| 1 | L1₹13.5 CrAdmitted-Finance | ₹13.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹13.8 CrAdmitted-Finance | ₹13.8 Cr | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | J.R.G CONSTRUCTIONS L2 | A.K. ENGINEERS & CONTRACTORS PVT. LTD. L1 |
|---|---|---|---|---|---|
| 1.01 | DESIGN AND CONSTRUCTION OF 120 M LONG (2 SPANS OF 60 M EACH) MAJOR PMT PSC BOX GIRDER BRIDGE (OPEN FOUNDATION FOR ABUTMENTS & WELL FOUNDATION FOR PIER) INCLUDING SSI OVER SUKHA NALLAH AT KM 46.00 ON ROAD BASOLI-BANI-BHADARWAH OVER ALREADY CONSTRUCTED ABUTMENTS AND PARTIALLY CONSTRUCTED INTERMEDIATE PIER UNDER 69RCC / 13BRTF / PROJECT SAMPARK IN THE STATE OF J&K as per approved GAD and other approved design and drawings including proof checking of design and drawings from IIT based on Special conditions, Particular specifications, NIT of the tender document including load testing of super structure as specified, all preparatory works, POT & POT cum PTFE bearings, construction of balance part of substructure and PSC superstructure including design and approval of superstructure drawing, launching/erection of staging work if required, Wearing coat having non-skid surface, strip seal expansion joints, RCC hand railings, Kerbs, RCC crash barrier, guard posts, drainage arrangement over carriage way and footpath, approach slab, dirt wall, return walls, wing walls, service arrangement for utilities, painting with non-corrosive paint (The painting will be done with cold galvanized painting popularly known as zinga coating painting as per fifth revision of MoRT&H specifications) for roads and bridge works to all exposed steel works and kerbs, testing of the superstructure as specified, protective works, temporary river training works and diversions, 1.5 mtr wide foot path both sides and all other items of works required and necessary for complete construction of bridge including curing of all concrete works all as directed by the Deptt. | 69.36 | Mtr | 19,85,950 ₹13.8 Cr | 19,44,000 ₹13.5 Cr |
Tender Value
₹5.4 Cr
EMD Value
₹5.9 L
Closing Date
5 May 2026, 11:00 amClosed
Chief Engineer Project Sampark
HQ CE (P) Sampark, near peer baba, Kunjwani, Jammu,180010
DESIGN AND CONSTRUCTION OF 120 M LONG (2 SPANS OF 60 M EACH) MAJOR PMT PSC BOX GIRDER BRIDGE (OPEN FDN FOR ABUTMENTS AND WELL FDN FOR PIER) INCLUDING SSI OVER SUKHA NALLAH AT KM 46.00 ON ROAD BASOLI-BANI-BHADARWAH UNDER 69RCC/13BRTF/PROJECT SAMPARK
2026_BRO_760313_1
CE (P) SPK/01/2026-27
Open Tender
Civil Works
540 days
AT KM 46.00 ON ROAD BASOLI-BANI-BHADARWAH
As per Tender Document
9 documents required · 9 mandatory
₹0
₹5.9 L
Yes
HQ CE (P) Sampark, near peer baba, Kunjwani, Jammu
8 May 2026
14 Apr 2026
6 May 2026
14 Apr 2026
5 May 2026
21 Apr 2026
15 Apr 2026 - 18 Apr 2026
20 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
DESIGN AND CONSTRUCTION OF 120 M LONG (2 SPANS OF 60 M EACH) MAJOR PMT PSC BOX GIRDER BRIDGE (OPEN FOUNDATION FOR ABUTMENTS & WELL FOUNDATION FOR PIER) INCLUDING SSI OVER SUKHA NALLAH AT KM 46.00 ON ROAD BASOLI-BANI-BHADARWAH OVER ALREADY CONSTRUCTED ABUTMENTS AND PARTIALLY CONSTRUCTED INTERMEDIATE PIER UNDER 69RCC / 13BRTF / PROJECT SAMPARK IN THE STATE OF J&K as per approved GAD and other approved design and drawings including proof checking of design and drawings from IIT based on Special conditions, Particular specifications, NIT of the tender document including load testing of super structure as specified, all preparatory works, POT & POT cum PTFE bearings, construction of balance part of substructure and PSC superstructure including design and approval of superstructure drawing, launching/erection of staging work if required, Wearing coat having non-skid surface, strip seal expansion joints, RCC hand railings, Kerbs, RCC crash barrier, guard posts, drainage arrangement over carriage way and footpath, approach slab, dirt wall, return walls, wing walls, service arrangement for utilities, painting with non-corrosive paint (The painting will be done with cold galvanized painting popularly known as zinga coating painting as per fifth revision of MoRT&H specifications) for roads and bridge works to all exposed steel works and kerbs, testing of the superstructure as specified, protective works, temporary river training works and diversions, 1.5 mtr wide foot path both sides and all other items of works required and necessary for complete construction of bridge including curing of all concrete works all as directed by the Deptt. | - | Mtr | - | - | item3 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.14 MB
TenderSukhaBal.pdf
Tender Documents • 5.99 MB
BOQ_851633.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid