Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.9 L
Closing Date
21 Mar 2026, 5:00 pmClosed
ACE, SIJUA
OFFICE OF ACE, SIJUA
Cleaning of Main and Branch drain at Zero seam colony Tetulmari Colliery under Sijua Area
2026_BCCL_356404_1
GM/SA/Civil/2025-26/eNIT-72
Open Tender
Civil Works - Others
Percentage
8 days
Tetulmari
Please refer Tender Documents
4 documents required · 4 mandatory
Exempted
5 Aug 2026
12 Mar 2026
23 Mar 2026
12 Mar 2026
21 Mar 2026
12 Mar 2026
12 Mar 2026 - 18 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0Item Description/ Heading | |||||
| 1.01 | Cleaning of drain,excavating loose soil,liquid mud and debrises by taking out other malbas etc. all complete along colony road side including disposals of the same with a lead of 50M | 351 | cum | 198.95 | ₹69,831.45 |
| 1.02 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 1,257.66 | sqm | 10.5 | ₹13,205.43 |
| 1.03 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.
All kinds of soil | 993.6 | sqm | 20.4 | ₹20,269.44 |
| 1.04 | Carriage of garbage/sludge by mechanical transport including loading, unloading and stacking : 1 trip for 3 km lead (Sub Analysis ) | 566.24 | cum | 179 | ₹1,01,356.96 |
| 1.05 | Brick work with clay flyash F.P.S. (non modular) brick of class designation 7.5 in foundation and plinth in: CM 1:6 (1 cement : 6 coarse sand) | 5.24 | cum | 5,002.04 | ₹26,210.69 |
| 1.06 | 12 mm cement plaster finished with a floating coat of neat cement of mix : 1:4 (1 cement: 4 fine sand) | 40.28 | sqm | 288.25 | ₹11,610.71 |
| 1.07 | Total impact of GST for the purpose of CTC | - | Nos | - | - |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.15 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 3.32 MB
BOQ_369251.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .