Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
1 Jul 2026, 6:00 pm7d left
Similar tender results from the same govt authority in the past 3 years.
Superintending Engineer, Project Implementation Unit, Health & Family Welfare Department.
A.R.C. year 2026-27 for civil works for various health care facilities in Ta-Veraval,Ta-Sutrapada & Ta-Talala, Dist.Girsomnath.
314434
2026-27/34/05
Open
Civil Works
Gandhinagar
1 document required · 1 mandatory
₹2,400
PIU-General Fund A/c 11-114
₹1 L
15 Jun 2026
15 Jun 2026
15 Jun 2026
1 Jul 2026
15 Jun 2026
NAME OF WORK : A.R.C. year 2026-27 for civil works for various health care facilities in Ta-Veraval,Ta-Sutrapada & Ta-Talala, Dist.Girsomnath.
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1 C001 Cariage of GSW pipe lead 100mm (upto 10 ton) Rmt 1.66 Rupee One and Sixty Six Paise Only
2 C001A Cariage of GSW pipe lead 100mm (more than 10 ton)
Rmt 1.66 Rupee One and Sixty Six Paise Only
3 C002 Cariage of GSW pipe lead 125mm (upto 10 ton) Rmt 2.47 Rupees Two and Forty Seven Paise Only
4 C002A Cariage of GSW pipe lead 125mm (more than 10 ton)
Rmt 2.47 Rupees Two and Forty Seven Paise Only
5 C003 Cariage of GSW pipe lead 150mm (upto 10 ton) Rmt 3.30 Rupees Three and Thirty Paise Only
6 C003A Cariage of GSW pipe lead 150mm (more than 10 ton)
Rmt 3.30 Rupees Three and Thirty Paise Only
7 C004 Cariage of GSW pipe lead 200mm (upto 10 ton) Rmt 3.30 Rupees Three and Thirty Paise Only
8 C004A Cariage of GSW pipe lead 200mm (more than 10 ton)
Rmt 3.30 Rupees Three and Thirty Paise Only
9 C005 Cariage of RCC pipe lead 250mm (upto 10 ton) Rmt 13.25 Rupees Thirteen and Twenty Five Paise Only
10 C005A Cariage of RCC pipe lead 250mm (more than 10 ton)
Rmt 13.25 Rupees Thirteen and Twenty Five Paise Only
11 C006 Cariage of RCC pipe lead 300mm (upto 10 ton) Rmt 15.91 Rupees Fifteen and Ninety One Paise Only
12 C006A Cariage of RCC pipe lead 300mm (more than 10 ton)
Rmt 15.91 Rupees Fifteen and Ninety One Paise Only
13 C007 Cariage of RCC pipe lead 350 to 400 mm (upto 10 ton) Rmt
Rupees Twenty Four and Eighty Five Paise
14 C007A Cariage of RCC pipe lead 350 to 400 mm (more than 10 ton) Rupees Twenty Four and Eighty Five Paise
15 C008 Cariage of RCC pipe lead 450 to 500 mm (upto 10 ton) Rmt 36.15 Rupees Thirty Six and Fifteen Paise Only
16 C008A Cariage of RCC pipe lead 450 to 500 mm (more than 10 ton)
Rmt 36.15 Rupees Thirty Six and Fifteen Paise Only
17 C009 Cariage of RCC pipe lead 600 700 & 750 mm (upto 10 ton) Rmt
Rupees Sixty Six and Twenty Seven Paise
18 C009A Cariage of RCC pipe lead 600 700 & 750 mm (more than 10 ton) Rupees Sixty Six and Twenty Seven Paise
19 C010 Cariage of RCC pipe lead 900 to 1200mm (upto 10 ton) Rmt
Rupees Ninety Nine and Thirty Nine Paise
20 C010A Cariage of RCC pipe lead 900 to 1200mm (more than 10 ton) Rupees Ninety Nine and Thirty Nine Paise
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
21 C011 Carriage Hoops Iron (upto 10 ton) MT
Rupees One Hundred Ninety Two and Fifty
Nine Paise Only
22 C011A Carriage Hoops Iron (more than 10 ton) Rupees One Hundred Ninety Two and Fifty
MT 192.59 Nine Paise Only
23 C012 Carriage of Asbestos Sheet (upto 10 ton) MT
Rupees Two Hundred Twenty Two and Sixty
24 C012A Carriage of Asbestos Sheet (more than 10 ton) Rupees One Hundred Seventy One and Forty
MT 171.44 Four Paise Only
25 C013 Carriage of Bitumen (upto 10 ton) MT
Rupees One Hundred Seventy Five and
Twenty Two Paise Only
26 C013A Carriage of Bitumen (more than 10 ton) Rupees One Hundred Seventy Five and
MT 175.22 Twenty Two Paise Only
27 C014 Carriage of Bricks (upto 10 ton) 1000 Each
Rupees One Hundred Ninety Seven and
Eighty Two Paise Only
28 C014A Carriage of Bricks (more than 10 ton) Rupees One Hundred Ninety Seven and
1000 Each 197.82 Eighty Two Paise Only
29 C015 Carriage of brick bats chhara (upto 10 ton) cu.m.
Rupees One Hundred Ninety Seven and
Eighty Two Paise Only
30 C015A Carriage of brick bats chhara (more than 10 ton) Rupees One Hundred Ninety Seven and
cu.m. 197.82 Eighty Two Paise Only
31 C016 Carriage of Brick aggregate 40mm size (upto 10 ton) cu.m.
Rupees One Hundred Ninety Seven and
Eighty Two Paise Only
32 C016A Carriage of Brick aggregate 40mm size (more than 10 ton) Rupees One Hundred Ninety Seven and
cu.m. 197.82 Eighty Two Paise Only
33 C017 Carriage of C.I. Grating (upto 10 ton) Each 2.87 Rupees Two and Eighty Seven Paise Only
34 C017A Carriage of C.I. Grating (more than 10 ton)
Each 2.87 Rupees Two and Eighty Seven Paise Only
35 C018 Carriage of chips agg. (upto 10 ton) cu.m.
Rupees Ninety Eight and Ninety One Paise
36 C018A Carriage of chips agg. (more than 10 ton) Rupees Ninety Eight and Ninety One Paise
cu.m. 98.91 Only
37 C019 Carriage of Cement (upto 10 ton) MT 71.70 Rupees Seventy One and Seventy Paise Only
38 C019A Carriage of Cement (more than 10 ton)
MT 71.70 Rupees Seventy One and Seventy Paise Only
39 C020 Carriage of CI cover and frame (upto 10 ton) Each
Rupees Twenty Eight and Seventy Four Paise
40 C020A Carriage of CI cover and frame (more than 10 ton) Rupees Twenty Eight and Seventy Four Paise
Each 28.74 Only
41 C021 Carriage of CI cover without frame (upto 10 ton) each 13.94 Rupees Thirteen and Ninety Four Paise Only
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
42 C021A Carriage of CI cover without frame (more than 10 ton)
each 13.94 Rupees Thirteen and Ninety Four Paise Only
43 C022 Carriage of Coarse Sand (upto 10 ton) cu.m. 45.53 Rupees Forty Five and Fifty Three Paise Only
44 C022A Carriage of Coarse Sand (more than 10 ton)
cu.m. 45.53 Rupees Forty Five and Fifty Three Paise Only
100 C023 Carriage of concrete block (39cm x 20cm x 19cm) (upto 10 ton) 100 Each 71.70 Rupees Seventy One and Seventy Paise Only
101 C023A Carriage of concrete block (39cm x 20cm x 19cm) (more than 10 ton)
100 Each 71.70 Rupees Seventy One and Seventy Paise Only
102 C024 Carriage of Earth. 0.5km. (upto 10 ton) cu.m. 4.52 Rupees Four and Fifty Two Paise Only
103 C024A Carriage of Earth. 0.5km. (more than 10 ton)
cu.m. 4.52 Rupees Four and Fifty Two Paise Only
104 C025 Carriage of Earth. 1km. (upto 10 ton) cu.m. 8.61 Rupees Eight and Sixty One Paise Only
105 C025A Carriage of Earth. 1km. (more than 10 ton)
cu.m. 8.61 Rupees Eight and Sixty One Paise Only
106 C026 Carriage of Earth. 2km. (upto 10 ton) cu.m. 16.37 Rupees Sixteen and Thirty Seven Paise Only
107 C026A Carriage of Earth. 2km. (more than 10 ton)
cu.m. 16.37 Rupees Sixteen and Thirty Seven Paise Only
108 C027 Carriage of Earth. 3km. (upto 10 ton) cu.m. 23.90 Rupees Twenty Three and Ninety Paise Only
109 C027A Carriage of Earth. 3km. (more than 10 ton)
cu.m. 23.90 Rupees Twenty Three and Ninety Paise Only
110 C028 Carriage of Fine Sand (upto 10 ton) cu.m. 45.53 Rupees Forty Five and Fifty Three Paise Only
111 C028A Carriage of Fine Sand (more than 10 ton)
cu.m. 45.53 Rupees Forty Five and Fifty Three Paise Only
112 C029 Carriage of Marble (upto 10 ton) cu.m.
Rupees Ninety Eight and Ninety One Paise
113 C029A Carriage of Marble (more than 10 ton) Rupees Ninety Eight and Ninety One Paise
cu.m. 98.91 Only
114 C030 Carriage of Marble Chips (upto 10 ton) cu.m.
Rupees Ninety Eight and Ninety One Paise
115 C030A Carriage of Marble Chips (more than 10 ton) Rupees Ninety Eight and Ninety One Paise
cu.m. 98.91 Only
116 C031 Carriage of Murrum (upto 10 ton) cu.m. 45.53 Rupees Forty Five and Fifty Three Paise Only
117 C031A Carriage of Murrum (more than 10 ton)
cu.m. 45.53 Rupees Forty Five and Fifty Three Paise Only
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
118 C032 Carriage of Rubble (upto 10 ton) cu.m.
Rupees One Hundred Thirty Nine and Sixty
119 C032A Carriage of Rubble (more than 10 ton) Rupees One Hundred Thirty Nine and Sixty
cu.m. 139.62 Two Paise Only
120 C033 Carriage of Precast slabs (concrete) (upto 10 ton) cu.m. 71.70 Rupees Seventy One and Seventy Paise Only
121 C033A Carriage of Precast slabs (concrete) (more than 10 ton)
cu.m. 71.70 Rupees Seventy One and Seventy Paise Only
122 C034 Carriage of Quarry Spall (upto 10 ton) cu.m.
Rupees Ninety Eight and Ninety One Paise
123 C034A Carriage of Quarry Spall (more than 10 ton) Rupees Ninety Eight and Ninety One Paise
cu.m. 98.91 Only
124 C035 Carriage of Steam Coal (upto 10 ton) MT
Rupees Ninety Eight and Ninety One Paise
125 C035A Carriage of Steam Coal (more than 10 ton) Rupees Ninety Eight and Ninety One Paise
126 C036 Carriage of Steel (upto 10 ton) MT
Rupees One Hundred Twenty Seven and
Twenty Five Paise Only
127 C036A Carriage of Steel (more than 10 ton) Rupees One Hundred Twenty Seven and
MT 127.25 Twenty Five Paise Only
128 C037 Carriage of Hand Broken Stone agg. 40 to 63mm (upto 10 ton) cu.m.
Rupees One Hundred Eighteen and Forty
Eight Paise Only
129 C037A Carriage of Hand Broken Stone agg. 40 to 63mm (more than 10 ton) Rupees One Hundred Eighteen and Forty
cu.m. 118.48 Eight Paise Only
130 C038 Carriage of Brick agg. 20mm size (upto 10 ton) cu.m. 71.70 Rupees Seventy One and Seventy Paise Only
131 C038A Carriage of Brick agg. 20mm size (more than 10 ton)
cu.m. 71.70 Rupees Seventy One and Seventy Paise Only
132 C039 Carriage of Stone Aggregate 20mm size (upto 10 ton) cu.m.
Rupees One Hundred Six and Eighty Two
133 C039A Carriage of Stone Aggregate 20mm size (more than 10 ton) Rupees One Hundred Six and Eighty Two
cu.m. 106.82 Paise Only
134 C040 Carriage of Stone Aggregate 40mm size (upto 10 ton) cu.m.
Rupees One Hundred Eighteen and Forty
Eight Paise Only
135 C040A Carriage of Stone Aggregate 40mm size (more than 10 ton) Rupees One Hundred Eighteen and Forty
cu.m. 118.48 Eight Paise Only
136 C041 Carriage of tiles (upto 10 ton) 1000 Each 60.56 Rupees Sixty and Fifty Six Paise Only
137 C041A Carriage of tiles (more than 10 ton)
1000 Each 60.56 Rupees Sixty and Fifty Six Paise Only
138 C042 Carriage of Timber (upto 10 ton) cu.m. 30.28 Rupees Thirty and Twenty Eight Paise Only
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
139 C042A Carriage of Timber (more than 10 ton)
cu.m. 30.28 Rupees Thirty and Twenty Eight Paise Only
140 C043 Carriage of Unslaked Lime (upto 10 ton) cu.m. 30.28 Rupees Thirty and Twenty Eight Paise Only
141 C043A Carriage of Unslaked Lime (more than 10 ton)
cu.m. 30.28 Rupees Thirty and Twenty Eight Paise Only
142 C044 Carriage Of Tube Tonne
Rupees One Hundred Seventy Five and
Twenty Two Paise Only
143 C053 Carriage of Galvenized MS Tubes upto 50mm dia (upto 10 ton) Each 31.80 Rupees Thirty One and Eighty Paise Only
144 C053A Carriage of Galvenized MS Tubes upto 50mm dia (more than 10 ton)
Each 31.80 Rupees Thirty One and Eighty Paise Only
145 C054 Carriage of sheets GI/MS (upto 10 ton) MT 31.80 Rupees Thirty One and Eighty Paise Only
146 C054A Carriage of sheets GI/MS (more than 10 ton)
MT 31.80 Rupees Thirty One and Eighty Paise Only
147 C055 Carriage of Stone Aggregate 6mm size (upto 10 ton) cu.m.
Rupees One Hundred Six and Eighty Two
148 C055A Carriage of Stone Aggregate 6mm size (more than 10 ton) Rupees One Hundred Six and Eighty Two
cu.m. 106.82 Paise Only
149 C062 Carriage of Stone (upto 10 ton) cu.m.
Rupees One Hundred Six and Eighty Two
150 C062A Carriage of Stone (more than 10 ton) Rupees One Hundred Six and Eighty Two
cu.m. 106.82 Paise Only
151 C063 Carraige of concrete panels Cmt. 71.70 Rupees Seventy One and Seventy Paise Only
152 E001 Extra for 40mm thick shutters instead of 35mm thick L.S 60.60 Rupees Sixty and Sixty Paise Only
153 E002 Less for 25mm thick shutters instead of 35mm thick L.S 50.50 Rupees Fifty and Fifty Paise Only
154 E003 Extra for Labour Charges for Hot Mix Plant L.S
Rupees Four Hundred One and Ninety Eight
155 E004 Extra for Carriage of Stone L.S 2.49 Rupees Two and Forty Nine Paise Only
156 E005 Extra for Scaffolding L.S 2.49 Rupees Two and Forty Nine Paise Only
157 E006 Extra for Blasting Powder L.S
Rupees Three Hundred Sixty Eight and Sixty
Five Paise Only
158 E007 Extra Labour for Sinking And Chiselling L.S
Rupees Nine Hundred Seventy Nine and
Seventy Paise Only
159 E008 Extra for knetledge block of CC 1:3:6 and labour for loading L.S
Rupees Seven Hundred Forty Eight and Forty
160 E009 Extra for Cover blocks L.S
Rupees Twenty One and Twenty One Paise
161 E010 Extra for Labour charges for cutting, Bending and welding L.S 10.10 Rupees Ten and Ten Paise Only
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
162 E011 Extra for controlled Concrete L.S
Rupees Four Hundred Ninety Four and
Ninety Paise Only
163 E012 Extra cost of centering and shuttering L.S
Rupees Two Hundred Thirty Two and Thirty
164 E013 Extra Cost of Hire Charges for Mech. Mixer L.S
Rupees Fifty Three and Forty Three Paise
165 E014 Extra for Cement Mortar 1:3 for Mixing L.S 44.44 Rupees Forty Four and Forty Four Paise Only
166 E015 Extra for Carriage of Panels, shuters, particle board etc. L.S 6.38 Rupees Six and Thirty Eight Paise Only
167 E016 Extra for M.S. Plate / Flat L.S 8.08 Rupees Eight and Eight Paise Only
168 E017 Extra cost of rivet fixing, hook and wahser etc. L.S 15.55 Rupees Fifteen and Fifty Five Paise Only
169 E018 Extra for RCC precast jali 50mm thick L.S
Rupees One Hundred Eighty Eight and Eighty
Seven Paise Only
170 E019 Carriage of material etc. 89647,5300,55 Rawl,9800 1st class carpen,5600 L.S 1.50 Rupee One and Fifty Paise Only
171 E020 Labour charges for light fitting & diffusers L.S
Rupees One Hundred Seventy Six and
Seventy Five Paise Only
172 E021 Labour Charges for filling Rock Wool L.S 5.26 Rupees Five and Twenty Six Paise Only
173 E022 Labour Charges for Installation of Vapour Breather Membrane L.S 15.15 Rupees Fifteen and Fifteen Paise Only
174 E023 Wastage and overlapping of the thermal bubble insulation L.S 6.06 Rupees Six and Six Paise Only
175 E024 Transporation of thermal bubble insulation from factory to site including loading /
L.S 6.06 Rupees Six and Six Paise Only
176 E025 Labour Charges for fixing thermal bubble insulation L.S
Rupees Twenty Five and Twenty Five Paise
177 E026 Labour Charges for fixing 12mm thick Cement Board L.S
Rupees One Hundred Forty One and Forty
178 E027 Conveyance charge 5 km lead L.S
Rupees Two Hundred Thirty Seven and
Eighty Seven Paise Only
179 H001 Hire Charges for Bitiminious filter oil Fire Hour
Rupees One Hundred Seventy Eight and
Three Paise Only
180 H002 Hire Charges for Bitiminious Mixer Hour
Rupees One Hundred Sixty and Five Paise
181 H003 Hire Charges for Boiler Hour
Rupees One Hundred Nineteen and Eighty
Three Paise Only
182 H004 Hire Charges for Pneumatic Road Roller Hr
Rupees Five Hundred Sixty and Sixty Three
183 H005 Hire Charges for Tendon Road Roller Hour
Rupees Five Hundred Sixty and Sixty Three
184 H006 Hire charges for Comprssor Per Day
Rupees Two Hundred Five and Forty Two
185 H007 Hire charges for Crane Hr
Rupees Seven Hundred Six and Fourteen
186 H008 Hire Charges for Mech. Mixer ( Extra Cost) L.S
Rupees Forty Five and Twenty Eight Paise
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
187 H009 Hire Charges for Mech. Mortar mill L.S 31.07 Rupees Thirty One and Seven Paise Only
188 H010 Hire charges for penumetic drill & Pavement bracker Hr 86.19 Rupees Eighty Six and Nineteen Paise Only
189 H011 Hire charges for road Roller Per Day
Rupees Two Thousand Three Hundred
Ninety Six and Sixty One Paise Only
190 H012 Hire charges for vibrator L.S
Rupees Thirty Four and Twenty Four Paise
191 H013 Hire Charges for Vibratory Road Roller Hour 41.09 Rupees Forty One and Nine Paise Only
192 H014 Hire charges of required pilling Machineries Hour
Rupees Five Hundred Thirty Four and Ninety
193 H015 Hire charges of surface Vibrator Each 51.36 Rupees Fifty One and Thirty Six Paise Only
194 H016 Hydraulic Excavator 1 cum bucket capacity @ 60 cum per hour hour
Rupees Seven Hundred Eighteen and Ninety
Eight Paise Only
195 H017 Tipper 10 tonne capacity tonne 1.37 Rupee One and Thirty Seven Paise Only
196 H018 Dozer 80 HP for spreading @ 200 cum per hour hour
Rupees Two Thousand Fifty Four and
Twenty Four Paise Only
197 H019 Motor grader for grading @ 100 cum per hour hour
Rupees One Thousand Three Hundred
Twenty Two and Forty One Paise Only
198 H020 Vibratory roller 8 - 10 tonnes @ 100 cum per hour hour
Rupees Eight Hundred Fifty and Seventy
Nine Paise Only
199 H021 Hire Charges of drilling machine Days
Rupees Two Hundred Seventy Eight and
Seventeen Paise Only
200 H022 Tractor with rotovator hrs
Rupees Two Hundred Nine and Seventy One
201 H023 Bitumen emulsion pressure distributor days
Rupees Five Hundred Thirteen and Fifty Five
202 H024 Excavator Pile Driving Day
Rupees Eight Hundred Fifty Five and Ninety
Three Paise Only
203 H025 Core Drill Rmt.
Rupees One Thousand One Hundred Twenty
Five and Fifty Five Paise Only
204 H026 Impact Drill and Hand Socket Day
Rupees Five Hundred Thirteen and Fifty Five
205 H027 Wrench Day
Rupees Two Hundred Fifty Six and Seventy
Eight Paise Only
206 H028 Scissor Jack Day
Rupees Two Hundred Fifty Six and Seventy
Eight Paise Only
207 H029 Rail Cutting Day
Rupees Two Hundred Thirteen and Ninety
Eight Paise Only
208 H030 Zinc Coating LS
Rupees Five Thousand One Hundred Thirty
Five and Sixty Paise Only
209 H031 Diesel Generator Day
Rupees Six Thousand Four Hundred
Nineteen and Forty Nine Paise Only
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
210 H032 Truck (Considering 1 Truck for 20 days @ Rs.5000 Per Day) Day
Rupees Four Thousand Two Hundred
Seventy Nine and Sixty Six Paise Only
211 H033 Tractor Trolley (Considering 1 Tractor Trolley for 20 Days (8 Hours per Day Rupees One Thousand Six Hundred Seventy
Day 1677.63 Seven and Sixty Three Paise Only
Rs.245 per Hour)
212 H034 Design of the structure using specialised steel framing software Kg. 4.28 Rupees Four and Twenty Eight Paise Only
213 H035 Computerised Profile Marking Machine Hrs
Rupees Seven Hundred Seventy and Thirty
Four Paise Only
214 H036 Pre heat boiler Hrs 85.60 Rupees Eighty Five and Sixty Paise Only
215 L001 Labour charges - Bandhani Each
Rupees Six Hundred Twenty Eight and
Twenty Two Paise Only
216 L002 Labour charges - Bhisti Each
Rupees Five Hundred Eighty Four and
Seventy Nine Paise Only
217 L003 Labour charges - Blacksmith 1st Class Each
Rupees Seven Hundred Sixty Seven and Sixty
218 L004 Labour charges - Blacksmith 2nd Class Each
Rupees Six Hundred Seventy Six and Seventy
219 L005 Labour charges - Breaker Each
Rupees Six Hundred Fifty Seven and Fifty
220 L006 Labour charges - Bullock with Driver to Mortar Mill Each
Rupees Two Hundred Ninety Seven and
Thirty Four Paise Only
221 L007 Labour charges - Carpentar 1st Class Each
Rupees Eight Hundred Nine and One Paise
222 L008 Labour charges - Carpentar 2nd Class Each
Rupees Six Hundred Ninety Eight and Ninety
223 L009 Labour charges - Chowkidar Each
Rupees Five Hundred Forty Four and Thirty
Nine Paise Only
224 L010 Labour charges - Compressar Operator Each
Rupees Seven Hundred Sixty Seven and Sixty
225 L011 Labour charges - Crane operator with Helper Each
Rupees Nine Hundred Forty Eight and Thirty
Nine Paise Only
226 L012 Labour charges - Excavator Each
Rupees Six Hundred Forty One and Thirty
Five Paise Only
227 L013 Labour charges - Extra labar sinking and chisselling Each
Rupees Two Thousand Six Hundred Twelve
and Eighty Seven Paise Only
228 L014 Labour charges - Fitter Each
Rupees Seven Hundred Eleven and Four
229 L015 Labour charges - Glazier Each
Rupees Seven Hundred Fifteen and Eight
230 L016 Labour charges - Handcart with Mazdoor Each
Rupees Five Hundred Fifty Six and Fifty One
231 L017 Labour charges - Hole Driller Each
Rupees Five Hundred Ninety One and Eighty
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
232 L018 Labour charges - Mason 1st Class Each
Rupees Seven Hundred Ninety Eight and
Ninety One Paise Only
233 L019 Labour charges - Mason 2nd Class Each
Rupees Six Hundred Ninety Seven and
Ninety One Paise Only
234 L020 Labour charges - Mate Each
Rupees Five Hundred Fourteen and Nine
235 L021 Labour charges - Mazdoor (Female) Each
Rupees Four Hundred Eighty Four and Eighty
236 L022 Labour charges - Mazdoor (Male) Each 510.05 Rupees Five Hundred Ten and Five Paise Only
237 L023 Labour charges - Mistry Each
Rupees Seven Hundred Seventy Three and
Sixty Six Paise Only
238 L024 Labour charges - Painter Each
Rupees Seven Hundred Eleven and Four
239 L025 Labour charges - Plumber (Fitter) Each
Rupees Seven Hundred Thirty Six and
Twenty Nine Paise Only
240 L026 Labour charges - Plumber(Fitter)Assist Each
Rupees Five Hundred Ninety Eight and
Ninety Three Paise Only
241 L027 Labour charges - Polisher Each
Rupees Six Hundred Ninety Seven and
Ninety One Paise Only
242 L028 Labour charges - Spraymen Each
Rupees Six Hundred Forty Eight and Forty
243 L029 Labour charges - Supervision for Machinery Each
Rupees Seven Hundred Seventy Four and
Sixty Seven Paise Only
244 L030 Labour charges - Welder Each
Rupees Seven Hundred Sixty One and Fifty
Four Paise Only
245 L031 Labour charges - White Washer Each
Rupees Five Hundred Seventy Seven and
Seventy Two Paise Only
246 L032 Labour charges - Winch Operator Each
Rupees Seven Hundred Ninety Three and
Eighty Six Paise Only
247 L034 Labour for Applying Two Coat of Preventitive Coating on Steel per day (Painter) Rupees Six Hundred Thirty Two and Twenty
Days 632.26 Six Paise Only
248 L035 Labour for Removing (Descaling) Rust & Applying one coat per day (Semi Skilled) Rupees Four Hundred Sixty Six and Sixty Two
Days 466.62 Paise Only
249 L036 Semi Skill helper days
Rupees Five Hundred One and Ninety Seven
250 L037 Unskilled Labour days
Rupees Four Hundred Ninety One and Eighty
Seven Paise Only
251 L038 Labour charges - Mazdoor with Hand Cart each
Rupees Five Hundred Ninety Four and Eighty
Nine Paise Only
252 L039 helper days
Rupees Four Hundred Fifty Six and Fifty Two
253 L040 Labour charges Beldar Each 303.00 Rupees Three Hundred Three Only
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
254 L044 Labour charges - Chiseller (Semi Skilled) Each
Rupees Four Hundred Sixty Six and Sixty Two
255 L045 Appklicating Operator No.
Rupees Seven Hundred Fifty Seven and Fifty
256 M019 Abonite ball cock 25mm dia Each 88.16 Rupees Eighty Eight and Sixteen Paise Only
257 M020 Abonite ball cock 50mm dia Each
Rupees One Hundred Eighteen and Twelve
258 M021 Acid proof paint (Chocolate or Black) Litre
Rupees One Hundred Eighty Eight and Thirty
259 M022 Aldrop 20mm. dia Size with necessary fitting Iron Oxidised 20cms. Length Each 38.52 Rupees Thirty Eight and Fifty Two Paise Only
260 M023 Aldrop 20mm. dia Size with necessary fitting Iron Oxidised 25cms. Length Each
Rupees Forty Two and Seventy Nine Paise
261 M024 Aldrop 20mm. dia Size with necessary fitting Iron Oxidised 30cms. Length Each 51.36 Rupees Fifty One and Thirty Six Paise Only
262 M025 Aldrop 20mm. dia Size with necessary fitting Iron Oxidised 35cms. Length
Each 59.91 Rupees Fifty Nine and Ninety One Paise Only
263 M026 Aldrop 20mm. dia Size with necessary fitting Alluminium 20cms. Length Each 68.48 Rupees Sixty Eight and Forty Eight Paise Only
264 M027 Aldrop 20mm. dia Size with necessary fitting Alluminium 25cms. Length Each 70.18 Rupees Seventy and Eighteen Paise Only
265 M028 Aldrop 20mm. dia Size with necessary fitting Alluminium 30cms. Length Each 94.15 Rupees Ninety Four and Fifteen Paise Only
266 M029 Aldrop 20mm. dia Size with necessary fitting Alluminium 35cms. Length Each
Rupees One Hundred Eleven and Twenty
Seven Paise Only
267 M030 Aldrop 20mm. dia Size with necessary fitting Brass 20cms. Length Each
Rupees Two Hundred Eighteen and Twenty
268 M031 Aldrop 20mm. dia Size with necessary fitting Brass 25cms. Length Each
Rupees Two Hundred Thirty Five and Thirty
Eight Paise Only
269 M032 Aldrop 20mm. dia Size with necessary fitting Brass 30cms. Length Each
Rupees Two Hundred Forty Eight and
Twenty Two Paise Only
270 M033 Aldrop 20mm. dia Size with necessary fitting Brass 35cms. Length Each
Rupees Two Hundred Seventy Three and
Ninety Paise Only
271 M034 Aldrop 20mm. dia Size with necessary fitting Brass CP 20cms. Length Each
Rupees Two Hundred Thirty One and Ten
272 M035 Aldrop 20mm. dia Size with necessary fitting Brass CP 25cms. Length Each
Rupees Two Hundred Forty Three and
Ninety Five Paise Only
273 M036 Aldrop 20mm. dia Size with necessary fitting Brass CP 30cms. Length Each
Rupees Two Hundred Forty Eight and
Twenty Two Paise Only
274 M037 Aldrop 20mm. dia Size with necessary fitting Brass CP 35cms. Length Each
Rupees Two Hundred Seventy Three and
Ninety Paise Only
275 M038 Aluminum paint Litre
Rupees One Hundred Seventy One and
Eighteen Paise Only
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
276 M039 Aluminum Perforated jali of any size sq.m.
Rupees One Hundred Fifty Eight and Thirty
Five Paise Only
277 M040 Aluminum Powder kg 11.98 Rupees Eleven and Ninety Eight Paise Only
278 M041 Aluminum sheet 22 guage thick sq.m.
Rupees One Hundred Ninety Two and Fifty
Nine Paise Only
279 M042 Angle bracket Iron 10 x 12 size (25cms x 30cms.) Doz.
Rupees One Hundred Ninety Four and
Twenty Nine Paise Only
280 M043 Angle bracket Iron 12 x 14 size (309 cms. x 35cms) Doz.
Rupees Two Hundred One and Fourteen
281 M044 Angle size 15 x 15 cm. (Glazed) 10 Each 94.15 Rupees Ninety Four and Fifteen Paise Only
282 M045 Anodised Alluminum Screws 20 mm 100 Each 41.95 Rupees Forty One and Ninety Five Paise Only
283 M046 Anodised Alluminum Screws 30 mm 100 Each 62.48 Rupees Sixty Two and Forty Eight Paise Only
284 M047 Anodised Alluminum Screws 40 mm 100 Each 66.76 Rupees Sixty Six and Seventy Six Paise Only
285 M048 Anodised Aluminum Butt hinges 100 mm x 63 mm x 3.2 mm 10 Each
Rupees Two Hundred Four and Fifty Seven
286 M049 Anodised Aluminum Butt hinges 50 mm x 45 mm x 3.2 mm 10 Each
Rupees One Hundred Five and Twenty Eight
287 M050 Anodised Aluminum Butt hinges 75 mm x 45 mm x 3.2 mm 10 Each
Rupees One Hundred Eleven and Twenty
Seven Paise Only
288 M051 Anodised Aluminum Butt hinges 75 mm x 63 mm x 3.2 mm 10 Each
Rupees One Hundred Thirty Four and Thirty
Eight Paise Only
289 M052 Anticorrosive bituminous paint Litre 77.03 Rupees Seventy Seven and Three Paise Only
290 M053 Asbestos Rope Rmt 7.71 Rupees Seven and Seventy One Paise Only
291 M054 Asphalt CRMB 50 Bulk MT
Rupees Forty Three Thousand Six Hundred
Eight and Three Paise Only
292 M055 Asphalt CRMB 50 pack Rupees Forty Seven Thousand Eight
MT 47887.70 Hundred Eighty Seven and Seventy Paise
293 M056 Asphalt CRMB 55 Bulk Rupees Forty Three Thousand Six Hundred
MT 43652.54 Fifty Two and Fifty Four Paise Only
294 M057 Asphalt CRMB 55 Pack Rupees Forty Seven Thousand Nine Hundred
MT 47932.21 Thirty Two and Twenty One Paise Only
295 M058 Asphalt CRMB 60 Bulk MT
Rupees Forty Four Thousand Eighty and Fifty
296 M059 Asphalt CRMB 60 Pack MT
Rupees Forty Eight Thousand Three Hundred
Sixty and Seventeen Paise Only
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
297 M060 Asphalt Grade VG 40 pack MT
Rupees Forty Seven Thousand Seventy Six
and Twenty Seven Paise Only
298 M061 Asphalt Grade VG 30 Bulk MT
Rupees Forty Thousand One Hundred Thirty
Six and Thirty Seven Paise Only
299 M062 Asphalt Grade VG 30 Pack Rupees Forty Five Thousand Five Hundred
MT 45561.27 Sixty One and Twenty Seven Paise Only
300 M063 Asphalt Grade VG 10 Bulk Rupees Thirty Nine Thousand Three
MT 39328.37 Hundred Twenty Eight and Thirty Seven
301 M064 Asphalt Grade VG 10 pack Rupees Forty Four Thousand Seven Hundred
MT 44753.27 Fifty Three and Twenty Seven Paise Only
302 M065 Asphalt Grade VG 40 Bulk MT
Rupees Forty One Thousand Eighty Four and
Seventy Five Paise Only
303 M066 Asphalt PMB SB 40 Bulk MT
Rupees Six Thousand Eight Hundred Eighty
Nine and Forty Paise Only
304 M067 Asphalt PMB SB 40 Pack MT
Rupees Ten Thousand Three Hundred Eleven
and Forty One Paise Only
305 M068 Asphalt PMB SB 70 Bulk MT
Rupees Seven Thousand Fifty Three and
Seventy Four Paise Only
306 M069 Asphalt PMB SB 70 Pack MT
Rupees Ten Thousand Five Hundred Sixty
Three and Ninety One Paise Only
307 M070 Bajri or figure glass 3mm thick sq.m.
Rupees One Hundred Sixty Two and Sixty
Three Paise Only
308 M071 Bajri or figure glass 4mm thick sq.m.
Rupees One Hundred Ninety Two and Fifty
Nine Paise Only
309 M072 Ball Catch width spring 1/2 Dia (13mm) Each 8.55 Rupees Eight and Fifty Five Paise Only
310 M073 Ball Catch width spring 5/8 Dia. (16mm) Each 6.85 Rupees Six and Eighty Five Paise Only
311 M074 Ballies 125 mm dia. Rmt 32.46 Rupees Thirty Two and Forty Six Paise Only
312 M075 Ballies 80 mm dia. Rmt
Rupees Twenty Four and Thirty Five Paise
313 M076 Barbed wire for fencing of galvanized steel wire Quintal
Rupees Five Thousand Eight Hundred
Twenty and Thirty Four Paise Only
314 M077 Bat clamps 100 mm dia Each 15.40 Rupees Fifteen and Forty Paise Only
315 M078 Bat clamps 80 mm dia Each 11.13 Rupees Eleven and Thirteen Paise Only
316 M079 Battens 75mm x100mm. country wood cu.dm. 20.54 Rupees Twenty and Fifty Four Paise Only
317 M080 Battens Indian teakwood size 12mm x 12mm Rmt 3.42 Rupees Three and Forty Two Paise Only
318 M081 Battens Indian teakwood size 12mm x 19mm Rmt 5.57 Rupees Five and Fifty Seven Paise Only
319 M082 Battens Indian teakwood size 12mm x 35mm Rmt 11.98 Rupees Eleven and Ninety Eight Paise Only
320 M083 Battens Indian teakwood size 19mm x 19mm Rmt 7.27 Rupees Seven and Twenty Seven Paise Only
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
321 M084 Battens Indian teakwood size 19mm x 25mm Rmt 11.13 Rupees Eleven and Thirteen Paise Only
322 M085 Battens 50 mm x 25 mm Rmt 20.54 Rupees Twenty and Fifty Four Paise Only
323 M086 Battens 50 mm x 50 mm cu.dm. 20.54 Rupees Twenty and Fifty Four Paise Only
324 M087 Battens 75 mm x 100 mm Rmt 20.54 Rupees Twenty and Fifty Four Paise Only
325 M088 Battens 75 mm x 50 mm cu.dm. 20.54 Rupees Twenty and Fifty Four Paise Only
326 M089 Bees Wax kg 61.63 Rupees Sixty One and Sixty Three Paise Only
327 M090 Bevelled edge mirror 600mm x 450mm Each
Rupees Two Hundred Thirty Three and Sixty
Seven Paise Only
328 M091 Bilimoria Brick 1000 Each
Rupees Three Thousand One Hundred
Thirteen and Eighty Eight Paise Only
329 M092 Binding wire of 18 gauge thick annealed iron kg 40.23 Rupees Forty and Twenty Three Paise Only
330 M093 Binding Wires kg 40.23 Rupees Forty and Twenty Three Paise Only
331 M094 Bitumen Washer 100 Each 41.95 Rupees Forty One and Ninety Five Paise Only
332 M095 Bituminous Paint Litre 43.65 Rupees Forty Three and Sixty Five Paise Only
333 M096 Black Japan Paint. Litre 43.65 Rupees Forty Three and Sixty Five Paise Only
334 M097 Black plastic sheet with cover with C.P. Brass Hinges and Rubber butters white Rupees Two Hundred Forty Nine and Eight
Vitrious China Paise Only
335 M098 Black stone for cooking Platfrom (1.50 Sq.Mt.) Each
Rupees Four Hundred Seventy Three and
Thirty Three Paise Only
336 M099 Blasting Powder kg 43.65 Rupees Forty Three and Sixty Five Paise Only
337 M100 Bolt 'L' 3 to 4 size iron (7.5cms to 10 cms) Doz. 55.63 Rupees Fifty Five and Sixty Three Paise Only
338 M1000 Waterproof gypsum board 12.5 mm thick Sqm
Rupees One Hundred Twenty Eight and
Thirty Nine Paise Only
339 M1001 Perimetre channel 15 mmx 27 mm x 30 mm x 0.55 mm Rmt
Rupees Twenty Five and Sixty Seven Paise
340 M1002 Intermediate channel of size 15 mm x 45 mm x 0.90 mm at 1220 C/C Rmt 40.32 Rupees Forty and Thirty Two Paise Only
341 M1003 Ceiling steel section of size 80 mm x 26 mm x 0.50 mm at 457 mm C/C Rmt 41.95 Rupees Forty One and Ninety Five Paise Only
342 M1004 Celing angle of size 25 mm x 10 mm Rmt 12.84 Rupees Twelve and Eighty Four Paise Only
343 M1005 Sofit cleat of size 22 mm x 37 mm No. 1.71 Rupee One and Seventy One Paise Only
344 M1006 Raw / plug No. 5.13 Rupees Five and Thirteen Paise Only
345 M1007 Nut bolts No. 1.71 Rupee One and Seventy One Paise Only
346 M1008 Connecting clips No. 3.64 Rupees Three and Sixty Four Paise Only
347 M1009 Joining paper tap Rmt 0.86 Eighty Six Paise Only
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
348 M101 Bolts 12 mm dia. 10 cm. Long kg
Rupees Fifty Four and Seventy Eight Paise
349 M1010 Joining compound kg
Rupees Twenty Three and Ninety Seven
350 M1011 Migratory Corrosion Admixture POLYALK CP 293 kg
Rupees Two Hundred Seven and Sixty Three
351 M1012 Migratory Corrosion Admixture POLYALK CP 293 kg 245.00 Rupees Two Hundred Forty Five Only
352 M1013 Rock Wool kg 44.58 Rupees Forty Four and Fifty Eight Paise Only
353 M1014 Vapour Breather Membrane Sqm
Rupees One Hundred Twenty Eight and
Thirty Nine Paise Only
354 M1015 One-side alluminium thermal bubble insulation barrier including taxes Sqm 85.60 Rupees Eighty Five and Sixty Paise Only
355 M1016 12mm thick Cement Fibre Board Sqm
Rupees Four Hundred Sixty and Forty Nine
356 M1017 Factory finished cold formed Light guage steel Sheet kg 90.56 Rupees Ninety and Fifty Six Paise Only
357 M1018 Powder coated Alluminium Section 63.50 x 38.10 x 1.95 mm @ Wt. 1.094 Kg/mt Rupees Two Hundred One and Fourteen
Kg 201.14 Paise Only
358 M1019 CSS1 kg 38.52 Rupees Thirty Eight and Fifty Two Paise Only
359 M102 Bolts 12 mm dia. 10 cm. Long kg 64.64 Rupees Sixty Four and Sixty Four Paise Only
360 M1020 Precast light weight concrete hollow core wall Nos.
Rupees Nine Hundred Seventy Five and
Seventy Six Paise Only
361 M1021 Adhesive Kg. 10.27 Rupees Ten and Twenty Seven Paise Only
362 M1022 Supply of Roller Safety Barrier in Heavy weight MS Section with 550 Gm / Sqm Rupees Thirty Four lakh Fifty Two Thousand
Lot ######### Two Hundred Five and Sixty Seven Paise Only
hot dip galvanize
363 M1023 Precast light weight concrete hollow core wall Nos.
Rupees One Thousand Two Hundred
Seventy Two and Sixty Paise Only
364 M1024 Ready Mix Cement Mortar 1:3 (40 Kg) No of Bags
Rupees One Hundred Nineteen and Eighty
Three Paise Only
365 M1025 Ready Mix Cement Mortar 1:4 (40 Kg) No of Bags
Rupees One Hundred Six and Ninety Nine
366 M1026 Ready Mix Cement Mortar 1:6 (40 Kg) No of Bags
Rupees Ninety Eight and Forty Three Paise
367 M1027 Providing solar stud (incl GST 18 %) 1 No. 1010.00 Rupees One Thousand Ten Only
368 M1028 Epoxy Chemical (incl GST 18 %) 1 No.
Rupees Two Hundred Twenty Two and Fifty
Four Paise Only
369 M1029 Tiles - 600 x 600 x 16 MM piece
Rupees Two Hundred Eight and Eighty Five
370 M103 Boundry Stone Each
Rupees Thirty One and Sixty Seven Paise
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
371 M1030 Main Runner 15 mm T-32 Web height 3000 mm length piece
Rupees One Hundred Thirty Eight and Sixty
372 M1031 Cross Tee 15 mm T-32 Web Height 1200 mm Length piece 56.49 Rupees Fifty Six and Forty Nine Paise Only
373 M1032 Cross Tee 15 mm T-32 Web Height 600 mm Length piece
Rupees Twenty Eight and Twenty Five Paise
374 M1033 Angle Moulding 24mm piece
Rupees One Hundred Nineteen and Eighty
Three Paise Only
375 M1034 Tiles - 600 x 600 x 20 MM piece
Rupees Two Hundred Sixty One and Ninety
376 M1035 Tiles - 600 x 600 x 15 MM piece
Rupees Two Hundred Twenty Seven and
Sixty Seven Paise Only
377 M1036 Tiles - 600 x 600 x 0.5 mm GI Metal piece
Rupees Two Hundred Twenty Nine and
Thirty Nine Paise Only
378 M1037 Main Runner 24 mm T-38 Web height 3000 mm length piece
Rupees One Hundred Eighteen and Twelve
379 M1038 Cross Tee 24 mm T-25 Web Height 1200 mm Length piece
Rupees Forty Seven and Ninety Three Paise
380 M1039 Cross Tee 24 mm T-25 Web Height 600 mm Length piece
Rupees Twenty Three and Ninety Seven
381 M104 Brass Screw Down bib type. 15mm dia. Each
Rupees One Hundred Forty and Thirty Seven
382 M1040 Tiles - 600 x 600 x 0.5 mm GI Metal with 20% perforation area with 1.8 mm dia Rupees Three Hundred Ninety Eight and One
holes and having NRC (Noise Reduction Coe cient) of 0.5 Paise Only
383 M1041 Supply of Galvalume Steel Coll with AZ 150 and 550 Mpa for cold formed steel
Kg. 64.20 Rupees Sixty Four and Twenty Paise Only
fabrication including taxes
384 M1042 Production cost of light gauge steel members Kg. 21.40 Rupees Twenty One and Forty Paise Only
385 M1043 Supply and fixing of galvanized screws for bolting of the structural and non
structural LGS members as per specification and anchor hilti bolts for fixing LGS Kg. 17.12 Rupees Seventeen and Twelve Paise Only
frame to plinth
386 M1044 Supply of galvanized iron profile deck sheet 0.80 mm - 1.00 mm thick Sq.Mt
Rupees Six Hundred Forty One and Ninety
Five Paise Only
387 M1045 Providing self drilling screws with EPDM washer for fixing the deck sheet Sq.Mt
Rupees Twenty Five and Sixty Seven Paise
388 M1046 Transport of deck sheet from manufacturing facility to work site including loading / Rupees Twenty Five and Sixty Seven Paise
389 M1047 2mm Aluminium / 4mmACP sheeting fixed with Type-11 Class-C High Intensity
Rupees Five Thousand Eight Hundred Ninety
Grade Sheeting as per IRC 67 : 2012 reflective sheeting of size including lettering Sq.Mtr 5890.52 and Fifty Two Paise Only
and signs as applicable
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
390 M1048 2mm Aluminium / 4mmACP sheeting fixed with Type-4 Class-B High Intensity
Rupees Three Thousand Nine Hundred
Grade Sheeting as per IRC 67 : 2012 reflective sheeting of size including lettering Sq.Mtr 3994.63 Ninety Four and Sixty Three Paise Only
and signs as applicable
391 M1049 Plastirib - Thermoplastic Road Marking White 2 mm thick base : 5 Kg per smt Rupees One Hundred One and Fifty Eight
cum 101.58 Paise Only
392 M105 Brass Screw Down bib type. 20mm dia Each
Rupees One Hundred Seventy Six and Thirty
Three Paise Only
393 M1050 Drop on glass beads: 250 gm per Smt x 100 Smt KG 62.48 Rupees Sixty Two and Forty Eight Paise Only
394 M1051 Plastirib - Thermoplastic Road Marking White 2 mm thick base : 5 Kg per smt
KG 81.32 Rupees Eighty One and Thirty Two Paise Only
395 M1052 AFP (Aluminum Backed Flexible Prismaticn Sheeting Smt
Rupees Four Thousand Three Hundred Forty
Eight and Thirteen Paise Only
396 M1053 Cat Eye / Road Stud No.
Rupees One Hundred Eighty and Seventy
Seven Paise Only
397 M1054 Epoxy Adhesive for fixing Cat Eye No
Rupees Seven Hundred Eighty Seven and
Eighty Paise Only
398 M1055 Median Marker No.
Rupees One Hundred Seventy and Ninety
399 M1059 HYSD bar Rupees Five Thousand Nine Hundred Thirty
Quintal 5935.77 Five and Seventy Seven Paise Only
400 M106 Brass screw down stop cock 15 mm dia Each
Rupees One Hundred Seventy Six and Thirty
Three Paise Only
401 M1060 R.C.C Heavy Duty Non-Pressure pipe I.S.Class NP=2 750mm dia. Meter
Rupees One Hundred Seventy Six and Thirty
Three Paise Only
402 M107 Brass screw down stop cock 20 mm dia Each
Rupees One Hundred Ninety One and
Seventy Three Paise Only
403 M108 Brass screw down stop cock 25 mm dia Each
Rupees One Hundred Eighty Nine and
Sixteen Paise Only
404 M109 Brick bats chhara cu.m.
Rupees One Hundred Fifty One and Seventy
Seven Paise Only
405 M110 Brick aggregate 40mm size cu.m.
Rupees Two Hundred Twenty Four and
Thirty Eight Paise Only
406 M111 C.I. Cap Gril As per Std. Design Each 44.51 Rupees Forty Four and Fifty One Paise Only
407 M112 C.I. Cover with frame 300mm x 300mm Each
Rupees Four Hundred and Fifty Eight Paise
408 M113 C.I. Cover with frame 455mm x 610mm Each
Rupees Eight Hundred Twenty and Eighty
Four Paise Only
409 M114 C.I. Cover with frame 500mm x 700mm Each
Rupees One Thousand One Hundred Forty
and Ninety Six Paise Only
410 M115 C.I. Cover with frame 600mm x 850mm Each
Rupees Three Thousand Six Hundred Eighty
One and Thirty Seven Paise Only
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
411 M116 C.I. Cover with frame for manholes Quintal
Rupees Five Thousand Six Hundred Eighty
Two and Fifty Three Paise Only
412 M117 C.I. Cover without frame 300mm x 300mm Each
Rupees Four Hundred Seventy and Seventy
413 M118 C.I. Cover without frame 455mm x 610mm Each
Rupees Nine Hundred Sixty Five and Forty
Nine Paise Only
414 M119 C.I. Cover without frame 500mm x 700mm Each
Rupees One Thousand Three Hundred Forty
Two and Ten Paise Only
415 M120 C.I. Cover without frame 600mm x 850mm Each
Rupees Four Thousand Three Hundred
Thirty One and Two Paise Only
416 M121 C.I. Cover without frame for manholes Quintal
Rupees Six Thousand Six Hundred Eighty
Four and Eighty Three Paise Only
417 M122 C.I. Cowel 100 mm dia Each
Rupees Three Hundred Forty Four and Nine
418 M123 C.I. Cowel 75mm dia Each
Rupees Two Hundred Forty Eight and
Twenty Two Paise Only
419 M124 C.I. Flushing cistem with fittings 12.5 Litre High level Each
Rupees Six Hundred Forty and Twenty Four
420 M125 C.I. Greating 100 mm x 100 mm Each
Rupees Fifty Eight and Twenty One Paise
421 M126 C.I. Nahni trap Each
Rupees One Hundred Thirty Six and Ten
422 M127 C.I. or M.S Brackets Each 44.51 Rupees Forty Four and Fifty One Paise Only
423 M128 C.I. ring painted with coal tar Each 94.15 Rupees Ninety Four and Fifteen Paise Only
424 M129 C.I. steps 50cm x 15cm. 2.25cm. Each
Rupees One Hundred Twelve and Thirteen
425 M130 C.P. Brash Screws & Washers 25 mm size Each 14.55 Rupees Fourteen and Fifty Five Paise Only
426 M131 C.P. Brass 1/2 turn flush cock 20 mm dia Each
Rupees Two Hundred Eighteen and Twenty
427 M132 C.P. Brass 1/2 turn flush cock 25 mm dia Each
Rupees Two Hundred Twenty Five and
Ninety Seven Paise Only
428 M133 C.P. Brass 1/2 turn flush cock 32 mm dia Each
Rupees Two Hundred Thirty Six and Twenty
Four Paise Only
429 M134 C.P. Brass shower rose 100mm dia. Each
Rupees Two Hundred Forty and Fifty Two
430 M135 C.P. Brass toilet paper holder of stand and size Each
Rupees Two Hundred Twenty and Eighty
Three Paise Only
431 M136 C.R.C Sheet Quintal
Rupees Four Thousand Five Hundred Ten
and Seventy Six Paise Only
432 M137 Cast iron grating 100mm dia. Each
Rupees Thirty One and Sixty Seven Paise
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
433 M138 Cast iron grating 150mm dia. Each 44.51 Rupees Forty Four and Fifty One Paise Only
434 M139 Cast Iron Spigot and Socket soil pipe 100mm Each
Rupees One Thousand One Hundred Eighty
One and Eighteen Paise Only
435 M140 Cast Iron Spigot and Socket soil pipe 75mm Each
Rupees Nine Hundred Eighty and Ninety
436 M141 Cast Steel Rocker Bairing MT
Rupees Fifty Thousand Four Hundred
Eighteen and Sixty Eight Paise Only
437 M142 Cast Steel Rocker Rocker Bairing MT
Rupees Fifty Thousand Four Hundred
Eighteen and Sixty Eight Paise Only
438 M143 Cement MT
Rupees Five Thousand Two Hundred Eighty
Six and Thirty Four Paise Only
439 M144 Cement Bags (Empty) Each 2.40 Rupees Two and Forty Paise Only
440 M145 Ceramic Tiles sq.m.
Rupees Two Hundred Thirteen and Ninety
Eight Paise Only
441 M146 Chain link 2 10 x 10 gauge (Galvanised) sq.m.
Rupees Two Hundred Fifty Six and Seventy
Eight Paise Only
442 M147 Chain link 2.5 10x10 gauge chain link Plastic sq.m.
Rupees Two Hundred Fifty Six and Seventy
Eight Paise Only
443 M148 Chapras for cupboard Brass Size 4 to 6 Doz.
Rupees Two Hundred Eighty Six and Seventy
Four Paise Only
444 M149 Chapras for cupboard Brass Size less than 4 Doz.
Rupees Two Hundred Sixty Five and Thirty
Four Paise Only
445 M150 Chapras for cupboard Iron Size 3x6 (7.5cms x 15cms) Doz. 70.18 Rupees Seventy and Eighteen Paise Only
446 M151 Chapras for cupboard Iron Size less than 3 (9.5 cms.) Doz. 53.07 Rupees Fifty Three and Seven Paise Only
447 M152 Chicken wire mesh 16 x24 sq.m.
Rupees One Hundred Eighty Four and Two
448 M153 Chromium Plated brass Bib tap. 15mm dia. Each
Rupees One Hundred Sixty and Five Paise
449 M154 Chromium Plated brass Bib tap. 20mm dia. Each
Rupees One Hundred Eighty Four and Two
450 M155 Chromium platted bottle trap Each
Rupees Two Hundred Fifty Three and Forty
451 M156 Clamps in two semi-circular halves of M.S. Flat 40 mm x 3 mm kg 51.36 Rupees Fifty One and Thirty Six Paise Only
452 M157 Coal Tar Litre
Rupees Twenty Three and Ninety Seven
453 M158 Coarse sand cu.m.
Rupees Three Hundred Ten and Thirty Paise
454 M159 Coil type spring Each
Rupees One Hundred Sixty Seven and
Seventy Six Paise Only
455 M160 Coir string kg 37.51 Rupees Thirty Seven and Fifty One Paise Only
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
456 M161 Cold Twisted Bars Quintal
Rupees Four Thousand Seven Hundred Nine
and Sixty Three Paise Only
457 M162 Commercial Plywood Sheet 12 mm sq.m.
Rupees Three Hundred Eight and Ninety
Nine Paise Only
458 M163 Commercial Plywood Sheet 19 mm sq.m.
Rupees Three Hundred Eighty Six and Two
459 M164 Commercial Plywood Sheet 25 mm sq.m.
Rupees Four Hundred Twenty Nine and Sixty
Seven Paise Only
460 M165 Commercial Plywood Sheet 6 mm sq.m.
Rupees One Hundred Fifty Six and Sixty
Three Paise Only
461 M166 Common Burnt clay Bricks Conventional size 1000 Each
Rupees Five Thousand Two Hundred Thirty
Five and Forty Eight Paise Only
462 M167 Common Burnt clay Bricks Modular size 20x10x10 cm 1000 Each
Rupees Five Thousand Four Hundred Eighty
Four and Seventy Eight Paise Only
463 M168 Contry wood Malayasian mersova (imported) cu.dm.
Rupees Twenty Five and Sixty Seven Paise
464 M169 Coolex glass (Heat resistant) sq.m.
Rupees Two Hundred Thirty Five and Thirty
Eight Paise Only
465 M170 Copper metal ball cock 25mm dia Each
Rupees One Hundred Thirteen and Eighty
Four Paise Only
466 M171 Copper metal ball cock 50mm dia Each
Rupees One Hundred Sixty Two and Sixty
Three Paise Only
467 M174 Country Wood cu.dm.
Rupees Twenty Two and Twenty Five Paise
468 M175 Crimp Jali 12 gauge sq.m.
Rupees Two Hundred Sixty Nine and Sixty
469 M176 Crushed stone aggregate for Hard Quality 10 to 20mm size cu.m.
Rupees Five Hundred Twenty Two and Forty
Five Paise Only
470 M177 Crushed stone aggregate for Hard Quality 10mm size cu.m.
Rupees Six Hundred Seventeen and Forty
Four Paise Only
471 M178 Crushed stone aggregate for Hard Quality 20mm size cu.m.
Rupees Six Hundred Fifty Three and Eighty
Five Paise Only
472 M179 Crushed stone aggregate for Hard Quality 40mm size cu.m.
Rupees Five Hundred Five and Four Paise
473 M180 Crushed stone aggregate for Hard Quality 40mm to 63mm size cu.m.
Rupees Four Hundred Sixty Three and Eighty
Seven Paise Only
474 M181 Crushed stone aggregate for Hard Quality 6 to 10mm size cu.m.
Rupees Four Hundred Thirty Three and
Eighty Paise Only
475 M183 Dark shade pigment kg 65.05 Rupees Sixty Five and Five Paise Only
476 M184 Datta nylon for furniture size 1 to 1 1/4 (2.5 cms to 3.0 cms) Each 6.85 Rupees Six and Eighty Five Paise Only
477 M185 Datta rubber for door size upto 1 (2.5cms) Each 12.84 Rupees Twelve and Eighty Four Paise Only
478 M186 Decorative ply wood 4 mm thick sq.m.
Rupees Two Hundred Fifty Five and Seven
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
479 M187 Devdar wood battens and Planks cu.dm. 20.54 Rupees Twenty and Fifty Four Paise Only
480 M188 Diesel Litre
Rupees Eighty Eight and Eighty Eight Paise
481 M189 Distemper Primer Litre
Rupees Fifty Eight and Twenty One Paise
482 M190 Door closers (Heavy type of 765 number) Hardwire or Everite Prabhat or Rupees Four Hundred Seventy and Seventy
Equivalent. Six Paise Only
483 M191 Door closers arrow type with spring 12 length as approved sample (30 cms) Rupees Four Hundred Seventy Nine and
Each 479.33 Thirty Three Paise Only
484 M192 Door shutters Decorative type 25mm. thick Both sides teak finished sq.m.
Rupees One Thousand One Hundred Twelve
and Seventy One Paise Only
485 M193 Door shutters Decorative type 35mm. thick Both sides teak finished sq.m.
Rupees One Thousand Eighty Seven and
Three Paise Only
486 M194 Dry Distemper kg 36.80 Rupees Thirty Six and Eighty Paise Only
487 M195 Emulsion with aldring heptachlor or chlordane Litre
Rupees One Hundred Twenty Seven and
Fifty Three Paise Only
488 M196 Emulsion with Dieldrin Litre
Rupees One Hundred Twenty Seven and
Fifty Three Paise Only
489 M197 Enamel Paint Litre
Rupees One Hundred Fifty Three and
Twenty One Paise Only
490 M198 Enamel Primer Litre
Rupees Ninety Eight and Forty Three Paise
491 M199 Expanded metal jali 12 x 12 gauge sq.m.
Rupees One Hundred Sixty Two and Sixty
Three Paise Only
492 M200 Extra cost of R.S. having width 3.5Mt. & above sq.m.
Rupees Two Hundred Thirty Four and Fifty
493 M201 Fevicol S.R. 998 kg
Rupees One Hundred Fifty Four and Seven
494 M202 Fibre Base Bitumen Saturated under Layer Type-L sq.m.
Rupees Seventy Six and Seventeen Paise
495 M203 Fibre Base Self finished Felt Type-ll. Grade sq.m. 88.16 Rupees Eighty Eight and Sixteen Paise Only
496 M204 Fibre Insulation Board 12 mm thick sq.m.
Rupees One Hundred Sixty and Ninety One
497 M205 Fibre Insulation Board 18 mm thick sq.m.
Rupees Two Hundred Thirty Two and Eighty
498 M206 Fibre Insulation Board 25 mm thick sq.m.
Rupees Two Hundred Ninety Eight and
Seventy Two Paise Only
499 M207 Fifth K.M. Pre Cast R.C.C. Stone as per I.R.C.Type Design. Each
Rupees Nine Hundred Sixteen and Seventy
500 M208 Fifth K.M. Stone as per I.R.C.Type Design. Each
Rupees Five Hundred Seventy Three and
Forty Eight Paise Only
501 M209 Fine sand cu.m.
Rupees Two Hundred Eighty Three and Forty
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
502 M210 Flat back wash basin Colour glazed 450 x 300 size Each
Rupees Four Hundred Seventy and Seventy
503 M211 Flat back wash basin Colour glazed 550 x 400 size Each
Rupees Four Hundred Forty Seven and Sixty
Five Paise Only
504 M212 Flat back wash basin Colour glazed 630 x 510 size Each
Rupees One Thousand One Hundred Sixty
Eight and Thirty Five Paise Only
505 M213 Flat back wash basin White vitrious china 450mm x 300mm size Each
Rupees Four Hundred Six and Fifty Seven
506 M214 Flat back wash basin White vitrious china 550mm x 400mm Each
Rupees Five Hundred Fifty Six and Thirty Six
507 M215 Flat back wash basin White vitrious china 630 x 510 size Rupees One Thousand One Hundred Twenty
Each 1121.27 One and Twenty Seven Paise Only
508 M216 Flushing cistern P.V.C. with fittings 12.5 Litre high level Each
Rupees Six Hundred Eighty Four and Seventy
Five Paise Only
509 M217 Flushing cistern White vitrious with C.P. Brass handle etc. 12.5 Litre Low level Rupees One Thousand Three Hundred Sixty
Each 1360.93 and Ninety Three Paise Only
510 M218 Fly Ash Brick 1000 Each
Rupees Seven Thousand Eighty Two and
Sixty Three Paise Only
511 M219 Fuel Steam Coal Quintal
Rupees One Hundred Sixty Three and Fifty
512 M220 Fuse Each 95.01 Rupees Ninety Five and One Paise Only
513 M221 G.I Sheet 0.8 mm thick Corrugated class-3 Quintal
Rupees Four Thousand Six Hundred One and
Forty Nine Paise Only
514 M222 G.I Sheet 0.8 mm thick Plain class-3 Quintal
Rupees Four Thousand Four Hundred
Seventy Six and Fifty Two Paise Only
515 M223 G.I Sheet 0.8 mm thick Semi-Circular class-3 Quintal
Rupees Four Thousand Four Hundred
Seventy Six and Fifty Two Paise Only
516 M224 G.I. Barbed Wire Quintal
Rupees Five Thousand Eight Hundred
Twenty and Thirty Four Paise Only
517 M225 G.I. Pipe 30 cm long 50 mm dia Each 87.30 Rupees Eighty Seven and Thirty Paise Only
518 M226 G.I. J or L Hooks 10 Each
Rupees Seventy Five and Thirty Three Paise
519 M227 G.I. Plain Washer 100 Each
Rupees Seventy Five and Thirty Three Paise
520 M228 G.I.Seam Bolts and Nuts 25 mm x 6 mm 10 Each
Rupees One Hundred and Fourteen Paise
521 M229 G.S.W. fitting Bends. 100mm dia. Each
Rupees Forty Two and Seventy Nine Paise
522 M230 G.S.W. fitting Bends. 150mm dia Each 51.36 Rupees Fifty One and Thirty Six Paise Only
523 M231 G.S.W. Half round channel 150mm dia. 60 Cm long Each
Rupees Thirty Nine and Thirty Seven Paise
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
524 M232 G.S.W. Junction 100 mm dia Each
Rupees Fifty Four and Seventy Eight Paise
525 M233 G.S.W. Junction 150 mm dia Each 101.00 Rupees One Hundred One Only
526 M234 Galvanised Mild steel tube Lower Grade 150mm dia Rmt
Rupees Eight Hundred Thirteen and Thirteen
527 M235 Galvanised Mild steel tube Medium Grade 15mm dia Rmt 80.46 Rupees Eighty and Forty Six Paise Only
528 M236 Galvanised Mild steel tube Medium Grade 20mm dia Rmt
Rupees One Hundred Four and Forty Two
529 M237 Galvanised Mild steel tube Medium Grade 25mm dia Rmt
Rupees One Hundred Forty Eight and Eight
530 M238 Galvanised Mild steel tube Medium Grade 32mm dia Rmt
Rupees One Hundred Eighty Seven and Forty
Five Paise Only
531 M239 Galvanised Mild steel tube Medium Grade 40mm dia Rmt
Rupees Two Hundred Twenty Eight and Fifty
Three Paise Only
532 M240 Galvanised Mild steel tube Medium Grade 50mm dia Rmt
Rupees Two Hundred Ninety Eight and
Seventy Two Paise Only
533 M241 Galvanised Mild steel tube Medium Grade 65mm dia Rmt
Rupees Three Hundred Seventy Four and
Four Paise Only
534 M242 Galvanised Mild steel tube Medium Grade 80mm dia Rmt
Rupees Four Hundred Eighty Two and
Seventy Five Paise Only
535 M243 Gauge Plate Quintal
Rupees Four Thousand One and Forty Eight
536 M244 Geru in crystal (Sona) kg 1.73 Rupee One and Seventy Three Paise Only
537 M245 GIMS Nuts 5 mm thick 80 mm dia Each
Rupees Fifty Four and Seventy Eight Paise
538 M246 GIMS T 65 mm x 65 mm Each
Rupees Two Hundred Thirty and Twenty Five
539 M247 Glass 2 mm to 3 mm thick sq.m.
Rupees One Hundred Six and Ninety Nine
540 M248 Glass Shelf with C.P. Guard Rail and Brackets 600mm x 120mm Each
Rupees One Hundred Ninety Seven and
Seventy Two Paise Only
541 M249 Glass strips 4 mm thick 40mm depth Rmt 11.13 Rupees Eleven and Thirteen Paise Only
542 M250 Glass strips 6mm thick 40mm depth Rmt 14.55 Rupees Fourteen and Fifty Five Paise Only
543 M251 Glasses 2 mm to 3 mm thick sq.m.
Rupees One Hundred Twenty Four and
Eleven Paise Only
544 M252 Glasses 3 mm thick sq.m.
Rupees One Hundred Ninety Six and Eighty
Seven Paise Only
545 M253 Granite Slab (18 mm thick) 1 side Polished sq.m.
Rupees One Thousand Three Hundred Sixty
and Ninety Three Paise Only
546 M254 Griding Polishing Rounding or edges of Glass or Glazing Sheet Rmt
Rupees Seventeen and Ninety Eight Paise
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
547 M255 Grindina Polishing rounding or edges of glass or glazing sheet (B) Rubbings &
sq.m. 36.80 Rupees Thirty Six and Eighty Paise Only
Polishing of tiles or stone flooring
548 M256 Ground glass (Frosted or obscurd on one side) 3 mm thick sq.m.
Rupees One Hundred Seventy One and
Eighteen Paise Only
549 M257 Ground glass (Frosted or obscurd on one side) 4 mm thick sq.m.
Rupees One Hundred Ninety Six and Eighty
Seven Paise Only
550 M258 Ground glass (Frosted or obscurd on one side) 5 mm thick sq.m.
Rupees Two Hundred Forty Eight and
Twenty Two Paise Only
551 M259 Guard Stone Each
Rupees Thirty One and Sixty Seven Paise
552 M260 Gum kg 21.40 Rupees Twenty One and Forty Paise Only
553 M261 Gun metal screw down bib tap-15 mm dia Each
Rupees One Hundred Thirty Six and Ten
554 M262 Gun metal screw down bib tap-20 mm dia Each
Rupees One Hundred Fifty Two and Thirty
555 M263 Gun metal wheel valve 15mm dia Each
Rupees One Hundred Sixty and Five Paise
556 M264 Gun metal wheel valve 20mm dia Each
Rupees One Hundred Seventy Four and Sixty
557 M265 Gun Metal Wheel Valve 25mm dia. Each
Rupees Three Hundred Sixty and Thirty Five
558 M266 Gun metal wheel valve 32mm dia Each
Rupees Two Hundred Sixty Nine and Sixty
559 M267 Gun Metal Wheel Valve 40mm dia. Each
Rupees Five Hundred Sixty Eight and Thirty
Four Paise Only
560 M268 Hacksaw blade double thread Doz. 51.36 Rupees Fifty One and Thirty Six Paise Only
561 M269 Hactometer Stone as per Type design. Each 91.59 Rupees Ninety One and Fifty Nine Paise Only
562 M270 Hactometer Stone Pre Cast R.C.C. Stone as per Type design Each
Rupees Two Hundred Twenty Nine and
Thirty Nine Paise Only
563 M271 Hammer Iron 1 LBS Each 51.36 Rupees Fifty One and Thirty Six Paise Only
564 M272 Hammer Iron 2 LBS Each
Rupees Seventy Two and Seventy Five Paise
565 M273 Hand broken stone aggregate 25mm size to 90mm size cu.m.
Rupees Two Hundred Seventy Three and
Eighty Nine Paise Only
566 M274 Hand broken stone aggregate 40mm size to 63mm size. cu.m.
Rupees Three Hundred Twenty One and
Thirty Nine Paise Only
567 M275 Handle for doors Windows Cupboards etc. Brass 10 cms. Length Each 51.36 Rupees Fifty One and Thirty Six Paise Only
568 M276 Handle for doors Windows Cupboards etc. Brass 15 cms. Length Each 59.91 Rupees Fifty Nine and Ninety One Paise Only
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
569 M277 Handle for doors Windows Cupboards etc. C.P. Brass 10 cms. Length Each
Rupees Thirty Four and Twenty Four Paise
570 M278 Handle for doors Windows Cupboards etc. C.P. Brass 15 cms. Length Each 44.51 Rupees Forty Four and Fifty One Paise Only
571 M279 Handle for doors Windows Cupboards etc. 10 cms. Length Each 15.40 Rupees Fifteen and Forty Paise Only
572 M280 Handle for doors Windows Cupboards etc. 15 cms. Length Each 18.83 Rupees Eighteen and Eighty Three Paise Only
573 M281 Handle for doors Windows Cupboards etc. Iron Oxidized 10 cms. Length Each 10.27 Rupees Ten and Twenty Seven Paise Only
574 M282 Handle for doors Windows Cupboards etc. Iron Oxidized 15 cms. Length Each 11.13 Rupees Eleven and Thirteen Paise Only
575 M283 Handle for steel window (Right & Left) Alluminium Each
Rupees Twenty Nine and Ninety Six Paise
576 M284 Handle for steel window (Right & Left) Brass Each 43.65 Rupees Forty Three and Sixty Five Paise Only
577 M285 Handle for steel window (Right & Left) Iron oxidized Each 50.50 Rupees Fifty and Fifty Paise Only
578 M286 Handle for steel window (Right & Left) Wrinkle finish Each
Rupees Seventeen and Ninety Eight Paise
579 M287 Hard board sheet 4 mm thick sq.m.
Rupees One Hundred Twenty Four and
Eleven Paise Only
580 M288 Hard Drawn Steel Wire Fabric sq.m.
Rupees Two Hundred Nine and Seventy One
581 M289 Hard Marrum cu.m.
Rupees One Hundred Fifty One and Ninety
Eight Paise Only
582 M290 Hi Tensile Steel Wire MT
Rupees Fifty Seven Thousand Sixty One and
Fifty Eight Paise Only
583 M291 Hinges (Strap) Alluminium 10 cms. Length Each
Rupees Twenty Five and Sixty Seven Paise
584 M292 Hinges (Strap) Alluminium 15 cms. Length Each 38.52 Rupees Thirty Eight and Fifty Two Paise Only
585 M293 Hinges (Strap) Alluminium 20 cms length Each 47.08 Rupees Forty Seven and Eight Paise Only
586 M294 Hinges (Strap) M.S. 10 cms. Length or equivalent Pair
Rupees Twenty Four and Eighty Three Paise
587 M295 Hinges (Strap) M.S. 12.5 cms. Length or equivalent Pair
Rupees Thirty Four and Twenty Four Paise
588 M296 Hinges butt. I.S.I Mark Brass (Railway type heavy) 7.5 cms. Length or equivalent
Pair 64.20 Rupees Sixty Four and Twenty Paise Only
589 M297 Hinges butt. I.S.I Mark Brass (Railway type heavy) 7.5 cms. Length or equivalent Rupees One Hundred Eleven and Ten Paise
Pair 111.10 Only
590 M298 Hinges butt. I.S.I Mark Steel 10 cms. Length 14 gauge Pair 17.12 Rupees Seventeen and Twelve Paise Only
591 M299 Hinges butt. I.S.I Mark Steel 7.5 cms. Length 16 gauge Pair 50.50 Rupees Fifty and Fifty Paise Only
592 M300 Hinges butt. I.S.I Mark Alluminium 10 cms. Length Pair 64.20 Rupees Sixty Four and Twenty Paise Only
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
593 M301 Hinges butt. I.S.I Mark Alluminium 7.5 cms. Length Pair 38.52 Rupees Thirty Eight and Fifty Two Paise Only
594 M302 Hinges butt. I.S.I Mark C.P.Brass (Railway type Hinges) 10 cms. Length Pair
Rupees Seventy Eight and Seventy Five Paise
595 M303 Hinges butt. I.S.I Mark C.P.Brass (Railway type Hinges) 7.5 cms. Length Pair 81.32 Rupees Eighty One and Thirty Two Paise Only
596 M304 Hinges Parilamentary Steel 10 cms. Length Each
Rupees One Hundred Sixty Six and Ninety
597 M305 Hinges Parilamentary Steel 12.5 cms length Each
Rupees One Hundred Twenty Four and
Eleven Paise Only
598 M306 Hinges Parilamentary Steel 7.5 cms. Length Each
Rupees One Hundred Six and Ninety Nine
599 M307 Hinges Parilamentary Brass 10 cms. Length Each 29.10 Rupees Twenty Nine and Ten Paise Only
600 M308 Hinges Parilamentary Brass 12.5 cms length Each 38.52 Rupees Thirty Eight and Fifty Two Paise Only
601 M309 Hinges Parilamentary Brass 7.5 cms. Length Each
Rupees Twenty Three and Ninety Seven
602 M310 Hinges Spring 10 cms. Length Each
Rupees One Hundred Eleven and Twenty
Seven Paise Only
603 M311 Hinges Spring 7.5 cms. Length Each
Rupees One Hundred Four and Forty Two
604 M312 Hirakani Each
Rupees One Hundred Sixty Two and Sixty
Three Paise Only
605 M313 Hood Cover 0.9 mm thick Rmt
Rupees One Hundred Four and Sixteen Paise
606 M314 Hood Cover 1.25 mm thick Rmt
Rupees One Hundred Eight and Eighty Nine
607 M315 Hooks and Eyes Alluminium 10 cms. Length Each 18.83 Rupees Eighteen and Eighty Three Paise Only
608 M316 Hooks and Eyes Alluminium 15 cms. Length Each 21.40 Rupees Twenty One and Forty Paise Only
609 M317 Hooks and Eyes Alluminium 20 cms length Each 30.82 Rupees Thirty and Eighty Two Paise Only
610 M318 Hooks and Eyes C.P.Brass 10 cms. Length Each
Rupees Twenty Three and Ninety Seven
611 M319 Hooks and Eyes C.P.Brass 15 cms. Length Each
Rupees Thirty Three and Thirty Eight Paise
612 M320 Hooks and Eyes C.P.Brass 20 cms length Each
Rupees Forty Two and Seventy Nine Paise
613 M321 Hooks and Eyes Iron oxidized 10 cms. Length Each 6.85 Rupees Six and Eighty Five Paise Only
614 M322 Hooks and Eyes Iron oxidized 15 cms. Length Each 7.71 Rupees Seven and Seventy One Paise Only
615 M323 Hooks and Eyes Iron oxidized 20 cms length Each 8.55 Rupees Eight and Fifty Five Paise Only
616 M324 Indian Teak wood cu.dm. 47.08 Rupees Forty Seven and Eight Paise Only
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
617 M325 Beading Indian Teak wood cu.dm. 51.36 Rupees Fifty One and Thirty Six Paise Only
618 M326 Indicator Stone as per RCC Type Design Each
Rupees Two Hundred Twenty Nine and
Thirty Nine Paise Only
619 M327 Indicator Stone as per Type Design Each
Rupees Eighty Four and Seventy Four Paise
620 M328 Integral W.P. compound (Liquid of standard quality) tested as perI.S. 2645 - 1975 Rupees Seventy Two and Seventy Five Paise
Litre 72.75 Only
621 M329 Inter Lock [Kadaka lock] Each
Rupees Two Hundred Nine and Seventy One
622 M330 Iron bib tap 15mm. Dia Each
Rupees Twenty Seven and Thirty Nine Paise
623 M331 Iron bib tap 20mm. Dia Each 35.95 Rupees Thirty Five and Ninety Five Paise Only
624 M332 Iron Hinges 100 mm x 58 mm x 1.4 mm 10 Each
Rupees One Hundred and Fourteen Paise
625 M333 Iron Hinges 100 mm x 58 mm x 1.9 mm 10 Each
Rupees One Hundred Four and Forty Two
626 M334 Iron Hinges 50 mm x 37 mm x 1.5 mm 10 Each 79.60 Rupees Seventy Nine and Sixty Paise Only
627 M335 Iron Hinges 75 mm x 47 mm x 1.7 mm 10 Each 88.16 Rupees Eighty Eight and Sixteen Paise Only
628 M336 Iron Screws. 20 mm 100 Each 66.76 Rupees Sixty Six and Seventy Six Paise Only
629 M337 Iron Screws. 30 mm 100 Each 88.16 Rupees Eighty Eight and Sixteen Paise Only
630 M338 Iron Screws. 40 mm 100 Each
Rupees One Hundred Four and Forty Two
631 M339 Junction Equal double 100 mm dia Each
Rupees Twenty Eight and Twenty Five Paise
632 M340 Junction Equal double 80 mm dia Each
Rupees Twenty Five and Sixty Seven Paise
633 M341 Junction Equal Single 100 mm dia Each
Rupees Twenty Nine and Ninety Six Paise
634 M342 Junction Equal Single 80 mm dia Each
Rupees Twenty Three and Ninety Seven
635 M343 Junction Board R.C.C. Each
Rupees Five Hundred Forty Five and Twenty
Three Paise Only
636 M344 Jute string kg 56.75 Rupees Fifty Six and Seventy Five Paise Only
637 M345 Kada (Indian) with English ball bearing. Pair
Rupees Two Hundred Thirteen and Thirteen
638 M346 Kerosene Litre 80.80 Rupees Eighty and Eighty Paise Only
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
639 M347 Koda Iron Each
Rupees One Hundred Fifteen and Fifty Five
640 M348 Latch (Tadi) as per sample approved sectional flats (Heavy) Alluminium 25 cms
Each 46.22 Rupees Forty Six and Twenty Two Paise Only
length & 16mm dia
641 M349 Latch (Tadi) as per sample approved sectional flats (Heavy) Alluminium 30 cms Rupees Fifty Eight and Twenty One Paise
length & 16mm dia Only
642 M350 Latch (Tadi) as per sample approved sectional flats (Heavy) Alluminium 35 cms
Each 60.77 Rupees Sixty and Seventy Seven Paise Only
length & 16mm dia
643 M351 Latch (Tadi) as per sample approved sectional flats (Heavy) Brass 20 cms.
Each 71.90 Rupees Seventy One and Ninety Paise Only
644 M352 Latch (Tadi) as per sample approved sectional flats (Heavy) Brass 25 cms.
Each 81.32 Rupees Eighty One and Thirty Two Paise Only
645 M353 Latch (Tadi) as per sample approved sectional flats (Heavy) Brass 30 cms length Rupees Ninety Eight and Forty Three Paise
Each 98.43 Only
646 M354 Latch (Tadi) as per sample approved sectional flats (Heavy) Brass 35 cms length Rupees One Hundred Six and Ninety Nine
Each 106.99 Paise Only
647 M355 Latch (Tadi) as per sample approved sectional flats (Heavy) C.P. Brass 20 cms. Rupees Seventy Two and Seventy Five Paise
648 M356 Latch (Tadi) as per sample approved sectional flats (Heavy) C.P. Brass 25 cms. Rupees Eighty Nine and Eighty Seven Paise
649 M357 Latch (Tadi) as per sample approved sectional flats (Heavy) C.P. Brass 30 cms
Each 94.15 Rupees Ninety Four and Fifteen Paise Only
650 M358 Latch (Tadi) as per sample approved sectional flats (Heavy) C.P. Brass 35 cms Rupees One Hundred Six and Ninety Nine
length Paise Only
651 M359 Latch (Tadi) as per sample approved sectional flats (Heavy) Iron Oxidized
Each 21.40 Rupees Twenty One and Forty Paise Only
cms length & 16mm dia
652 M360 Latch (Tadi) as per sample approved sectional flats (Heavy) Iron Oxidized
Each 26.53 Rupees Twenty Six and Fifty Three Paise Only
cms length & 16mm dia
653 M361 Latch (Tadi) as per sample approved sectional flats (Heavy) Iron Oxidized 35 Rupees Twenty Nine and Ninety Six Paise
cms length & 16mm dia Only
654 M362 Latch for steel window 25 cms to 35cms. Alluminium Each 30.82 Rupees Thirty and Eighty Two Paise Only
655 M363 Latch for steel window 25 cms to 35cms. Brass Each
Rupees Twenty Three and Ninety Seven
656 M364 Latch for steel window 25 cms to 35cms. Iron oxidized Each 21.40 Rupees Twenty One and Forty Paise Only
657 M365 Latch for steel window 25 cms to 35cms. Wrinkle finish Each
Rupees Twenty Nine and Ninety Six Paise
658 M366 Light shade pigment kg
Rupees Sixty Nine and Thirty Three Paise
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
659 M367 Lime gotton crystal Quintal
Rupees Three Hundred Forty Three and
Forty Paise Only
660 M368 Limpet Washer 100 Each
Rupees Twenty Nine and Ninety Six Paise
661 M369 Linseed Oil Litre
Rupees One Hundred Fourteen and Forty Six
662 M370 Locks Baby latch brass chromium 75mm long. Each
Rupees Two Hundred Sixty Nine and Sixty
663 M371 Locks Bath room latch Navtal (Godrej) Each
Rupees Two Hundred Seventy Three and
Ninety Paise Only
664 M372 Locks Godrej cupboard 3 (7.5 cms) Each
Rupees One Hundred Two and Seventy One
665 M373 Locks Godrej Mortice lock cover Each
Rupees Three Hundred Twenty Nine and
Fifty Three Paise Only
666 M374 Locks Godrej Night latch Each
Rupees One Hundred Twenty Eight and
Thirty Nine Paise Only
667 M375 Locks Locker brass Navtal (Godrej) 75mm dia 7 lever with and set keys. Each
Rupees Two Hundred Thirteen and Ninety
Eight Paise Only
668 M376 M.I. fisher Union 32 mm dia Each
Rupees Sixty Seven and Sixty Three Paise
669 M377 M.I. fisher Union 40 mm dia Each
Rupees Seventy Five and Seventy Five Paise
670 M378 M.S. Fixed Plate Bearing MT
Rupees Forty Four Thousand Sixteen and
Thirty Two Paise Only
671 M379 M.S. Plate / Flat Quintal
Rupees Three Thousand Six Hundred Sixty
Six and Eighty Two Paise Only
672 M380 M.S. Road Sign Board / Village Name Board Non-Reflective Type Each
Rupees One Thousand Three Hundred Forty
Eight and Ninety Five Paise Only
673 M381 M.S. Road Sign Board / Village Name Board Reflective Type Each
Rupees Two Thousand Three Hundred
Seventy Six and Ninety Two Paise Only
674 M382 M.S. Rocker Bearing MT
Rupees Forty Four Thousand Sixteen and
Thirty Two Paise Only
675 M383 M.S. Roller Bearing MT
Rupees Forty Four Thousand Sixteen and
Thirty Two Paise Only
676 M384 M.S. Sheet 1 mm thick Quintal
Rupees Four Thousand Two Hundred
Nineteen and Seventy Five Paise Only
677 M385 M.S. village Name Board or Junction Board Each
Rupees Two Thousand Seven Hundred One
and Thirty Three Paise Only
678 M386 Manglore Tiles 1000 Each
Rupees Two Thousand Nine Hundred Forty
Three and Forty Three Paise Only
679 M387 Marble number Plate Each char.
Rupees One Hundred Fifty Six and Sixty
Three Paise Only
680 M388 Marble chips upto 4 mm size. Quintal
Rupees Seven Hundred Forty Four and Sixty
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
681 M389 Marble Powder cu.m.
Rupees One Thousand Three Hundred Thirty
Six and Ninety Seven Paise Only
682 M390 Marble Slab 18 to 20 mm sq.m. 600.01 Rupees Six Hundred and One Paise Only
683 M391 Marble Slab stone 25mm thick double polished sq.m.
Rupees Six Hundred Eighty Four and Seventy
Five Paise Only
684 M392 Marble Slab Extra for mirror finishing on marble slab flooring sq.m.
Rupees One Hundred Seventy and Thirty
Three Paise Only
685 M393 Marble Slab Machine cut marble tiles 6mm thick 30cms x 15cms Mirror finish with Rupees Five Hundred Forty Seven and
chamfering and grove back Seventy Nine Paise Only
686 M394 Marble Slab Polished granite stone 20 to 25mm thick black sq.m.
Rupees Two Thousand Five Hundred Sixty
Seven and Seventy Nine Paise Only
687 M395 Marble Slab Polished granite stone 20 to 25mm thick Colour sq.m.
Rupees Three Thousand Six Hundred Eighty
and Fifty One Paise Only
688 M396 Marble Slab Polished marble stone (Rajnagar or Makran 20mm. thick sq.m.
Rupees Seven Hundred Twenty Seven and
Fifty Four Paise Only
689 M397 Marble Slab Polished marble stone Rajnagar Makarana 20mm size sq.m.
Rupees Seven Hundred Twenty Seven and
Fifty Four Paise Only
690 M398 Marble Slab Polished marble stone Rajnagar Makarana 20mm size 180 x 60 cms. Rupees One Thousand Sixty One and Thirty
sq.m. 1061.36 Six Paise Only
691 M399 Marble Slab Polished marble stone Rajnagar Makarana 20mm size 60 x 45 cms. Rupees Nine Hundred Eighty Four and Thirty
sq.m. 984.33 Three Paise Only
692 M400 Marble Slab Polished marble stone Rajnagar Makarana 20mm size 90 x 60 cms. Rupees One Thousand Thirty Five and Sixty
sq.m. 1035.67 Seven Paise Only
693 M401 Marble Slab White adango 180 x 60cms. sq.m.
Rupees Eight Hundred Ninety Eight and
Seventy Three Paise Only
694 M402 Marble Slab White adango 180x60 cms sq.m.
Rupees Eight Hundred Ninety Eight and
Seventy Three Paise Only
695 M403 Marble Slab White adango 20mm thick colour grey 60x60 cms. sq.m.
Rupees Eight Hundred Thirteen and Thirteen
696 M404 Marble Slab White adango 60 x 60 cm. sq.m.
Rupees Seven Hundred Forty and Thirty
Eight Paise Only
697 M405 Marble Slab White adango 60x45 cms. sq.m.
Rupees Seven Hundred Ten and Forty Two
698 M406 Marble Slab White adango 60x45cm. sq.m.
Rupees Seven Hundred Ten and Forty Two
699 M407 Marble Slab White adango 90x6 cm. sq.m.
Rupees Seven Hundred Seventy and Thirty
Four Paise Only
700 M408 Marble Slab White adango 90x60 cms. sq.m.
Rupees Eight Hundred Fifty Five and Ninety
Three Paise Only
701 M409 Marble year Plate 20cm x 15cm. x 2.5cm Each
Rupees One Hundred Fifty Six and Sixty
Three Paise Only
702 M410 Marbo granite flooring tiles 8mm th. sq.m.
Rupees Three Hundred Twenty Five and
Twenty Five Paise Only
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
703 M411 Medium shade pigment kg
Rupees Sixty Nine and Thirty Three Paise
704 M412 Mild Steel Bars Quintal
Rupees Four Thousand Four Hundred Ninety
Five and Fifty One Paise Only
705 M413 Munj for white washing kg
Rupees Twenty Eight and Eighty Six Paise
706 M414 Murrum/ binding Material cu.m.
Rupees One Hundred Six and Sixty Six Paise
707 M415 Neo Prene Bearing (480 x 310 x 48 mm) Cu.Cm. 0.88 Eighty Eight Paise Only
708 M416 Nickel Plated bright finished M.S. Piano Hinges Rmt
Rupees One Hundred Thirty and Ten Paise
709 M417 Nickel plated finished M.S.Piano hinges Alluminium 19mm. width (15cm. Length ) Rupees One Hundred Fifty Three and
Rmt 153.21 Twenty One Paise Only
710 M418 Nickel plated finished M.S.Piano hinges Alluminium 25mm. width (15cm. Length ) Rupees One Hundred Ninety and Two Paise
Rmt 190.02 Only
711 M419 Nickel plated finished M.S.Piano hinges BRASS 19mm. width 6 (15cm. Length ) Rupees Two Hundred Seven and Thirteen
Rmt 207.13 Paise Only
712 M420 Nickel plated finished M.S.Piano hinges BRASS 25mm. width 6(15cm. Length ) Rupees Two Hundred Ten and Fifty Five
Rmt 210.55 Paise Only
713 M421 Nickel Plated screws 25 mm dia. sq.m.
Rupees One Hundred Thirty Three and Fifty
714 M422 Non Decorative type 25 mm thick Door Shutter sq.m.
Rupees Eight Hundred Nine and Seventy
715 M423 Non Decorative type 35 mm thick Door Shutter sq.m.
Rupees One Thousand Sixty Nine and Ninety
716 M424 Non reflective solar contact film for fixing on glass. sq.m.
Rupees Four Hundred Six and Fifty Seven
717 M425 North Light Adjustable Ridge Pair
Rupees Ninety One and Thirty Eight Paise
718 M426 Off-set 50 mm - 100 mm dia Each 21.40 Rupees Twenty One and Forty Paise Only
719 M427 Off-set 50 mm - 80 mm dia Each
Rupees Seventeen and Ninety Eight Paise
720 M428 Off-set 75 mm - 100 mm dia Each
Rupees Twenty Two and Twenty Five Paise
721 M429 Off-set 75 mm - 80 mm dia Each
Rupees Seventeen and Ninety Eight Paise
722 M430 Oil bound distemper kg 51.36 Rupees Fifty One and Thirty Six Paise Only
723 M431 Oil of 30 No. Litre
Rupees One Hundred Fifty Six and Sixty
Three Paise Only
724 M432 Omai plast for sunk Portion EP-101 kg
Rupees Five Hundred Thirteen and Fifty Five
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
725 M433 Ordinary K.M. Stone (For NH.S.H. M.D.R) Each
Rupees Three Hundred Forty Four and Nine
726 M434 Ordinary K.M. Stone Pre Cast R.C.C. Stone as per Type design (For Rupees Six Hundred Eleven and Thirteen
NH.S.H.M.D.R.) Paise Only
727 M435 Ordinary K.M. Stone Pre Cast R.C.C. Stone as per Type design (ForO.D.R. & Rupees Five Hundred Thirty Four and Ninety
V.R.) Six Paise Only
728 M436 Ordinary K.M.Stone ForO.D.R. & V.R.) Each
Rupees Three Hundred Five and Fifty Seven
729 M437 P.V.C bib tap 15mm. Dia Each 21.40 Rupees Twenty One and Forty Paise Only
730 M438 P.V.C bib tap 20mm. Dia Each
Rupees Twenty Nine and Ninety Six Paise
731 M439 P.V.C. flooring sheetP.V.C 2mm thick sq.m.
Rupees Three Hundred Seventy Six and Sixty
732 M440 P.V.C. flooring sheetP.V.C. 2.5mm thick sq.m.
Rupees Four Hundred Ninety Six and Forty
Five Paise Only
733 M441 P.V.C. Nahni trap Each 59.91 Rupees Fifty Nine and Ninety One Paise Only
734 M442 P.V.C. Pipes 10 kgf / Sq.cm. 110 mm dia. Rmt
Rupees Two Hundred Seventy Six and Forty
Seven Paise Only
735 M443 P.V.C. Pipes 10 kgf / Sq.cm. 50mm dia. Rmt
Rupees Eighty Nine and Eighty Seven Paise
736 M444 P.V.C. Pipes 10 kgf / Sq.cm. 75mm dia. Rmt
Rupees One Hundred Sixty One and Seventy
Seven Paise Only
737 M445 P.V.C. Pipes 10 kgf / Sq.cm. 20mm dia. Rmt
Rupees Twenty Two and Twenty Five Paise
738 M446 P.V.C. Pipes 10 kgf / Sq.cm. 25mm dia. Rmt
Rupees Thirty One and Sixty Seven Paise
739 M447 P.V.C. Pipes 10 kgf / Sq.cm. 32mm dia. Rmt 40.23 Rupees Forty and Twenty Three Paise Only
740 M448 P.V.C. Pipes 10 kgf / Sq.cm. 40mm dia. Rmt 59.91 Rupees Fifty Nine and Ninety One Paise Only
741 M449 P.V.C. Pipes 6 kgf / Sq.cm. 110 mm dia. Rmt
Rupees Two Hundred Nine and Seventy One
742 M450 P.V.C. Pipes 6 kgf / Sq.cm. 50mm dia. Rmt
Rupees Fifty Eight and Twenty One Paise
743 M451 P.V.C. Pipes 6 kgf / Sq.cm. 75mm dia. Rmt
Rupees One Hundred Ten and Forty One
744 M452 P.V.C. Pipes 6 kgf / Sq.cm. 20mm dia. Rmt 20.54 Rupees Twenty and Fifty Four Paise Only
745 M453 P.V.C. Pipes 6 kgf / Sq.cm. 25mm dia. Rmt 30.82 Rupees Thirty and Eighty Two Paise Only
746 M454 P.V.C. Pipes 6 kgf / Sq.cm. 32mm dia. Rmt 37.66 Rupees Thirty Seven and Sixty Six Paise Only
747 M455 P.V.C. Pipes 6 kgf / Sq.cm. 40mm dia. Rmt 40.23 Rupees Forty and Twenty Three Paise Only
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
748 M456 Particle board sheet 12 mm thick sq.m.
Rupees Two Hundred Seven and Thirteen
749 M457 Particle board sheet 19 mm thick sq.m.
Rupees Two Hundred Sixty Five and Thirty
Four Paise Only
750 M458 Particle board sheet 25 mm thick sq.m.
Rupees Three Hundred Forty Five and
Seventy Nine Paise Only
751 M459 Particle board sheet 35 mm thick sq.m.
Rupees Four Hundred Fifty Eight and
Seventy Eight Paise Only
752 M460 Petrol Litre
Rupees Eighty Eight and Eighty Eight Paise
753 M461 Pillar tap 15mm dia Each
Rupees Two Hundred Sixty Four and Forty
Eight Paise Only
754 M462 Pillar tap 20mm dia Each
Rupees Three Hundred Three and Eighty Six
755 M467 Plain G.I. Sheet 1 mm thick Quintal
Rupees Four Thousand Eight Hundred
Seventy Four and Fifty Three Paise Only
756 M468 Plain Glass sheet 3 mm thick sq.m.
Rupees One Hundred Sixty Six and Ninety
757 M469 Plain Glass sheet 4 mm thick sq.m.
Rupees One Hundred Seventy Nine and
Seventy Five Paise Only
758 M470 Planks 30 mm thick Kail or equivalent soft wood cu.dm. 21.40 Rupees Twenty One and Forty Paise Only
759 M471 Planks 38 mm thick Kail or equivalent soft wood cu.dm.
Rupees Twenty Two and Twenty Five Paise
760 M472 Plastic Emulsion Paint Litre
Rupees One Hundred Sixty Seven and
Seventy Six Paise Only
761 M473 Plate glass (Table glass) 5.5 mm with all edge polished . sq.m.
Rupees Three Hundred Three and Eighty Six
762 M474 Plywood with both faces teak finished 12mm. thick sq.m.
Rupees Three Hundred Fifty and Ninety
Three Paise Only
763 M475 Plywood with both faces teak finished 15mm. thick sq.m.
Rupees Four Hundred Nineteen and Forty
764 M476 Plywood with both faces teak finished 18mm. thick sq.m.
Rupees Four Hundred Forty Five and Nine
765 M477 Plywood with both faces teak finished 3mm. thick sq.m.
Rupees One Hundred Seventy One and
Eighteen Paise Only
766 M478 Plywood with both faces teak finished 4mm. thick sq.m.
Rupees Two Hundred Six and Twenty Eight
767 M479 Plywood with both faces teak finished 6mm. thick sq.m.
Rupees One Hundred Eighty Four and Two
768 M480 Plywood with both faces teak finished 8mm. thick sq.m.
Rupees Two Hundred Forty Eight and
Twenty Two Paise Only
769 M481 Plywood designed with one side commercial and other side teak finished 12mm. Rupees Two Hundred Eighty Two and Forty
thick Six Paise Only
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
770 M482 Plywood designed with one side commercial and other side teak finished 15mm. Rupees Three Hundred Fifty and Ninety
thick Three Paise Only
771 M483 Plywood designed with one side commercial and other side teak finished 18mm. Rupees Three Hundred Fifty and Ninety
thick Three Paise Only
772 M484 Plywood designed with one side commercial and other side teak finished 6mm. Rupees One Hundred Sixty Two and Sixty
thick Three Paise Only
773 M485 Plywood designed with one side commercial and other side teak finished 8mm. Rupees One Hundred Ninety Six and Eighty
thick Seven Paise Only
774 M486 Plywood sheet (both faces commerical) 3mm. Rmt
Rupees One Hundred Twenty Eight and
Thirty Nine Paise Only
775 M487 Plywood sheet (both faces commerical) 4mm. Rmt
Rupees One Hundred Fifty Four and Seven
776 M488 Plywood sheet (both faces commerical) 6mm Rmt
Rupees One Hundred Fifty Six and Sixty
Three Paise Only
777 M489 Plywood sheet 9 mm thick (Commercial) sq.m.
Rupees Two Hundred Forty and Fifty Two
778 M490 Polished Kota Stone Slab Green. 25 mm thick sq.m.
Rupees Two Hundred and Twenty Nine Paise
779 M491 Polished Kota Stone Slab Green. 30 mm thick sq.m.
Rupees Two Hundred Seven and Ninety Nine
780 M492 Polished Kota Stone Slab Green. 40 mm thick sq.m.
Rupees Two Hundred Twenty Four and
Twenty Five Paise Only
781 M493 Pre-cast Cement concrete tiles sq.m.
Rupees Seventy Six and Seventeen Paise
782 M494 Precast RCC Jali 100 mm thick sq.m.
Rupees One Hundred Seventy Six and Thirty
Three Paise Only
783 M495 Precast RCC Jali 25 mm thick sq.m.
Rupees One Hundred Twelve and Thirteen
784 M496 Precast RCC Jali 40 mm thick sq.m.
Rupees One Hundred Twenty Eight and
Thirty Nine Paise Only
785 M497 Precast RCC Jali 50 mm thick sq.m.
Rupees One Hundred Thirty Six and Ten
786 M498 Precast RCC Jali 75 mm thick sq.m.
Rupees One Hundred Sixty and Five Paise
787 M499 Pre-Moulded bituminous joint Filler 12mm size. sq.m.
Rupees Five Hundred Fifty Three and
Seventy Nine Paise Only
788 M500 Pre-Moulded bituminous joint Filler 20mm size sq.m.
Rupees Six Hundred Eleven and Thirteen
789 M501 Pre-Moulded bituminous joint Filler 25mm size sq.m.
Rupees Eight Hundred Two and Eighty Seven
790 M502 Pulleys 25 mm dia. Each 92.45 Rupees Ninety Two and Forty Five Paise Only
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
791 M503 Pulleys 38 mm dia. Each
Rupees Ninety Five and Eighty Seven Paise
792 M504 Putty as per ISI specification for fixing glass on steel windows. kg
Rupees Thirty Four and Twenty Four Paise
793 M505 Quarry Spall. cu.m.
Rupees One Hundred Thirty Two and Ninety
Nine Paise Only
794 M506 R.C.C Heavy Duty Non-Pressure pipe I.S. Class NP=2 150mm dia. Rmt
Rupees One Hundred Two and Seventy One
795 M507 R.C.C Heavy Duty Non-Pressure pipe I.S. Class NP=2 250mm dia. Rmt
Rupees One Hundred Forty Nine and
Seventy Nine Paise Only
796 M508 R.C.C Heavy Duty Non-Pressure pipe I.S. Class NP=2 300mm dia. Rmt
Rupees Three Hundred Eighty Five and
Seventeen Paise Only
797 M509 R.C.C Heavy Duty Non-Pressure pipe I.S. Class NP=2 1000mm dia. Rmt
Rupees One Thousand Five Hundred Thirty
Two and Twelve Paise Only
798 M510 R.C.C Heavy Duty Non-Pressure pipe I.S. Class NP=2 450mm dia. Rmt
Rupees Six Hundred Forty One and Ninety
Five Paise Only
799 M511 R.C.C Heavy Duty Non-Pressure pipe I.S. Class NP=2 500mm dia. Rmt
Rupees Seven Hundred Seventy and Thirty
Four Paise Only
800 M512 R.C.C Heavy Duty Non-Pressure pipe I.S. Class NP=2 900mm dia. Rmt
Rupees One Thousand Three Hundred Fifty
Two and Thirty Seven Paise Only
801 M513 R.C.C Heavy Duty Non-Pressure pipe I.S. Class NP=2 1100mm dia. Rmt
Rupees One Thousand Seven Hundred Thirty
Seven and Fifty Four Paise Only
802 M514 R.C.C Heavy Duty Non-Pressure pipe I.S. Class NP=2 1200mm dia. Rmt
Rupees One Thousand Eight Hundred Forty
and Twenty Five Paise Only
803 M515 R.C.C Heavy Duty Non-Pressure pipe I.S. Class NP=2 600mm dia. Rmt
Rupees Eight Hundred Thirty Seven and Ten
804 M516 R.C.C Heavy Duty Non-Pressure pipe I.S. Class NP=2 800mm dia. Rmt
Rupees One Thousand Two Hundred Forty
One and Ten Paise Only
805 M517 R.C.C Heavy Duty Non-Pressure Pipe I.S. Class NP=3 300mm dia. Rmt
Rupees Four Hundred Seventeen and
Seventy Paise Only
806 M518 R.C.C Heavy Duty Non-Pressure Pipe I.S. Class NP=3 450mm dia. Rmt
Rupees Eight Hundred Eight and Eighty Six
807 M519 R.C.C Heavy Duty Non-Pressure Pipe I.S. Class NP=3 900mm dia. Rmt
Rupees Two Thousand Five Hundred Eighty
Four and Ninety One Paise Only
808 M520 R.C.C Heavy Duty Non-Pressure Pipe I.S. Class NP=3 600mm dia. Rmt
Rupees One Thousand Four Hundred Twelve
and Twenty Nine Paise Only
809 M521 R.C.C Heavy Duty Non-Pressure Pipe I.S. Class NP=3 800mm dia. Rmt
Rupees One Thousand Nine Hundred
Thirteen and Eighty Seven Paise Only
810 M522 R.C.C Heavy Duty Non-Pressure Pipe I.S. Class NP=3 1100mm dia. Rmt
Rupees Three Thousand Five Hundred Eighty
Six and Thirty Six Paise Only
811 M523 R.C.C Heavy Duty Non-Pressure Pipe I.S. Class NP=3 1200mm dia. Rmt
Rupees Four Thousand Two Hundred Eighty
Eight and Twenty Two Paise Only
812 M524 R.C.C Heavy Duty Non-Pressure Pipe I.S. Class NP=3 1400mm dia. Rmt
Rupees Five Thousand Eight Hundred
Twenty Eight and Ninety Paise Only
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
813 M525 R.C.C Heavy Duty Non-Pressure Pipe I.S. Class NP=3 1600mm dia. Rmt
Rupees Seven Thousand Five Hundred
Seventy Five Only
814 M526 R.C.C Heavy Duty Non-Pressure Pipe I.S. Class NP=3 1800mm dia. Rmt
Rupees Eight Thousand Seven Hundred
Ninety Eight and Ninety Eight Paise Only
815 M527 Rajula Stone Each 65.90 Rupees Sixty Five and Ninety Paise Only
816 M528 Ready mixed Red Lead Paint Litre
Rupees Seventy Two and Seventy Five Paise
817 M529 Red Flag Each 14.43 Rupees Fourteen and Forty Three Paise Only
818 M530 Residual Bitumen Rupees Thirty Five Thousand Nine Hundred
MT 35949.15 Forty Nine and Fifteen Paise Only
819 M531 RList Preventivet (Polymer Base) kg
Rupees One Hundred Ninety Two and Fifty
Nine Paise Only
820 M532 RList Remover Com Primer (Polymer Base) Litre
Rupees Two Hundred Twenty Two and Fifty
Four Paise Only
821 M533 Rolling shutter Rolling shutter having width below 3.5mt. sq.m.
Rupees One Thousand Nine Hundred
Twenty Four and Thirteen Paise Only
822 M534 Rolling shutter Rolling shutter of G.I. sheet any size grill sq.m.
Rupees One Thousand One Hundred Ninety
Eight and Thirty Paise Only
823 M535 Rolling shutters having width Above 3.5 Mt. sq.m.
Rupees Two Thousand Five Hundred Thirty
Nine and Fifty Five Paise Only
824 M536 Resin (0.5kg Pkt.) kg 81.32 Rupees Eighty One and Thirty Two Paise Only
825 M537 Rough Kotach stone Slab. 25 mm thick sq.m.
Rupees One Hundred Forty Eight and Eight
826 M538 Rough Kotach stone Slab. 40 mm thick sq.m.
Rupees Two Hundred and Twenty Nine Paise
827 M539 Rubber Plug Each 12.84 Rupees Twelve and Eighty Four Paise Only
828 M540 Rubble cu.m.
Rupees Two Hundred Thirty Four and Thirty
829 M541 Rubble (Heavy) at not Less than 40 kg. cu.m.
Rupees Two Hundred Fifty Nine and Ninety
Seven Paise Only
830 M542 S.W. Gulley Trap 150mm x 100 mm size. Each
Rupees Fifty Four and Seventy Eight Paise
831 M543 S.W. guly trap 100 x 100 mm size Each 36.80 Rupees Thirty Six and Eighty Paise Only
832 M544 Salt natural kg 9.09 Rupees Nine and Nine Paise Only
833 M545 Sand paper 100Nos size Doz.
Rupees Thirty Four and Twenty Four Paise
834 M546 Sand paper 50 Nos. size Doz. 30.82 Rupees Thirty and Eighty Two Paise Only
835 M547 Sand paper 80Nos size Doz. 30.82 Rupees Thirty and Eighty Two Paise Only
836 M548 Screened gravel 10mm size cu.m.
Rupees Two Hundred Sixty Five and Ninety
Seven Paise Only
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
837 M549 Screened gravel 12mm size cu.m.
Rupees Two Hundred Sixty Five and Ninety
Seven Paise Only
838 M550 Sheet glass ordinary quality 3 mm thick sq.m.
Rupees One Hundred Forty Five and Fifty
839 M551 Sheet glass ordinary quality 4 mm thick sq.m.
Rupees One Hundred Fifty Four and Seven
840 M552 Sheet glass ordinary quality 5 mm thick sq.m.
Rupees Two Hundred Thirteen and Ninety
Eight Paise Only
841 M553 Sheet glass ordinary quality 6 mm thick sq.m.
Rupees Two Hundred Thirty Nine and Sixty
842 M554 Shellac kg 47.08 Rupees Forty Seven and Eight Paise Only
843 M555 Soft Brush. Each 30.82 Rupees Thirty and Eighty Two Paise Only
844 M556 Soft brushes 100 mm size Each
Rupees Two Hundred Thirteen and Ninety
Eight Paise Only
845 M557 Soft brushes 20 mm size Each
Rupees Fifty Eight and Twenty One Paise
846 M558 Soft brushes 25 mm size Each 65.05 Rupees Sixty Five and Five Paise Only
847 M559 Soft brushes 40 mm size Each 81.32 Rupees Eighty One and Thirty Two Paise Only
848 M560 Soft brushes 50mm size Each
Rupees One Hundred Nineteen and Eighty
Three Paise Only
849 M561 Soft brushes 75 mm size Each
Rupees One Hundred Sixty Two and Sixty
Three Paise Only
850 M562 Spirit Litre 43.65 Rupees Forty Three and Sixty Five Paise Only
851 M563 Spun Yarn kg 46.17 Rupees Forty Six and Seventeen Paise Only
852 M564 Standard shoe 100 mm dia Each
Rupees Twenty Three and Ninety Seven
853 M565 Standard shoe 80 mm dia Each 21.40 Rupees Twenty One and Forty Paise Only
854 M566 Stone dust cu.m.
Rupees One Hundred Sixty Six and Twenty
Four Paise Only
855 M567 Stone Slab 100mm thickness sq.m.
Rupees Two Hundred Sixty Five and Thirty
Four Paise Only
856 M568 Stone ware pipes 100mm dia. 60cm. Long Each
Rupees Twenty Nine and Ninety Six Paise
857 M569 Stone ware pipes 150mm dia. 60cm. Long Each
Rupees Forty Two and Seventy Nine Paise
858 M570 Structual steel M.S. Channel joints Tee Gusset Plate etc. Quintal
Rupees Three Thousand Eight Hundred Forty
Nine and Thirteen Paise Only
859 M571 Synthetic Enamel Paint Litre
Rupees One Hundred Fifty Three and
Twenty One Paise Only
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
860 M572 T.Iron Bracket 40 mm x 40 mm x 6 mm Quintal
Rupees Four Thousand Sixteen and Three
861 M573 T.M.T. Bars Fe- 415 Quintal
Rupees Five Thousand One Hundred Thirty
Eight and Eighty Eight Paise Only
862 M574 Taper G.S.W. Bend 100mm x 150mm Each 62.48 Rupees Sixty Two and Forty Eight Paise Only
863 M575 Terrazo tiles chequered Dark Shade 22mm thick sq.m.
Rupees One Hundred Six and Ninety Nine
864 M576 Terrazo tiles chequered Light shade 22mm thick sq.m.
Rupees Ninety Eight and Forty Three Paise
865 M577 Terrazo tiles chequered Dark shade 28 mm thick sq.m.
Rupees Eighty Nine and Eighty Seven Paise
866 M578 Terrazo tiles chequered Light shade 28 mm thick sq.m. 85.60 Rupees Eighty Five and Sixty Paise Only
867 M579 Terrazo tiles Dark shade 20 mm thick sq.m.
Rupees One Hundred Fifteen and Fifty Five
868 M580 Terrazo tiles Light shade 20 mm thick sq.m.
Rupees One Hundred Eleven and Twenty
Seven Paise Only
869 M581 Terrazzo tiles grey cement base. Dark shade 20mm. thick sq.m.
Rupees One Hundred Twenty Eight and
Thirty Nine Paise Only
870 M582 Terrazzo tiles grey cement base. Light shade 20mm. thick sq.m.
Rupees One Hundred Forty Five and Fifty
871 M583 Terrazzo tiles white cement base Dark shade 20mm thick sq.m.
Rupees Two Hundred Thirty Five and Thirty
Eight Paise Only
872 M584 Terrazzo tiles white cement base Light shade 20mm thick sq.m.
Rupees One Hundred Ninety Two and Fifty
Nine Paise Only
873 M585 Thick Wire Brushes Each 62.52 Rupees Sixty Two and Fifty Two Paise Only
874 M586 Through & Bond Stone Each 22.12 Rupees Twenty Two and Twelve Paise Only
875 M587 Towel Rail Pair of C.P. Brass Brackets 60mm x 20mm Each
Rupees Three Hundred Twenty and Thirteen
876 M588 Turpentine Litre 40.23 Rupees Forty and Twenty Three Paise Only
877 M589 Unscreened gravel cu.m.
Rupees One Hundred Ninety Nine and Forty
Nine Paise Only
878 M590 Unslaked Lime Quintal
Rupees One Hundred Sixty Three and Fifty
879 M591 Urinal Flat Back Each
Rupees Three Hundred Seventy Four and
Four Paise Only
880 M592 Urinal Ladies squatting pan Each
Rupees Five Hundred Seventy Seven and
Seventy Five Paise Only
881 M593 Urinal Squatting type Each
Rupees Four Hundred Twenty Eight and
Eighty Three Paise Only
882 M594 Urinal Stall type full size Each
Rupees One Thousand Five Hundred Forty
and Sixty Seven Paise Only
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
883 M595 Urinal Stall type half size Each
Rupees One Thousand One Hundred Twelve
and Seventy One Paise Only
884 M596 Varnish Litre 61.63 Rupees Sixty One and Sixty Three Paise Only
885 M597 Vegetable black (Kajali) (0.5kg.Pkt.) Pkt. 65.65 Rupees Sixty Five and Sixty Five Paise Only
886 M598 Vision panel for Door Each 29.10 Rupees Twenty Nine and Ten Paise Only
887 M599 Vitryfied Granite tiles 8 mm to 10 m thick 24 x 24 size Dark Shade sq.m.
Rupees Two Hundred Ninety Nine and Fifty
Eight Paise Only
888 M600 Vitryfied Granite tiles 8 mm to 10 m thick 36 x 36 size sq.m.
Rupees Six Hundred Forty One and Ninety
Five Paise Only
889 M602 Waste Pipe for Wash basin C.P. 32 mm dia Each 53.07 Rupees Fifty Three and Seven Paise Only
890 M603 Waste Pipe for Wash basin C.P. 40 mm dia Each 70.18 Rupees Seventy and Eighteen Paise Only
891 M604 Water proofing materials Omaiseal of Bitumen base in semin-liquid form (cold
Litre 68.48 Rupees Sixty Eight and Forty Eight Paise Only
892 M605 Water proofing materials of std. make in powder form kg 5.39 Rupees Five and Thirty Nine Paise Only
893 M606 Water proofing materials Omaiseal for filling joints of C.I. Pipes . kg
Rupees Two Hundred Sixty Five and Thirty
Four Paise Only
894 M607 Water proofing materials Omaiseal for filling joints of C.I. Pipes. Epoxy base Rupees Four Hundred Thirty Six and Fifty
kg 436.52 Two Paise Only
895 M608 Water Proofing Cement Paint kg 29.10 Rupees Twenty Nine and Ten Paise Only
896 M609 Water proofing material heasion base self finish tar felt roll sq.m. 47.08 Rupees Forty Seven and Eight Paise Only
897 M610 Water proofing materials kg 36.80 Rupees Thirty Six and Eighty Paise Only
898 M611 Water proofing materials of polyarethine on Aromatic Base kg
Rupees Three Hundred Twenty and Ninety
Eight Paise Only
899 M612 Water proofing materials of polyarethine on Elepantic base kg
Rupees Four Hundred Sixty Two and Twenty
900 M613 Water proofing materials silicon baseWater repellent compund Litre
Rupees Two Hundred Nine and Seventy One
901 M614 Welding Charge Rmt
Rupees Five Hundred Thirteen and Fifty Five
902 M615 White Bela stone (size to be measured) No 46.75 Rupees Forty Six and Seventy Five Paise Only
903 M616 White Cement Rupees Twenty Seven Thousand Six Hundred
MT 27617.19 Seventeen and Nineteen Paise Only
904 M617 White Lime ( White washing) Quintal 404.00 Rupees Four Hundred Four Only
905 M618 White Paint Litre
Rupees One Hundred Forty Eight and Ninety
Three Paise Only
906 M619 White vitriour china Wash down W.C. (European) Each
Rupees One Thousand Seven Hundred
Eleven and Eighty Seven Paise Only
907 M620 White vitrious china 100mm 'P' or 'S' trap Each
Rupees Seventy Four and Forty Seven Paise
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
908 M621 White vitrious china foot rest for W.C. Pair
Rupees Fifty Four and Seventy Eight Paise
909 M622 White vitrious China Sink 600mm x 450mm x 150mm Each
Rupees One Thousand Two Hundred Forty
Five and Thirty Eight Paise Only
910 M623 White vitrious ching W.C. sqatting pan (India type) Each
Rupees One Thousand Two Hundred Eighty
Three and Ninety Paise Only
911 M624 White vitrious ching W.C. sqatting pan Anglo Indian Each
Rupees One Thousand Three Hundred
Twenty Six and Seventy Paise Only
912 M625 White vitrious ching W.C. sqatting pan European type Each
Rupees Five Hundred Six and Seventy One
913 M626 White vitrious ching W.C. sqatting pan Orrisa type 580 x 400 size Each
Rupees Six Hundred Eighty Four and Seventy
Five Paise Only
914 M627 White Zinc powder (Zinc oxide) kg 94.15 Rupees Ninety Four and Fifteen Paise Only
915 M628 White glazed tiles 15cm x 15cm x 6cm. 10 Each
Rupees Fifty Four and Seventy Eight Paise
916 M629 Whiting chalk kg 5.32 Rupees Five and Thirty Two Paise Only
917 M630 Wire Gauge Jali of 0.56 mm sq.m.
Rupees One Hundred Thirty Seven and
Eighty Paise Only
918 M631 Wire Gauge Jali of 0.71 mm sq.m.
Rupees One Hundred Seventy Six and Thirty
Three Paise Only
919 M632 Wire spring grade No. 2 for Rolling Shutter 27.5 CM long Each
Rupees Five Hundred Forty Seven and
Seventy Nine Paise Only
920 M633 Wired figured glass 6.4 mm thick sq.m.
Rupees Three Hundred Thirteen and Twenty
Seven Paise Only
921 M634 Wooden peg Each 0.86 Eighty Six Paise Only
922 M635 Yellow clay (ltalian type) kg 8.66 Rupees Eight and Sixty Six Paise Only
923 M636 Iron Angle 75 x 75 x 6mm kg 51.36 Rupees Fifty One and Thirty Six Paise Only
924 M637 Iron Angle for stand & frame kg
Rupees Forty Two and Seventy Nine Paise
925 M638 Surfacing gray coat process (Board) sq.m. 17.12 Rupees Seventeen and Twelve Paise Only
926 M639 Retro reflective process (Board) (Eng. Grade) sq.m.
Rupees Twenty Five and Sixty Seven Paise
927 M640 Screen Printing / Art work process (Board) (Eng.) sq.m.
Rupees Thirty Four and Twenty Four Paise
928 M641 Packing Forwarding and Transportation (No-Leg) L.S
Rupees Four Hundred Twenty Seven and
Ninety Seven Paise Only
929 M642 Retro reflective precess (Board) (Hi-Intensity) sq.m.
Rupees Two Hundred Sixty Five and Thirty
Four Paise Only
930 M643 Alluminium Sheet 2mm Thick KGS.
Rupees One Hundred Fifteen and Fifty Five
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
931 M644 Dozer 80 HP with attachment Hour
Rupees Two Thousand Two Hundred Twenty
Five and Forty Two Paise Only
932 M645 Fixing Charges cu.m. 12.84 Rupees Twelve and Eighty Four Paise Only
933 M646 Whiting kg 5.32 Rupees Five and Thirty Two Paise Only
934 M647 Precast Concrete Blocks (1:3:6) (39 X 20 X 19 CMS) 100 each
Rupees One Thousand Nine Hundred Thirty
Five and Twenty Six Paise Only
935 M648 Flat iron bracket with bolts nuts bitumen & G Each 91.59 Rupees Ninety One and Fifty Nine Paise Only
936 M649 Teak reaper Rmt 7.06 Rupees Seven and Six Paise Only
937 M650 MS Flat iron bracket Each
Rupees Thirty One and Sixty Seven Paise
938 M651 Plastic roofing compound kg 13.70 Rupees Thirteen and Seventy Paise Only
939 M652 Nails 50mm long kg
Rupees Twenty Two and Twenty Five Paise
940 M653 C.I rainwater pipe 75mm dia. Rmt
Rupees One Hundred Sixty Seven and
Seventy Six Paise Only
941 M654 Sand rainwater pipe 75mm dia. Rmt
Rupees One Hundred Ninety Six and Eighty
Seven Paise Only
942 M655 Steel Plate & Angle Rupees Thirty Eight Thousand Four Hundred
MT 38491.27 Ninety One and Twenty Seven Paise Only
943 M656 Winch Each
Rupees Thirty Thousand Fifty One and
Seventy Eight Paise Only
944 M657 Chisel Rupees Nineteen Thousand Six Hundred
Each 19686.45 Eighty Six and Forty Five Paise Only
945 M658 Sluge pump (Roller) Rupees One lakh Fifty Five Thousand Three
Each 155351.70 Hundred Fifty One and Seventy Paise Only
946 M659 Tubes Set
Rupees Fifteen Thousand Five Hundred
Thirty Five and Seventeen Paise Only
947 M660 Tripod & Wirerope Rupees One lakh Twenty Four Thousand
Set 124281.36 Two Hundred Eighty One and Thirty Six Paise
948 M661 Trimie pipe and Misc. Cassing Rupees Ninety Eight Thousand Three
Set 98389.40 Hundred Eighty Nine and Forty Paise Only
949 M662 Sheathing pipe 42mm St. of 7mm Rmt 32.52 Rupees Thirty Two and Fifty Two Paise Only
950 M663 C.I. Pipe 100mm Dia Rmt
Rupees One Thousand One Hundred Eighty
One and Eighteen Paise Only
951 M664 G.I. Pipe 100mm Dia Rmt
Rupees Six Hundred Eighty Four and Seventy
Five Paise Only
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
952 M665 G.I. Pipe 50mm Dia A- Class Rmt
Rupees Two Hundred Eighty Two and Forty
953 M666 G.I. Pipe 40mm Dia A - Class Rmt
Rupees Two Hundred Fifty Six and Seventy
Eight Paise Only
954 M667 G.I. Coupling 50mm Dia A- Class Rmt 81.32 Rupees Eighty One and Thirty Two Paise Only
955 M668 G.I. Coupling 40mm Dia A - Class Rmt 41.09 Rupees Forty One and Nine Paise Only
956 M669 Hollow concrete blocks (Size 39 x 9 x 19 cms) Each 15.40 Rupees Fifteen and Forty Paise Only
957 M670 Hollow concrete blocks (Size 39 x 14 x 9 cms) Each 19.68 Rupees Nineteen and Sixty Eight Paise Only
958 M671 Hollow concrete blocks (Size 39 x 14 x 19 cms) Each
Rupees Twenty Two and Sixty Eight Paise
959 M672 Pegs Each 1.71 Rupee One and Seventy One Paise Only
960 M673 Water Tanker 6 kl capacity Hour
Rupees One Hundred Seventy One and
Eighteen Paise Only
961 M674 R.S. Joists 350 x 200 x 6 @ 56.9 kg. Quintal
Rupees Three Thousand Eight Hundred Forty
Nine and Thirteen Paise Only
962 M675 12mm thick M.S. plate Quintal
Rupees Three Thousand Eight Hundred Forty
Nine and Thirteen Paise Only
963 M676 16mm Dia. rivets Quintal
Rupees Two Thousand Eight Hundred
Twenty Four and Fifty Eight Paise Only
964 M677 Principal rafter 100 x 100 x 10 Quintal
Rupees Two Thousand Eight Hundred
Twenty Four and Fifty Eight Paise Only
965 M678 Gusset plate Quintal
Rupees Three Thousand Eight Hundred Forty
Nine and Thirteen Paise Only
966 M679 Ties (Flat) Quintal
Rupees Two Thousand Eight Hundred
Twenty Four and Fifty Eight Paise Only
967 M680 20mm holding down bolt Quintal
Rupees Two Thousand Eight Hundred
Twenty Four and Fifty Eight Paise Only
968 M681 M.S. Channel Quintal
Rupees Three Thousand Eight Hundred Forty
Nine and Thirteen Paise Only
969 M682 M.S Tee Quintal
Rupees Three Thousand Eight Hundred Forty
Nine and Thirteen Paise Only
970 M683 Flat iron diagonal 20 x 5mm Quintal
Rupees Four Thousand Three Hundred Sixty
Five and Twenty Five Paise Only
971 M684 Angle iron 40 x 40 x 6 Quintal
Rupees Three Thousand Eight Hundred Forty
Nine and Thirteen Paise Only
972 M685 M.S. Angel kg 40.02 Rupees Forty and Two Paise Only
973 M686 Alluminium section any size, powder coated kg
Rupees One Hundred Seventy One and
Eighteen Paise Only
974 M687 Alluminium section any size, anodized kg
Rupees Twenty Nine and Ninety Six Paise
975 M688 Rubber gasket for glass beading Rmt 7.71 Rupees Seven and Seventy One Paise Only
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
976 M689 TMT Bar FE 500 D Quintal
Rupees Six Thousand One and Forty Two
977 M690 Vitrified Granite tiles 8 mm to 10 m thick 24" x 24 " size Antiskid Sqm
Rupees Four Hundred Fifteen and Thirteen
978 M691 Vitrified Granite tiles 8 mm to 10 m thick 24" x 24 " size Light Shade Sqm
Rupees Three Hundred Thirteen and Twenty
Seven Paise Only
979 M692 Weather proof acrylic exterior emulsion paint Ltr
Rupees One Hundred Sixty Seven and
Seventy Six Paise Only
980 M693 R.C.C Heavy Duty Non-Pressure Pipe I.S.Class NP=4 300mm dia. Meter
Rupees Five Hundred Thirteen and Fifty Five
981 M694 R.C.C Heavy Duty Non-Pressure Pipe I.S.Class NP=4 450mm dia. Meter
Rupees Eight Hundred Thirteen and Thirteen
982 M695 R.C.C Heavy Duty Non-Pressure Pipe I.S.Class NP=4 600mm dia Meter
Rupees One Thousand Six Hundred Forty
Three and Thirty Nine Paise Only
983 M696 R.C.C Heavy Duty Non-Pressure Pipe I.S.Class NP=4 900mm dia Meter
Rupees Two Thousand Nine Hundred One
and Sixty One Paise Only
984 M697 R.C.C Heavy Duty Non-Pressure Pipe I.S.Class NP=4 1000mm dia Meter
Rupees Three Thousand Four Hundred Six
and Sixty One Paise Only
985 M698 R.C.C Heavy Duty Non-Pressure Pipe I.S.Class NP=4 1200mm dia Meter
Rupees Five Thousand Two Hundred Thirty
Eight and Thirty Paise Only
986 M699 R.C.C Heavy Duty Non-Pressure Pipe I.S.Class NP=4 1400mm dia Meter
Rupees Six Thousand Two Hundred Forty
Eight and Thirty Paise Only
987 M700 R.C.C Heavy Duty Non-Pressure Pipe I.S.Class NP=4 1600mm dia Meter
Rupees Eight Thousand Seven Hundred
Thirty and Fifty One Paise Only
988 M701 R.C.C Heavy Duty Non-Pressure Pipe I.S.Class NP=4 1800mm dia Meter
Rupees Eleven Thousand Forty One and Fifty
989 M702 Glass bricks 19 x 19 x10 Cm No.
Rupees Eighty Three and Eighty Eight Paise
990 M703 Glass Bricks 19 x 19 x8 Cm No. 80.46 Rupees Eighty and Forty Six Paise Only
991 M704 Floor spring heavy duty No.
Rupees One Thousand Eight Hundred
Eighteen and Eighty Six Paise Only
992 M705 S.S. Stopper 60 Cm long of ASIS 304 No.
Rupees Three Hundred Sixty Three and
Seventy Seven Paise Only
993 M706 S.S. Stopper 30 Cm long of ASIS 304 No.
Rupees One Hundred Eighty Two and Thirty
994 M707 S.S. Stopper 20 Cm long of ASIS 304 No.
Rupees One Hundred Twenty Seven and
Fifty Three Paise Only
995 M708 S.S. Aldrop 20 Cm long of ASIS 304 Grade No.
Rupees Two Hundred Eighteen and Twenty
996 M709 S.S. Aldrop 25 Cm long of ASIS 304 Grade No.
Rupees Three Hundred Twenty Seven and
Eighty Three Paise Only
997 M710 S.S. Aldrop 30 Cm long of ASIS 304 Grade No.
Rupees Four Hundred and Fifty Eight Paise
998 M711 S.S. Handle for door/ window 10 Cm size of ASIS 304 Grade No.
Rupees Fifty Four and Seventy Eight Paise
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
999 M712 S.S. Handle for Door 15 Cm size of ASIS 304 Grade No.
Rupees Seventy Six and Seventeen Paise
1000 M713 S.S. Pipe Handle for door 30 Cm size o ASIS 316 Grade No.
Rupees Eight Hundred Seventy Three and
Five Paise Only
1001 M714 S.S. Railing pipe 50 mm x 16 G ASIS 304 Grade Rmt
Rupees One Thousand Fourteen and Twenty
Eight Paise Only
1002 M715 S.S. Rialing Sq pipe 32x32 mm x 16G ASIS 304 Grade Rmt
Rupees Four Hundred Fifty Eight and
Seventy Eight Paise Only
1003 M716 S.S. Railing pipe 16 mm x 16G ASIS 304 Grade Rmt
Rupees Three Hundred Sixty Nine and
Seventy Six Paise Only
1004 M717 C.P. Pillar cock 15 mm Heavy duty swan neck No.
Rupees Six Hundred Forty Seven and Ninety
Five Paise Only
1005 M718 C.P. Angle stop cock 15 mm Heavy duty with cap No.
Rupees Four Hundred Seven and Forty Two
1006 M719 C.P. Bib cock 15 mm Heavy duty with cap No.
Rupees Four Hundred and Fifty Eight Paise
1007 M720 Concealed cock 15 mm Heavy duty with cap No.
Rupees Four Hundred Ninety One and Thirty
1008 M721 Glass 12 mm thick Sqmtr
Rupees Six Hundred Eighty Four and Seventy
Five Paise Only
1009 M722 Glass 10 mm thick Sqmtr
Rupees Five Hundred Ninety Nine and
Fifteen Paise Only
1010 M723 Glass 8 mm thick Sqmtr
Rupees Four Hundred Seventy and Seventy
1011 M724 Labour Charges half round edge for Granite Rmt 85.85 Rupees Eighty Five and Eighty Five Paise Only
1012 M725 Labour Charges Quarter round edge for granite Rmt 51.51 Rupees Fifty One and Fifty One Paise Only
1013 M726 Labour Charges edge finished for Granite Rmt
Rupees Forty Three and Forty Three Paise
1014 M727 Labour Charges half round edge for Kota/Marble Rmt 51.51 Rupees Fifty One and Fifty One Paise Only
1015 M728 Labour charges quarter round edge for Kota/ Marble Rmt
Rupees Thirty Four and Thirty Four Paise
1016 M729 SS Sink Glosy ASIS 304 Grade x 1mm thick with over all size 610x460 mm & Rupees One Thousand Five Hundred Forty
bowl size 560x410x200 and Sixty Seven Paise Only
1017 M730 SS Sink Glosy ASIS 304 Grade x 1mm thick with over all size 510x432mm & Rupees One Thousand Twenty Seven and
bowl size 445x368x190 Twelve Paise Only
1018 M731 SS Sink Glosy ASIS 304 Grade x 1mm thick with over all size 485x410 mm & Rupees Eight Hundred Ninety Eight and
bowl size 410x365x165 Seventy Three Paise Only
1019 M732 Alluminium Composite pannel 3 mm thick Sqmtr
Rupees Six Hundred Fifty Four and Seventy
Nine Paise Only
1020 M733 Alluminium Composite Pannel 4 mm thick Sqmtr
Rupees Seven Hundred Twenty Seven and
Fifty Four Paise Only
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1021 M734 Multy wall plycarbonate sheet 6 mm thick Sqmtr
Rupees Nine Hundred Twenty Four and
Forty Paise Only
1022 M735 S.S. Door / window hinges 4x1"x1" No.
Rupees Fifty Four and Seventy Eight Paise
1023 M736 S.S. Door / Window hinges 4x3/4"x3/4" No.
Rupees Twenty Two and Twenty Five Paise
1024 M737 S.S. Door / Window hinges 3x3/4"x3/4" No.
Rupees Seventeen and Ninety Eight Paise
1025 M738 Jet spray heavy duty with S.S. Braided hose 60 cm long No.
Rupees Three Hundred Eight and Ninety
Nine Paise Only
1026 M739 Health Fauset Heavy duty with hook with fitting No.
Rupees Five Hundred Eighty Two and Three
1027 M740 Precast concrete block of C.C.1:3:6 100 Nos.
Rupees One Thousand Nine Hundred Thirty
Five and Twenty Six Paise Only
1028 M741 Alluminium fixtures and fstenings. No.
Rupees One Hundred Fifty and Sixty Four
1029 M742 Iron fixtures and fstenings. No. 66.76 Rupees Sixty Six and Seventy Six Paise Only
1030 M743 35 mm thick shutters Cu.Dm. 36.80 Rupees Thirty Six and Eighty Paise Only
1031 M744 Tiles size 15 cm x 15 cm (Glazed) 10 Nos.
Rupees Fifty Four and Seventy Eight Paise
1032 M745 Flat iron bracket with nuts, bolts,bitumen and G.I. Washers. Each 91.59 Rupees Ninety One and Fifty Nine Paise Only
1033 M746 M.S. flat iron bracket Each
Rupees Thirty One and Sixty Seven Paise
1034 M747 Plastic proofing compound. Kg. 13.70 Rupees Thirteen and Seventy Paise Only
1035 M748 Teak reaper Meter. 7.06 Rupees Seven and Six Paise Only
1036 M749 Nails 50 mm long. Kg.
Rupees Twenty Two and Twenty Five Paise
1037 M750 C.I.75 mm diameter rain water pipe Rmt.
Rupees One Hundred Sixty Seven and
Seventy Six Paise Only
1038 M751 Whiting cholk Kg. 5.32 Rupees Five and Thirty Two Paise Only
1039 M752 Flatting varnish Liter 67.62 Rupees Sixty Seven and Sixty Two Paise Only
1040 M753 Insecticides. Liter
Rupees Two Hundred Sixty Four and Forty
Eight Paise Only
1041 M754 Aeronex powder Kg. 11.98 Rupees Eleven and Ninety Eight Paise Only
1042 M755 D.D.V.P. Liter
Rupees Two Hundred Thirty One and Ninety
1043 M756 Heptachlor Liter
Rupees Two Hundred Thirty One and Ninety
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1044 M757 Melethione Liter
Rupees Two Hundred Thirty One and Ninety
1045 M758 Acetone Liter
Rupees Two Hundred Thirty One and Ninety
1046 M759 Pags Each 2.02 Rupees Two and Two Paise Only
1047 M760 Galvanised M.S. Tee Each
Rupees One Hundred Twenty Eight and
Thirty Nine Paise Only
1048 M761 Galvanised M.S. 5 mm nut. Each
Rupees Twenty Three and Ninety Seven
1049 M762 A.C. rain water pipe 75 mm diameter (1.8 meter long) Rmt.
Rupees Twenty Two and Twenty Five Paise
1050 M763 A.C. rain water pipe 100 mm diameter (1.8 meter long) Rmt.
Rupees Twenty Five and Sixty Seven Paise
1051 M764 M.S. iron bracket Each 20.54 Rupees Twenty and Fifty Four Paise Only
1052 M765 G.I. inlet connection Each 11.98 Rupees Eleven and Ninety Eight Paise Only
1053 M766 Brass screw down stop tap 20 mm dia Each
Rupees One Hundred Seventy Four and Sixty
1054 M767 Brass screw down stop tap 25 mm dia Each
Rupees One Hundred Eighty Nine and
Sixteen Paise Only
1055 M768 Gun metal wheel valve (i) 15 mm diameter. Each
Rupees One Hundred Sixty and Five Paise
1056 M769 Gun metal wheel valve (i) 20 mm diameter. Each
Rupees One Hundred Seventy Four and Sixty
1057 M770 Gun metal wheel valve (i) 35 mm diameter. Each
Rupees Two Hundred Sixty Nine and Sixty
1058 M771 Chromium plated 20 mm diameter half turn flush cock. Each
Rupees Two Hundred Eighteen and Twenty
1059 M772 Chromium plated 25 mm diameter half turn flush cock. Each
Rupees Two Hundred Twenty Five and
Ninety Seven Paise Only
1060 M773 Chromium plated 32 mm diameter half turn flush cock. Each
Rupees Two Hundred Thirty Six and Twenty
Four Paise Only
1061 M774 Cromium plated bottle trap. Each
Rupees Two Hundred Fifty Three and Forty
1062 M775 Ball cock of copper 25 mm diameter Each
Rupees One Hundred Thirteen and Eighty
Four Paise Only
1063 M776 Ball cock of copper 50 mm diameter Each
Rupees One Hundred Sixty Two and Sixty
Three Paise Only
1064 M777 Ball cock of abonite 25 mm diameter Each 88.16 Rupees Eighty Eight and Sixteen Paise Only
1065 M778 Ball cock of abonite 50 mm diameter Each
Rupees One Hundred Eighteen and Twelve
1066 M779 Gully trap 100mm x 100 mm size. Each 36.80 Rupees Thirty Six and Eighty Paise Only
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1067 M780 I.S. Class NP2 Heavy duty Non- Pressure Pipe (i) 250 mm diameter Rmt.
Rupees Two Hundred Thirty Five and Thirty
Eight Paise Only
1068 M781 1.80 mm thick FRP sheet Sqmtr
Rupees Two Hundred Eighteen and Twenty
1069 M782 Plywood all proof ( IS 710 ) 6 mm Sqmtr
Rupees Two Hundred Ninety One and Two
1070 M783 Plywood all proof ( IS 710 ) 8/9 mm Sqmtr
Rupees Three Hundred Forty Two and Thirty
Seven Paise Only
1071 M784 Plywood all proof ( IS 710 ) 12 mm Sqmtr
Rupees Three Hundred Eighty Five and
Seventeen Paise Only
1072 M785 Plywood all proof ( IS 710 ) 16 mm Sqmtr
Rupees Five Hundred Thirteen and Fifty Five
1073 M786 Plywood all proof ( IS 710 ) 18/19 mm Sqmtr
Rupees Five Hundred Ninety Nine and
Fifteen Paise Only
1074 M787 Laminated sheet 0.80 mm thick Sqmtr
Rupees One Hundred Seventy One and
Eighteen Paise Only
1075 M788 Laminated sheet 1.00 mm thick Sqmtr
Rupees Two Hundred Ninety Nine and Fifty
Eight Paise Only
1076 M789 CPVC Pipe SDR 13.5 - 15 mm daimeter (1/2)" Rmt
Rupees Thirty Nine and Thirty Seven Paise
1077 M790 CPVC Pipe SDR 13.5 - 20 mm daimeter (3/4)" Rmt 62.48 Rupees Sixty Two and Forty Eight Paise Only
1078 M791 CPVC Pipe SDR 13.5 - 25 mm daimeter (1)" Rmt 86.45 Rupees Eighty Six and Forty Five Paise Only
1079 M792 CPVC Pipe SDR 13.5 - 32 mm daimeter (1 1/4)" Rmt
Rupees One Hundred Twenty Seven and
Fifty Three Paise Only
1080 M793 CPVC Pipe SDR 13.5 - 40 mm daimeter (1 1/2)" Rmt
Rupees One Hundred Seventy Four and Sixty
1081 M794 CPVC Pipe SDR 13.5 - 50 mm daimeter Rmt
Rupees Two Hundred Eighty Six and Seventy
Four Paise Only
1082 M795 CPVC Pipe jointing solution 50 ml each
Rupees Thirty Nine and Thirty Seven Paise
1083 M796 U PVC SCH40 for cold water 15 mm dia(1/2)" Rmt 21.40 Rupees Twenty One and Forty Paise Only
1084 M797 U PVC SCH40 for cold water 20 mm dia (3/4)" Rmt
Rupees Twenty Seven and Thirty Nine Paise
1085 M798 U PVC SCH40 for cold water 25 mm dia (1)" Rmt
Rupees Forty Two and Seventy Nine Paise
1086 M799 U PVC SCH40 for cold water 32 mm dia (1 1/4)" Rmt 55.63 Rupees Fifty Five and Sixty Three Paise Only
1087 M800 U PVC SCH40 for cold water 40 mm dia (1 1/2)" Rmt 70.18 Rupees Seventy and Eighteen Paise Only
1088 M801 U PVC SCH40 for cold water 50 mm dia (2)" Rmt
Rupees Ninety Five and Eighty Seven Paise
1089 M802 UPVC Pipe jointing solution 50 ml each 66.76 Rupees Sixty Six and Seventy Six Paise Only
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1090 M803 PVC SWR pipes IS 13592 for Drain - 75 mmdia Rmt
Rupees One Hundred Forty Four and Sixty
Five Paise Only
1091 M804 PVC SWR pipes IS 13592 for Drain - 90 mmdia Rmt
Rupees Two Hundred Three and Seventy
1092 M805 PVC SWR pipes IS 13592 for Drain - 110 mmdia Rmt
Rupees Two Hundred Sixty Five and Thirty
Four Paise Only
1093 M806 PVC SWR pipes IS 13592 for Drain - 160 mmdia Rmt
Rupees Five Hundred Fifteen and Twenty
Seven Paise Only
1094 M807 PVC SWR Nani Trap IS 14735 for Drain -75 mm dia with jali No 68.48 Rupees Sixty Eight and Forty Eight Paise Only
1095 M808 PVC SWR Nani Trap IS 14735 for Drain -100 mm dia with jali No
Rupees Seventy Five and Thirty Three Paise
1096 M809 PVC SWR P- Trap IS 14735 for Drain -110x110 No
Rupees One Hundred Fifty Nine and Twenty
1097 M810 PVC SWR P- Trap IS 14735 for Drain -125x110 No
Rupees One Hundred Eighty Nine and
Sixteen Paise Only
1098 M811 PVC SWR S- Trap IS 14735 for Drain -110x110 No
Rupees Two Hundred Eighty and Seventy
Five Paise Only
1099 M812 PVC SWR S- Trap IS 14735 for Drain -125x110 No
Rupees Two Hundred Ninety Eight and
Seventy Two Paise Only
1100 M813 PVC SWR Single Y" - 75 mm dia" No
Rupees Fifty Eight and Twenty One Paise
1101 M814 PVC SWR Single Y" -110 mm dia" No
Rupees One Hundred Eleven and Twenty
Seven Paise Only
1102 M815 PVC SWR Double Y" - 75 mm dia" No
Rupees Eighty Three and Eighty Eight Paise
1103 M816 PVC SWR Double Y" -110 mm dia" No
Rupees One Hundred Forty Eight and Eight
1104 M817 PVC SWR Single T" - 75 mm dia" No
Rupees Forty Eight and Seventy Nine Paise
1105 M818 PVC SWR Single T" -110 mm dia" No 89.02 Rupees Eighty Nine and Two Paise Only
1106 M819 PVC SWR Gully Trap 160 x 110 No
Rupees Two Hundred Eighty Nine and Thirty
1107 M820 PVC SWR Single Y" - 75 mm dia With Door" No 77.03 Rupees Seventy Seven and Three Paise Only
1108 M821 PVC SWR Single Y" -110 mm dia With Door" No
Rupees One Hundred Thirty Seven and
Eighty Paise Only
1109 M822 PVC SWR Double Y" - 75 mm dia With Door" No
Rupees One Hundred Six and Ninety Nine
1110 M823 PVC SWR Double Y" -110 mm dia With Door" No
Rupees One Hundred Seventy Four and Sixty
1111 M824 PVC SWR Single T" - 75 mm dia With Door" No 59.05 Rupees Fifty Nine and Five Paise Only
1112 M825 PVC SWR Single T" -110 mm dia With Door" No
Rupees One Hundred Nine and Fifty Five
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1113 M826 PVC SWR Reducer 110 x 75 No 43.65 Rupees Forty Three and Sixty Five Paise Only
1114 M827 PVC SWR Piipe clamp 75 mm No 8.55 Rupees Eight and Fifty Five Paise Only
1115 M828 PVC SWR Piipe clamp 110 mm No 12.84 Rupees Twelve and Eighty Four Paise Only
1116 M829 PVC SWR Piipe Bend 87.5 degree with door for 75 mm diameter No 37.66 Rupees Thirty Seven and Sixty Six Paise Only
1117 M830 PVC SWR Piipe Bend 87.5 degree with door for 90 mm diameter No 56.49 Rupees Fifty Six and Forty Nine Paise Only
1118 M831 PVC SWR Piipe Bend 87.5 degree with door for 110 mm diameter No 62.48 Rupees Sixty Two and Forty Eight Paise Only
1119 M832 PVC SWR WC Connector 110 mm No
Rupees One Hundred Twenty Eight and
Thirty Nine Paise Only
1120 M833 PVC SWR LIP RING 110 X 110 No 23.11 Rupees Twenty Three and Eleven Paise Only
1121 M834 PVC SWR LIP RING 110 X 125 No
Rupees Twenty Eight and Twenty Five Paise
1122 M835 PVC SWR Vent Cowl 75 mm dia No 9.41 Rupees Nine and Forty One Paise Only
1123 M836 PVC SWR Vent Cowl 110 mm dia No 19.68 Rupees Nineteen and Sixty Eight Paise Only
1124 M837 PVC SWR Coupler 75 mm dia No
Rupees Twenty Eight and Twenty Five Paise
1125 M838 PVC SWR Coupler 110 mm dia No
Rupees Forty Five and Thirty Seven Paise
1126 M839 PVC SWR Piipe Bend 45 degree 75 mm dia No
Rupees Thirty One and Sixty Seven Paise
1127 M840 PVC SWR Piipe Bend 45 degree 110 mm dia No 59.05 Rupees Fifty Nine and Five Paise Only
1128 M841 R.C.C Heavy Duty Non-Pressure Pipe I.S. Class NP=3 casted by Vertically Rupees Five Hundred Fifty Eight and Seven
Vibrated Technology -300mm dia. Paise Only
1129 M842 R.C.C Heavy Duty Non-Pressure Pipe I.S. Class NP=3 casted by Vertically Rupees Eight Hundred Fifty Five and Ninety
Vibrated Technology -450mm dia. Three Paise Only
1130 M843 R.C.C Heavy Duty Non-Pressure Pipe I.S. Class NP=3 casted by Vertically Rupees One Thousand Sixty Nine and Ninety
Vibrated Technology -500mm dia. One Paise Only
1131 M844 R.C.C Heavy Duty Non-Pressure Pipe I.S. Class NP=3 casted by Vertically Rupees One Thousand One Hundred Fifty
Vibrated Technology -600mm dia. Five and Fifty One Paise Only
1132 M845 R.C.C Heavy Duty Non-Pressure Pipe I.S. Class NP=3 casted by Vertically Rupees Two Thousand Twenty Four and
Vibrated Technology -900mm dia. Twenty Eight Paise Only
1133 M846 R.C.C Heavy Duty Non-Pressure Pipe I.S. Class NP=3 casted by Vertically Rupees Three Thousand Six Hundred Forty
Vibrated Technology -1000mm dia. One and Ninety Nine Paise Only
1134 M847 R.C.C Heavy Duty Non-Pressure Pipe I.S. Class NP=3 casted by Vertically Rupees Four Thousand Nine Hundred Sixty
Vibrated Technology -1200mm dia. Four and Forty Paise Only
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1135 M848 R.C.C Heavy Duty Non-Pressure Pipe I.S. Class NP=3 casted by Vertically Rupees Five Thousand Nine Hundred Forty
Rmt 5948.73 Eight and Seventy Three Paise Only
Vibrated Technology -1400mm dia.
1136 M849 R.C.C Heavy Duty Non-Pressure Pipe I.S. Class NP=4 casted by Vertically Rupees Five Hundred Twenty Two and
Vibrated Technology -300mm dia. Twelve Paise Only
1137 M850 R.C.C Heavy Duty Non-Pressure Pipe I.S. Class NP=4 casted by Vertically Rupees One Thousand Fourteen and Twenty
Vibrated Technology -450mm dia. Eight Paise Only
1138 M851 R.C.C Heavy Duty Non-Pressure Pipe I.S. Class NP=4 casted by Vertically Rupees One Thousand Two Hundred Ninety
Vibrated Technology -500mm dia. Six and Seventy Four Paise Only
1139 M852 R.C.C Heavy Duty Non-Pressure Pipe I.S. Class NP=4 casted by Vertically Rupees One Thousand Nine Hundred and
Vibrated Technology -600mm dia. Seventeen Paise Only
1140 M853 R.C.C Heavy Duty Non-Pressure Pipe I.S. Class NP=4 casted by Vertically Rupees Three Thousand Five Hundred
Vibrated Technology -900mm dia. Ninety Four and Ninety One Paise Only
1141 M854 R.C.C Heavy Duty Non-Pressure Pipe I.S. Class NP=4 casted by Vertically Rupees Four Thousand Four Hundred
Vibrated Technology -1000mm dia. Twenty and Eighty Nine Paise Only
1142 M855 R.C.C Heavy Duty Non-Pressure Pipe I.S. Class NP=4 casted by Vertically Rupees Six Thousand One Hundred Sixty
Vibrated Technology -1200mm dia. Two and Seventy One Paise Only
1143 M856 R.C.C Heavy Duty Non-Pressure Pipe I.S. Class NP=4 casted by Vertically Rupees Eight Thousand Three Hundred
Vibrated Technology -1400mm dia. Thirty Two and Fifty Paise Only
1144 M857 Vitryfied tiles 8 mm to 10 m thick 600 X600 MM size Light shed sq.m.
Rupees Two Hundred Fifty Six and Seventy
Eight Paise Only
1145 M858 Anodised to Alluminium section kg 36.80 Rupees Thirty Six and Eighty Paise Only
1146 M859 Darkshed pigment kg 65.05 Rupees Sixty Five and Five Paise Only
1147 M860 Belt clamp 80mm Each 11.13 Rupees Eleven and Thirteen Paise Only
1148 M861 Belt clamp 100mm Each 15.40 Rupees Fifteen and Forty Paise Only
1149 M862 Off-set 75 mm - 80 mm dia Each
Rupees Seventeen and Ninety Eight Paise
1150 M863 G.S.W. bend 150 mm Each 51.36 Rupees Fifty One and Thirty Six Paise Only
1151 M864 Anodised Aluminum Butt hinges 75 mm x63 mm x 3.2 mm 10 Each
Rupees One Hundred Thirty Four and Thirty
Eight Paise Only
1152 M865 R.C.C Heavy Duty Non-Pressure pipe I.S.Class NP=2 750mm dia. Rmt
Rupees One Thousand One Hundred Ninety
Eight and Thirty Paise Only
1153 M866 R.C.C Heavy Duty Non-Pressure Pipe I.S.Class NP=3 900mm dia. Rmt
Rupees Two Thousand Three Hundred Fifty
Seven and Twenty Four Paise Only
1154 M867 Brick bats 20mm cu.m.
Rupees One Hundred Thirty Seven and
Ninety Eight Paise Only
1155 M868 DDVP Litre
Rupees Two Hundred Thirty One and Ninety
1156 M869 Heptachlor Litre
Rupees Two Hundred Thirty One and Ninety
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1157 M870 Melethione Litre
Rupees Two Hundred Thirty One and Ninety
1158 M871 Acetone Litre
Rupees Two Hundred Thirty One and Ninety
1159 M872 Pre-Moulded Asphalt joint Filler 20mm size Rmt
Rupees Six Hundred Eleven and Thirteen
1160 M873 100 mm thick SIL FLEX (Capcell HD 100) expansion joint filler board in sheet Rupees Twenty Five and Sixty Seven Paise
1161 M874 Hydrocell XL semi rigid UV resistance high performance laminated closed cell Rupees Twenty Five and Sixty Seven Paise
polythene foam joint filler in sheet foam Only
1162 M875 Expansion joint sealing System on 100 mm Wide sqm
Rupees Four Thousand One Hundred Eight
and Forty Eight Paise Only
1163 M876 Polysulphide material density of material 1650 Kg/m3 Kg
Rupees Three Hundred Eighty Three and
Forty Six Paise Only
1164 M877 PU foam expancell. Rmt
Rupees Twenty Seven and Thirty Nine Paise
1165 M878 4mm thick exterior composite panel sqm
Rupees Eight Hundred Fifty Five and Ninety
Three Paise Only
1166 M879 Anodized Alluminium Groove member For top fix glass. Sec:4431 Kg
Rupees Two Hundred Thirteen and Ninety
Eight Paise Only
1167 M880 Powder coated Alluminium Groove member For top fix glass.Sec:4431 Kg
Rupees Two Hundred Thirteen and Ninety
Eight Paise Only
1168 M881 Anodized Alluminium Horizontal four track Section :8787, 122.20 x 31.75 x 1.10 Rupees Two Hundred Thirteen and Ninety
mm @ Wt. 1.205 Kg/mt Eight Paise Only
1169 M882 Powder coated Alluminium Horizontal four track Section :8787, 122.20 x 31.75 x Rupees Two Hundred Thirteen and Ninety
1.10 mm @ Wt. 1.205 Kg/mt Eight Paise Only
1170 M883 Anodized Alluminium Horizontal Shutter Section 8947, 40.00 x 18.00 x 1.29 mm Rupees Two Hundred Thirteen and Ninety
@ Wt. 0.456 Kg/mt Eight Paise Only
1171 M884 Anodized Alluminium Horizontal three track Section :92mm x 31.75mm x 1.30mm Rupees Two Hundred Thirteen and Ninety
(of Jindal Section no:8688,@ Wt. 1.07 Kg/mt) Eight Paise Only
1172 M885 Powder coated Alluminium Horizontal three track Section :92mm x 31.75mm x Rupees Two Hundred Thirteen and Ninety
1.30mm (of Jindal Section no:8688,@ Wt. 1.07 Kg/mt) Eight Paise Only
1173 M886 Anodized Alluminium Horizontal Two track Section :8687, 61.85 x 31.75 x 1.20 Rupees Two Hundred Thirteen and Ninety
mm @ Wt. 0.695 Kg/mt Eight Paise Only
1174 M887 Powder coated Alluminium Horizontal Two track Section :8687, 61.85 x 31.75 x Rupees Two Hundred Thirteen and Ninety
1.20 mm @ Wt. 0.695 Kg/mt Eight Paise Only
1175 M888 Anodized Alluminium Vertical four track Section :8935, 122.20 x 31.75 x 1.50 mm Rupees Two Hundred Thirteen and Ninety
@ Wt. 1.398 Kg/mt Eight Paise Only
1176 M889 Powder coated Alluminium Vertical four track Section :8935, 122.20 x 31.75 x Rupees Two Hundred Thirteen and Ninety
1.50 mm @ Wt. 1.398 Kg/mt Eight Paise Only
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1177 M890 Anodized Alluminium Vertical Shutter Section 8949, 40.00 x 18.00 x 1.29 mm @ Rupees Two Hundred Thirteen and Ninety
Wt. 0.456 Kg/mt Eight Paise Only
1178 M891 Powder coated Alluminium Vertical Shutter Section 8949, 40.00 x 18.00 x 1.29 Rupees Two Hundred Thirteen and Ninety
mm @ Wt. 0.456 Kg/mt Eight Paise Only
1179 M892 Anodized Alluminium Vertical Shutter Section 8948, 40.00 x 18.00 x 1.29 mm @ Rupees Two Hundred Thirteen and Ninety
Wt. 0.547 Kg/mt Eight Paise Only
1180 M893 Powder coated Alluminium Vertical Shutter Section 8948, 40.00 x 18.00 x 1.29 Rupees Two Hundred Thirteen and Ninety
mm @ Wt. 0.547 Kg/mt Eight Paise Only
1181 M894 Anodized Alluminium Vertical three track Section :92mm x 31.75mm x 1.50mm Rupees Two Hundred Thirteen and Ninety
(of Jindal Section no:8933,@ Wt. 1.06 Kg/mt) Eight Paise Only
1182 M895 Powder coated Alluminium Vertical three track Section :92mm x 31.75mm x Rupees Two Hundred Thirteen and Ninety
1.50mm (of Jindal Section no:8933,@ Wt. 1.06 Kg/mt) Eight Paise Only
1183 M896 Anodized Alluminium Vertical Shutter Section 8947, 40.00 x 18.00 x 1.29 mm @ Rupees Two Hundred Thirteen and Ninety
Wt. 0.456 Kg/mt Eight Paise Only
1184 M897 Powder coated Alluminium Vertical Shutter Section 8947, 40.00 x 18.00 x 1.29 Rupees Two Hundred Thirteen and Ninety
mm @ Wt. 0.456 Kg/mt Eight Paise Only
1185 M898 Anodized Alluminium Vertical Two track Section :8758, 61.85 x 31.75 x 1.30 mm Rupees Two Hundred Thirteen and Ninety
@ Wt. 0.659 Kg/mt Eight Paise Only
1186 M899 Powder coated Alluminium Vertical Two track Section :8758, 61.85 x 31.75 x 1.30 Rupees Two Hundred Thirteen and Ninety
mm @ Wt. 0.659 Kg/mt Eight Paise Only
1187 M900 Anodized Aluminium , Section :2443, 127.00 x 38.10 x 1.35 mm @ Wt.1.384 Rupees Two Hundred Thirteen and Ninety
Kg/mt Eight Paise Only
1188 M901 Powder coated Alluminium Section :2443, 127.00 x 38.10 x 1.35 mm @ Wt.1.384 Rupees Two Hundred Thirteen and Ninety
Kg/mt Eight Paise Only
1189 M902 Anodized Alluminium 95mm x 24mm x 1.17mm (of Jindal Section no:2459 @ Rupees Two Hundred Thirteen and Ninety
wt.of 0.738Kg/mt) Eight Paise Only
1190 M903 Powder coated Alluminium 95mm x 24mm x 1.17mm (of Jindal Section no:2459 Rupees Two Hundred Thirteen and Ninety
@ wt.of 0.738Kg/mt) Eight Paise Only
1191 M904 Anodized Alluminium Section 63.50 x 38.10 x 1.2 mm @ Wt. 0.643 Kg/mt Kg
Rupees Two Hundred Thirteen and Ninety
Eight Paise Only
1192 M905 Powder coated Alluminium Section 63.50 x 38.10 x 1.2 mm @ Wt. 0.643 Kg/mt Rupees Two Hundred Thirteen and Ninety
Kg 213.98 Eight Paise Only
1193 M906 Beading clips Size 19.00 x 17.30 x 0.90 mm @ Wt. 0.124 Kg/mt. Kg
Rupees Two Hundred Thirteen and Ninety
Eight Paise Only
1194 M907 Pre-cast kerb block M250 Grade Rmt.
Rupees One Hundred Seventy One and
Eighteen Paise Only
1195 M908 Paver block M200 Grade 60mm Thick sqm
Rupees Three Hundred Thirty Three and
Eighty Two Paise Only
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1196 M910 Paver block M250 Grade 60mm Thick sqm
Rupees Three Hundred Eighty and Eighty
Nine Paise Only
1197 M911 Glzed tiles piece wastege. sqm 64.20 Rupees Sixty Four and Twenty Paise Only
1198 M912 Polycarbonate multi wall Roofing sheet sqm
Rupees Nine Hundred Twenty Four and
Forty Paise Only
1199 M913 Hardware material hilti screw and rubber silicon sealer and alluminium strip of Rupees Three Hundred Ten and Eighty Three
size 50 x 3 mm Paise Only
1200 M914 Birla or Asian acrylic lapy ( putty) sqm 18.42 Rupees Eighteen and Forty Two Paise Only
1201 M915 wall primer of approved brand sqm 16.52 Rupees Sixteen and Fifty Two Paise Only
1202 M916 PVC water tank litre 3.21 Rupees Three and Twenty One Paise Only
1203 M917 Plasticizer 300 ml of 50 kg cement liter
Rupees Twenty Five and Sixty Seven Paise
1204 M918 Sunext 8 (3 coat) sqmr.
Rupees Seventeen and Ninety Eight Paise
1205 M919 1. 12 mm thick CAPCELL HD - 100 pre-moulded compressible filler board Rupees Two Hundred Fifty Six and Seventy
sqm 256.78 Eight Paise Only
1206 M920 1. 20 mm thick CAPCELL HD - 100 pre-moulded compressible filler board Rupees Four Hundred Twenty Seven and
sqm 427.97 Ninety Seven Paise Only
1207 M921 1. 40 mm thick CAPCELL HD - 100 pre-moulded compressible filler board Rupees Eight Hundred Fifty Five and Ninety
sqm 855.93 Three Paise Only
1208 M922 1. 12mm x 10 mm sealant for 12 mm thick pre-moulded compressible filler board Rupees Three Hundred Ninety Eight and One
kg 398.01 Paise Only
1209 M923 1. 20mm x 10 mm sealant for 20 mm thick pre-moulded compressible filler board Rupees Three Hundred Ninety Eight and One
kg 398.01 Paise Only
1210 M924 Aerated light weight concrete block 600 x 200 x 200 mm Nos. 76.00 Rupees Seventy Six Only
1211 M925 1. 15 mm diametre backup rod m 5.78 Rupees Five and Seventy Eight Paise Only
1212 M926 1. 20 mm diametre backup rod m 9.63 Rupees Nine and Sixty Three Paise Only
1213 M927 1. 30 mm diametre backup rod m 11.55 Rupees Eleven and Fifty Five Paise Only
1214 M928 1. 50 mm diametre backup rod m 38.52 Rupees Thirty Eight and Fifty Two Paise Only
1215 M929 1. 60 mm diametre backup rod m 51.36 Rupees Fifty One and Thirty Six Paise Only
1216 M930 PPGI Sheet ( 0.5 mm Thk) (100+100+10 wt. of 0.82425 per no.) Nos. 64.20 Rupees Sixty Four and Twenty Paise Only
1217 M931 PPGI Sheet ( 0.5 mm Thk) (150+150+10 wt. of 1.21675 per no.) Nos. 64.20 Rupees Sixty Four and Twenty Paise Only
1218 M932 1. 15 mm diameter CPVC (SDR 13.5) PIPE with fittings like lbow, tee Meter 46.22 Rupees Forty Six and Twenty Two Paise Only
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1219 M933 1. 20 mm diameter CPVC (SDR 13.5) PIPE Meter
Rupees Seventy Three and Sixty One Paise
1220 M934 1. 25 mm diameter CPVC (SDR 13.5) PIPE Meter
Rupees One Hundred One and Eighty Six
1221 M935 1. 32 mm diameter CPVC (SDR 13.5) PIPE Meter
Rupees One Hundred Forty Nine and
Seventy Nine Paise Only
1222 M936 1. 40 mm diameter CPVC (SDR 13.5) PIPE Meter
Rupees Two Hundred Five and Forty Two
1223 M937 1. 50 mm diameter CPVC (SDR 13.5) PIPE Meter
Rupees Three Hundred Thirty Seven and
Twenty Four Paise Only
1224 M938 15mm dia. U.P.V.C. Pipe ( ( SCH- 40) length = 12.0 mt Rmt
Rupees Twenty Four and Eighty Three Paise
1225 M939 25mm dia. U.P.V.C. Pipe ( ( SCH- 40) length = 12.0 mt Rmt 50.50 Rupees Fifty and Fifty Paise Only
1226 M940 32mm dia. U.P.V.C. Pipe ( ( SCH- 40) length = 12.0 mt Rmt 65.05 Rupees Sixty Five and Five Paise Only
1227 M941 40mm dia. U.P.V.C. Pipe ( ( SCH- 40) length = 12.0 mt Rmt 82.17 Rupees Eighty Two and Seventeen Paise Only
1228 M942 50mm dia. U.P.V.C. Pipe ( ( SCH- 40) length = 12.0 mt Rmt
Rupees One Hundred Twelve and Ninety
Eight Paise Only
1229 M943 Clamps including Nails Nos 4.28 Rupees Four and Twenty Eight Paise Only
1230 M944 Solution 50 ml adhesive solvent Nos
Rupees Seventy Eight and Seventy Five Paise
1231 M945 3. Clamps No. 95.01 Rupees Ninety Five and One Paise Only
1232 M946 4. Solution No. 15.40 Rupees Fifteen and Forty Paise Only
1233 M947 1. 160 dia UPVC pipe Rmt 606.00 Rupees Six Hundred Six Only
1234 M949 5. Jani Hails ml
Rupees Ninety Two and Ninety Two Paise
1235 M950 30mm thick PUF Insulated continuous sandwich panels ( 0.5 mm thick pre coated
Rupees One Thousand One Hundred Fifty
Sqm 1150.16 and Sixteen Paise Only
GI sheet on both side of Polyurethane foam with external face being corrugated)
1236 M951 30mm thick PUF Insulated continuous sandwich panels( 0.35 mm thick pre
Rupees Nine Hundred Ninety Three and
coated GI sheet on both side of Polyurethane foam with external face being Sqm 993.74 Seventy Four Paise Only
1237 M952 50mm thick PUF Insulated continuous sandwich panels( 0.50 mm thick pre
Rupees One Thousand One Hundred
coated GI sheet on both side of Polyurethane foam with external face being Sqm 1176.05 Seventy Six and Five Paise Only
1238 M953 50mm thick PUF Insulated continuous sandwich panels( 0.35 mm thick pre
Rupees One Thousand Eleven and Seventy
coated GI sheet on both side of Polyurethane foam with external face being Sqm 1011.71 One Paise Only
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1239 M954 40mm thick PUF Insulated continuous sandwich panels( 0.5 mm thick pre coated
Rupees One Thousand One Hundred Thirty
Sqm 1134.11 Four and Eleven Paise Only
GI sheet on both side of Polyurethane foam with external face being corrugated)
1240 M955 40mm thick PUF Insulated continuous sandwich panels( 0.35 mm thick pre
Rupees Nine Hundred Sixty Nine and
coated GI sheet on both side of Polyurethane foam with external face being Sqm 969.77 Seventy Seven Paise Only
1241 M956 RHS 122 x 61 x 3.6 (2904mm) Kg 51.36 Rupees Fifty One and Thirty Six Paise Only
1242 M957 8mm Plate (122 X 61mm) Kg 41.09 Rupees Forty One and Nine Paise Only
1243 M958 8mm Plate (300 x 300) Kg 41.09 Rupees Forty One and Nine Paise Only
1244 M959 8mm Plate (100 x 75) Kg 41.09 Rupees Forty One and Nine Paise Only
1245 M960 8mm Plate (110 x 70) Kg 41.09 Rupees Forty One and Nine Paise Only
1246 M961 PPGI Sheet 52mm x 30mm ( 0.5 mm Thk) Nos. 64.20 Rupees Sixty Four and Twenty Paise Only
1247 M962 Machineing Charge for making continous Profiling for PPGI Sheet 52mm x
Rmt 51.36 Rupees Fifty One and Thirty Six Paise Only
30mm ( 0.5 mm Thk)
1248 M964 Machineing Charge for making continous Profiling PPGI Sheet 42mm x 30mm (
Rmt 51.36 Rupees Fifty One and Thirty Six Paise Only
1249 M965 PPGI Sheet 42mm x 30mm ( 0.5 mm Thk) Nos. 64.20 Rupees Sixty Four and Twenty Paise Only
1250 M967 PPGI Sheet 1000mm x 600mm ( 0.5 mm Thk) Nos. 64.20 Rupees Sixty Four and Twenty Paise Only
1251 M969 PPGI Sheet 1000mm x 600mm ( 0.5 mm Thk) Nos. 64.20 Rupees Sixty Four and Twenty Paise Only
1252 M970 Machineing Charge for making continous Profiling PPGI Sheet 1000mm x Rupees Four Hundred Forty Five and Nine
600mm ( 0.5 mm Thk) Paise Only
1253 M971 PPGI Sheet End Cap for 30mm thick panel ( 0.5 mm Thk) Nos. 64.20 Rupees Sixty Four and Twenty Paise Only
1254 M973 PPGI Sheet End Cap for 40mm thick panel ( 0.5 mm Thk) Nos. 64.20 Rupees Sixty Four and Twenty Paise Only
1255 M975 PPGI Sheet Corner Angle 25x25 for Various Flashing ( 0.5 mm Thk) Nos. 64.20 Rupees Sixty Four and Twenty Paise Only
1256 M977 PPGI Sheet Corner Angle 50x50 for Various Flashing ( 0.5 mm Thk) Nos. 64.20 Rupees Sixty Four and Twenty Paise Only
1257 M979 PPGI Sheet Corner Angle 100x100 for Various Flashing ( 0.5 mm Thk) Nos. 64.20 Rupees Sixty Four and Twenty Paise Only
1258 M981 PPGI Sheet Corner Angle 150x150 for Various Flashing ( 0.5 mm Thk) Nos. 64.20 Rupees Sixty Four and Twenty Paise Only
1259 M983 Silane Nanotechnology Kg
Rupees Six Hundred Eighty Four and Seventy
Five Paise Only
1260 M984 Acrylic copolymer Kg
Rupees Two Hundred Thirteen and Ninety
Eight Paise Only
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1261 M985 Water Kg 0.25 Twenty Five Paise Only
1262 M986 Water tanker with pressure distributor/sprayer hrs
Rupees Four Hundred Twenty Seven and
Ninety Seven Paise Only
1263 M987 Silane Nanotechnology (for bitumen emulsion application) Kg
Rupees One Thousand Twenty Seven and
Twelve Paise Only
1264 M988 BT Metal 25 to 40 MM & Aggregate 13.2 and down chips & SD including Rupees Eight Hundred Eighty Five and
conveyence Thirteen Paise Only
1265 M989 Silane Nanotechnology Z Kg
Rupees One Thousand One Hundred Ninety
Eight and Thirty Paise Only
1266 M990 Light weight Calcium Silicate tegular edged 595X595 Modular Acoustical celling Rupees Eight Hundred Thirteen and Thirteen
tiles with 15 mm Thick Densified edges including 5% wastage Paise Only
1267 M991 Galvanized Steel main Tee ceiling section Size 24x38x0.33mm (3 metre long) Rupees One Hundred Fifty Four and Seven
Each 154.07 Paise Only
1268 M992 Galvanized Steel perimeter wall Angle Size 24 x 24 x 0.40 mm (3.00 metre long) Rupees One Hundred Forty Five and Ninety
Each 145.93 Three Paise Only
1269 M993 Galvanized Steel intermediate cross T section Size 24 x 28 x 0.30 mm (
Each 77.03 Rupees Seventy Seven and Three Paise Only
1270 M994 Galvanized Steel intermediate cross T section Size 24 x 28 x 0.30 ( 0.6 metre
Each 38.60 Rupees Thirty Eight and Sixty Paise Only
1271 M995 Hanger rod 4mm thick Each 5.99 Rupees Five and Ninety Nine Paise Only
1272 M996 Level Adjustment clip Size 85x30x0.8 mm Each 5.13 Rupees Five and Thirteen Paise Only
1273 M997 Dash fastener 12.5 mm dia 50 mm long Each 41.09 Rupees Forty One and Nine Paise Only
1274 M998 Soffit cleat 25mmx35mmx1.60mm Each 2.57 Rupees Two and Fifty Seven Paise Only
1275 M999 Wooden screws with plastic rawl plugs 35mm x 8mm, Each 0.86 Eighty Six Paise Only
1276 02001A 2.5.1 Lime Mortar 1:1 (1-lime putty/ Equivalent dry Hydrated Lime : 1-Fine Rupees One Thousand Eight Hundred Fifty
sand) (more than 10 ton) Seven and Twenty Nine Paise Only
1277 02002A 2.5.2 Lime Mortar 1:2 (1-lime putty/ Equivalent dry Hydrated Lime : 2-Fine Rupees One Thousand Six Hundred Eighty
sand) (more than 10 ton) Four and Twenty One Paise Only
1278 02003A 2.5.3 Lime Mortar 1:3 (1-lime putty/Equivalent dry Hydrated Lime : 3 - Fine Rupees One Thousand Five Hundred Ninety
sand) (more than 10 ton) Seven and Ninety Two Paise Only
1279 02004A 0 Lime Mortar 1:1.5 (1-lime putty/ Equivalent dry Hydrated Lime : 1.5 Fine Rupees One Thousand Seven Hundred
sand) (more than 10 ton) Ninety and Eight Paise Only
1280 02005A 2.5.11 Cement Mortar 1:1 (1-Cement: 1- fine sand) (more than 10 ton) cu.m
Rupees Six Thousand Two Hundred Thirty
Two and Fifty Three Paise Only
1281 02006A 2.5.12 Cement Mortar 1:2(1-Cement: 2-fine sand) (more than 10 ton) cu.m
Rupees Four Thousand Four Hundred Eighty
Seven and Eighteen Paise Only
1282 02007A 2.5.13 Cement Mortar 1:3(1-Cement: 3- fine sand ) (more than 10 ton) cu.m
Rupees Three Thousand Six Hundred
Fourteen and Ninety One Paise Only
1283 02008A 2.5.14 Cement Mortar 1:4(1-Cement: 4- fine sand ) (more than 10 ton) cu.m
Rupees Two Thousand Nine Hundred
Seventeen and Sixty Seven Paise Only
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1284 02009A 2.5.15 Cement Mortar 1:5(1-Cement: 5- fine sand ) (more than 10 ton) cu.m
Rupees Two Thousand Five Hundred Forty
Two and Twenty Three Paise Only
1285 02010A 2.5.16 Cement Mortar 1:6(1-Cement: 6- fine sand ) (more than 10 ton) cu.m
Rupees Two Thousand Two Hundred Twenty
and Forty Two Paise Only
1286 02011A 2.5.18 Cement Mortar 1:3 (1-Cement: 3 - coarse sand) (more than 10 ton) Rupees Three Thousand Six Hundred Forty
cu.m 3643.73 Three and Seventy Three Paise Only
1287 02012A 2.5.19 Cement Mortar 1:4 (1-Cement: 4 - coarse sand) (more than 10 ton) cu.m
Rupees Two Thousand Nine Hundred Forty
Six and Forty Eight Paise Only
1288 02013A 2.5.20 Cement Mortar 1:5 (1-Cement: 5 - coarse sand) (more than 10 ton) cu.m
Rupees Two Thousand Five Hundred
Seventy One and Five Paise Only
1289 02014A 2.5.21 Cement Mortar 1:6 (1-Cement: 6 - coarse sand) (more than 10 ton) cu.m
Rupees Two Thousand Two Hundred Forty
Nine and Twenty Four Paise Only
1290 02015A 0 Cement Mortar 1:8 (1-Cement: 8 - fine sand) (more than 10 ton) cu.m
Rupees One Thousand Nine Hundred
Twenty Seven and Forty Four Paise Only
1291 02016A 0 Lime Mortat 1:1.5 (1- Lime putty / Equivalent dry hydrated Lime:1.5 coarse sand) Rupees One Thousand Eight Hundred
(more than 10 ton) Fourteen and Six Paise Only
1292 04001A 0 Excavation for foundation upto 1.5 m depth including sorting out and stacking
Rupees One Hundred Twenty Eight and
of useful materials and disposing off the excavated stuff upto 50 Meter cu.m 128.79 Seventy Nine Paise Only
lead.(A) Loose or soft soil
1293 04001B 0 Excavation for foundation upto 1.5 m depth including sorting out and stacking
Rupees One Hundred Sixty Four and Sixty
of useful materials and disposing off the excavated stuff upto 50 Meter cu.m 164.64 Four Paise Only
lead.(B) Dense or Hard soil
1294 04001C 0 Excavation for foundation upto 1.5 m depth including sorting out and stacking
Rupees Two Hundred Eighty One and
of useful materials and disposing off the excavated stuff upto 50 Meter cu.m 281.73 Seventy Three Paise Only
lead.(C) Hard Murrum
1295 04001D 0 Excavation for foundation upto 1.5 m depth including sorting out and stacking
Rupees Two Hundred Eighty Nine and Forty
of useful materials and disposing off the excavated stuff upto 50 Meter cu.m 289.40 Paise Only
lead.(D) Soft rock not requiring Blasting
1296 04001E 0 Excavation for foundation upto 1.5 m depth including sorting out and stacking
Rupees Six Hundred Fifty Seven and Thirty
of useful materials and disposing off the excavated stuff upto 50 Meter cu.m 657.36 Six Paise Only
lead.(E) Hard Rock
1297 04002A 0 Excavation for foundation for depth from 1.5 m to 3.0 m including sorting out
Rupees One Hundred Forty Two and Seventy
and stacking of useful materials and disposing off the excavated stuff cu.m 142.78 Eight Paise Only
upto 50 Meter lead.(A) Loose or soft soil
1298 04002B 0 Excavation for foundation for depth from 1.5 m to 3.0 m including sorting out
Rupees One Hundred Seventy Eight and
and stacking of useful materials and disposing off the excavated stuff cu.m 178.62 Sixty Two Paise Only
upto 50 Meter lead.(B) Dense or Hard soil
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1299 04002C 0 Excavation for foundation for depth from 1.5 m to 3.0 m including sorting out
Rupees Three Hundred and Eighty Nine
and stacking of useful materials and disposing off the excavated stuff cu.m 300.89 Paise Only
upto 50 Meter lead.(C) Hard Murrum
1300 04002D 0 Excavation for foundation for depth from 1.5 m to 3.0 m including sorting out
Rupees Three Hundred Fourteen and Thirty
and stacking of useful materials and disposing off the excavated stuff upto cu.m 314.30 Paise Only
50 Meter lead. (D) Soft rock not requiring Blasting
1301 04002E 0 Excavation for foundation for depth from 1.5 m to 3.0 m including sorting out
Rupees Six Hundred Eighty Two and Twenty
and stacking of useful materials and disposing off the excavated stuff cu.m 682.27 Seven Paise Only
upto 50 Meter lead.(E) Hard Rock
1302 04003A 0 Excavation for foundation for depth from 3.0 m to 5.0 m including sorting out
Rupees One Hundred Fifty Six and Seventy
and stacking of useful materials and disposing off the excavated stuff upto cu.m 156.77 Seven Paise Only
50 Meter lead.(A) Loose or soft soil
1303 04003B 0 Excavation for foundation for depth from 3.0 m to 5.0 m including sorting out
Rupees One Hundred Ninety One and Sixty
and stacking of useful materials and disposing off the excavated stuff cu.m 191.65 Five Paise Only
upto 50 Meter lead.(B) Dense or Hard soil
1304 04003C 0 Excavation for foundation for depth from 3.0 m to 5.0 m including sorting out
Rupees Three Hundred Fourteen and Thirty
and stacking of useful materials and disposing of the excavated stuff upto cu.m 314.30 Paise Only
50 Meter lead.(C) Hard Murrum
1305 04003D 0 Excavation for foundation for depth from 3.0 m to 5.0 m including sorting out
Rupees Three Hundred Thirty Nine and
and stacking of useful materials and disposing off the excavated stuff upto cu.m 339.22 Twenty Two Paise Only
50 Meter lead.(D) Soft rock not requiring Blasting
1306 04003E 0 Excavation for foundation for depth from 3.0 m to 5.0 m including sorting out
Rupees Seven Hundred Seven and Eighteen
and stacking of useful materials and disposing off the excavated stuff cu.m 707.18 Paise Only
upto 50 Meter lead.(E) Hard Rock
1307 04004A 0 Extra for additional depth more than 5.0 m for excavation for foundation including
sorting out and stacking of useful materials and disposing of the excavated stuff cu.m 22.52 Rupees Twenty Two and Fifty Two Paise Only
upto 50 m lead.(A) Loose or soft soil
1308 04004B 0 Extra for additional depth more than 5.0 m for excavation for foundation including
sorting out and stacking of useful materials and disposing off the excavated cu.m 22.52 Rupees Twenty Two and Fifty Two Paise Only
stuff upto 50 m lead.(B) Dense or Hard soil
1309 04004C 0 Extra for additional depth more than 5.0 m for excavation for foundation including
sorting out and stacking of useful materials and disposing of the excavated cu.m 30.97 Rupees Thirty and Ninety Seven Paise Only
stuff upto 50 m lead.(C) Hard Murrum
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1310 04004D 0 Extra for additional depth more than 5.0 m for excavation for foundation including
Rupees Thirty Nine and Ninety Eight Paise
sorting out and stacking of useful materials and disposing off the excavated cu.m 39.98 Only
stuff upto 50 m lead.(D) Soft rock not require Blasting
1311 04004E 0 Extra for additional depth more than 5.0 m for excavation for foundation including
Rupees Thirty Nine and Ninety Eight Paise
sorting out and stacking of useful materials and disposing of the excavated cu.m 39.98 Only
stuff upto 50 m lead.(E) Hard Rock
1312 04005A 0 Add extra for Disposing off the excavated stuff of above items for lead of (A)
cu.m 17.45 Rupees Seventeen and Forty Five Paise Only
1313 04005B 0 Add extra for Disposing off the excavated stuff of above items for lead of (B) Rupees Thirty Four and Ninety One Paise
100 m to 200 m Only
1314 04005C 0 Add extra for Disposing off the excavated stuff of above items for lead of (C)
cu.m 52.36 Rupees Fifty Two and Thirty Six Paise Only
1315 04005D 0 Add extra for Disposing off the excavated stuff of above items for lead of (D) Rupees Seventy Seven and Fifty Seven Paise
300 m to 400 m Only
1316 04005E 0 Add extra for Disposing off the excavated stuff of above items for lead of (E) Rupees One Hundred Twenty Nine and
400 to 500 m Twenty Eight Paise Only
1317 4006 4 Filling available excavated earth (excluding rock) in trenches. plinth,
Rupees One Hundred Thirty Seven and Forty
sides of foundations etc. in layers not exceeding 20 cm. in depth consolidating cu.m 137.47 Seven Paise Only
each disposited layer by ramming and watering.
1318 04007A 4 Filling in plinth with sand under floors including watering ramming, Rupees Four Hundred Ninety Six and
consolidating and dressing complete (more than 10 ton) Seventy Seven Paise Only
1319 04008A 0 Filling in foundation and plinth with murrum or selected soil in layers of 20cm.
Rupees Three Hundred Seven and Forty One
thickness including watering, ramming and consolidating etc. complete. (more cu.m 307.41 Paise Only
1320 04009A 0 Filling in foundation and plinth with brick Bats Chhara in layers of 20cm. thickness
Rupees Six Hundred Twenty Nine and Forty
cu.m 629.48 Eight Paise Only
including watering, remming and consolidating etc. complete. (more than 10 ton)
1321 04010A 4 Boring holes 3.5 m deep in ordinary soil (for cast in situ piles) and getting out the
Rupees One Thousand One Hundred Fifteen
soil and disposal of the surplus excavated soil as directed within a lead of 50 Each 1115.42 and Forty Two Paise Only
Meter for following diameter of pipes.(i)200 mm
1322 04010B 4 Boring holes 3.5 m deep in ordinary soil (for cast in situ piles) and getting out the
Rupees One Thousand Three Hundred Thirty
soil and disposal of the surplus excavated soil as directed within a lead of 50 Each 1335.62 Five and Sixty Two Paise Only
Meter for following diameter of pipes.(ii) 250 mm
1323 04010C 4 Boring holes 3.5 m deep in ordinary soil (for cast in situ piles) and getting out the
Rupees One Thousand Five Hundred Sixty
soil and disposal of the surplus excavated soil as directed within a lead of 50 Each 1561.19 One and Nineteen Paise Only
Meter for following diameter of pipes.(iii) 300 mm
1324 04011A 4 Extra for under reaming inside the bore Holes for under reamed piles of following Rupees Four Hundred Forty Five and Twenty
Diameter.(i) 200 mm One Paise Only
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1325 04011B 4 Extra for under reaming inside the bore Holes for under reamed piles of following Rupees Five Hundred Thirty Four and
Diameter.(ii) 250 mm Twenty Five Paise Only
1326 04011C 4 Extra for under reaming inside the bore Holes for under reamed piles of following Rupees Six Hundred Sixty Four and Fifty One
Diameter.(iii) 300 mm Paise Only
1327 04012A 4 Add to or deduct from the rate for Bore Holes of 3.5 m Depth, if bore holes are
Rupees Three Hundred Seventy Three and
Each 373.97 Ninety Seven Paise Only
made deeper or shallower than 3.5M. for Piles of following diameter.(i) 200 mm
1328 04012B 4 Add to or deduct from the rate for Bore Holes of 3.5 m Depth, if bore holes are
Rupees Four Hundred Ninety Eight and Sixty
Each 498.63 Three Paise Only
made deeper or shallower than 3.5M. for Piles of following diameter.(ii) 250 mm
1329 04012C 4 Add to or deduct from the rate for Bore Holes of 3.5 m Depth, if bore holes are
Rupees Five Hundred Fifty Seven and Ninety
made deeper or shallower than 3.5M. for Piles of following diameter.(iii) 300 mm Each 557.99 Nine Paise Only
(Below item executed with manual)
1330 04B001A 0 Excavation for foundation upto 1.5 m depth including sorting out and stacking
Rupees Two Hundred Twelve and Fifty Two
of useful materials and disposing off the excavated stuff upto 50 Meter cu.m 212.52 Paise Only
lead.(A) Loose or soft soil
1331 04B001B 0 Excavation for foundation upto 1.5 m depth including sorting out and stacking
Rupees Two Hundred Seventy Two and Fifty
of useful materials and disposing off the excavated stuff upto 50 Meter cu.m 272.57 Seven Paise Only
lead.(B) Dense or Hard soil
1332 04B001C 0 Excavation for foundation upto 1.5 m depth including sorting out and stacking
Rupees Four Hundred Sixty Five and
of useful materials and disposing off the excavated stuff upto 50 Meter cu.m 465.14 Fourteen Paise Only
lead.(C) Hard Murrum
1333 04B001D 0 Excavation for foundation upto 1.5 m depth including sorting out and stacking
Rupees Five Hundred Fifty Eight and Twenty
of useful materials and disposing off the excavated stuff upto 50 Meter cu.m 558.28 Eight Paise Only
lead.(D) Soft rock not requiring Blasting
1334 04B001E 0 Excavation for foundation upto 1.5 m depth including sorting out and stacking
Rupees One Thousand Forty One and
of useful materials and disposing off the excavated stuff upto 50 Meter cu.m 1041.72 Seventy Two Paise Only
lead.(E) Hard Rock
1335 04B002A 0 Excavation for foundation for depth from 1.5 m to 3.0 m including sorting out
Rupees Two Hundred Thirty Five and Five
and stacking of useful materials and disposing off the excavated stuff cu.m 235.05 Paise Only
upto 50 Meter lead.(A) Loose or soft soil
1336 04B002B 0 Excavation for foundation for depth from 1.5 m to 3.0 m including sorting out
Rupees Two Hundred Ninety Five and Ten
and stacking of useful materials and disposing off the excavated stuff cu.m 295.10 Paise Only
upto 50 Meter lead.(B) Dense or Hard soil
1337 04B002C 0 Excavation for foundation for depth from 1.5 m to 3.0 m including sorting out
Rupees Four Hundred Ninety Eight and
and stacking of useful materials and disposing off the excavated stuff cu.m 498.93 Ninety Three Paise Only
upto 50 Meter lead.(C) Hard Murrum
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1338 04B002D 0 Excavation for foundation for depth from 1.5 m to 3.0 m including sorting out
Rupees Five Hundred Eighty One and Ninety
and stacking of useful materials and disposing off the excavated stuff upto cu.m 581.94 Four Paise Only
50 Meter lead. (D) Soft rock not requiring Blasting
1339 04B002E 0 Excavation for foundation for depth from 1.5 m to 3.0 m including sorting out
Rupees One Thousand Eighty One and
and stacking of useful materials and disposing off the excavated stuff cu.m 1081.75 Seventy Five Paise Only
upto 50 Meter lead.(E) Hard Rock
1340 04B003A 0 Excavation for foundation for depth from 3.0 m to 5.0 m including sorting out
Rupees Two Hundred Fifty Seven and Fifty
and stacking of useful materials and disposing off the excavated stuff upto cu.m 257.57 Seven Paise Only
50 Meter lead.(A) Loose or soft soil
1341 04B003B 0 Excavation for foundation for depth from 3.0 m to 5.0 m including sorting out
Rupees Three Hundred Seventeen and Sixty
and stacking of useful materials and disposing off the excavated stuff cu.m 317.62 Two Paise Only
upto 50 Meter lead.(B) Dense or Hard soil
1342 04B003C 0 Excavation for foundation for depth from 3.0 m to 5.0 m including sorting out
Rupees Five Hundred Twenty One and Forty
and stacking of useful materials and disposing of the excavated stuff upto cu.m 521.45 Five Paise Only
50 Meter lead.(C) Hard Murrum
1343 04B003D 0 Excavation for foundation for depth from 3.0 m to 5.0 m including sorting out
Rupees Six Hundred Twenty Seven and
and stacking of useful materials and disposing off the excavated stuff upto cu.m 627.94 Ninety Four Paise Only
50 Meter lead.(D) Soft rock not requiring Blasting
1344 04B003E 0 Excavation for foundation for depth from 3.0 m to 5.0 m including sorting out
Rupees One Thousand One Hundred Twenty
and stacking of useful materials and disposing off the excavated stuff cu.m 1121.77 One and Seventy Seven Paise Only
upto 50 Meter lead.(E) Hard Rock
1345 05001A 5.1.6 Providing and laying in foundation and plinth / under floors lime concrete with
hand broken stone aggregates 40mm nominal size and 40% mortar comprising of Rupees Two Thousand Nine Hundred Ninety
1-Lime putty : 2-Fine sand and curing complete excluding cost of formwork. Seven and Six Paise Only
(more than 10 ton)
1346 05002A 5.1.8 Providing and laying in foundation and plinth / under floors lime concrete with
graded brick aggregates 40 mm nominal size and 40% mortar comprising of 1- Rupees Two Thousand Nine Hundred Nine
Limeputty : 2-Fine sand and curing completeexcluding cost of formwork. (more and Fifty One Paise Only
1347 05003A 5.3.2 Providing and laying cement concrete 1:3:6 (1-Cement : 3- coarse sand : 6- hand
Rupees Three Thousand One Hundred
broken stone aggregates 40 mmnominal size) and curing complete excluding cu.m 3118.07 Eighteen and Seven Paise Only
cost of formwork in (A) Foundation and Plinth (more than 10 ton)
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1348 05004A 5.3.3 Providing and laying cement concrete 1:4:8 (1- Cement : 4- coarse sand : 8- hand
Rupees Two Thousand Seven Hundred
broken stone aggregates 40 mm nominal size) and curing complete excluding cu.m 2792.52 Ninety Two and Fifty Two Paise Only
cost of formwork in (A) Foundation and Plinth (more than 10 ton)
1349 05005A 5.3.14 Providing and laying cement concrete 1:3:6 (1- Cement : 3- Coarse sand : 6-
Rupees Four Thousand One Hundred Ninety
crushed stone aggregates 20 mm nominal size) and curing complete including cu.m 4192.33 Two and Thirty Three Paise Only
cost of formwork in (A) Wall Caps / Coping (more than 10 ton)
1350 05006A 5.3.4 Providing and laying cement concrete 1:5:10 (1- Cement : 5- Coarse sand : 10-
Rupees Two Thousand Six Hundred Twenty
hand broken stone aggregates 40 mm nominal size) and curing complete cu.m 2629.75 Nine and Seventy Five Paise Only
excluding cost of formwork in (A) Foundation and Plinth (more than 10 ton)
1351 05007A 5.3.2 Providing and laying cement concrete 1:3:6 (1- Cement : 3- Coarse sand : 6-
Rupees Three Thousand Eighty Nine and
Graded brick bat aggregate 40mm normal size) and curing complete excluding cu.m 3089.20 Twenty Paise Only
cost of formwork in (A) Foundation and Plinth (more than 10 ton)
1352 05008A 5.3.3 Providing and laying cement concrete 1:4:8 (1- Cement : 4- Coarse sand : 8-
Rupees Two Thousand Seven Hundred Sixty
Graded Brick bats aggregate 40mm normal size) and curing complete excluding cu.m 2763.64 Three and Sixty Four Paise Only
cost of formwork in (A) Foundation and Plinth (more than 10 ton)
1353 05009A 5.3.8 Providing and laying cement concrete 1:5:10 (1- Cement : 5- fine sand : 10-
Rupees Two Thousand Five Hundred Eighty
graded brick bat aggregates 40mm nominal size) and curing complete excluding cu.m 2586.51 Six and Fifty One Paise Only
cost of formwork in (A) Foundation and Plinth (more than 10 ton)
1354 05010AA 5.3.13 Providing and laying cement concrete 1:2:4 (1- Cement : 2- Coarse sand : 4-
Rupees Three Thousand Eight Hundred Forty
graded stone aggregates 20 mm nominal size) and curing complete excluding cu.m 3842.91 Two and Ninety One Paise Only
cost of formwork in (A) Foundation and Plinth (more than 10 ton)
1355 05010BA 5.3.13 Providing and laying cement concrete 1:2:4 (1- Cement : 2- Coarse sand : 4-
graded stone aggregates 20 mm nominal size) and curing complete excluding Rupees Three Thousand Eight Hundred Forty
cost of formwork in (B)Independent piers, columns, and pillars, upto floor two Two and Ninety One Paise Only
level (more than 10 ton)
1356 05011AA 5.4.1 Providing and laying cement concrete work 1:2:4 (1- Cement : 2- Coarse sand : 4-
graded stone aggregates 20 mm nominal size) and curing complete excluding Rupees Four Thousand One Hundred Thirty
cu.m 4131.72 One and Seventy Two Paise Only
cost of formwork and reinforcement for reinforced concrete work in (A)
Foundations, footings, Base or columns and Mass concrete (more than 10 ton)
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1357 05011BA 5.4.1 Providing and laying cement concrete work 1:2:4 (1- Cement : 2- Coarse sand : 4-
graded stone aggregates 20 mm nominal size) and curing complete excluding
Rupees Four Thousand Two Hundred
cost of formwork and reinforcement for reinforced concrete work in (B) Slabs, cu.m 4227.54 Twenty Seven and Fifty Four Paise Only
landing, shelves, Balconis , Lintels, Beams, Girders and Cantilever upto floor
two level. (more than 10 ton)
1358 05011DA 5.4.1 Providing and laying cement concrete work 1:2:4 (1- Cement : 2- Coarse sand : 4-
graded stone aggregates 20 mm nominal size) and curing complete excluding Rupees Four Thousand Two Hundred
cu.m 4227.54 Twenty Seven and Fifty Four Paise Only
cost of formwork and reinforcement for reinforced concrete work in (D) Columns,
Pillars posts and struts upto floor two level. (more than 10 ton)
1359 05011EA 5.4.1 Providing and laying cement concrete work 1:2:4 (1- Cement : 2- Coarse sand : 4-
graded stone aggregates 20 mm nominal size) and curing complete excluding Rupees Five Thousand Sixty Three and Forty
cu.m 5063.45 Five Paise Only
cost of formwork and reinforcement for reinforced concrete work in (E)Staircases
excluding landing upto floor two level (more than 10 ton)
1360 05011KA 5.4.1 Providing and laying cement concrete work 1:2:4 (1- Cement : 2- Coarse sand : 4-
graded stone aggregates 20 mm nominal size) and curing complete excluding Rupees Four Thousand Four Hundred
cu.m 4477.47 Seventy Seven and Forty Seven Paise Only
cost of formwork and reinforcement for reinforced concrete work in (K)Vertical
and Horizontial its upto floor two level. (more than 10 ton)
1361 05012A 5.4.4 Providing and laying cement concrete 1:2:4 (1- Cement : 2- Coarse sand : 4-
graded stone aggregates 20 mm nominal size) for reinforced concrete Chhajjas
not exceeding 10cm. thickness upto floor two level including finishing the exposed Rupees Six Thousand Seven Hundred Thirty
surfaces with cement mortar 1:3 (1-cement, 3 Fine sand) to give a smooth and and Ninety Paise Only
even surface centering and formwork and curing complete excluding cost of
reinforcement. (more than 10 ton)
1362 05013A 5.4.10 Providing Mild Steel reinfircement for R.C.C. work including bending binding, and
kg 61.65 Rupees Sixty One and Sixty Five Paise Only
placing in position complete upto floor two level. (more than 10 ton)
1363 05014AA 5.4.11 Providing H.Y.S.D. Bar reinforcement for R.C.C. work including bending, binding
Rupees Sixty Three and Eighty Seven Paise
and placing in position complete upto floor two level (more than 10 ton)
1364 05014BA 5.4.11 Providing TMT Bar FE 415 reinforcement for R.C.C. work including bending,
Rupees Sixty Eight and Thirty Three Paise
binding and placing in position complete upto floor two level (more than 10 ton)
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1365 05014C 5.4.11 Providing TMT Bar FE 500/500D reinforcement for R.C.C. work including
Rupees Seventy Seven and Twenty Nine
kg 77.29 Paise Only
bending, binding and placing in position complete upto floor two level (upto 10 ton)
1366 05015A 5.4.13 Extra for additional lift of concrete for all R.C.C. work above floor two level Rupees Forty One and Ninety Seven Paise
excluding cost of reinforcment (more than 10 ton) Only
1367 05016A 5.4.13A Extra for additional lift of reinforcing steel for all R.C.C. work above floor two level.
kg 1.10 Rupee One and Ten Paise Only
(more than 10 ton)
1368 5017 5.4.16 Deduct for omiting in R.C.C. work smooth finishing of the exposed surface with Rupees One Hundred Fifty Two and Seventy
cement mortar 1:3 (1-Cement : 3- Fine sand) One Paise Only
1369 5018 5.4.18 Providing throating or plaster drip and moulding to R.C.C. Chhajja. Rmt 45.10 Rupees Forty Five and Ten Paise Only
1370 05019A 5.6.2 Providing upto floor two level precast cement concrete jali or grill 1:2:4 mix (1-
Cement : 2- coarse sand : 4-graded stone aggregate 6mm nominal size) Rupees Seven Hundred Eighty Six and Forty
Sqm 786.43 Three Paise Only
reinforced with 1.6 mm dia. Mild steel wire including roughening,cleaning, fixing
and finishing in cement mortar 1:3 and curing complete. (A) 50mm thick
1371 05019B 5.6.2 Providing upto floor two level precast cement concrete jali or grill 1:2:4 mix (1-
Cement : 2- coarse sand : 4-graded stone aggregate 6mm nominal size) Rupees Seven Hundred Eighteen and Fifty
Sqm 718.59 Nine Paise Only
reinforced with 1.6 mm dia. Mild steel wire including roughening,cleaning, fixing
and finishing in cement mortar 1:3 and curing complete. (B) 40mm thick
1372 05019C 5.6.2 Providing upto floor two level precast cement concrete jali or grill 1:2:4 mix (1-
Cement : 2- coarse sand : 4-graded stone aggregate 6mm nominal size) Rupees Six Hundred Eighty Seven and Forty
Sqm 687.44 Four Paise Only
reinforced with 1.6 mm dia. Mild steel wire including roughening,cleaning, fixing
and finishing in cement mortar 1:3 and curing complete. (C) 25mm thick
1373 05019D 5.6.2 Providing upto floor two level precast cement concrete jali or grill 1:2:4 mix (1-
Cement : 2- coarse sand : 4-graded stone aggregate 6mm nominal size) Rupees Eight Hundred Forty Eight and
Sqm 848.75 Seventy Five Paise Only
reinforced with 1.6 mm dia. Mild steel wire including roughening,cleaning, fixing
and finishing in cement mortar 1:3 and curing complete. (D) 75mm thick
1374 05019E 5.6.2 Providing upto floor two level precast cement concrete jali or grill 1:2:4 mix (1-
Cement : 2- coarse sand : 4-graded stone aggregate 6mm nominal size) Rupees Eight Hundred Ninety Two and
Sqm 892.75 Seventy Five Paise Only
reinforced with 1.6 mm dia. Mild steel wire including roughening,cleaning, fixing
and finishing in cement mortar 1:3 and curing complete.(E) 100mm thick
1375 5020 5.6.9 Extra for additional lift for providing and fixing in position precast R.C.C. units
Sqm 10.46 Rupees Ten and Forty Six Paise Only
above floor two level
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1376 05021A 5.7.1 Providing and laying damp proof course 25mm thick cement concrete 1:2:4 (1-
Rupees Three Hundred Thirty Seven and
Cement : 2 coarse sand : 4 stone aggregate 10 mm nominal size) and curing Sqm 337.30 Thirty Paise Only
complete (more than 10 ton)
1377 5022 5.7.5 Extra for providing and mixing water proofing material in Cement concrete in mix Litres or Kg
per Quintal 49.16 Rupees Forty Nine and Sixteen Paise Only
proportion recommended by the manufacturers. of Cement
1378 05023AA 5.8.1 Providing and laying controlled cement concrete M.150 for curing complete
Rupees Four Thousand Sixty Nine and Fifty
excluding cost of formwork and reinforcement for reinforced concrete work in (A) cu.m 4069.59 Nine Paise Only
Foundations, footings,Base of columns and Mass concrete (more than 10 ton)
1379 05023BA 5.8.1 Providing and laying controlled cement concrete M.150 for curing complete
Rupees Four Thousand Three Hundred
excluding cost of formwork and reinforcement for reinforced concrete work in (B) cu.m 4379.79 Seventy Nine and Seventy Nine Paise Only
Walls, from top of foundation level upto floor two level (more than 10 ton)
1380 05023CA 5.8.1 Providing and laying controlled cement concrete M.150 for curing complete
excluding cost of formwork and reinforcement for reinforced concrete work in (C) Rupees Four Thousand Three Hundred Fifty
Slabs, landing, shelves, Balconies, Lintels, Beams, Girders and Cantilever upto Three and Seventeen Paise Only
floor two level (more than 10 ton)
1381 05023DA 5.8.1 Providing and laying controlled cement concrete M.150 for curing complete
Rupees Four Thousand Four Hundred Fifty
excluding cost of formwork and reinforcement for reinforced concrete work in (D) cu.m 4458.57 Eight and Fifty Seven Paise Only
Columns, Pillars posts and struts upto floor two level. (more than 10 ton)
1382 05023EA 5.8.1 Providing and laying controlled cement concrete M.150 for curing complete
Rupees Five Thousand Four Hundred Sixty
excluding cost of formwork and reinforcement for reinforced concrete work in (E) cu.m 5465.59 Five and Fifty Nine Paise Only
Staircases excluding landing upto floor two level (more than 10 ton)
1383 05023KA 5.8.1 Providing and laying controlled cement concrete M.150 for curing complete
Rupees Four Thousand Seven Hundred Sixty
excluding cost of formwork and reinforcement for reinforced concrete work in (K) cu.m 4767.81 Seven and Eighty One Paise Only
Vertical and Horizontial its upto floor two level. (more than 10 ton)
1384 05024AA 5.8.2 Providing and laying controlled cement concrete M.200 and curing complete
excluding the cost of formwork and reinforcement for reinforced concrete work in Rupees Four Thousand One Hundred Fifty
(A) Foundations, footings, Base of columns and Mass concrete (more than 10 Eight and Two Paise Only
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1385 05024BA 5.8.2 Providing and laying controlled cement concrete M.200 and curing complete
Rupees Four Thousand Seven Hundred Ten
excluding the cost of formwork and reinforcement for reinforced concrete work in cu.m 4710.03 and Three Paise Only
(B) Walls, from top of foundation level upto floor two level (more than 10 ton)
1386 05024CA 5.8.2 Providing and laying controlled cement concrete M.200 and curing complete
excluding the cost of formwork and reinforcement for reinforced concrete work in Rupees Four Thousand Six Hundred Eighty
(C) Slabs,landing,shelves,Balconies Lintels, Beams, Girders and Cantilever Three and Forty One Paise Only
upto floor two level. (more than 10 ton)
1387 05024DA 5.8.2 Providing and laying controlled cement concrete M.200 and curing complete
Rupees Four Thousand Seven Hundred
excluding the cost of formwork and reinforcement for reinforced concrete work in cu.m 4788.81 Eighty Eight and Eighty One Paise Only
(D) Columns, Pillars posts and struts upto floor two level. (more than 10 ton)
1388 05024EA 5.8.2 Providing and laying controlled cement concrete M.200 and curing complete
Rupees Five Thousand Seven Hundred Forty
excluding the cost of formwork and reinforcement for reinforced concrete work in cu.m 5745.96 Five and Ninety Six Paise Only
(E) Staircases excluding landing upto floor two level (more than 10 ton)
1389 05024KA 5.8.2 Providing and laying controlled cement concrete M.200 and curing complete
Rupees Four Thousand Nine Hundred Forty
excluding the cost of formwork and reinforcement for reinforced concrete work in cu.m 4946.70 Six and Seventy Paise Only
(K) Vertical and Horizontial its upto floor two level. (more than 10 ton)
1390 05025AA 5.8.3 Providing and laying controlled cement concrete M.250 and curing complete
excluding the cost of formwork and reinforcement for reinforced concrete work in Rupees Four Thousand Four Hundred
(A) Foundations, footings, Base of columns and Mass concrete. (more than 10 Twenty Nine and Sixty Five Paise Only
1391 05025BA 5.8.3 Providing and laying controlled cement concrete M.250 and curing complete
Rupees Four Thousand Seven Hundred
excluding the cost of formwork and reinforcement for reinforced concrete work in cu.m 4739.85 Thirty Nine and Eighty Five Paise Only
(B) Walls, from top of foundation level upto floor two level (more than 10 ton)
1392 05025CA 5.8.3 Providing and laying controlled cement concrete M.250 and curing complete
excluding the cost of formwork and reinforcement for reinforced concrete work in Rupees Four Thousand Seven Hundred
(C) Slabs,landing,shelves,Balconies, Lintels, Beams, Girders and Cantilever Thirteen and Twenty Three Paise Only
upto floor two level. (more than 10 ton)
1393 05025DA 5.8.3 Providing and laying controlled cement concrete M.250 and curing complete
Rupees Four Thousand Eight Hundred
excluding the cost of formwork and reinforcement for reinforced concrete work in cu.m 4818.63 Eighteen and Sixty Three Paise Only
(D) Columns, Pillars posts and struts, upto floor two level. (more than 10 ton)
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1394 05026A 0 Providing and Laying ordinary cement concrete 1:2:4 (1- Cement 2- coarse sand :
4- graded stone aggregates 20 mm nominal size) and finishing smooth with Rupees Eight Thousand Three Hundred Fifty
cu.m 8355.04 Five and Four Paise Only
curing etc. complete including the cost of formwork but excluding the cost of
reinforsement for R.C.C work in (i) Slabs upto 8cm thickness
1395 05026B 0 Providing and Laying ordinary cement concrete 1:2:4 (1- Cement 2- coarse sand :
4- graded stone aggregates 20 mm nominal size) and finishing smooth with
Rupees Seven Thousand Four Hundred
curing etc. complete including the cost of formwork but excluding the cost of cu.m 7475.61 Seventy Five and Sixty One Paise Only
reinforsement for R.C.C work in (ii) Slabs having more than 8 cm and upto
1396 05026C 0 Providing and Laying ordinary cement concrete 1:2:4 (1- Cement 2- coarse sand :
4- graded stone aggregates 20 mm nominal size) and finishing smooth with
Rupees Six Thousand Eight Hundred Eighty
curing etc. complete including the cost of formwork but excluding the cost of cu.m 6888.15 Eight and Fifteen Paise Only
reinforsement for R.C.C work in (iii) Slabs having more than 10 cm and upto
1397 05026D 0 Providing and Laying ordinary cement concrete 1:2:4 (1- Cement 2- coarse sand :
4- graded stone aggregates 20 mm nominal size) and finishing smooth with
Rupees Six Thousand Three Hundred Four
curing etc. complete including the cost of formwork but excluding the cost of cu.m 6304.20 and Twenty Paise Only
reinforsement for R.C.C work in (iv) Slabs having more than 13 cm and upto
1398 05027A 0 Providing and Laying controlled cement concrete M.150 and finishing smooth with
Rupees Eight Thousand Four Hundred Sixty
curing etc. complete including the cost of formwork but excluding the cost of cu.m 8463.69 Three and Sixty Nine Paise Only
reinforsement for R.C.C work in (i) Slabs upto 8cm thickness
1399 05027B 0 Providing and Laying controlled cement concrete M.150 and finishing smooth with
curing etc. complete including the cost of formwork but excluding the cost of
Rupees Seven Thousand Five Hundred
reinforsement for R.C.C work in (ii) Slabs having more than 8 cm and upto 10 cu.m 7584.25 Eighty Four and Twenty Five Paise Only
1400 05027C 0 Providing and Laying controlled cement concrete M.150 and finishing smooth with
curing etc. complete including the cost of formwork but excluding the cost of Rupees Six Thousand Seven Hundred
reinforsement for R.C.C work in (iii) Slabs having more than 10 cm and upto 13 Seventy One and Sixty Six Paise Only
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1401 05027D 0 Providing and Laying controlled cement concrete M.150 and finishing smooth with
curing etc. complete including the cost of formwork but excluding the cost of
Rupees Six Thousand Four Hundred Twelve
reinforsement for R.C.C work in (iv) Slabs having more than 13 cm and upto 15 cu.m 6412.84 and Eighty Four Paise Only
1402 05028A 0 Providing and laying ordinary cement concrete 1:2:4 (1- Cement 2- coarse sand :
4- graded stone aggregates 20 mm nominal size) exposed work with curing etc. Rupees Nine Thousand Five Hundred Forty
complete including the cost of formwork but excluding the cost of reinforsement Two and Five Paise Only
for R.C.C work in (i) Slabs upto 8cm thickness
1403 05028B 0 Providing and laying ordinary cement concrete 1:2:4 (1- Cement 2- coarse sand :
4- graded stone aggregates 20 mm nominal size) exposed work with curing etc. Rupees Eight Thousand Four Hundred
cu.m 8425.21 Twenty Five and Twenty One Paise Only
complete including the cost of formwork but excluding the cost of reinforsement
for R.C.C work in (ii) Slabs having more than 8 cm and upto 10 cm.thickness
1404 05028C 0 Providing and laying ordinary cement concrete 1:2:4 (1- Cement 2- coarse sand :
4- graded stone aggregates 20 mm nominal size) exposed work with curing etc.
Rupees Seven Thousand Four Hundred Fifty
complete including the cost of formwork but excluding the cost of reinforsement cu.m 7454.03 Four and Three Paise Only
for R.C.C work in (iii) Slabs having more than 10 cm and upto 13 cm. thickness
1405 05028D 0 Providing and laying ordinary cement concrete 1:2:4 (1- Cement 2- coarse sand :
4- graded stone aggregates 20 mm nominal size) exposed work with curing etc.
Rupees Six Thousand Nine Hundred Thirty
complete including the cost of formwork but excluding the cost of reinforsement cu.m 6937.59 Seven and Fifty Nine Paise Only
for R.C.C work in (iv) Slabs having more than 13 cm and upto 15 cm.thickness
1406 05029A 0 Providing and laying controlled cement concrete M.150 and exposed work with
curing etc. complete including the cost of formwork but excluding the cost of Rupees Nine Thousand Six Hundred Fifty and
reinforsement for R.C.C work in (i) Slabs upto 8cm thickness Sixty Nine Paise Only
1407 05029B 0 Providing and laying controlled cement concrete M.150 and exposed work with
curing etc. complete including the cost of formwork but excluding the cost of
Rupees Eight Thousand Five Hundred Thirty
reinforsement for R.C.Cwork in (ii) Slabs having more than 8 cm and upto 10 cu.m 8533.85 Three and Eighty Five Paise Only
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1408 05029C 0 Providing and laying controlled cement concrete M.150 and exposed work with
curing etc. complete including the cost of formwork but excluding the cost of
Rupees Seven Thousand Five Hundred One
reinforsement for R.C.Cwork in (iii) Slabs having more than 10 cm and upto 13 cu.m 7501.90 and Ninety Paise Only
1409 05029D 0 Providing and laying controlled cement concrete M.150 and exposed work with
curing etc. complete including the cost of formwork but excluding the cost of Rupees Seven Thousand Forty Six and
reinforsement for R.C.Cwork in (iv) Slabs having more than 13 cm and upto 15 Twenty Three Paise Only
1410 5030 0 Providing and laying ordinary cement concrete 1:2:4 (1- Cement 2- coarse sand :
4- graded stone aggregates 20 mm nominal size) for R.C.C lintel including
Rupees Eight Thousand Nine Hundred
finishing smooth with,curing etc. complete including the cost of formwork but cu.m 8923.77 Twenty Three and Seventy Seven Paise Only
excluding the cost of reinforcement.
1411 05031A1 0 Providing and laying ordinary cement concrete 1:2:4 (1- Cement 2- coarse sand :
4- graded stone aggregates 20 mm nominal size) and finishing smooth
with,curing etc. complete including the cost of formwork but excluding the cost of Rupees Eight Thousand Five Hundred Ninety
reinforcement for R.C.C work in (A) BEAMS :(i) Having cross-sectional area Three and Eighty Paise Only
1412 05031A2 0 Providing and laying ordinary cement concrete 1:2:4 (1- Cement 2- coarse sand :
4- graded stone aggregates 20 mm nominal size) and finishing smooth
with,curing etc. complete including the cost of formwork but excluding the cost of Rupees Seven Thousand Six Hundred Sixty
reinforcement for R.C.C work in (A) BEAMS :(ii) Having cross-sectional area Five and Sixty Paise Only
more than 0.08Sq.M and upto 0.12 Sq.M
1413 05031A3 0 Providing and laying ordinary cement concrete 1:2:4 (1- Cement 2- coarse sand :
4- graded stone aggregates 20 mm nominal size) and finishing smooth
with,curing etc. complete including the cost of formwork but excluding the cost of Rupees Six Thousand Five Hundred Seventy
reinforcement for R.C.C work in (A) BEAMS :(iii) Having cross-sectional area Eight and Seven Paise Only
more than 0.12Sq.M and upto 0.18 Sq.M
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1414 05031B1 0 Providing and laying ordinary cement concrete 1:2:4 (1- Cement 2- coarse sand :
4- graded stone aggregates 20 mm nominal size) and finishing smooth
with,curing etc. complete including the cost of formwork but excluding the cost of Rupees Twelve Thousand Two Hundred
reinforcement for R.C.C work in (B) COLUMNS: (i) Having cross-sectional area Seventy Two and Ninety Four Paise Only
1415 05031B2 0 Providing and laying ordinary cement concrete 1:2:4 (1- Cement 2- coarse sand :
4- graded stone aggregates 20 mm nominal size) and finishing smooth
Rupees Ten Thousand Six Hundred Fifty
with,curing etc. complete including the cost of formwork but excluding the cost of cu.m 10658.16 Eight and Sixteen Paise Only
reinforcement for R.C.C work in (B) COLUMNS: (ii) Having cross-sectional area
more than 0.08 Sq.M and upto 0.18 Sq.M
1416 05031B3 0 Providing and laying ordinary cement concrete 1:2:4 (1- Cement 2- coarse sand :
4- graded stone aggregates 20 mm nominal size) and finishing smooth
Rupees Eight Thousand Six Hundred Ninety
with,curing etc. complete including the cost of formwork but excluding the cost of cu.m 8692.87 Two and Eighty Seven Paise Only
reinforcement for R.C.C work in (B) COLUMNS: (iii) Having cross-sectional area
more than 0.12Sq.M and upto 0.18 Sq.M
1417 05032A1 0 Providing and laying ordinary cement concrete M.150exposed work with curing
etc. complete including the cost of formwork but excluding the cost of Rupees Ten Thousand Four Hundred Forty
reinforcement for R.C.C. work in (A) BEAMS :(i) Having cross-sectional area Three and Six Paise Only
1418 05032A2 0 Providing and laying controlled cement concrete M.150exposed work with curing
etc. complete including the cost of formwork but excluding the cost of Rupees Nine Thousand One Hundred Sixty
reinforcement for R.C.C. work in (A) BEAMS :(ii) Having cross-sectional area Six and Thirty Six Paise Only
more than 0.08Sq.M and upto 0.12 Sq.M
1419 05032A3 0 Providing and laying controlled cement concrete M.150exposed work with curing
etc. complete including the cost of formwork but excluding the cost of Rupees Seven Thousand Six Hundred
reinforcement for R.C.C. work in (A) BEAMS :(iii) Having cross-sectional area Seventy and Fifty Paise Only
more than 0.12Sq.M and upto 0.18 Sq.M
1420 05032B1 0 Providing and laying controlled cement concrete M.150exposed work with curing
etc. complete including the cost of formwork but excluding the cost of Rupees Fourteen Thousand Two Hundred
reinforcement for R.C.C. work in (B) COLUMNS:(i) Having cross-sectional area Eighty Three and Fifty Nine Paise Only
1421 05032B2 0 Providing and laying controlled cement concrete M.150exposed work with curing
etc. complete including the cost of formwork but excluding the cost of Rupees Twelve Thousand Two Hundred Fifty
reinforcement for R.C.C. work in(B) COLUMNS:(ii) Having cross-sectional area Seven and Seventy Three Paise Only
more than 0.08 Sq.M and upto 0.18 Sq.M
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1422 05032B3 0 Providing and laying controlled cement concrete M.150exposed work with curing
etc. complete including the cost of formwork but excluding the cost of Rupees Nine Thousand Eight Hundred Eighty
reinforcement for R.C.C. work in(B) COLUMNS:(iii) Having cross-sectional area Four and Ten Paise Only
more than 0.12Sq.M and upto 0.18 Sq.M
1423 05033A1 0 Providing and laying controlled cement concrete M.200 exposed work with curing
etc. complete including the cost of formwork but excluding the cost of Rupees Ten Thousand Seven Hundred Sixty
reinforcement for R.C.C. work in(A) BEAMS :(i) Having cross-sectional area Two and Sixty Five Paise Only
1424 05033A2 0 Providing and laying controlled cement concrete M.200 exposed work with curing
etc. complete including the cost of formwork but excluding the cost of Rupees Nine Thousand Four Hundred Eighty
reinforcement for R.C.C. work in (A) BEAMS :(ii) Having cross-sectional area Five and Ninety Five Paise Only
more than 0.08Sq.M and upto 0.12 Sq.M
1425 05033A3 0 Providing and laying controlled cement concrete M.200 exposed work with curing
etc. complete including the cost of formwork but excluding the cost of Rupees Seven Thousand Nine Hundred
reinforcement for R.C.C. work in (A) BEAMS :(iii) Having cross-sectional area Ninety and Nine Paise Only
more than 0.12Sq.M and upto 0.18 Sq.M
1426 05033B1 0 Providing and laying controlled cement concrete M.200 exposed work with curing
etc. complete including the cost of formwork but excluding the cost of Rupees Fourteen Thousand Six Hundred
reinforcement for R.C.C. work in (B) COLUMNS:(i) Having cross-sectional area Three and Nineteen Paise Only
1427 05033B2 0 Providing and laying controlled cement concrete M.200 exposed work with curing
etc. complete including the cost of formwork but excluding the cost of Rupees Twelve Thousand Five Hundred
reinforcement for R.C.C. work in (B) COLUMNS:(ii) Having cross-sectional area Seventy Seven and Thirty Three Paise Only
more than 0.08 Sq.M and upto 0.18 Sq.M
1428 05033B3 0 Providing and laying controlled cement concrete M.200 exposed work with curing
etc. complete including the cost of formwork but excluding the cost of Rupees Ten Thousand Two Hundred Three
reinforcement for R.C.C. work in (B) COLUMNS:(iii) Having cross-sectional area and Seventy Paise Only
more than 0.12Sq.M and upto 0.18 Sq.M
1429 05034A1 0 Providing and laying controlled cement concrete M.250 exposed work with curing
etc. complete including the cost of formwork but excluding the cost of Rupees Ten Thousand Eight Hundred
reinforcement for R.C.C. work in (A) BEAMS :(i) Having cross-sectional area Twenty Four and Twenty Six Paise Only
1430 05034A2 0 Providing and laying controlled cement concrete M.250 exposed work with curing
etc. complete including the cost of formwork but excluding the cost of Rupees Nine Thousand Five Hundred Forty
reinforcement for R.C.C. work in (A) BEAMS :(ii) Having cross-sectional area Seven and Fifty Six Paise Only
more than 0.08Sq.M and upto 0.12 Sq.M
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1431 05034A3 0 Providing and laying controlled cement concrete M.250 exposed work with curing
etc. complete including the cost of formwork but excluding the cost of Rupees Eight Thousand Fifty One and
reinforcement for R.C.C. work in (A) BEAMS :(iii) Having cross-sectional area Seventy Paise Only
more than 0.12Sq.M and upto 0.18 Sq.M
1432 05034B1 0 Providing and laying controlled cement concrete M.250 exposed work with curing
etc. complete including the cost of formwork but excluding the cost of Rupees Fourteen Thousand Six Hundred
reinforcement for R.C.C. work in (B) COLUMNS:(i) Having cross-sectional area Sixty Four and Eighty Paise Only
1433 05034B2 0 Providing and laying controlled cement concrete M.250 exposed work with curing
etc. complete including the cost of formwork but excluding the cost of Rupees Twelve Thousand Six Hundred Thirty
reinforcement for R.C.C. work in (B) COLUMNS:(ii) Having cross-sectional area Eight and Ninety Four Paise Only
more than 0.08 Sq.M and upto 0.18 Sq.M
1434 05034B3 0 Providing and laying controlled cement concrete M.250 exposed work with curing
etc. complete including the cost of formwork but excluding the cost of Rupees Ten Thousand Two Hundred Sixty
reinforcement for R.C.C. work in (B) COLUMNS: (iii) Having cross-sectional area Five and Thirty One Paise Only
more than 0.12Sq.M and upto 0.18 Sq.M
1435 5035 0 Providing and applying anticarrasive treatment with polymer base materials to
the steel rainfarcement including descaling the dust and applying the preventive Rupees Four Thousand One Hundred Sixty
coating of approved make (for the R.C.C. structures near coastal area only) etc Eight and Ninety Six Paise Only
1436 5047 Providing and fixing in expansion joint 100 mm thick SIL FLEX (Capcell HD 100)
Rupees Two Thousand Nine Hundred Eighty
expansion joint board of best quality and approved make including cutting to Sqm 2982.06 Two and Six Paise Only
required size and shape at all levels etc. complete as directed.
1437 5048 Providing and laying and fixing 50 mm thick expansion joint by hydro cell semi
rigid UV resistance with high performance laminated closed cell polythene foam Rupees One Thousand Four Hundred Ninety
joint filler in sheet foam as directed, etc. complete. One and Three Paise Only
1438 5049 Providing and laying and fixing 25 mm thick expansion joint by hydro cell semi
rigid UV resistance with high performance laminated closed cell polythene foam Rupees Seven Hundred Forty Five and Fifty
joint filler in sheet foam as directed, etc. complete. One Paise Only
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1439 5050 Applying and providing Expansion joint sealing System on 100 mm vide joint
including cleaning of exansion joint by mechanical means provision of adhesive
and flexible membrane with required bond length as per menufracturer Rupees Four Thousand Seven Hundred
specification and 4mm thick alluminium strip covering with one side sloted and Seventy Two Only
bolted with suitable system, inclusive of all manpower, machinery and material as
per specification and as directed.
1440 5051 Providing and filling the expansion joint by Thioflex 600 polymer or equivalent
confirm to BS 4254-1983 as per required shade and manufactured specifi-cation
by making groove of 50 mm x 12.5 mm lather by cutting or by repairing groove Rupees Five Hundred Fifteen and Thirty Nine
and removing mortar drop or any other foreign materials including applying primer Paise Only
and filling required size (oversize of joint PU foam etc. complete.
1441 5052 Providing and filling the expansion joint by Thioflex 600 polymer or equivalent
confirm to BS 4254-1983 as per required shade and manufactured specifi-cation
by making groove of 25 mm x 12.5 mm lather by cutting or by repairing groove Rupees Two Hundred Seventy Three and
and removing mortar drop or any other foreign materials including applying primer Sixty Eight Paise Only
and filling required size (oversize of joint PU foam etc. complete.
1442 5053 Providing and fixing 25 cm Wide & 3mm thick exterior composite panel on
existing expansion joint horizontally & vertically with all material, hardware, Rupees One Thousand Fifty Four and Thirty
acessories & fittings etc completed. Four Paise Only
1443 5054 Providing and laying in position Ready Mixed M-150 grade concrete for
reinforced cement conctere work , using cement content as per approved Design
Mix manufactured in fully automatic batching plant and transported to site of
work in transit mixer for a lead up to 10 kms having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced cement
Rupees Four Thousand Nine and Eighty Five
concrete work including pumping of R.M.C. from transit mixer to site of laying, cu.m 4009.85 Paise Only
excluding the cost of centering shuttering finishing and reinforcement including
cost of admixtures in recommended proportions as per IS: 9103 to accelerate/
retard setting of concrete, improve workability without impairing strength and
durability as per direction of the Engineer - in - charge. Without Fly Ash (Min
cement level as per latest IS 456 shall be maintained) (Cement level 320 kg )
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1444 5055 Providing and laying in position Ready Mixed M-200 grade concrete for
reinforced cement conctere work , using cement content as per approved Design
Mix manufactured in fully automatic batching plant and transported to site of
work in transit mixer for a lead up to 10 kms having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced cement
Rupees Five Thousand Sixty Four and Thirty
concrete work including pumping of R.M.C. from transit mixer to site of laying, cu.m 5064.36 Six Paise Only
excluding the cost of centering shuttering finishing and reinforcement including
cost of admixtures in recommended proportions as per IS: 9103 to accelerate/
retard setting of concrete, improve workability without impairing strength and
durability as per direction of the Engineer - in - charge. Without Fly Ash (Min
cement level as per latest IS 456 shall be maintained) (Cement level 400 kg )
1445 5056 Providing and laying in position Ready Mixed M-250 grade concrete for
reinforced cement conctere work , using cement content as per approved Design
Mix manufactured in fully automatic batching plant and transported to site of
work in transit mixer for a lead up to 10 kms having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced cement
Rupees Five Thousand One Hundred
concrete work including pumping of R.M.C. from transit mixer to site of laying, cu.m 5119.15 Nineteen and Fifteen Paise Only
excluding the cost of centering shuttering finishing and reinforcement including
cost of admixtures in recommended proportions as per IS: 9103 to accelerate/
retard setting of concrete, improve workability without impairing strength and
durability as per direction of the Engineer - in - charge. Without Fly Ash (Min
cement level as per latest IS 456 shall be maintained) (Cement level 450 kg )
1446 5057 Providing and laying in position Ready Mixed M-300 grade concrete for
reinforced cement conctere work , using cement content as per approved Design
Mix manufactured in fully automatic batching plant and transported to site of
work in transit mixer for a lead up to 10 kms having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced cement
Rupees Five Thousand Three Hundred
concrete work including pumping of R.M.C. from transit mixer to site of laying, cu.m 5311.16 Eleven and Sixteen Paise Only
excluding the cost of centering shuttering finishing and reinforcement including
cost of admixtures in recommended proportions as per IS: 9103 to accelerate/
retard setting of concrete, improve workability without impairing strength and
durability as per direction of the Engineer - in - charge. Without Fly Ash (Min
cement level as per latest IS 456 shall be maintained) (Cement level 475 kg )
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1447 5058 Providing and laying in position Ready Mixed M-350 grade concrete for
reinforced cement conctere work , using cement content as per approved Design
Mix manufactured in fully automatic batching plant and transported to site of
work in transit mixer for a lead up to 10 kms having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced cement
Rupees Five Thousand Four Hundred Nine
concrete work including pumping of R.M.C. from transit mixer to site of laying, cu.m 5409.41 and Forty One Paise Only
excluding the cost of centering shuttering finishing and reinforcement including
cost of admixtures in recommended proportions as per IS: 9103 to accelerate/
retard setting of concrete, improve workability without impairing strength and
durability as per direction of the Engineer - in - charge. Without Fly Ash(Min
cement level as per latest IS 456 shall be maintained) (Cement level 500 kg )
1448 5059 Providing and applying anti carbonation, anti fading, mold resistant, heat
insulating, and 100% acrylic breathable decorative external waterproof coating of
approved shade having Viscosity @ Room Temperature by Ford cup No. B-4
(dilute 2 parts of product with I part of water) 18 to 30 sec. pH of 7.00 to 10.00 Rupees One Hundred Twenty Six and Eighty
and Sp. Gravity @ Room Temperature 1.30+0.1, tested for carbon dioxide Six Paise Only
diffusion resistance properties for coating materials and coating systems for
exterior masonry and concrete as per DIN EN 1062-6 (2002-2010) by a NBA
Grade "A" accredited institution.
1449 5059 Providing and applying anti carbonation, anti fading, mold resistant, heat
insulating, and 100% acrylic breathable decorative external waterproof coating of
approved shade having Viscosity @ Room Temperature by Ford cup No. B-4
(dilute 2 parts of product with I part of water) 18 to 30 sec. pH of 7.00 to 10.00 Rupees One Hundred Twenty Six and Eighty
and Sp. Gravity @ Room Temperature 1.30+0.1, tested for carbon dioxide Six Paise Only
diffusion resistance properties for coating materials and coating systems for
exterior masonry and concrete as per DIN EN 1062-6 (2002-2010) by a NBA
Grade "A" accredited institution.
1450 5060 Providing and fixing CAPCELL HD - 100 pre-moulded compressible filler board in
black colour confirming to MoRT&H Specifications (Clause 1015), having
minimum density 95kg/cum.metre, non-staining with less than 1% water Rupees Five Hundred Ninety Two and
absorption & compression recovery of 93% minimum as per specification for 12 Fourteen Paise Only
mm wide expansion joint including cutting to required size and shape at all levels
etc. complete as directed.
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1451 5061 Providing and fixing CAPCELL HD - 100 pre-moulded compressible filler board in
black colour confirming to MoRT&H Specifications (Clause 1015), having
minimum density 95kg/cum.metre, non-staining with less than 1% water Rupees Eight Hundred Three and Twenty
absorption & compression recovery of 93% minimum as per specification for 20 Two Paise Only
mm wide expansion joint including cutting to required size and shape at all levels
etc. complete as directed.
1452 5062 Providing and fixing CAPCELL HD - 100 pre-moulded compressible filler board in
black colour confirming to MoRT&H Specifications (Clause 1015), having
minimum density 95kg/cum.metre, non-staining with less than 1% water Rupees One Thousand Three Hundred Thirty
absorption & compression recovery of 93% minimum as per specification for 40 and Ninety Two Paise Only
mm wide expansion joint including cutting to required size and shape at all levels
etc. complete as directed.
1453 5063 Providing and applying the elastomeric joint sealant two component, high
performance polysulfide formulation conforming to BS:4254 and ASTM C
Rupees One Hundred Seventy Eight and
having weathering resistance to ultra-violet rays and shall exhibit shore A Rmt 178.70 Seventy Paise Only
hardness of 25 and have movement accommodation factor 25% including using
of compatible primer of approved standard etc. complete. for 12 mm thick joint
1454 5064 Providing and applying the elastomeric joint sealant two component, high
performance polysulfide formulation conforming to BS:4254 and ASTM C
Rupees Two Hundred Fifty Eight and Eight
having weathering resistance to ultra-violet rays and shall exhibit shore A Rmt 258.08 Paise Only
hardness of 25 and have movement accommodation factor 25% including using
of compatible primer of approved standard etc. complete. For 20 mm thick joint
1455 06001AA 6 Brick work using common burnt clay building bricks having crushing strength not
Rupees Four Thousand Seven Hundred Forty
less than 35 kg./Sq.Cm. in foundation and plinth in Cement Mortar 1:5. (1- cu.m 4746.69 Six and Sixty Nine Paise Only
Cement : 5 -fine sand)(A) Modular (more than 10 ton)
1456 06001BA 6 Brick work using common burnt clay building bricks having crushing strength not
Rupees Four Thousand Three Hundred
less than 35 kg./Sq.Cm. in foundation and plinth in Cement Mortar 1:5. (1- cu.m 4376.38 Seventy Six and Thirty Eight Paise Only
Cement : 5 -fine sand)(B) Conventional (more than 10 ton)
1457 06001CA 6 Brick work using common burnt clay building bricks having crushing strength not
Rupees Five Thousand Three Hundred Sixty
less than 35 kg./Sq.Cm. in foundation and plinth in Cement Mortar 1:5. (1- cu.m 5367.46 Seven and Forty Six Paise Only
Cement : 5 -fine sand)(C) Fly Ash Bricks (more than 10 ton)
1458 06002AA 6 Brick work using common burnt clay building bricks having crushing strength not
Rupees Four Thousand Six Hundred Forty
less than 35 kg./Sq.Cm. in foundation and plinth in Cement Mortar 1:6 (1- cu.m 4642.33 Two and Thirty Three Paise Only
Cement : 6 -fine sand)(A) Modular (more than 10 ton)
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1459 06002BA 6 Brick work using common burnt clay building bricks having crushing strength not
Rupees Four Thousand Three Hundred Forty
less than 35 kg./Sq.Cm. in foundation and plinth in Cement Mortar 1:6 (1- cu.m 4345.62 Five and Sixty Two Paise Only
Cement : 6 -fine sand)(B) Conventional (more than 10 ton)
1460 06002CA 6 Brick work using common burnt clay building bricks having crushing strength not
Rupees Five Thousand Two Hundred Fifty
less than 35 kg./Sq.Cm. in foundation and plinth in Cement Mortar 1:6 (1- cu.m 5250.14 and Fourteen Paise Only
Cement : 6 -fine sand)(C) Fly Ash Bricks (more than 10 ton)
1461 06003AA 0 Brick work using common burnt clay building bricks having crushing strength not
Rupees Four Thousand Five Hundred Thirty
less than 35 kg./Sq.Cm. in foundation and plinth in Cement Mortar 1:8 (1- cu.m 4534.09 Four and Nine Paise Only
Cement : 8 -fine sand)(A) Modular (more than 10 ton)
1462 06003BA 0 Brick work using common burnt clay building bricks having crushing strength not
Rupees Four Thousand Two Hundred
less than 35 kg./Sq.Cm. in foundation and plinth in Cement Mortar 1:8 (1- cu.m 4221.91 Twenty One and Ninety One Paise Only
Cement : 8 -fine sand)(B) Conventional (more than 10 ton)
1463 06003CA 0 Brick work using common burnt clay building bricks having crushing strength not
Rupees Five Thousand One Hundred Forty
less than 35 kg./Sq.Cm. in foundation and plinth in Cement Mortar 1:8 (1- cu.m 5145.66 Five and Sixty Six Paise Only
Cement : 8 -fine sand)(C) Fly Ash Bricks (more than 10 ton)
1464 06004AA 0 Brick work using common burnt clay building bricks having crushing strength not
Rupees Four Thousand Five Hundred Forty
less than 35 kg./Sq.Cm. in foundation and plinth in Lime Mortar 1:1.5 (1- Lime cu.m 4543.63 Three and Sixty Three Paise Only
putty :1.5 -fine sand)(A) Modular (more than 10 ton)
1465 06004BA 0 Brick work using common burnt clay building bricks having crushing strength not
Rupees Four Thousand Two Hundred Thirty
less than 35 kg./Sq.Cm. in foundation and plinth in Lime Mortar 1:1.5 (1- Lime cu.m 4232.82 Two and Eighty Two Paise Only
putty :1.5 -fine sand)(B) Conventional (more than 10 ton)
1466 06004CA 0 Brick work using common burnt clay building bricks having crushing strength not
Rupees Five Thousand One Hundred
less than 35 kg./Sq.Cm. in foundation and plinth in Lime Mortar 1:1.5 (1- Lime cu.m 5114.49 Fourteen and Forty Nine Paise Only
putty :1.5 -fine sand)(C) Fly Ash Bricks (more than 10 ton)
1467 06005AA 0 Brick work using common burnt clay building bricks having crushing strength not
Rupees Four Thousand Five Hundred Twenty
less than 35 kg./Sq.Cm. in foundation and plinth in Lime Mortar 1: 2 (1- Lime cu.m 4524.44 Four and Forty Four Paise Only
putty : 2 -fine sand)(A) Modular (more than 10 ton)
1468 06005BA 0 Brick work using common burnt clay building bricks having crushing strength not
Rupees Four Thousand Two Hundred Ten
less than 35 kg./Sq.Cm. in foundation and plinth in Lime Mortar 1: 2 (1- Lime cu.m 4210.89 and Eighty Nine Paise Only
putty : 2 -fine sand)(B) Conventional (more than 10 ton)
1469 06005CA 0 Brick work using common burnt clay building bricks having crushing strength not
Rupees Five Thousand Sixty Eight and Sixty
less than 35 kg./Sq.Cm. in foundation and plinth in Lime Mortar 1: 2 (1- Lime cu.m 5068.66 Six Paise Only
putty : 2 -fine sand)(C) Fly Ash Bricks (more than 10 ton)
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1470 06006A 6 Extra for brick work in superstructure above plinth level upto floor two level (A) Rupees Two Hundred Eighty Two and Thirty
Modular One Paise Only
1471 06006B 6.19 Extra for brick work in superstructure above plinth level upto floor two level (B) Rupees Two Hundred Ninety Five and
Conventional Fourteen Paise Only
1472 06006C 6.19 Extra for brick work in superstructure above plinth level upto floor two level(C) Fly Rupees Two Hundred Ninety Five and
Ash Bricks Fourteen Paise Only
1473 06007A1 6.2 Extra for brick work in superstructure above floor two level Item No. 1(6.12) (A) per floor per
46.67 Rupees Forty Six and Sixty Seven Paise Only
A Modular (more than 10 ton) cu.m
1474 06007A2 6.2 Extra for brick work in superstructure above floor two level Item No. 1(6.12) (B) per floor per Rupees Forty Three and Seventy Four Paise
A Conventional (more than 10 ton) cu.m Only
1475 06007A3 6.2 Extra for brick work in superstructure above floor two level Item No. 1(6.12) (C) per floor per Rupees Fifty Three and Ninety Three Paise
A Fly Ash Bricks (more than 10 ton) cu.m Only
1476 06007B1 6 Extra for brick work in superstructure above floor two level Item No. 2(6.13) (A) per floor per
46.42 Rupees Forty Six and Forty Two Paise Only
A Modular (more than 10 ton) cu.m
1477 06007B2 6 Extra for brick work in superstructure above floor two level Item No. 2(6.13) (B) per floor per Rupees Forty Three and Forty Three Paise
A Conventional (more than 10 ton) cu.m Only
1478 06007B3 6 Extra for brick work in superstructure above floor two level Item No. 2(6.13) (C) per floor per
53.62 Rupees Fifty Three and Sixty Two Paise Only
A Fly Ash Bricks (more than 10 ton) cu.m
1479 06007C1 6 Extra for brick work in superstructure above floor two level Item No. 3 (A) Modular per floor per
45.32 Rupees Forty Five and Thirty Two Paise Only
A (more than 10 ton) cu.m
1480 06007C2 6 Extra for brick work in superstructure above floor two level Item No. 3 (B) per floor per
42.20 Rupees Forty Two and Twenty Paise Only
A Conventional (more than 10 ton) cu.m
1481 06007C3 6 Extra for brick work in superstructure above floor two level Item No. 3 (C) Fly Ash per floor per
52.39 Rupees Fifty Two and Thirty Nine Paise Only
A Bricks (more than 10 ton) cu.m
1482 06007D1 6 Extra for brick work in superstructure above floor two level Item No. 4 (A) Modular per floor per
45.41 Rupees Forty Five and Forty One Paise Only
A (more than 10 ton) cu.m
1483 06007D2 6 Extra for brick work in superstructure above floor two level Item No. 4 (B) per floor per
42.30 Rupees Forty Two and Thirty Paise Only
A Coventional (more than 10 ton) cu.m
1484 06007D3 6.2 Extra for brick work in superstructure above floor two level Item No. 4 (C) Fly Ash per floor per
52.49 Rupees Fifty Two and Forty Nine Paise Only
A Bricks (more than 10 ton) cu.m
1485 06007E1 6.2 Extra for brick work in superstructure above floor two level Item No. 5 (A) Modular per floor per Rupees Forty Five and Twenty Two Paise
A (more than 10 ton) cu.m Only
1486 06008A1 6.3 (i) Half brick masonry in common brunt clay building bricks having crushing
Rupees Six Hundred Thirty Nine and Thirty
strength not less than 35 Kg/Sq.Cm. in Cement mortar 1:4 (1- Cement : 4 - Sqm 639.36 Six Paise Only
A coarse sand ) in foundation and plinth (A) Modular (more than 10 ton)
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1487 06008A2 6.3 (i) Half brick masonry in common brunt clay building bricks having crushing
Rupees Six Hundred Forty Eight and Fifty
strength not less than 35 Kg/Sq.Cm. in Cement mortar 1:4 (1- Cement : 4 - Sqm 648.58 Eight Paise Only
A coarse sand ) in foundation and plinth (B) Conventional (more than 10 ton)
1488 06008A3 6.3 (i) Half brick masonry in common brunt clay building bricks having crushing
Rupees Seven Hundred Forty Two and Forty
strength not less than 35 Kg/Sq.Cm. in Cement mortar 1:4 (1- Cement : 4 - Sqm 742.43 Three Paise Only
A coarse sand ) in foundation and plinth (C)Fly Ash Bricks (more than 10 ton)
1489 06008B1 6.3 (ii) Half brick masonry in common brunt clay building bricks having crushing
Rupees Six Hundred Twenty Nine and Ninety
strength not less than 35 Kg/Sq.Cm. in Cement mortar 1:5 (1- Cement : 5 - Sqm 629.97 Seven Paise Only
A coarse sand ) in foundation and plinth (A) Modular (more than 10 ton)
1490 06008B2 6.3 (ii) Half brick masonry in common brunt clay building bricks having crushing
Rupees Six Hundred Thirty Eight and Seven
strength not less than 35 Kg/Sq.Cm. in Cement mortar 1:5 (1- Cement : 5 - Sqm 638.07 Paise Only
A coarse sand ) in foundation and plinth (B) Conventional (more than 10 ton)
1491 06008B3 6.3 (ii) Half brick masonry in common brunt clay building bricks having crushing
Rupees Seven Hundred Twenty Seven and
strength not less than 35 Kg/Sq.Cm. in Cement mortar 1:5 (1- Cement : 5 - Sqm 727.77 Seventy Seven Paise Only
A coarse sand ) in foundation and plinth (C)Fly Ash Bricks (more than 10 ton)
1492 06008C1 6.3 (iii) Half brick masonry in common brunt clay building bricks having crushing
Rupees Six Hundred Fifteen and Two Paise
strength not less than 35 Kg/Sq.Cm. in Lime mortar 1:1.5 ( 1- Lime : 1.5 -coarse Sqm 615.02 Only
A sand ) in foundation and plinth (A) Modular (more than 10 ton)
1493 06008C2 6.3 (iii) Half brick masonry in common brunt clay building bricks having crushing
Rupees Six Hundred Twenty One and Thirty
strength not less than 35 Kg/Sq.Cm. in Lime mortar 1:1.5 ( 1- Lime : 1.5 -coarse Sqm 621.31 One Paise Only
A sand ) in foundation and plinth (B) Conventional (more than 10 ton)
1494 06008C3 6.3 (iii) Half brick masonry in common brunt clay building bricks having crushing
Rupees Six Hundred Ninety Eight and Forty
strength not less than 35 Kg/Sq.Cm. in Lime mortar 1:1.5 ( 1- Lime : 1.5 -coarse Sqm 698.44 Four Paise Only
A sand ) in foundation and plinth (C)Fly Ash Bricks (more than 10 ton)
1495 06008E2 6.2 Extra for brick work in superstructure above floor two level Item No. 5 (B) Rupees Forty Three and Seventy Four Paise
A Coventional (more than 10 ton) Only
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1496 06009AA 6.31 Half brick masonry in common brunt clay building bricks having crushing strength
not less than 35 Kg/Sq.Cm. in Cement mortar 1:3 ( 1-Cement : 3-coarse sand ) Rupees Seven Hundred and Sixty Four Paise
Sqm 700.64 Only
with 2 Nos of 6mm Mild steel round bars after every three course embedded in
Cement Mortar in foundation and plinth (A) Modular (more than 10 ton)
1497 06009BA 6.31 Half brick masonry in common brunt clay building bricks having crushing strength
not less than 35 Kg/Sq.Cm. in Cement mortar 1:3 ( 1-Cement : 3-coarse sand ) Rupees Seven Hundred Eleven and Ninety
Sqm 711.95 Five Paise Only
with 2 Nos of 6mm Mild steel round bars after every three course embedded in
Cement Mortar in foundation and plinth (B) Conventional (more than 10 ton)
1498 06009CA 6.31 Half brick masonry in common brunt clay building bricks having crushing strength
not less than 35 Kg/Sq.Cm. in Cement mortar 1:3 ( 1-Cement : 3-coarse sand ) Rupees Eight Hundred Seventeen and Fifty
Sqm 817.58 Eight Paise Only
with 2 Nos of 6mm Mild steel round bars after every three course embedded in
Cement Mortar in foundation and plinth (C)Fly Ash Bricks (more than 10 ton)
1499 06009E3 6.2 Extra for brick work in superstructure above floor two level Item No. 5 (C) Fly Ash
cu.m 50.59 Rupees Fifty and Fifty Nine Paise Only
A Bricks (more than 10 ton)
1500 06010A 6.32 Extra for half brick masonry in superstructure above plinth level upto floor two
Sqm 52.07 Rupees Fifty Two and Seven Paise Only
level. (A) Modular
1501 06010B 6.32 Extra for half brick masonry in superstructure above plinth level upto floor two
Sqm 57.01 Rupees Fifty Seven and One Paise Only
level. (B) Conventional
1502 06010C 6.32 Extra for half brick masonry in superstructure above plinth level upto floor two
Sqm 57.01 Rupees Fifty Seven and One Paise Only
level. (C)Fly Ash Bricks
1503 06011AA 6.33 Extra for half brick masonry in superstructure above floor two level. (A) Modular
Sqm 6.39 Rupees Six and Thirty Nine Paise Only
(more than 10 ton)
1504 06011BA 6.33 Extra for half brick masonry in superstructure above floor two level.(B)
Sqm 6.48 Rupees Six and Forty Eight Paise Only
Conventional (more than 10 ton)
1505 06011CA 6.33 Extra for half brick masonry in superstructure above floor two level. (C) Fly Ash
Sqm 7.70 Rupees Seven and Seventy Paise Only
Bricks (more than 10 ton)
1506 06012AA 6.55 Half brick thick honey- comb brick work with common burnt clay building bricks
Rupees Three Hundred Thirty Two and
having crushing strength not less than 35 Kg/Sq.Cm. (i) In Cement Mortar 1:4 ( 1- Sqm 332.18 Eighteen Paise Only
Cement : 4 - coarse sand) (more than 10 ton)
1507 06012BA 6.55 Half brick thick honey- comb brick work with common burnt clay building bricks
Rupees Three Hundred Twenty Five and
having crushing strength not less than 35 Kg/Sq.Cm. (ii) In Cement Mortar 1:5 ( 1- Sqm 325.96 Ninety Six Paise Only
Cement : 5 - coarse sand) (more than 10 ton)
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1508 06012CA 6.55 Half brick thick honey- comb brick work with common burnt clay building bricks
Rupees Three Hundred Eighty Four and
having crushing strength not less than 35 Kg/Sq.Cm. (iii) Fly Ash Brick In Sqm 384.96 Ninety Six Paise Only
Cement Mortar 1:5 ( 1-Cement : 5 - coarse sand) (more than 10 ton)
1509 6014 Masonary work using Aerated light weight concrete block having crushing
strength not less than 35 kg/sqcm for super structure above plinth level upto floor Rupees Four Thousand Six Hundred One and
two level in cement mortar 1:5 ( 1 cement : 5 fine sand ) complete as per Nine Paise Only
Technical Specification
1510 6015 Providing and laying Precast Lightweight concrete hollow core wall with hollow
core concrete unit of approved make & size of 92 mm thick, 600 mm wide and
2400 mm / 2600 mm / 2850 mm / 3000 mm / 3300 mm in legth made from of Rupees Seven Hundred Fifty Four and Forty
controlled cement concrete M20 having cube compressive strength not less than Seven Paise Only
20 MPa jointing with high strength & tensile adhesion non-shrink cementitious
joint compound / P.U. Foam. (Plaster not required)
1511 6016 Providing and laying Precast Lightweight concrete hollow core wall with hollow
core concrete unit of approved make & size of 120 mm thick, 600 mm wide and
2400 mm / 2600 mm / 2850 mm / 3000 mm / 3300 mm in legth made from of Rupees Eight Hundred Fifty and Forty Two
controlled cement concrete M20 having cube compressive strength not less than Paise Only
20 MPa jointing with high strength & tensile adhesion non-shrink cementitious
joint compound / P.U. Foam. (Plaster not required)
1512 6017 Providing and laying Precast Regular concrete hollow core wall with hollow core
concrete unit of approved make & size of 92 mm thick, 600 mm wide and
mm / 2600 mm / 2850 mm / 3000 mm / 3300 mm in legth made from of Rupees Seven Hundred Eighty Four and
controlled cement concrete M35 having cube compressive strength not less than Seventy Seven Paise Only
35 MPa jointing with high strength & tensile adhesion non-shrink cementitious
joint compound / P.U. Foam. (Plaster not required)
1513 6018 Providing and laying Precast Regular concrete hollow core wall with hollow core
concrete unit of approved make & size of 120 mm thick, 600 mm wide and
mm / 2600 mm / 2850 mm / 3000 mm / 3300 mm in legth made from of Rupees Eight Hundred Eighty Three and
controlled cement concrete M35 having cube compressive strength not less than Seventy Five Paise Only
35 MPa jointing with high strength & tensile adhesion non-shrink cementitious
joint compound / P.U. Foam. (Plaster not required)
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1514 07001AA 7.6 (i) Uncoursed Rubble Masonry with hard stone of approved quality in foundations
Rupees Two Thousand Five Hundred Ninety
and plinth in Cement Mortar 1:6 (1-cement : 6-coarse sand including levelling cu.m 2599.08 Nine and Eight Paise Only
up etc. complete (more than 10 ton)
1515 07001BA 7.6 (ii) Uncoursed Rubble Masonry with hard stone of approved quality in
Rupees Two Thousand Six Hundred Forty
foundations and plinth in Cement Mortar 1:5 (1-cement : 5-coarse sand cu.m 2641.38 One and Thirty Eight Paise Only
including levelling up etc. complete (more than 10 ton)
1516 07001CA 7.6 (iii) Uncoursed Rubble Masonry with hard stone of approved quality in
Rupees Two Thousand Four Hundred Forty
foundations and plinth in Lime Mortar 1:1.5 (1-Lime : 1.5-coarse sand including cu.m 2443.98 Three and Ninety Eight Paise Only
levelling up etc. complete (more than 10 ton)
1517 7002 7.8 Extra over Item 7.6 for super structure above plinth level upto floor two level Rupees Three Hundred Ninety Two and
cu.m 392.29 Twenty Nine Paise Only
1518 07003A 7.9 Extra for additional lift in superstructure above floor two level. (more than 10 ton) Rupees Twenty Five and Ninety Nine Paise
cu.m 25.99 Only
1519 07004A 7.17 A Coursed rubble masonry with hard stone of approved quality in foundations and
Rupees Three Thousand Four Hundred
plinth in Cement Mortar 1:6 (1-Cement : 6-coarse sand) etc. complete. (more cu.m 3489.87 Eighty Nine and Eighty Seven Paise Only
1520 07005AA 7.17 B Coursed rubble masonry with stone of approved quality in foundations and plinth
Rupees Three Thousand Five Hundred
in Cement Mortar 1:5 (1-Cement : 5-coarse sand) etc. complete. (more than 10 cu.m 3528.32 Twenty Eight and Thirty Two Paise Only
1521 07005BA 7.17 C Coursed rubble masonry with stone of approved quality in foundations and plinth
Rupees Three Thousand Six Hundred Forty
in Cement Mortar 1:4 (1-Cement : 4-coarse sand) etc. complete. (more than 10 cu.m 3640.96 and Ninety Six Paise Only
1522 07005CA 7.17 D Coursed rubble masonry with stone of approved quality in foundations and plinth
Rupees Three Thousand Eight Hundred Fifty
in Cement Mortar 1:3 (1-Cement : 3-coarse sand) etc. complete. (more than 10 cu.m 3850.13 and Thirteen Paise Only
1523 7006 7.19 Extra over item No. 7.17 for superstructure above plinth level upto floor two level Per floor per Rupees Three Hundred Sixty Six and Sixty
cu.m Three Paise Only
1524 07007A 7.2 Extra for additional lift in superstructure above floor two level. (more than 10 ton) Per floor per Rupees Thirty Seven and Ninety Five Paise
1525 07008A 0 White Stone Bela mesonry block in course in superstructure with stone of
Rupees Five Thousand Four Hundred Eighty
approved quality in Lime Mortar 1:1.5 (1-Lime putty : 1.5- finesand) including cu.m 5485.27 Five and Twenty Seven Paise Only
packing the joints etc. complete. (more than 10 ton)
1526 07009A 0 White Stone Bela mesonry work in partition walls upto 15 cm thickness in cement Rupees Seven Hundred Eight and Forty
Mortar 1:4 ( 1- Cement : 4- course sand) (more than 10 ton) Paise Only
1527 07010A 0 White Stone Bela mesonry block in course in superstructure with stone of
Rupees Six Thousand Six Hundred Ninety
approved quality in Lime Mortar 1:5 (1-Cement :5- course sand) including packing cu.m 6698.05 Eight and Five Paise Only
the joints etc. complete. (more than 10 ton)
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1528 07011A 0 White Stone Bela mesonry block in course in superstructure with stone of
Rupees Six Thousand Six Hundred Seventy
approved quality in Lime Mortar 1:6 (1-Cement : 6- course sand) including cu.m 6671.13 One and Thirteen Paise Only
packing the joints etc. complete. (more than 10 ton)
1529 07012A 7.75 Precast concrete block masonry (including quoin blocks jamb blocks closer etc.)
with solid concrete blocks of approved size made of cement concrete 1:3:6 mix (1- Rupees Three Thousand Seven Hundred
cu.m 3771.97 Seventy One and Ninety Seven Paise Only
Cement : 3 coarse sand: 6- graded stone aggregates of 20 mm and down grade)
in foundation and plinth cement morter 1:6 (more than 10 ton)
1530 7013 7.93 Extra for masonry work with precast concrete block in superstructue above plinth Rupees Two Hundred Ninety Five and
upto floor two level. Fourteen Paise Only
1531 07014A 7.82 Precast concrete block masonry in partition walls 10 cm. thick with solid block of
approved size (including quion blocks Jamb blocks closer etc.) made of C.C.1:3:6 Rupees Six Hundred Seventy Six and Eighty
(1- Cement : 3- coarse sand : 6 graded stone aggregates 20 mm and down Five Paise Only
grade) (A) in C.M. 1:4. (more than 10 ton)
1532 7015 0 Providing and laying hollow block masonry 90 mm thick using hollow concrete
blocks IS 2185 (Part-I ) grade B (5.0) with Cement Mortar 1:4 laying in perfect Rupees Three Hundred Seventy Six and
Sqm 376.43 Forty Three Paise Only
line level and plinth preparing grading the joints incl. the cost of scaffolding and
curing etc. (A) Block masonry in 1:1:8 cement lime mortar
1533 7016 0 Providing and laying hollow block masonry 140 mm thick using follow blocks
masonry IS 2185 (Part-I ) grade B (5.0) with Cement Mortar 1:4 laying in parfect Rupees Four Hundred Fifty Five and Sixty Six
Sqm 455.66 Paise Only
line level and plint propering groding the jaints ind. the cast of seaffolding and
quiring etc . (A) Block masonry in 1:1:8 cement lime mortar
1534 7017 0 Providing and laying hollow block masonry 190 mm thick using follow blocks
masonry IS 2185 (Part-I ) grade B (5.0) with Cement Mortar 1:4 laying in perfect Rupees Five Hundred Nineteen and Ninety
Sqm 519.94 Four Paise Only
line level and plint propering groding the jaints ind. the cast of seaffolding and
quiring etc (A) Block masonry in 1:1:8 cement lime mortar
1535 09001AA 9 Providing formwork of ordinary timber planking so as to give a rough finish
including centering shuttering strutting and propping etc. Height of propping and
centering below supporting floor to ceiling not exceeding 4 M. and removal of Rupees One Hundred Ninety Two and Forty
the same for in situ reinforced concrete and plain concrete work in. (A) Nine Paise Only
Foundations Footings Bases of Columns etc. and Mass concrete. (more than
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1536 09001B1 9 Providing formwork of ordinary timber planking so as to give a rough finish
including centering shuttering strutting and propping etc. Height of propping and
centering below supporting floor to ceiling not exceeding 4 M. and removal of Rupees Two Hundred Seventy Nine and
the same for in situ reinforced concrete and plain concrete work in. (B) Flat Ninety Seven Paise Only
surfaces such as soffits of supspened floors slabs Landings and the like. (1)
A Floors etc. upto 200 mm in thickness. (more than 10 ton)
1537 09001B2 9 Providing formwork of ordinary timber planking so as to give a rough finish
including centering shuttering strutting and propping etc. Height of propping and
centering below supporting floor to ceiling not exceeding 4 M. and removal of Rupees Three Hundred Two and Seventy
the same for in situ reinforced concrete and plain concrete work in. (B) Flat Three Paise Only
surfaces such as soffits of suspended floor roof slabs Landings and the like. (2)
A Floors etc. above 200mm in thickness. (more than 10 ton)
1538 09001CA 9 Providing formwork of ordinary timber planking so as to give a rough finish
including centering shuttering strutting and propping etc. height of propping and
centering below supporting floor to ceiling not exceeding 4 M. and removal of Rupees Two Hundred Fifty Five and Forty
the same for in situ reinforced concrete and plain concrete work in. (C) Vertical Eight Paise Only
surface such as walls (any thickness) partitions and the like including attached
buttresses & string course & the like. (more than 10 ton)
1539 09001G1 9 Providing formwork of ordinary timber planking so as to give a rough finish
including centering shuttering strutting and propping etc. height of propping and
centering below supporting floor to ceiling not exceeding 4 M. and removal of Rupees Three Hundred Thirty and Seventy
the same for in situ reinforced concrete and plain concrete work in. (G) Columns Two Paise Only
PillarsPosts and struts. (1) Square Rectangular Polygonal in plan. (more than
1540 09001G2 9 Providing formwork of ordinary timber planking so as to give a rough finish
including centering shuttering strutting and propping etc. height of propping and
Rupees Four Hundred Twenty Eight and
centering below supporting floor to ceiling not exceeding 4 M. and removal of Sqm 428.71 Seventy One Paise Only
the same for in situ reinforced concrete and plain concrete work in. (G) Columns
A PillarsPosts and struts. (2)Circular or curved in Plan. (more than 10 ton)
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1541 09001H1 9 Providing formwork of ordinary timber planking so as to give a rough finish
including centering shuttering strutting and propping etc. height of propping and
centering below supporting floor to ceiling not exceeding 4 M. and removal of Rupees Two Hundred Fifteen and Twenty
the same for in situ reinforced concrete and plain concrete work in. (H) (1) Sides Three Paise Only
and soffits of Beams Beam Haunchings cantilevers Girders Bressumers and
A Lintels not exceeding 1 M. in Depth. (more than 10 ton)
1542 09001H2 9 Providing formwork of ordinary timber planking so as to give a rough finish
including centering shuttering strutting and propping etc. height of propping and
centering below supporting floor to ceiling not exceeding 4 M. and removal of Rupees Two Hundred Eighty Eight and
the same for in situ reinforced concrete and plain concrete work in. (H) (2) Sides Seventy Three Paise Only
and soffits of Beams Beam Haunchings canti-levers Girders Bressumers and
A Lintels exceeding 1M.in Depth. (more than 10 ton)
1543 09001IA 9 Providing formwork of ordinary timber planking so as to give a rough finish
including centering shuttering strutting and propping etc. height of propping and
Rupees Seventy Five and Twenty Five Paise
centering below supporting floor to ceiling not exceeding 4 M. and removal of Sqm 75.25 Only
the same for in situ reinforced concrete and plain concrete work in. (I) Edges of
slabs and Breaks in floors and walls. (more than 10 ton)
1544 09001KA 9 Providing formwork of ordinary timber planking so as to give a rough finish
including centering shuttering strutting and propping etc. height of propping and
centering below supporting floor to ceiling not exceeding 4 M. and removal of Rupees Six Hundred Forty Two and Nineteen
the same for in situ reinforced concrete and plain concrete work in. (K) Small Paise Only
surfaceassuch as cantiever brackets and ends of steps caps and basses to
pilasters and Columns and the like. (more than 10 ton)
1545 09001LA 9 Providing formwork of ordinary timber planking so as to give a rough finish
including centering shuttering strutting and propping etc. height of propping and
centering below supporting floor to ceiling not exceeding 4 M. and removal of Rupees One Hundred Seventy One and Forty
the same for in situ reinforced concrete and plain concrete work in. (L) Chullah Nine Paise Only
Hoods, weather shades Chhajjas Corbels etc. including edges. (more than
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1546 09001MA 9 Providing formwork of ordinary timber planking so as to give a rough finish
including centering shuttering strutting and propping etc. height of propping and
centering below supporting floor to ceiling not exceeding 4 M. and removal of Rupees Two Hundred Seventy One and
the same for in situ reinforced concrete and plain concrete work in. (M) Staircase Twenty Three Paise Only
with sloping or stepped soffits including risers and stringers excluding landing.
