Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29,900Admitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹32,200+₹2,300 (7.69%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | Not Admitted-Fee/PreQual/Technical VILL NO1 BEHIND CELEBRATION MALL BHUWANA UDAIPUR RAJASTHAN 313001 | UDAIPUR | RAJASTHAN | 313001 | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received | |
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
| Sl No | Description | Qty | Unit | Rajkumar Khatik L2 | SK SURVEYOR AND CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Detail survey of site with total station including plane tables Survey of builtup area showing road level, boundary walls, electric poles, adjacent building/plot details, setback, other existing structures (temporary or permanent), sewer lines & septic tank, main plumbing lines, nalahs or drains waterbodies/waterlogging areas as may be required depending up on the site conditions/topography of the area including printout on required size paper in three copies & one soft copy of approved media Rate per Km. Builtupt area less than 10% | 1 | Per Km. | 8,000 ₹8,000 | 6,500 ₹6,500 Lowest |
| 2.00 | Detail survey of site with total station including plane tables Survey of builtup area showing road level, boundary walls, electric poles, adjacent building/plot details, setback, other existing structures (temporary or permanent), sewer lines & septic tank, main plumbing lines, nalahs or drains waterbodies/waterlogging areas as may be required depending up on the site conditions/topography of the area including printout on required size paper in three copies & one soft copy of approved media Rate per Hect. Builtupt area less than 10% | 1 | Per Hect. | 3,300 ₹3,300 Lowest | 3,300 ₹3,300 Lowest |
| 3.00 | Detail survey of site with total station including plane tables survey of builtup area showing road level, boundary walls, electric poles, adjacent building/plot details, setback, other existing structures (temporary or permanent), sewer lines & septic tank, main plumbing lines, nalahs or drains waterbodies/waterlogging areas as may be required depending up on the site conditions/topography of the area including printout on required size paper in three copies & one soft copy of approved media Rate per Hect. Builtupt area 10% to 50% | 1 | Per Hect. | 7,000 ₹7,000 | 6,500 ₹6,500 Lowest |
| 4.00 | Detail survey of site with total station including plane tables survey of builtup area showing road level, boundary walls, electric poles, adjacent building/plot details, setback, other existing structures (temporary or permanent), sewer lines & septic tank, main plumbing lines, nalahs or drains waterbodies/waterlogging areas as may be required depending up on the site conditions/topography of the area including printout on required size paper in three copies & one soft copy of approved media Rate per Hect. Builtupt area greater than 50% | 1 | Per Hect. | 13,000 ₹13,000 Lowest | 13,200 ₹13,200 |
| 5.00 | Construction block piller of municipal land as revenue map at linterval of 15.0 mtr of As required haring size0.60m x0.60m x 1.0m above ground level and foundation 0.75 x 0.75 x 0.45m in stone masonary in cm 1:6 and plater all the face 20 mm thick cm 1:6 including earth work finishing wall with premium acrylic smooth exterior paint base of water profing cement paint. Including Site Clearance | 1 | per nos | 900 ₹900 | 400 ₹400 Lowest |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
11 Dec 2025, 6:00 pmClosed
EO SAGWARA
NAGAR PALIKA SAGWARA
Survey work for land bank
2025_DLB_516519_1
3100
Open Tender
Survey and Investigation Services
Percentage
90 days
sagwara
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
EO SAGWARA
₹60,000
Yes
15 Dec 2025
2 Dec 2025
12 Dec 2025
2 Dec 2025
11 Dec 2025
2 Dec 2025
Amount
Detail survey of site with total station including plane tables Survey of builtup area showing road level, boundary walls, electric poles, adjacent building/plot details, setback, other existing structures (temporary or permanent), sewer lines & septic tank, main plumbing lines, nalahs or drains waterbodies/waterlogging areas as may be required depending up on the site conditions/topography of the area including printout on required size paper in three copies & one soft copy of approved media Rate per Km. Builtupt area less than 10%
Detail survey of site with total station including plane tables Survey of builtup area showing road level, boundary walls, electric poles, adjacent building/plot details, setback, other existing structures (temporary or permanent), sewer lines & septic tank, main plumbing lines, nalahs or drains waterbodies/waterlogging areas as may be required depending up on the site conditions/topography of the area including printout on required size paper in three copies & one soft copy of approved media Rate per Hect. Builtupt area less than 10%
Detail survey of site with total station including plane tables survey of builtup area showing road level, boundary walls, electric poles, adjacent building/plot details, setback, other existing structures (temporary or permanent), sewer lines & septic tank, main plumbing lines, nalahs or drains waterbodies/waterlogging areas as may be required depending up on the site conditions/topography of the area including printout on required size paper in three copies & one soft copy of approved media Rate per Hect. Builtupt area 10% to 50%
Detail survey of site with total station including plane tables survey of builtup area showing road level, boundary walls, electric poles, adjacent building/plot details, setback, other existing structures (temporary or permanent), sewer lines & septic tank, main plumbing lines, nalahs or drains waterbodies/waterlogging areas as may be required depending up on the site conditions/topography of the area including printout on required size paper in three copies & one soft copy of approved media Rate per Hect. Builtupt area greater than 50%
Construction block piller of municipal land as revenue map at linterval of 15.0 mtr of As required haring size0.60m x0.60m x 1.0m above ground level and foundation 0.75 x 0.75 x 0.45m in stone masonary in cm 1:6 and plater all the face 20 mm thick cm 1:6 including earth work finishing wall with premium acrylic smooth exterior paint base of water profing cement paint. Including Site Clearance
Rajkumar Khatik (BID ID -3392878)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.06 MB
BOQ_921695.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .