Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAccepted-AOC | ₹2.8 L | L1 | Accepted-AOC 1st Lowest |
| 2 | L2₹2.8 L+₹168 (0.06%)Rejected-AOC ASTANA ROAD BASIRHAT DIST NORTH 24 PARGANAS | BASIRHAT | NORTH 24 PARGANAS | WEST BENGAL | ₹2.8 L+₹168 (0.06%) | L2 | Rejected-AOC 2nd Lowest |
| 3 | L3₹2.8 L+₹223 (0.08%)Rejected-AOC VILL CHAMPALI P O NURPUR P S MINAKHAN NORTH 24 PARGANAS | NORTH 24 PARGANAS | WEST BENGAL | ₹2.8 L+₹223 (0.08%) | L3 | Rejected-AOC 3rd Lowest |
| 4 | Rejected-Technical | - | - | Rejected-Technical Due to no similar nature of work |
Tender Value
₹2.8 L
EMD Value
₹5,577
Closing Date
28 Jul 2026, 5:00 pmClosed
EE/BID
Office of the Executive Engineer Basirhat Irrigation Division Postal address Dhaltitha with Telephone No. Fax No. 03217 265258
Emergent Restoration of Sundarban Embankment for the of length of 100 metre along R/B of Ichamati river Near H/O Rabindranath Halder Mouza-Hingalganj in Block-Hingalganj under Hingalganj (I) Sub-Division of Basirhat Irrigation Division, District- Nor
2026_IWD_1033982_1
e SNIT No. -WBIW/EE/BID/e-SNIT- 05 of 2026-27
Open Tender
CIVIL WORKS
Percentage
7 days
Mouza- Hingalganj
Please refer Tender documents.
5 documents required · 5 mandatory
₹5,577
14 Aug 2026
24 Jul 2026
30 Jul 2026
24 Jul 2026
28 Jul 2026
24 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying, dressing and stacking at site bamboo pins above 5 cm. diameter and upto 7.5 cm. diameter.(Dia. to be measured at mid length). | - | Metre | 34.56 | - |
| 2 | Driving bamboo pins in standing or flowing water including scaffolding and driving appliances. (a) Where boats are not necessary. | - | Metre | 13.11 | - |
| 3 | Supplying, fitting and fixing with iron nails half split bamboo wailing pieces (av. dia. of bamboo not less than 5.0 cm.) | - | Metre | 26.22 | - |
| 4 | Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg). | - | Each Bag | 7.15 | - |
| 5 | Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates (stone / brick) and sewing as done in case of cement bags ,(tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of Engr-in-charge(cost is excluding the cost of any types of filling materials). NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/ bag. | - | Each Bag | 8.34 | - |
| 6 | Dumping in position earth / sand filled gunny / poly bags (capacity 50 kg) within a lead of 30 metre inclusive of all lifts. | - | Each Bag | 3.58 | - |
| 7 | Earth work from borrow pits over existing embankment or for repairs to embankment, closing breaches etc. within an initial lead of 30 metre and lift of 1.50 metre including breaking clods and depositing the same in layers not exceeding 25 cm. and rough dressing etc. complete as per profile. | - | Cum | 96.54 | - |
| 8 | Supplying fitting, fixing Darma mat in flowing or stagnant water or in dry areas with 16 SWG GI wire as per direction of the Engineerr-in-charge.A) Where boats are not necessary | - | Sqm | 203.8 | - |
| 9 | Supplying and laying Polythene Sheet (150gm/sq.m) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. | - | Sqm | 28.6 | - |
| 10 | Earthwork supplied by boat within a lead of 8.0 KM & all lifts for making embankments or for repairs to embankments, closing breaches or for any other purposes including loading, transporting, unloading and spreading in layers of 25 cms as per profile, all lifts bothways and head load including breaking clods, rough dressing ramming etc. complete as per direction of Engineer-in-charge.(measurement will be made on the basis of pre-work & post-work section / stack measurement with due allowance of shrinkage). No extra payment will be made for stacking. | - | Cum | 343.24 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
BOQ_2539424.xls
BOQ • 0.34 MB
2911.pdf
Tender Documents • 0.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .