender (s) without assigning any reason(s) thereof.
10A. The tender will be liable to be rejected out tight if the tenderer has filed in tender documents by ball pen instead in ink.
11. In addition to the above the tender will also be liable to be rejected outright if
(i) The tenderer proposes any alternation in the works specified or in the time allowed for carrying the work or any condition or correction made in any
code or mode of schedule 'B' or specifications.
(ii) Any of the page / pages of the tender is / are removed or replaced.
(iii) The tenderer does not initial all corrections, additions or pasted slips.
(iv) He makes any erasure in the tender. And
(v) The tenderer or in the case of a firm, each partner or the person holding the power of attorney there of does not sign or the signatures is / are not
attested by a witness the tender in the space provided for the purpose.
12. A certificate of registration as approved Contractor should be attached with the tender.
12A. In respect of the tenders from the Co-operative Society, a solvency, certificate of an amount equal to 20% of the amount of the work put to
tender will have to be produced along with the tender or a certificate regarding the borrowing capacity of the society issued by the Legal Assistant,
Directorate Cottage industries will have to be produced along with the tender.
13. (1) The several documents forming the contract are the essential parts of the contract a requirement occurring in one is as binding as though occurring in
all they are intended to be mutually explanatory and complementary and to described and provide for a complete work.
(2) In the event of any discrepancy, the several documents forming the contract or in any one document the following order or precedence should apply:
(a) Dimension and quantities: -
(i) Schedule 'B' of the tender form.
(ii) Specification.
On drawing, figured, dimensions, unless obviously, incorrect will be followed in
preference to scaled dimension.
(b) Description:
(i) Schedule 'B' of the tender form.
(ii) Specifications.
In case of defective description or ambiguity, the Engineer-in-Charge should issue further instructions directing in what manner the work is to be carried
out, it being understood that the best modern practice is to be followed. The Contractor should forthwith comply with such instructions.
14. The Contractor should take no advantage of any apparent error or omission in drawings or specifications and the Engineer-in-Charge shall make such
corrections and interpretations as necessary to fulfill the intent of the plants and specification.
15. All the materials to be used in the work may be from time to time subject to tests as per relevant I.S. as decided by the Engineer .
16. The board stating the detailed specifications and details of work as per Current circular of AMC/Government Circular No.TNC-1090-24-S, Dated 17-08-
2002, should be erected as directed on the site of work by the contractor without claiming extra for the same.
17. Action in case of disproportionate progress:
In case of extremely poor progress of the work or any item at any stage of work which in the opinion of the Engineer, cannot be made good by the
contractor considering his available resources, the Engineer will get it accelerated to make up the lost time through any other agency and recover the
additional cost incurred, if any, in getting the work done from the contractor after informing him in writing about the action envisaged by him. The action
may include blacklisting of the contractor based on the works and severity and decision of Municipal Commissioner shall be binding in this condition.
Contractor's Signature Addl. City Engineer
& Stamp (South West Zone)
Name of work: - Providing and Supplying Menpower & Machinary for water logging removing work at diff locations during monsoon season
in Bopal Ghuma area Of South West Zone.(Reinvite)
DECLARATION FORM
1. I/We hereby declare that I/We have visited the and fully acquainted myself / ourselves with the local regarding materials, labour and
other factors pertaining to the work before submitting this tender.
2. I/We hereby declare that I/We have carefully studied the conditions of contract, specification and other tender documents of this work
and agree to execute the same accordingly.
Signature of the Contractor
GENERAL RULES AND DIRECTION FOR THE GUIDANCE OF CONTRACTORS :
1. All works proposed to be executed by contract shall be notified in a form of invitation to tender pasted on a board hung up in the Addl.
City Engineer and signed by the Addl. City Engineer. This form will state the work to be carried out, as well as the date for submitting
and opening tenders and the time allowed for carrying out the work, also the amount of earnest money to be deposited with the tender
and the amount of the security deposit to be paid by the successful tenderer and the percentage, if any, to be ducted form bills, it will
also state whether a refund of quarry fees, royalties, octroi dues and ground-rent will he granted, copies of the specifications designs
and drawings and estimated rates, scheduled rates and any other documents required in connection with also be open for inspection
by Contractors at the office of the Addl. City Engineer during office hours. Where the works are proposed to be executed according to
the specifications recommended by a Contractor and approved by a competent authority on behalf of the Municipal Corporation such
specification with designs and drawings shall form part of the accepted tender.
2. In the event of the tender being submitted by a firm, it must be signed on his behalf by a person holding a power-of-attorney authorizing
3. Receipts for payments made on account of any work, when executed by firm, shall also be signed by all the partners, except where the
Contractors are described in their tender as a firm, in which case the receipt shall be signed in the name of the firm by one of the
partners or by some other person having authority to give effectual receipt for the firm.
4. Any person who submits a tender, shall fill up the usual printed form including the 'column' total according to estimated quantities,
stating at what rate he is willing to undertake each item of the work, Tenders which purpose any alteration in the works specified in the
said form of invitation to tender or in the time allowed for carrying out the work or which contain any other conditions of any sort, will
liable to rejection. No single tender include more than one work, but Contractors who wish to tender for two or more works, shall submit
a separate tender for each. Tenders. shall have the name and the number of the work (to which they refer) written outside the
5. The Addl. City Engineer or his duly authorized Assistant shall open tenders in the presence of any intending Contractors who have
submitted tenders or their representatives who may be present at the time and he will enter the amounts of the several tenders in a
comparative statement in a suitable form. In the event of a tender being accepted, the Contractor, shall thereupon for the purpose of
identification, sign copies of the specifications and other documents mentioned in this tender in the event of a tender being accepted
the contractor, shall thereupon for the purpose of indification, sign copies of the specifications and other documents mentioned in this
tender in the event of a tender being rejected, the Municipal Commissioner shall authorize the officer concerned to refund the amount
of the earnest money deposited to the Contractor making the tender on his giving a receipt for the return of the money.
6. The officer competent the dispose of the tenders shall have the right of rejecting all or any of the tenders.
7. No receipt for any payment alleged to have been made by a Contractor in regard to any matter relating to this tender or the contract
shall be valid and binding on Municipal Corporation unless it is signed by the Addl. City Engineer.
8. The memorandum of work to be tendered for any schedule of materials to the supplied by the Municipal Corporation and their rates
shall be filled in and completed by the office of the Addl. City Engineer before the tender form is issued. If a form issued to an intending
tenders has not been so filled in and completed, he shall request the said office to have this done before he completes and delivers his
9. All works shall be measured not be standard measure and according to the rules and customs of the Municipal Corporation without
reference to any local custom.
10. Under no circumstances shall any Contractor be entitled to claim enhanced rates for any item in this contract.
11. Every Contractor shall, unless exempted in writing by the Addl. City Engineer concerned, produce along with this tender, a solvency
certificate of his financial stability from the collector of the District within which he resides or a Bank's his certificate. If he fails to
produce such a certificate his tender will not be considered.
12. All corrections and additions or pasted slips should be initialed.
13. All measurement of work will be taken according to the usual method in use in the Municipal Corporation and as per I.S. code for
general practice and no proposals to adopt alternative methods will be accepted. The Addl. City Engineer's decision as to what is 'the
usual method in use in the Municipal Corporation' will be final.
14. The Contractor shall have to attach to his tender, Income-Tax Clearance certificate to be obtained from the Income-Tax Officer.
15. The Contractor will have to construct a shed for a storing controlled and valuable materials issued to him under schedule A' of the
agreement at work-site having double locking arrangement. The materials will then be taken for use in the presence of the
Departmental person. No. Material will be allowed to be removed form the site of work.
16. No foreign exchange will be released by the Department for the purpose of plant and machinery required for the execution of the work
contracted for.
17. Controlled materials (Essentially Certificate)
(i) As regards controlled materials, the Municipal Corporation will help to arrange for the permit as far as possible and help the
Contractor in securing the same. All incidental charges met with in procuring these materials shall be borne by the Contractor
himself. Though the Municipal Corporation will help to arrange for the permit as far as possible and help the Contractor in
obtaining materials, it shall not accept any responsibility for any delay or loss on account of delay caused to the contractor
while obtaining the same.
(ii) The contractor shall submit to. Addl. City Engineer on close of every calendar month, the monthly returns in the prescribed
forms as to the receipts and actual use of the controlled materials during the month.
(iii) The Contractor shall permit the Addl. City Engineer or his representatives to inspect the stock of the controlled materials stored
by him at any time whenever the Addl. City Engineer or his representative(s) so desire (s).
18. The tender for the work shall remain open for a period of (120 days) from the date of opening of the tenders for this work and the
tenderer shall not be allowed to withdraw of modify the offer on his own during this period. If any tenderer withdraws or marks any
modifications or additions in the terms and conditions of his tender, not acceptable to the Municipal Corporation, then Municipal
Corporation shall, without prejudice to any right or remedy, be at liberty to forfeit in full the said earnest money.
19. The Contractor shall employ only such labour that shall produce a valid certificate of having been vaccinated against small - pox within
a period of last three years.
TENDER FOR WORKS.
I/We hereby tender for the execution for the Municipal * In Figures as well in words.
Corporation of Ahmedabad (herein before and herein after
referred to as 'Corporation') of the work specified in the under
written memorandum within the time specified in such
memorandum at *
…………………………………... Percent below /
above the estimated rates specified schedule 'B'
(memorandum showing item of works to be carried out) and in
accordance in all respects with the specifications, designs,
drawings and instructions in writing referred to in this tender
and in Clause 13 of the annexed conditions of contract and
agree that when materials for the work are provided by
Corporation, such materials and the rates to be paid for them
shall be as provided in schedule 'A' hereto.
(a)General Description. Providing and Supplying (a) If several sub works are included the should
Menpower & Machinary for water logging be detailed in a separate list. The amount of
removing work at diff locations during monsoon earnest money to be deposited shall be in
season in Bopal Ghuma area Of South West accordance with instruction no.
Zone.(Reinvite)
(b) Estimate Cost: Rs.
(c) Earnest Money: 1% of the estimated amount of
tendered work. Rs.
(D) SECURITY DEPOSIT
(i) 5% of the contract value cost paid in cash if the contract value is less than Rs. 5000/-
(ii) (a) 1% of the estimated cost paid as earnest money along with the tender.
(b) Security Deposit is equal to 5% of the sectioned tender cost in form DD or Bank Guarantee.
(iii) Bank Guarantee from a Nationalized Bank or Bank approved by the Municipal Corporation for an amount equal to 5% of sectioned
Note – 1. All work shall be carried out as per Public Works Department Handbook and other specifications of Ahmedabad Municipal
Corporation or as directed.
Note – 2. Rates quoted include clearance of site (prior of commencement of work and at its close) in all respects and hold good for work under
all condition, site moisture weather etc
Contractor's Signature Addl. City Engineer
& Stamp (South West Zone)
SPECIFICATIONS OF MATERIALS
This section gives detail specifications for mainly used materials, for other materials refer Building Specifications.
For materials relevant specification of Building Specification shall apply.
TECHNICAL SPECIFICATIONS
NAME OF THE WORK:--Providing and Supplying Menpower&Machinary for water logging removing work at diff locations during
monsoon season in BopalGhuma area Of South West Zone.(A.R.C)
item no 1. Providing Labour for Mise. Work for Breakdown work releted job including required tools etc.comp.(Asper GWSSB SOR
2022-23, Basic Rate
+ PF + ESIC + Insurance+ GST+ tools+
item no 2. Providing and operation dewatering Pump including fuel charges & operator Charges etc. as directed etc. comp. (Shift for
Eight Hour) (For Each Pump Set, No payment should be allowed for non working condition of machinery )
item no 3. Hiring and operating Mud Pumps incl. Cost of fuel and operator including the cost of to and fro transportation, laying of the
delivery hoses as required, lowering and lifting the pumps as and when required etc. complete. Set Do As Directed. (No
payment should be allowed for non working condition of machinery )
item no 4. Hiring and operating the 20 KV 3 Phase Electric Generator for operating desilting machinery, and lighting and other
requirements with Arranging diesel to run the D.G. Set Do As Directed. 8 Hrs Shift. (No payment should be allowed for non
working condition of machinery )
item no 5. HiringCharges For J.C.B.MachineInclduing Cost Of
Fuel, Operator, Dirver Etc..
item no 6. Barricading the entire break down or excavated area on rental basis using wooden ballies / M.S.angles at
max. 2.00 meter centre to centre,
C.G.I. Sheet, reflective paint / Board out side to avoid accident & for smooth traffic diversion & movement
including cautionary board etc. Item also includes for making temporary sufficient nos of lighting arrangement
through out the work with necessary required arrangement. The same shall be removed after completion of work.
(Only for break down work from start to complete)
item no 7. Hiring of Tractor with trolley considering 8 Hrs. As working Day hours inclu. Driver (GWSSB SOR-2022- 23 Section-2E-
Miscellenous Item No.7)
item no 8. To provide chotahathi with all tools like bucket drum, showels, trikam, pavadas, etc,,to carryout different Work shall
be carried out as per the instrucitons of Engineer In-Charge.
I HAVE ALSO GONE THROUGH TECHNICAL SPECIFICATIONS FOR THE ITEMS (AS PER STANDARD P.W.D. TECHNICAL SPECIFICATION FOR THE
ITEMS AND ALSO I HAVE THE BOOK OF THE SAME) AND AGREE TO ABIDE BY THEM.
IN CASE OF WHERE IS NO TECHNICAL SPECIFICATION FOR THE ANY ITEMS AVAILABLE, SPECIFICATION GIVEN BY THE ENGINEER-IN-CHARGE
SHALL BE FOLLOWED AND FOR THE SAME I AGREE TO ABIDE BY THEM.
CONTRACTOR'S SIGNATURE Addl. City Engineer
& STAMP (SOUTH WEST ZONE)
Tender Notice No : 05 /2026-27 Tender No :
PRICE QUOTATION SHEET
Earnet Money Rs. : 9870.00 date of Submission of Tender : Dt. 29.06.2026, Time : 18:00 Hrs.
Tender Fee Rs. 900.00 Date of Opening of Tender : Dt. 30.06.2026, Time : 17:00 Hrs
Tender Class E2 or Above
Name of Work : : Providing and Supplying Menpower & Machinary for water logging removing work at diff locations
during monsoon season in Bopal Ghuma area Of South West Zone.(Reinvite)
Estimated Tender Amount Rs.9,87,00.00
I / We am / are willing to carry out work at _______________________________ % above / below* percent (should be written in figures and words) of the estimated cost, as
mentioned above. Amount of my / our tender works out for Rs. ______________________________________________ (in figures)
Note : * Please strike out above or below, whichever is not applicable.
Contractor's Signature Addl. City Engineer
& Stamp (South West Zone)
AHMEDABAD MUNICIPAL CORPORATION
MAHANAGAR SEVA SADAN - SOUTH WEST ZONE
Name of work:- Providing and Supplying Menpower & Machinary for water logging removing work at diff
locations during monsoon season in Bopal Ghuma area Of South West Zone.(Reinvite)
Sr. No. QTY Item Description Rate Per Amount
Providing Labour for Mice. Work for Breakdown
work releted job including required tools
etc.comp.(As per GWSSB SOR 2022-23, Basic Rate +
1 PF + ESIC + Insurance+ GST+ tools+
a 500.00 Unskilled Labour for 8 Hrs Shift 640.00 No
b 198.00 Skilled Labour for 8 Hrs Shift 656.00 No
Providing and operation dewatering Pump
including fuel charges & operator Charges etc. as
directed etc. comp. (Shift for Eight Hour) (For Each
Pump Set, No payment should be allowed for non
2 20.00 working condition of machinery ) 600.00 Shift
Hiring and operating Mud Pumps incl. Cost of fuel
and operator including the cost of to and fro
transportation, laying of the delivery hoses as
required, lowering and lifting the pumps as and
when required etc. complete. Set Do As Directed.
(No payment should be allowed for non working H.P/
3 4800.00 condition of machinery ) 16.00 Hr.
Hiring and operating the 20 KV 3 Phase Electric
Generator for operating desilting machinery, and
lighting and other requirements with Arranging
diesel to run the D.G. Set Do As Directed. 8 Hrs
Shift. (No payment should be allowed for non
4 30.00 working condition of machinery ) 2800.00 Shift
Hiring Charges For J.C.B.Machine Inclduing Cost Of
Fuel, Operator, Dirver Etc..
Barricading the entire break down or excavated
area on rental basis using wooden ballies /
M.S.angles at max. 2.00 meter centre to centre,
C.G.I. Sheet, reflective paint / Board out side to
avoid accident & for smooth traffic diversion &
movement including cautionary board etc. Item
also includes for making temporary sufficient nos
of lighting arrangement through out the work
with necessary required arrangement. The same
shall be removed after completion of work. (Only
6 48.8 for break down work from start to complete) 79.99 Rmt.
Hiring of Tractor with trolley considering 8 Hrs. As
7 100.00 working Day hours inclu. Driver (GWSSB SOR- 2104.09 Shift
2022- 23 Section-2E-Miscellenous Item No.7)
8 To provide chota hathi with all tools like bucket
drum, showels, trikam, pavadas, etc,,to carryout
different Work shall be carried out as per the
instrucitons of Engineer In-Charge. 1500.00 Shift
I/We am/are willing to carry out the work at % above/below % (should be written in
figures and words below/above the estimated rates mentioned above. Amount of
my/our tender works out as under:
1) % above / below is to be submitted online only.
2) All work shall be carried out as per the specifications or as
3)Rates quoted include cleaning of site (prior to commencement of
work and at its close) in all respects and hold formwork under all
conditions, site moisture, weather, etc
4) All the item rate are considering excluding cost of GST as per Government of
Gujarat Road And Building Dept. Reso. No. TNC/102022/457/C Dt.05/04/2022. So, bidder
shall be consider this change in BOQ
Contractor's Signature Addl. City Engineer
& Stamp (South West Zone)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Document 21.pdf
Ten 21 Abs.pdf
Download all tender documents and submit your bid