(more than 10 ton)
1547 09001QA 9 Providing formwork of ordinary timber planking so as to give a rough finish
including centering shuttering strutting and propping etc. height of propping and
Rupees Four Hundred Twenty Three and
centering below supporting floor to ceiling not exceeding 4 M. and removal of Sqm 423.46 Forty Six Paise Only
the same for in situ reinforced concrete and plain concrete work in. (Q) Vertical
fins and vertical sun breakers. (more than 10 ton)
1548 09002AA 9 Extra for additional height of propping and centering where the height of
propping and centering exceeds 4 .O M between supporting floor to ceiling Rupees Four Hundred Seven and Seventy
including temporary brick or stone pillars for supporting as required. (i)Height Five Paise Only
more than 4.0 M.and upto 5.0 M. (more than 10 ton)
1549 09002BA 9 Extra for additional height of propping and centering where the height of
propping and centering exceeds 4 .O M between supporting floor to ceiling Rupees Seven Hundred Fourteen and Eighty
including temporary brick or stone pillars for supporting as required. (ii) Height Five Paise Only
more than 5.0 M.and upto 6.0 M. (more than 10 ton)
1550 09002CA 9 Extra for additional height of propping and centering where the height of propping
and centering exceeds 4 .O M between supporting floor to ceiling including Rupees Six Hundred Eighteen and Nineteen
temporary brick or stone pillars for supporting as required. (iii) Height more than Paise Only
6.0 M. and upto 7.0 M (more than 10 ton)
1551 09003AA 10 Extra for Providing formwork with sheathing steel sheets so as to give a fair finish
Rupees Ninety Eight and Eighty Four Paise
in (A) Foundations, Footings, Bases of Columns etc. and Mass concrete (more Sqm 98.84 Only
1552 09003B1 10 Extra for Providing formwork with sheathing steel sheets so as to give a fair finish
Rupees Ninety Eight and Eighty Four Paise
in (B)Flat surfaces such as soffits of slabs Landings and the like. (1) Floors etc. Sqm 98.84 Only
A upto 200mm in thickness. (more than 10 ton)
1553 09003B2 10 Extra for Providing formwork with sheathing steel sheets so as to give a fair finish
Rupees Ninety Eight and Eighty Four Paise
in (B) Flat surfaces such as soffits of slabs Landings and the like. 2) Floors Sqm 98.84 Only
A etc.above 200mm in thickness. (more than 10 ton)
1554 09003CA 10 Extra for Providing formwork with sheathing steel sheets so as to give a fair finish
Rupees Ninety Eight and Eighty Four Paise
in (C)Vertical surface such as walls (anythickness) partitions & lime including Sqm 98.84 Only
attached pilasters buttresses plinth & string course & like. (more than 10 ton)
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1555 09003G1 10 Extra for Providing formwork with sheathing steel sheets so as to give a fair finish
Rupees Ninety Eight and Eighty Four Paise
in (G) Columns, Pillars, Posts and struts. (1) Square, Rectangular or polygonal Sqm 98.84 Only
A in plan. (more than 10 ton)
1556 09003G2 9.7 Extra for Providing formwork with sheathing steel sheets so as to give a fair finish
Rupees Ninety Eight and Eighty Four Paise
in (G) Columns, Pillars, Posts and struts. (2) Circular or curved in plan (more than Sqm 98.84 Only
1557 09003H1 9.7 Extra for Providing formwork with sheathing steel sheets so as to give a fair finish
Rupees Ninety Eight and Eighty Four Paise
in (H)(1) Sides and soffits of Beams, Beam Haunchingscantilevers Girders, Sqm 98.84 Only
A Bressumers and Lintels not exceeding 1 M. in Depth. (more than 10 ton)
1558 09003H2 9.7 Extra for Providing formwork with sheathing steel sheets so as to give a fair finish
Rupees Ninety Eight and Eighty Four Paise
in (H) (2) Sides and soffits of Beams, Beam Haunchings cantilevers Girders, Sqm 98.84 Only
A Bressumers and Lintels exceeding 1 M. in Depth. (more than 10 ton)
1559 09003IA 9.7 Extra for Providing formwork with sheathing steel sheets so as to give a fair finish
Rupees Ninety Eight and Eighty Four Paise
in (I) Edges of slabs and Breaks in floors and walls. (more than 10 ton)
1560 09003KA 9.7 Extra for Providing formwork with sheathing steel sheets so as to give a fair finish
Rupees Ninety Eight and Eighty Four Paise
in (K) Small surfaceas such as centilever endsnBrackets and end of steps caps Sqm 98.84 Only
and basses to pilasters and Columns including edges. (more than 10 ton)
1561 09003LA 9.7 Extra for Providing formwork with sheathing steel sheets so as to give a fair finish
Rupees Ninety Eight and Eighty Four Paise
in (L) Chullah Hoods weather Shades Chhajjas Corbels etc. and the like. (more Sqm 98.84 Only
1562 09003MA 9.7 Extra for Providing formwork with sheathing steel sheets so as to give a fair finish
Rupees Ninety Eight and Eighty Four Paise
in (M)Staircase with sloping or stepped soffits including sisers and stringers Sqm 98.84 Only
excluding landing. (more than 10 ton)
1563 09003QA 9.7 Extra for Providing formwork with sheathing steel sheets so as to give a fair finish Rupees Ninety Eight and Eighty Four Paise
in (Q)Vertical fins and vertical sun breakers. (more than 10 ton) Only
1564 10001A 10.1 Providing wood work in frames of Doors, windows cleare story windows and
Rupees Six Hundred Ten and Twenty Three
othersimilar works wrought, framede and fixed in position. (A) Indian Teak Wood 10 Cu.Dm. 610.23 Paise Only
(more than 10 ton)
1565 10002A 10.4 Providing wood work in Trusses, Purling, Rafter, Post,Post Plates, wall plates
Rupees One Thousand Three Hundred Eighty
Cu.Dm. 1387.60 Seven and Sixty Paise Only
and the like wrought framed, hoisted and fixed in position (more than 10 ton)
1566 10003A 10.5 Providing wood work in frames of false- ceiling, partitions etc sawn and put up in Rupees Six Hundred Sixty Five and Thirty
position. (A) Indian Teak Wood (more than 10 ton) Three Paise Only
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1567 10004AA 10.12 Providing and fixing 35 mm thick shutters for Doors, windows and clear story
Rupees Four Thousand One Hundred One
windows including anodised alluminium butt hinges with necessary screws.(A) Cu.Dm. 4101.06 and Six Paise Only
Indian Teak Wood (1) Fully Panelled (more than 10 ton)
1568 10004BA 10.12 Providing and fixing 35 mm thick shutters for Doors, windows and clear story
Rupees Three Thousand Four Hundred
windows including anodised alluminium butt hinges with necessary screws. (A) Sqm 3403.77 Three and Seventy Seven Paise Only
Indian Teak Wood (ii) Fully Glazed. (more than 10 ton)
1569 10004CA 10.12 Providing and fixing 35 mm thick shutters for Doors, windows and clear story
Rupees Three Thousand Seven Hundred
windows including anodised alluminium butt hinges with necessary screws. (A) Sqm 3752.41 Fifty Two and Forty One Paise Only
Indian Teak Wood(iii) Partly panelled and partly glazed. (more than 10 ton)
1570 10005AA 10.13 Providing and fixing 35 mm thick shutters for Doors, windows and clearstory
Rupees Three Thousand Seven Hundred
windows including blackenamelled M.S. butt hinges with necessary screws. (A) Sqm 3773.84 Seventy Three and Eighty Four Paise Only
Indian teak wood. (i) Fully Panelled. (more than 10 ton)
1571 10005BA 10 Providing and fixing 35 mm thick shutters for Doors, windows and clearstory
Rupees Three Thousand Seventy Six and
windows including blackenamelled M.S. butt hinges with necessary screws. (A) Sqm 3076.55 Fifty Five Paise Only
Indian teak wood. (ii) Fully Glazed. (more than 10 ton)
1572 10005CA 10 Providing and fixing 35 mm thick shutters for Doors, windows and clearstory
Rupees Three Thousand Four Hundred
windows including blackenamelled M.S. butt hinges with necessary screws. (A) Sqm 3425.20 Twenty Five and Twenty Paise Only
Indian teak wood. (iii) Partly panelled and partly glazed. (more than 10 ton)
1573 10006AA 10 Providing and fixing 25 mm thick shutters for cupboards etc. including anodised
Rupees Three Thousand One Hundred
alluminium butt hinges with necessary screws. (A) Indian teak wood. (i) Fully Sqm 3179.95 Seventy Nine and Ninety Five Paise Only
Panelled. (more than 10 ton)
1574 10006BA 10 Providing and fixing 25 mm thick shutters for cupboards etc. including anodised
Rupees Two Thousand Seven Hundred Thirty
alluminium butt hinges with necessary screws. (A) Indian teak wood. (ii) Fully Sqm 2736.20 Six and Twenty Paise Only
Glazed. (more than 10 ton)
1575 10006CA 10 Providing and fixing 25 mm thick shutters for cupboards etc. including anodised
Rupees Two Thousand Nine Hundred Fifty
alluminium butt hinges with necessary screws. (A) Indian teak wood. (iii) Partly Sqm 2958.08 Eight and Eight Paise Only
panelled and partly glazed. (more than 10 ton)
1576 10007AA 10 Providing and fixing 25 mm thick shutters for cupboards etc. including black
Rupees Three Thousand One Hundred Fifty
enamelled M.S. butt hinges with necessary screws. (A) Indian teak wood. (i) Fully Sqm 3151.67 One and Sixty Seven Paise Only
Panelled. (more than 10 ton)
1577 10007BA 10 Providing and fixing 25 mm thick shutters for cupboards etc. including black
Rupees Two Thousand Seven Hundred
enamelled M.S. butt hinges with necessary screws. (A) Indian teak wood. (ii) Fully Sqm 2707.92 Seven and Ninety Two Paise Only
Glazed. (more than 10 ton)
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1578 10007CA 10 Providing and fixing 25 mm thick shutters for cupboards etc. including black
Rupees Two Thousand Nine Hundred
enamelled M.S. butt hinges with necessary screws. (A) Indian teak wood. (iii) Sqm 2929.80 Twenty Nine and Eighty Paise Only
Partly panelled and partly glazed. (more than 10 ton)
1579 10008A 0 Add extra for providing and fixing 40 mm thick shutters instead of 35 mm thick Rupees Two Hundred Three and Three Paise
shutters. (more than 10 ton) Only
1580 10009AA 10.23 Providing and fixing 35 mm thick panelled ,glazed or panelled and glazed
shutters, for Doors windows and clearstory windows including anodised Rupees Three Thousand Six Hundred Fifty
alluminium But hinges with necessary screws and indian teak wood shutters with. Three and Thirty Seven Paise Only
(A) Plywood sheet panels. (more than 10 ton)
1581 10009BA 10.2 Providing and fixing 35 mm thick panelled ,glazed or panelled and glazed
shutters, for Doors windows and clearstory windows including anodised Rupees Three Thousand Six Hundred Fifty
alluminium But hinges with necessary screws and indian teak wood shutters with. Eight and Eighty Five Paise Only
(B) Particle board panels (more than 10 ton)
1582 10009CA 10.2 Providing and fixing 35 mm thick panelled ,glazed or panelled and glazed
shutters, for Doors windows and clearstory windows including anodised Rupees Three Thousand Six Hundred Twenty
alluminium But hinges with necessary screws and indian teak wood shutters with. Seven and Sixty Eight Paise Only
(C) Hard board panels. (more than 10 ton)
1583 10009DA 10.2 Providing and fixing 35 mm thick panelled ,glazed or panelled and glazed
shutters, for Doors windows and clearstory windows including anodised Rupees Three Thousand Six Hundred and
alluminium But hinges with necessary screws and indian teak wood shutters with. Thirty Paise Only
(D) Asbestos sheet panels. (more than 10 ton)
1584 10010AA 10.2 Providing and fixing 35 mm thick panelled ,glazed or panelled and glazed
shutters, for Doors windows and clearstory windows including black enamelled Rupees Three Thousand Three Hundred
M.S. But hinges with necessary screws. (A) Plywood sheet panels. (more than 10 Twenty Seven and Eighty Five Paise Only
1585 10010BA 10.2 Providing and fixing 35 mm thick panelled ,glazed or panelled and glazed
shutters, for Doors windows and clearstory windows including black enamelled Rupees Three Thousand Three Hundred
M.S. But hinges with necessary screws. (B) Particle board panels (more than 10 Thirty Three and Two Paise Only
1586 10010CA 10.2 Providing and fixing 35 mm thick panelled ,glazed or panelled and glazed
shutters, for Doors windows and clearstory windows including black enamelled Rupees Three Thousand Three Hundred One
M.S. But hinges with necessary screws. (C) Hard board panels. (more than 10 and Eighty Five Paise Only
1587 10010DA 10.2 Providing and fixing 35 mm thick panelled ,glazed or panelled and glazed
shutters, for Doors windows and clearstory windows including black enamelled Rupees Three Thousand Two Hundred
M.S. But hinges with necessary screws . (D) Asbestos sheet panels. (more than Seventy Four and Seventy Six Paise Only
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1588 10011 10.3 Provoding and fixing flush door shutters, solid core construction with frame of first
class hardwood with cross board and face veneer or plywood face panels,
Rupees One Thousand Eight Hundred
including anodised alluminium butt hinges with necessary screws. (B) Non- Sqm 1829.74 Twenty Nine and Seventy Four Paise Only
decorative type and block board core anodised alluminium butt hinges in flush
door shutters (2) 35 mm thick.
1589 10012 10.4 Extra for using bright finished M.S. piano hinges of (A) Nickel plated piano hinges. Rupees Nine Hundred Twenty Three and
Sqm 923.83 Eighty Three Paise Only
1590 10013 10.4 Extra for providing vision panel not exceeding 0.1 Sq.M. in all types of flush
Sqm 26.09 Rupees Twenty Six and Nine Paise Only
doors. (A) Rectangular or Square.
1591 10014A 10.5 Providing and fixing 30 mm wire gauge shutters using galvanised M.S. wire of
I.S. gauge designation of 85 G. with wire of 0.56 mm dia,for Doors, windows and Rupees Two Thousand Eight Hundred
Sqm 2823.19 Twenty Three and Nineteen Paise Only
clearstory windows including anodised alluminium butt hinges with necessary
screws. (A) Indian teak wood. (more than 10 ton)
1592 10015A 10.5 Providing and fixing 30 mm wire gauge shutters using galvanised M.S. wire of
I.S. gauge designation of 85 G. with wire of 0.56 mm dia,for Doors, windows and Rupees One Thousand Two Hundred
Sqm 1270.12 Seventy and Twelve Paise Only
clearstory windows including bright finished or/ and black enamellede M.S. butt
hinges with necessary Mango wood or equivalent quality. (more than 10 ton)
1593 10016 10.5 Extra for providing and fixing galvanised M.S wire gauge of I.S. gauge
Rupees Twenty Nine and Twenty One Paise
designation 140 G,to 000 Rs. windows and cleastory windows with wire of dia Sqm 29.21 Only
0.71 mm instead of I,S,gauge designation 85 G.with wire of dia.0.56 mm.
1594 10017 10.7 Providing and fixing 12 mm thick and 100mm wide pelmet of flat pressed 3 layer
neneed particle board solid core with 25 mm diametre alluminium curtain Road Rupees Two Hundred Twenty One and Fifty
and brackets including fixing with 25mm x 3mm M.S flat 10cm,long and plugs Five Paise Only
1595 10018A 10.8 Providing and fixing 40mm panelled, Glazed or panelled and glazed partitions
Rupees Three Thousand Five Hundred Eighty
fixed to frames with iron scews etc. complete with indian teak wood (Frames tobe Sqm 3581.89 One and Eighty Nine Paise Only
paid separately) (more than 10 ton)
1596 10019A 10.9 Providing and fixing Decorative plywood 4mm thick in partitions including fixing to
Rupees Eight Hundred Sixty Seven and Thirty
frames with screws etc, complete with 50mm x 12mm teak wood beading Sqm 867.32 Two Paise Only
(Frames tobe paid separately) (more than 10 ton)
1597 10021A 10.9 Providing and fixing in partitions 4mm thick medium hard board of approved
Rupees Five Hundred Seventy Five and
quality including fixing to fames with screws etc, complete with 50mm x 12mm Sqm 575.70 Seventy Paise Only
teak wood beading (Frames tobe paid separately) (more than 10 ton)
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1598 10022A 11.0 25 mm thick wooden shelves supported on 40 x 40mm x 6 mm T or L iron
Rupees One Thousand Three Hundred Thirty
brackets fixed at suitable distances but not exceeding 75 cm. apart with Mango Sqm 1338.98 Eight and Ninety Eight Paise Only
wood or equivalent quality. (more than 10 ton)
1599 10023A 11.0 40 mm thick wooden shelves supported on 40 x 40mm x 6 mm T or L iron
Rupees One Thousand Seven Hundred
brackets fixed at suitable distances not exceeding 75 cm. apart with Mango wood Sqm 1727.22 Twenty Seven and Twenty Two Paise Only
or equivalent quality. (more than 10 ton)
1600 10024A 11.0 Providing and fixing M.S. round or square bars with M.S.flats at required spacing
kg 70.50 Rupees Seventy and Fifty Paise Only
in wooden frames of windows and clerestory windows. (more than 10 ton)
1601 10025AA 10.1 Providing and fixing M.S. grills of required pattern to wooden frames of windows
Rupees One Hundred Eleven and Twenty
etc. with M.S. flats at required spacings and frame alround, square or round bars kg 111.29 Nine Paise Only
with round headed bolts and nuts or by screws (A) Plain Grill. (more than 10 ton)
1602 10025BA 10.1 Providing and fixing M.S. grills of required pattern to wooden frames of windows
etc. with M.S. flats at required spacings and frame alround, square or round bars Rupees One Hundred Sixty Eight and Fifty
with round headed bolts and nuts or by screws. (B) ORNAMENTAL GRILL Two Paise Only
(more than 10 ton)
1603 10026A 10.1 Providing and fixing hard drawn steel wire fabric 75mm x 25mm mesh or weight
Rupees Seven Hundred Seventy Seven and
not less than 7.75 kg. per Sq.M. to window frames etc. including 60 x 20mm Sqm 777.77 Seventy Seven Paise Only
beading of teak wood. (more than 10 ton)
1604 10027A 10.1 Providing and fixing Fly proof galvanised M.S. wire gauge of I.S.l gauge
Rupees Six Hundred Eighty Five and Ninety
designation 85 G. with wire of dia.0.56 mm to windows and celevating windows Sqm 685.91 One Paise Only
including 60 x 20mm beading of teak wood. (more than 10 ton)
1605 10028A 10.1 Providing and fixing first class indian teak wood 75mm x 60mm moulded hand Rupees Four Hundred Ninety One and Seven
rails in straight lengths complete. (more than 10 ton) Paise Only
1606 10029AA 0.00 (i) Providing and fixing glazed louvered glass windows and ventilators with
Rupees Four Thousand Two Hundred Two
teak wood frame 10cm. x 7cm. size including 3 coats of oil painting to wood Sqm 4202.12 and Twelve Paise Only
work etc.complete. (more than 10 ton)
1607 10029BA 0.00 (ii) Providing and fixing glazed louvered glass windows and ventilators with
Rupees Four Thousand Four Hundred Thirty
teak wood frame 10cm. x 7cm. size including 3 coats of oil painting to wood Sqm 4434.35 Four and Thirty Five Paise Only
work etc.complete. with wooden louvers plank 12mm thick (more than 10 ton)
1608 10030A 0.00 Providing and fixing 35 mm thick shutters for Doors, windows and clerestory
windows including Indian teak wood frames 10 cm x 7 cm. size including Rupees Four Thousand Six Hundred Forty
Sqm 4641.01 One and One Paise Only
anodized alluminium fixtures and fastenings including primer coat of approved
quality and two coats of oil painting etc, complete. (i) Fully Glazed.
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1609 10030B 0.00 Providing and fixing 35 mm thick shutters for Doors, windows and clerestory
windows including Indian teak wood frames 10 cm x 7 cm. size including Rupees Five Thousand Three Hundred Thirty
Sqm 5338.30 Eight and Thirty Paise Only
anodized alluminium fixtures and fastenings including primer coat of approved
quality and two coats of oil painting etc, complete. (ii) Fully Panelled.
1610 10030C 0.0 Providing and fixing 35 mm thick shutters for Doors, windows and clerestory
windows including Indian teak wood frames 10 cm x 7 cm. size including
Rupees Four Thousand Nine Hundred Eighty
anodized alluminium fixtures and fastenings including primer coat of approved Sqm 4989.65 Nine and Sixty Five Paise Only
quality and two coats of oil painting etc, complete. (iii) Partly panelled and partly
1611 10031A 0.0 Providing and fixing 35 mm thick shutters for Doors, windows and clerestory
windows including Indian teak wood frames 10 cm x 7 cm. size including black Rupees Four Thousand Six Hundred Forty
Sqm 4641.01 One and One Paise Only
enamelled iron oxidixed fixtures and fastenings including primer coat of approved
quality and two coats of oil painting etc, complete. (i) Fully Glazed.
1612 10031B 0.00 Providing and fixing 35 mm thick shutters for Doors, windows and clerestory
windows including Indian teak wood frames 10 cm x 7 cm. size including black Rupees Five Thousand Three Hundred Thirty
Sqm 5338.30 Eight and Thirty Paise Only
enamelled iron oxidixed fixtures and fastenings including primer coat of approved
quality and two coats of oil painting etc, complete. (ii) Fully Panelled.
1613 10031C 0.00 Providing and fixing 35 mm thick shutters for Doors, windows and clerestory
windows including Indian teak wood frames 10 cm x 7 cm. size including black
Rupees Four Thousand Nine Hundred Eighty
enamelled iron oxidixed fixtures and fastenings including primer coat of approved Sqm 4989.65 Nine and Sixty Five Paise Only
quality and two coats of oil painting etc, complete. (iii) Partly panelled and partly
1614 10032A 0.00 Providing and fixing 35 mm thick shutters for Doors, windows and clerestory
windows including Indian teak wood frames 12 cm x 7 cm. size including Rupees Four Thousand Eight Hundred Thirty
Sqm 4836.39 Six and Thirty Nine Paise Only
anodized alluminium fixtures and fastenings including primer coat of approved
quality and two coats of oil painting etc, complete. (i) Fully Glazed.
1615 10032B 0.00 Providing and fixing 35 mm thick shutters for Doors, windows and clerestory
windows including Indian teak wood frames 12 cm x 7 cm. size including Rupees Five Thousand Five Hundred Thirty
Sqm 5533.68 Three and Sixty Eight Paise Only
anodized alluminium fixtures and fastenings including primer coat of approved
quality and two coats of oil painting etc, complete. (ii) Fully Panelled.
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1616 10032C 0.00 Providing and fixing 35 mm thick shutters for Doors, windows and clerestory
windows including Indian teak wood frames 12 cm x 7 cm. size including
Rupees Five Thousand One Hundred Eighty
anodized alluminium fixtures and fastenings including primer coat of approved Sqm 5185.03 Five and Three Paise Only
quality and two coats of oil painting etc, complete. (iii) Partly panelled and partly
1617 10033A 0.00 Providing and fixing 35 mm thick shutters for Doors, windows and clerestory
windows including Indian teak wood frames 12 cm x 7 cm. size including black Rupees Four Thousand Five Hundred Fifty
Sqm 4551.69 One and Sixty Nine Paise Only
enamelled iron oxidized fixtures and fastenings including primer coat of approved
quality and two coats of oil painting etc, complete. (i) Fully Glazed.
1618 10033B 0.00 Providing and fixing 35 mm thick shutters for Doors, windows and clerestory
windows including Indian teak wood frames 12 cm x 7 cm. size including black Rupees Five Thousand Five Hundred Thirty
Sqm 5533.68 Three and Sixty Eight Paise Only
enamelled iron oxidized fixtures and fastenings including primer coat of approved
quality and two coats of oil painting etc, complete. (ii) Fully Panelled.
1619 10033C 0.00 Providing and fixing 35 mm thick shutters for Doors, windows and clerestory
windows including Indian teak wood frames 12 cm x 7 cm. size including black
Rupees Five Thousand One Hundred Eighty
enamelled iron oxidized fixtures and fastenings including primer coat of approved Sqm 5185.03 Five and Three Paise Only
quality and two coats of oil painting etc, complete. (iii) Partly panelled and partly
1620 10034 0.00 Add extra for providing and fixing 40mm thick shutters instead of 35 mm thick Rupees Two Hundred Seventy Two and
shutters including oil paining etc. complete. Thirteen Paise Only
1621 10035 0.00 Deduct for providing and fixing 25mm thick shutters instead of 35 mm thick Rupees Four Hundred Forty Four and
shutters including oil paining etc. complete. Twenty Two Paise Only
1622 10036 Providing and fixing FRP frame size 125x65 mm and 35mm thick FRP shutter
with wood grain raised panneled design finish shutter having extra reinforcement
on sides & edges in Gel coat finish. The core of the shutter & frame is to be filed
up with injected polyurethene foam done in situ alongwith embedded wooden Rupees Two Thousand Nineteen and Ninety
pieces for stiffening & also taking hinges & fintures. The whole FRP frame & Eight Paise Only
shutter is to be water proof weather proof, termite proof & resistance to mild
acid/alkali. Rates are to be inclusive of S.S hinges with fastener sleeve &
alluminium fixtures & fastenings.
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1623 10037 Providing and fixing FRP frame size 100x50 mm and 28mm thick FRP depress
panel shutter having extra reinforcement on sides & edges in Gel coat finish. The
core of the shutter & frame is to be filed up with injected fire retardant grade
polyurethene foam done in situ alongwith embedded wooden pieces for stiffening Rupees Two Thousand Three Hundred
& also taking hinges & fintures. The whole FRP frame & shutter is to be water Seventy Seven and Seventy Six Paise Only
proof weather proof, termite proof & resistance to mild acid/alkali. Rates are to be
inclusive of S.S hinges with necessary screws & alluminium fixtures & fastenings
& fastener sleeve.
1624 10038 Providing and fixing FRP frame size 125x65 mm and 35mm thick FRP shutter
having extra reinforcement on sides & edges in polish finish. The core of the
shutter & frame is to be filed up with injected polyurethene foam done in situ
Rupees Two Thousand Six Hundred Fifteen
alongwith embedded wooden pieces for stiffening & also taking hinges & fintures. Sqm 2615.04 and Four Paise Only
The whole FRP frame & shutter is to be water proof weather proof, termite proof
& resistance to mild acid/alkali. Rates are to be inclusive of S.S hinges with
necessary screws & alluminium S.S fixtures & fastenings & fastener sleeve.
1625 10039 Providing and fixing FRP of 28mm thick Fibre Glass shutter with 1.5 to 2.0 mm
thick fire retardent grade FRP skin in depressed panel design having extra
reinforcement on sides & edges & in Gel coat finish. The core of the shutter is to
be filled up with injected retardent grade polyurethane foam done in situ Rupees One Thousand Five Hundred Sixty
alongwith embedded wooden pieces for stiffening & also taking hinges & fintures. and Thirty Three Paise Only
The whole FRP frame & shutter is to be water proof ,weather proof, termite proof
& resistance to mild acid/alkali. Rates are to be inclusive of S.S hinges with
necessary screws & alluminium S.S fixtures & fastenings & fastener sleeve.
1626 10040 Providing and fixing FRP of 35mm thick Fiber Glass shutter with 1.5 to 2.0 mm
thick fire retardent grade FRP skin in depressed panel design having extra
reinforcement on sides & edges & in Gel coat finish. The core of the shutter is to
be filled up with injected retardent grade polyurethane foam done in situ Rupees One Thousand Two Hundred Sixty
alongwith embedded wooden pieces for stiffening & also taking hinges & fintures. Nine and Sixty Three Paise Only
The whole FRP frame & shutter is to be water proof ,weather proof, termite proof
& resistance to mild acid/alkali. Rates are to be inclusive of S.S hinges with
necessary screws & alluminium fixtures & fastenings.
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1627 10041 Supply of 35mm thick Fiber Glass shutter with 1.5 to 2.0 mm thick fire retardent
grade FRP skin in wood grain rasied panel design having extra reinforcement on
sides & edges & in polish design finish. The core of the shutter is to be filled up
with injected retardent grade polyurethane foam done in situ alongwith Rupees Nine Hundred Eighty Six and Thirty
embedded wooden pieces for stiffening & also taking hinges & fintures. The Nine Paise Only
whole shutter is to be water proof ,weather proof, termite proof & resistance to
mild acid/alkali. Rates are to be inclusive of S.S hinges with necessary screws &
alluminium S.S finish fixtures & fastenings.
1628 10042 Providing and fixing windown shutter of 75x30 mm size with 4mm fully glazed
panels with PVC batten main farme size having 1.5 to 2.0 mm thick fire retardent
grade FRP shutter having extra reinforcement on sides & edges in polish finish.
The core of the shutter & frame is to be filed up with injected polyurethene foam
Rupees Two Thousand Eight Hundred Forty
done in situ alongwith embedded wooden pieces for stiffening & also taking Sqm 2843.62 Three and Sixty Two Paise Only
hinges & fintures. The whole FRP frame & shutter is to be water proof weather
proof, termite proof & resistance to mild acid/alkali. Rates are to be inclusive of
S.S hinges with necessary screws & alluminium S.S fixtures & fastenings &
fastener sleeve.
1629 10043 Providing and fixing 30mm thick FACTORY MADE SOLID PANEL PVC DOOR
SHUTTER consisting of frame made out of M.S. tubes of 19 gauge thickness and
size of 19mm x 19mm for stiles and 15mm x 15 mm for top and bottom rails.
M.S. frame shall have a coat of steel primers of approved make and
manufacture, M.S. frame shall be covered with 5 mm thick heat moulded PVC ‘C’
channel of size 30 x 50 mm forming stiles, and 5mm thick 75mm wide PVC
Rupees One Thousand One Hundred Forty
sheets for top rail, lock rail and bottom rail on either side, and 10mm (5mm x 2) sqm 1146.37 Six and Thirty Seven Paise Only
thick, 20mm wide cross PVC sheet as gap insert for top rail and bottom rail,
Panelling of 5 stiles and rails with 30mm wide x 5mm thick PVC sheet beading on
eighter side, and joined together with solvent cement adhesive,. An additional
5mm thick PVC strip of 20mm width is to be stculk on the interior side of the ‘c’
channel using PVC solvent cement adhesive etc. complete as per direction of
Engineer in charge, manufacture’s specification and drawing.
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1630 10044 Providing and fixing 30mm thick FACTORY MADE SOLID BOTH SIDE PRELAM
PANEL PVC DOOR SHUTTER consisting of frame made out of M.S. tubes of
gauge thickness and size of 19mm x 19mm for stiles, top and bottom rails. M.S.
frame shall have a coat of steel primer of approved makde and manufactures.
M.S frame covered with 5mm thick heat moulded prelim PVC ‘C’ channel of siz
30mm thickness, 70 mm width of which 50mm shall be flat and 20mm shall be
tapered in 45 degree Angle on either side forming stiles, and 5mm thick, 95mm
wide pream PVC sheet out of which 75mm shall be flat and 20mm shall be
tapered in 45 degree on the inner side ot form top and bottom rail and 115mm
Rupees Two Thousand Two Hundred Thirty
wide prelim PVc sheet out of which 75nmm shall be flat and 20mm shall be sqm 2236.14 Six and Fourteen Paise Only
tapered on both side to form lock rail, Top, bottom and lock rails shall be provided
either side of the panel. 10mm (5mm x 2) thick 20mm wide cross PVC sheet shall
be provided as gap insert for top rail and bottom rails. Panelling of 5mm thck both
side prelim PVC sheet to be fitted in the M.S. frame welded,sealed to the stiles
and rails with 7mm (5mm + 2 mm) thick x 15mm wide PVC sheet beading on
inner side, and joined togeth with solvent cement adhesive. An additional 5mm
thick PVC strip of 20mm width is to be stuck on the interior side of the ‘C” chanel
using PVC solvent adhesive etc. complete as per direction of Engineering in
charge, manufacture’s specification and rawing.
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1631 10045 Providing and fixing 30mm thick FACTORY MADE SOLID SINGLE SIDE
PRELAM PANEL PVC DOOR SHUTTER consisting of frame made out of M.S.
tubes of 19 gauge thckness and size of 19mm x 19mm for stiles, and 15mm x
15mm for top and bottom rails. The M.s. frame shall have coat of steel primers of
approved makde and manufacture. The M.S. frame shall be covered with 5mm
thick heat moulded single side prelim PVC ‘C’ channel of size 30 x 50mm to form
stiles and 5mm thick and 75mm wide single side prelim PVC sheets shallbe for
the top, bttom and lock rails. Paneling of 5mm thick one side prelim sheet to be
fitted in the M.S. frame and sealed to the front (Prelam side) stiles and rails Rupees Two Thousand Twenty Three and
(which should have a 5mm 45 degree bent portion as beading) and attached to Three Paise Only
the back (white/lvory) stiles and rails (which should have a 10mm 90 degree bent
portion as beading) using 2 nos. 15mm wide x 5mm thick PVC sheet beading
inside the 9 degree bent beading. All stiles, rails and beading to be joined to the
panel using solvent cement.An additional 5mm thick PVC strip of 20mm width is
to be struck on the interior side of the ‘C’ channel using PvC solvent adhesive and
10mm thick (5mm x 20) thick 20mm width cross PVC sheet to be fitted as gap
insert for top and bottom rails, etc. complete as per direction of Engineer in
charge, manufacture’s specification and drawing.
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1632 10046 Providing and fixing 30mm thick FACTOR MADE FULLY GLAZED SOLID PVC
DOOR SHUTTER consisting of frame made out of M.S. tube of 19m gauge
thickness and size of 19mm x 19mm for styles and 15mm x 15mm for top, lock
and bottom rails M.S. frame shall have a coat of steel primer of approved make
and manufacture, M.s. frame shall be covered with 5mm thick heat moulded PVC
‘C” channel of size 75mm x 30mm x 50mm out of which 10mm shall be bent at
90 degree towards inner side on front face of the door forming stiles. For top rail
and bottom rail, M.S. frame shall be covered with 5mm thick, 100mm wide PVC
sheet out of whch 10mm shall be bent of 90 degree towars inner side on front
face of the door. M.S. frame at lock rail shall be covered with 125 mm wide PVC
Rupees Two Thousand Thirty Three and
sheet out of which 10mm on both the edges shall be bent at 90 degre on front sqm 2033.13 Thirteen Paise Only
face of the door and 75mm wide PVC sheet shall cover the M.S. frame at top,
lock and bottom rail on side of door, 5mm thick 20mm wide cross PVC sheet as
gap insert for tp and bottom rail.PVC sheet beading of 15mm thck (5mm x
15mm wide to be stuck, internally with solvent cement adhesive in stiles and rails.
Glass panel will be fitted exernally in the clear space available between the stiles
and rails and fixed between PVC sheet of stiles and rails bent at 90 degree on
front face and 15mm x 10mm ‘L’ shape outer beading nailed on stiles and rails at
the back side. So that the ‘L’ shape PVC beading can be removed when required
for replacement of broken glass etc. complete as per direction of Engineer in
charge and manufacture’s specification.
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1633 10047 Providing and fixing 30mm thick factory made wire guazed solid PVC Door
shutter consisting of frame made out of M.S. tubes of 19 gauge thickness and
size of 19mm x 19mm for stiles and 15mm x 15mm for top, lock and bottm rails,
M.S. frame shall have a coat of steel primers of approved make and
manufacture, 19mm x 19mm M.S. square tubes shall be coveed with 5mm thick
head mouled PVC ‘C’ channel of size 30mm thickness, 90mm width out of which
75mm shall be flat and 15 mm shall be bent in 90 degree angle on either side
forming stiles and 5mm thick 115mm wide PVC sheet out of which 100mm shal
be flat and 15mm shal be betn in 90 degree on the inner side to from top and
bottom rails and 130mm wide PVC sheet out of which 100mm shal be flat and
Rupees One Thousand Nine Hundred Eighty
15mm shal be bent in 90 degree on both side to from lock rail 10mm (5mm x 2) sqm 1987.68 Seven and Sixty Eight Paise Only
thick, 20mm wide cross PVC sheet as gap insert for top rail and bottom rail, panel
will be of G.I. wire gauge of 24 gauge to be fitted in by ‘C’ channel of size 10mm x
35mm on the either side in the stiles.The inner side ‘C’ channel is fixed by 19mm
x 19mm M.S. tube on both side with screws. The wire mesh in top, bottom and
lock rail is sealed with 15mm x 15mm tube with G.I.wire, 1mm (5mmm x 2) thick
PVC strip of 25mm width is to be stuck and screw on both side of G.I. wire guage
interior at the top, bottom and lock rails. An additional 5mm thck PVC strip of
20mm width is to be stuck on the interior side of the ‘C’ channel using PVC
solvent cement adhesive etc. complete as per dirction of Engineer in charge,
manufacture’s specification and drawing.
1634 10048 Providing and fixing 35mm thick factory made moulded door shuter consisting of
solid core single leaf flush door of 30mm thickness, lipped with 15mm (5mm x 3)
thick x 30mm width on one stiles and top rail and 10mm (5mm x 2) thick x 30mm
width on the other stiles and bottom rails. The inner panel laminated with 2mm
thick termite proof, water proof and fire resistant moulded PVC sheet with 2,4,6 Rupees Two Thousand One Hundred Fifty
raised panel design in different plain and /or prelim colours on one side after Two and Thirty One Paise Only
routing the moulded design on flush door and 2mm plain and/or prelim PVC
sheet on other side using rubber adhesive on flush door and solvent cement
adhesive on the PVC liping etc. complete as per direction of Engineer in charge,
manufacture’s specification and drawing.
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1635 10049 Providing and fixing 30mm thick factory made moulded door shutter wood free
consisting of frame made out of M.S. tubes of 19 gauge thickness and size of
25mm x 25mm for stiles, top and bottom rails, M.S. frame shall have a coat of
steel primers. The inner panel shall consist of 25mm thick High Density EPS
conforming to IS 4671-1984 bonded with 2mm thick termite proof, water proof
and fire resistant moulded PVC sheet with 2,4,6 raised panel design in different
plain and /or prelim colours after routing the moulded design on one side and Rupees One Thousand Nine Hundred
2mm plain and/or prelim PVC sheet on other side of the EPS. The edges of panel Seventy Nine and Sixty Paise Only
to be sealed with lipping of 10mm wide PVC sheet batton (made by sticking
PVC rigid foam sheets of 5mm thickness using PVC solvent cement) and stiles
25mm (5mm x 5) thick and 30mm width PVC sheet fitted along M.S. tube for lock
provision and for lock height 5mm thick PVC sheet of size 150mm x 100mm fixed
with upper and lower face of inner side of EPS panel etc. complete as per
direction of Engineer in charge manufacture’s specification and drawing.
1636 10050 Providing and fixing factory made polyvinyl chioride (PVC) door frame of the size
50 x 47 mm with a wall thickness of 5mm, made out of extruded 5mm rigid PVC
foam sheet, mitre out of two corners and joined with 2nos. of 150mm long
brackets of 15 x 15mm M.s. Square tubes. The two vertical door profiles are to be
reinforced with 19 x 19 mm m.s. square tube of 19 gauge, EPDM rubber gasket Rupees Three Hundred Eighteen and Three
weather seal to be provided through out the frame. The door frame shal be fixed Paise Only
to the wall using 65/100 mm long M.S. screws through the frame by using PVC
fasteners. A miniumum of 4 nos. os screws to be provided for each vertical
members and minium 2 nos. for horizontal members etc. complete as per
manufactures specification and direction of Engineer in charge.
Item NBO Rate with 1% L.C.
Item No Item Description Unit
In Figures In Word
1637 10051 Providing and fixing of fully glazed solid PVC panel PVC door along with solid
PVC door frame. 30mm thick FACTORY MADE FULLY GLAZED SOLID PVC
DOOR SHUTTER consisting of frame made out of M.S. tube of 19 gauge
thickness and size of 19mm x 19mm for style and 15mm x 15mm for top, lock
and bottom rail. M.S. frame shall have a coat of steel primer of approved make
and manufacture. M.S. frame shall be covered with 5 mm thick heat mouled PVC
‘C” channel of size 75mm x 30mm x 50mm out of whch 10mm shall be bent at
degree towards inner side on front face of the door. M.S. frame at lock rail shall
be covered with 125 mm wide PVC sheet out of which 0mm on both the edges
shall be bent at 90 degree on front face of the door and 7mm wide PVC sheet Rupees One Thousand Eight Hundred Ninety
shall cover the M.S. frame at top, lock and bottom rail on back side of door, 5 mm Nine and Forty Eight Paise Only
thick 20mm wide cross PVC sheet as gap insert for top and bottom rail. PVC
sheet beading of 15mm thick (5mm x3) 15mm wide to be stuck internally with
solvent cement adhesive in stiles and rails. Glass panel will be fittd externally in
the clear space available between the stiles and rails and fixed between PVC
sheet of stiles and rails bent at 90 degree on front face and 15mm x 10mm ‘L
shape outer beading nailed on stiles and rails at the back side. So tha the ‘L’
shape PVC beading can be removed when required for replacement of broken
glass etc. complete as per direction of Engineer in charge and manufactuture’s
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01-Make List-4171-06-10-2017.pdf
02-Make List - Civil Items-05-02-2020.pdf
Building-Specification.pdf
Ele-List of Approved Products-FINAL.pdf
GRs and Conditions-11-06-24.pdf
Insurance Clause-03-11-2025.pdf
Standard Specification for Electrical Work.pdf
Performance Bond and Bitumen date.pdf
20-Special Conditions-27-05-2026.pdf
Important instructions to Ele Agency.pdf
New make List (1).pdf
SBD ARC veraval sutrapada talala.pdf
Schedule B veraval sutrapada talala.pdf
Special note for agency.pdf
Tender Details-34-05.pdf
Download all tender documents and submit your bid